FORMWORK?
Suryakanta | March 16, 2015 | Building Construction, Concrete, Concrete
Technology, Construction | 18 Comments SUBSCRIBE TO BLOG
VIA EMAIL
REMOVAL OF FORMS Enter your email and receive new
Forms should not be removed until the concrete has sufficiently hardened posts.
in order that it can carry safely its own weight and any other live loads it is Email Address
subjected to.
Subscribe
The supporting period (period between placing of concrete in forms and
removal of forms) differ according to the type of cement used and the
design of formwork. In general structures carrying construction loads, side BULKING OF SAND – A
timbers shall not be removed within 7 days and supporting timbers within COMPLETE GUIDE
28 days of placing of concrete.
The strength referred to shall be that of concrete using the same cement
and aggregates, with the same proportions, and cured under conditions of 00:00 36:15
temperature and moisture similar to those existing on the work. Where
possible, the formwork should be left longer, as it would assist the curing.
JOIN US ON FACEBOOK
https://civilblog.org/2015/03/16/when-to-remove-concrete-formwork/ 1/9
7/20/2020 WHEN TO REMOVE CONCRETE FORMWORK? - CivilBlog.Org
18 Comments | May 11, 2014
Suryakanta
Geotechnical-Material Engineer. You can
connect me on Google +. To know more about
me just visit AboutMe
18 COMMENTS
https://civilblog.org/2015/03/16/when-to-remove-concrete-formwork/ 4/9
7/20/2020 WHEN TO REMOVE CONCRETE FORMWORK? - CivilBlog.Org
tunnaglorypoju@gmail.com
Gentleman,
(1) What time I can remove shuttering from “Horizontal
Beam” for my new house construction
(2) and overall slab time also
Regard
https://civilblog.org/2015/03/16/when-to-remove-concrete-formwork/ 5/9
7/20/2020 WHEN TO REMOVE CONCRETE FORMWORK? - CivilBlog.Org
Civilblog.org
14K likes
Like Page
Removal of Formwork
24 to 48 hours as may be
Walls, columns and vertical
decided by the engineer-in-
sides of beams
charge.
For rapid hardening cement, 3/7 of the above period will be sufficient in all
cases except vertical sides of slabs, beams and columns which should be
retained for 24 hours.
https://civilblog.org/2015/03/16/when-to-remove-concrete-formwork/ 2/9
7/20/2020 WHEN TO REMOVE CONCRETE FORMWORK? - CivilBlog.Org
REFERENCE
IS-456 – Plain and Reinforced Concrete – Code of Practice
SHARE THIS:
RELATED POSTS
WHAT IS STANDARD HOW TO CONSTRUCT A
DEVIATION AND HOW LOW COST BRICK
TO CALCULATE IT WITH WALKWAY?
AN EXAMPLE CALCULATION 4 Comments | Dec 30, 2015
https://civilblog.org/2015/03/16/when-to-remove-concrete-formwork/ 3/9
7/20/2020 WHEN TO REMOVE CONCRETE FORMWORK? - CivilBlog.Org
Muhammad Safdar
Riyad
best Regards
Ali
https://civilblog.org/2015/03/16/when-to-remove-concrete-formwork/ 6/9
7/20/2020 WHEN TO REMOVE CONCRETE FORMWORK? - CivilBlog.Org
https://civilblog.org/2015/03/16/when-to-remove-concrete-formwork/ 7/9
7/20/2020 WHEN TO REMOVE CONCRETE FORMWORK? - CivilBlog.Org
ADD A COMMENT
Comment:*
Name:*
Email Address:*
Website:
Save my name, email, and website in this browser for the next
time I comment.
ADD COMMENT
https://civilblog.org/2015/03/16/when-to-remove-concrete-formwork/ 8/9
7/20/2020 WHEN TO REMOVE CONCRETE FORMWORK? - CivilBlog.Org
BUILDING-CONSTRUCTION
https://civilblog.org/2015/03/16/when-to-remove-concrete-formwork/ 9/9