Professional Documents
Culture Documents
4 Storey Residential
4 Storey Residential
CLIENT:
ALI ADAM
HULHUMALE' NEIGHBORHOOD 3
NOT TO SCALE
N
7650
[25'-1"]
BOUNDARY LINE
1200 6450
[3'-11"] [21'-2"]
N
[3'-3"]
1000
1000mm set-back
[49'-2"]
[42'-7"]
PROPOSED 04 STOREY
14980
12980
BUILDING
@ LOT 11276 / HULHUMALE
1200mm
set
back
[VACANT PLOT]
LOT 11275
[3'-3"]
1000
1000mm set-back
1200 6450
[3'-11"] [21'-2"]
7650
[25'-1"]
RABARUGAS MAGU - 6
GOALHI
X
Y
3000 3000
[9'-10"] [9'-10"]
1050 1950
[3'-5"] [6'-5"]
[3'-3"]
1000
[2'-9"]
850
W2 W3
1
W2
[5'-7"]
1705
TOILET
- 1A
D4 1050
LIVING/DINING [3'-5"] D3
[16'-10"]
1A
5125
[17'-11"]
5450
W1 ROOM 1A
[11'-8"]
3545
D4 1800
D8 [5'-11"]
2
ROLLER SHUTTER
DOOR
Z Z
D7
[11'-6"]
[11'-2"]
3500
3400
[42'-7"]
12980
3 SHOP D2
(TO BE
[24'-8"]
7530
MECHANICALLY
VENTILATED) ENTRANCE
HALLWAY
[13'-1"]
[13'-3"]
3980
4030
D1 D6
4
[3'-3"]
1000
X
Y
6450
[21'-2"]
2050 1750 2050
[6'-9"] [5'-9"] [6'-9"]
ALUMN. FRAME TOP BOUNDARY LINE
HUNG HIGHLIGHT
TO MANUF'S DETAIL
W3 W3
1
TOILET
TOILET
BALCONY
[4'-7"]
[4'-7"]
1400
1400
- 01
- 02
D3 D3
W1
3000 3075
[9'-10"] [10'-1"]
[11'-8"]
3550
BEDROOM - 01 BEDROOM - 02
1800
[5'-11"]
D4 D4
2
4200
KITCHEN - 02
PLASTER &
PAINTED ON
[10'-10"]
[22'-5"]
[45'-10"]
1185
6830
13980
3300
D4
3
SITTING AREA D4
BEDROOM - 03
W1
[11'-1"]
3370
3000
[9'-10"]
2995
[9'-10"] D3
1050
600
[2']
- 03
1550
[4'-9"]
D5 VOID
[3'-3"]
1450
1000
W2
W3
M.S. RAILING ON 2050 2615 1485
BRICK WALL PARAPET [6'-9"] 6450 [8'-7"] [4'-10"]
WALL TO ARCHITECT'S DETAIL [21'-2"]
X
Y
6450
[21'-2"]
X
Y
2050 1750 2050
[6'-9"] [5'-9"] [6'-9"]
ENCASING IN BOUNDARY LINE
BRICKWALL
W3 W3
1
TOILET
BALCONY
TOILET
- 01
[5'-1"]
- 02
1550
D3 D3
[16'-11"]
W1
5150
3000 3000
[11'-10"]
[9'-10"] [9'-10"]
3600
BEDROOM - 02
BEDROOM - 01 1800
[5'-11"]
D4 D4
2
[4'-11"]
WITH 19MM Z Z
W1 4200
THK. CEMENT [13'-9"]
[10'-10"]
PLASTER &
3300
KITCHEN-01
[11'-2"]
PAINTED ON
3400
[42'-7"]
A
[5'-4"] SITTING /
12980
DINING
CERAMIC D4
WALL TILES 3
UP TO 1500MM D4
[12'-11"]
D4 3930
ON KITCHEN WALL W1 LIVING /
DINING
[10'-11"]
3330
[1'-7"]
3000 1715
D3 [9'-10"] [5'-8"]
D4
TOILET W2
4 - 03
[5'-7"]
1700
W2
[3'-3"]
1000
BALCONY
CERAMIC
VOID
TILES INTERNALLY
AROUND W3
THE WALL UPTO THE 2050 2615 1485
CEILING [6'-9"] [8'-7"] [4'-10"]
[INSIDE THE BATHROOM]
M.S. RAILING ON
Y
6450
[21'-2"]
X
Y
2050 1750 2050
[6'-9"] [5'-9"] [6'-9"]
ENCASING IN BOUNDARY LINE
BRICKWALL
W3 W3
1
TOILET
TOILET
BALCONY
[4'-7"]
1400
- 01
- 02
D3 D3
[16'-11"]
W1
3000
5150
3000
[9'-10"] [9'-10"]
BEDROOM - 01 BEDROOM
1800
- 02
[5'-11"]
115MM THK. BWK.
WITH 19MM D4 D4
THK. CEMENT 2
PLASTER &
PAINTED ON SITTING AREA
Z W1 Z
BOTH SIDES 4275
[14']
[42'-7"]
[10'-10"]
12980
3300
A
CERAMIC D4
WALL TILES 3
UP TO 1500MM D4 D4
ON KITCHEN WALL W1 BEDROOM - 03 LIVING /
DINING
[11'-1"]
[11'-1"]
3380
3380
KITCHEN - 04
3000
[9'-10"] 1715
D3 [5'-8"]
D4
1000 600
[3'-3"] [2']
TOILET W2
4
[4'-7"]
1400
- 03
[4'-9"]
1450
W2
CERAMIC BALCONY
TILES INTERNALLY VOID
AROUND W3
THE WALL UPTO THE 2050 2615 1485
CEILING [6'-9"] [8'-7"] [4'-10"]
[INSIDE THE BATHROOM]
M.S. RAILING ON
Y
X
7650
[25'-1"]
1200 6450
[3'-11"] [21'-2"]
[3'-3"]
1000
1
250MM HIGH PARAPET WALL
(REFER TO DETAIL B)
ROOF SLAB
SKYLIGHT DOOR
2
[52'-11"]
[46'-4"]
14130
16130
Z Z
A
4
[3'-3"]
1000
[3'-3"]
1000
1485
[4'-10"]
ROOF PLAN
SCALE - 1:100
Y
+6150MM (F.F.L )
+9150MM (F.F.L )
+3150MM (F.F.L )
+150MM (F.F.L )
GROUND FLR.
LEVEL
[39'-10"]
12150
[1'-2"] [9'-10"] [9'-10"] [9'-10"] [10'-4"]
350 3000 3000 3000 3150
[6"]
150
ELEVATION A
SCALE - 1:100
GROUND LEVEL
+/- EXISTING
PROJECT: FOUR STOREY RESIDENTIAL BUILDING AT LOT11276 CLIENT: DATE:
ALI ADAM 26/10/2014
CONTENTS: ELEVATION A
ARCHITECT: YUS PROJ. SHEET NO.:
NO P ART O F THI S DRAWI NG MA YB E P RODUCED O R TRANS MITTED I N A NY
FORM OR BY ANY MEANS WITHOUT PRIOR PERMISSION IN WRITING
NO.: 04H-1
8
FROM S + ARCH ITECTS C OMPANY. DO NOT SCALE TH ESE DRAWINGS.
A L L DI M E NS I O NS A RE I N M I LL I M ET E RS A ND F E ET UNL E S S NO T E D O T HE RW I S E .
A L L M E AS U RE M E NTS A R E TO B E CH E CK E D ON S ITE B Y TH E CON TRA C TOR STR.ENG: SAMNOON
TO CONFIRM ANY INFORMATION THAT IS NOT CLEAR OR INCORRECT.
DWG.
THIS DRAWING IS TO BE IN CONJUNCTION WITH OTHER RELEVANT DRAWINGS AND
SPECIFICATIONS. THIS DRAWING IS TO BE USED FOR THE DESIGNATED PROJECT ONLY.
DRAWN BY: AMEEL NO.: 8/31
[1'-2"]
350
ROOF BEAM LEVEL
+12150MM (F.F.L )
[9'-10"]
3000
THIRD FLOOR LEVEL
+9150MM (F.F.L )
[39'-10"]
[9'-10"]
12150
3000
SECOND FLOOR LEVEL
+6150MM (F.F.L )
[9'-10"]
3000
GROUND FLR.
+/- EXISTING +150MM (F.F.L )
GROUND LEVEL LEVEL
[6"]
150
ELEVATION B
SCALE - 1:100
[9'-10"]
3000
THIRD FLOOR LEVEL
+9150MM (F.F.L )
[39'-10"]
[9'-10"]
12150
3000
GROUND FLR.
+/- EXISTING +150MM (F.F.L )
GROUND LEVEL LEVEL
[6"]
150
ELEVATION C
SCALE - 1:100
BOUNDARY WALL
+6150MM (F.F.L )
+9150MM (F.F.L )
+3150MM (F.F.L )
+150MM (F.F.L )
GROUND LEVEL
COMPACT SOIL
GROUND FLR.
FOUNDATION
1200MM HIGH
DETAIL - B
LEVEL
LEVEL
[6"]
[1'-2"] [9'-10"] [9'-10"] [9'-10"] [9'-10"] 150
350 3000 3000 3000 3000
1200 1200
TOILET
TOILET
TOILET
-01
-01
-01
BED.R
BED.R
BED.R
-01
-03
-03
LIVING ROOM
LIVING ROOM
KITCHEN AREA
SECTION - Y Y
SHOP
BED.R
BED.R
RM.
LIV.
-01
-01
SCALE - 1:100
TOILET
TOILET
1000
BALC-
ONY
-03
-03
+/- EXISTING
GROUND
DETAIL - A
LEVEL
PROJECT: FOUR STOREY RESIDENTIAL BUILDING AT LOT11276 CLIENT: DATE:
ALI ADAM 26/10/2014
CONTENTS: SECTION - YY
ARCHITECT: YUS PROJ. SHEET NO.:
NO P ART O F THI S DRAWI NG MA YB E P RODUCED O R TRANS MITTED I N A NY
FORM OR BY ANY MEANS WITHOUT PRIOR PERMISSION IN WRITING
NO.: 04H-1
11
FROM S + ARCH ITECTS C OMPANY. DO NOT SCALE TH ESE DRAWINGS.
A L L DI M E NS I O NS A RE I N M I LL I M ET E RS A ND F E ET UNL E S S NO T E D O T HE RW I S E .
A L L M E AS U RE M E NTS A R E TO B E CH E CK E D ON S ITE B Y TH E CON TRA C TOR STR.ENG: SAMNOON
TO CONFIRM ANY INFORMATION THAT IS NOT CLEAR OR INCORRECT.
DWG.
THIS DRAWING IS TO BE IN CONJUNCTION WITH OTHER RELEVANT DRAWINGS AND
SPECIFICATIONS. THIS DRAWING IS TO BE USED FOR THE DESIGNATED PROJECT ONLY.
DRAWN BY: AMEEL NO.: 11/31
SKYLIGHT DOOR
350MM HIGH
PARAPET WALL
ON FLAT CONC.
ROOF SLAB
[1'-2"]
350
(REFER TO DETAIL B)
ROOF BEAM LEVEL
+12150MM (F.F.L )
STAIRCASE
[9'-10"]
3000
LIVING AREA
[9'-10"]
3000
LIVING AREA
KITCHEN AREA
[9'-10"]
3000
SHOP
GROUND FLR.
+/- EXISTING STAIRCASE +150MM (F.F.L )
GROUND LEVEL LEVEL
1200
COMPACT SOIL
FOUNDATION LEVEL
GROUND FLOOR
+6150MM (F.F.L )
+9150MM (F.F.L )
+3150MM (F.F.L )
COMPACT SOIL
+150MM (F.F.L )
FOUNDATION
LEVEL
BALCONY
TOILET
-01
LIVING/KITCHEN - 02
LIVING/KITCHEN - 02
BEDROOM - 03
SHOP
LIVING/KITCHEN
SITTING AREA
SITTING AREA
BEDROOM - 02
BEDROOM - 1A
BEDROOM - 02
BEDROOM - 02
SECTION - XX
BALCONY
BALCONY
BALCONY
TOILET
SCALE - 1:100
-03
GROUND LEVEL
+/- EXISTING
PROJECT: FOUR STOREY RESIDENTIAL BUILDING AT LOT11276 CLIENT: DATE:
ALI ADAM 26/10/2014
CONTENTS: SECTION - XX
ARCHITECT: YUS PROJ. SHEET NO.:
NO P ART O F THI S DRAWI NG MA YB E P RODUCED O R TRANS MITTED I N A NY
FORM OR BY ANY MEANS WITHOUT PRIOR PERMISSION IN WRITING
NO.: 04H-1
13
FROM S + ARCH ITECTS C OMPANY. DO NOT SCALE TH ESE DRAWINGS.
A L L DI M E NS I O NS A RE I N M I LL I M ET E RS A ND F E ET UNL E S S NO T E D O T HE RW I S E .
A L L M E AS U RE M E NTS A R E TO B E CH E CK E D ON S ITE B Y TH E CON TRA C TOR STR.ENG: SAMNOON
TO CONFIRM ANY INFORMATION THAT IS NOT CLEAR OR INCORRECT.
DWG.
THIS DRAWING IS TO BE IN CONJUNCTION WITH OTHER RELEVANT DRAWINGS AND
SPECIFICATIONS. THIS DRAWING IS TO BE USED FOR THE DESIGNATED PROJECT ONLY.
DRAWN BY: AMEEL NO.: 13/31
2800
1600
800 1900
600 800
300
1750
1800
2100
2100
F.L.L. F.L.L.
750
850
2100
2100
F.L.L. F.L.L.
D3 ALL BEDROOMS AREA: 1.29 SQM D4 TOILET -01,02 AND 03 AREA: 1.22 SQM
LOCATION ALL FLOORS LOCATION ALL FLOORS
REMARKS HINGED & FRAMED WOOD PANEL DOOR, REMARKS HINGED & FRAMED WOOD PANEL DOOR,
1500
800
700 700 700
FG GL GL
2600
1900
F.L.L.
F.L.L.
D5 SECOND FLOOR BALCONY AREA: 4.63 SQM D6 MAIN ENTRANCE AREA: 2.57 SQM
2600 1000
200
2200
2100
1100
F.L.L. F.L.L.
200
300
1500
1100
1100
2200
1000
1000
F.L.L.
F.L.L.
W1 BEDROOM & KITCHEN & SITTING AREA: 2.66 SQM W2 LIVING/DINING/KITCHEN AREA: 1.38 SQM
LOCATION ALL FLOORS LOCATION ALL FLOORS
REMARKS POWDER COATED ALM. FRAMED 3 PANEL REMARKS POWDER COATED ALM. FRAMED 1 PANEL
NOTE
TG TINTED GLASS
All door and window frames are to be
checked on site before fabrication CG CLEAR GLASS
600 FG FROSTED GLASS
800
500
1500
F.L.L.
7650
BOUNDARY LINE
1125
100 100
175
1 C2
C2 C1
100
5225
5225
200 300 150
2 C2
C1 C1
250
15100
3500
3500
150 150
150
3 C3
C1 C2
1325
4030
4030
1200
GROUND WELL
4 C1 C2 C2
1100
7650
BOUNDARY LINE
1300
1
ST1
5225
TB TB TB
1950
2
ST2
15100
3500
TB TB TB
STAIR STARTER BARS
T10@150C/C
[TWO LAYERS]
1650
3
ST3
2245
4030
TB TB TB
1200
GROUND WELL
2740
1450
4
ST4
FOUNDATION PLAN
SCALE - 1:100
7650
BOUNDARY LINE
1
B2 B2
5225
B4 B4 B4
B2 @ FLOOR
LEVEL
AND
HALF-LANDING
LEVEL
2
B6
15100
STAIR
VOID
3500
B2 B2 B2
1000
3
4030
B2 B2 B2
B2 B5
4
1000
7650
BOUNDARY LINE
1300 3125 1175 1950
1735
2050 1110 1040
5225
1040
1785
1735
2
1125
15100
STAIR
1450 VOID
3500
1450
1225
1000
3
1285
1285
1040
1385
1485
4
1100
1000
NOTE:
1T12 2T12
400
400
400
400
1R6@150 c/c 1R6@150 c/c
1R6@150 c/c 2T12 1R6@150 c/c
1T12
2T16 2T16
420
420
420
420
2R6@140 c/c 1R6@150 c/c
2R6@140 c/c 1R6@150 c/c
2T16 2T16
450
420
420
RC NOTE
200
200
2R6@150 c/c 2R6@150 c/c
5T20 4T16
250
2T16
1T12
R6 hook @150 c/c
200
1R6@150 c/c
1T12
2T16
COLUMN 'C3'
SCALE 1:20
200
3T12 (through)
400
1R6@150 c/c
50 3T12 (through)
RC NOTE
3T16
450
750
2T10@120 c/c
T10@150mm
300
c/c (b/w)
50
damp proof 3T16
membrane (through) 50mm lean concrete
1300
350
3T16 (through)
450
2T10@120 c/c
750
50
damp proof 4T16 (through)
membrane 50mm lean concrete
1300
4T16
580
3T10@140 c/c
2T16
900
T10@100mm
330
c/c (b/w)
50
damp proof 4T16 (through)
membrane 50mm lean concrete
1650
400
4T16 (through)
580
3T10@140 c/c
2T16
900
4T16
T10@100mm
320
c/c (b/w)
RC NOTE
FOOTING 'ST3 ' DETAIL
SCALE 1:20 1. All concrete element design conforms to BS8110.
2. Minimum compressive strength of concrete to be 25 N/sqmm.
3. Concrete mix ratio 1:2:3
4. Main reinforcement steel to be high strength deformed bars.
5. River sand and granite to be used as aggregates.
6. Use water free of salt and any other impurities.
7. All reinforcement shall be supported in its correct position when
concreting by using spacers.
NOTE
9. Cover to reinforcement as given below unless noted otherwise
Apply two layers of damp proofing agent Footing = 50mm
to all surfaces of concrete that comes Tie beams = 40mm
below natural ground level Floor beams = 40mm (top, bot), 40mm (sides)
Roof beams = 40mm (top, bot), 40mm (sides)
Column = 30mm
Slab = 25mm (top, bot)
4T16
580
3T10@140 c/c
2T16
900 T10@100mm
330 c/c (b/w)
50
damp proof 4T16 (through)
membrane 50mm lean concrete
1650
400
4T16 (through)
580
3T10@140 c/c
2T16
900
4T16
T10@100mm
320
c/c (b/w)
RC NOTE
FOOTING 'ST3 ' DETAIL
SCALE 1:20 1. All concrete element design conforms to BS8110.
2. Minimum compressive strength of concrete to be 25 N/sqmm.
3. Concrete mix ratio 1:2:3
4. Main reinforcement steel to be high strength deformed bars.
5. River sand and granite to be used as aggregates.
6. Use water free of salt and any other impurities.
7. All reinforcement shall be supported in its correct position when
concreting by using spacers.
NOTE
9. Cover to reinforcement as given below unless noted otherwise
Apply two layers of damp proofing agent Footing = 50mm
to all surfaces of concrete that comes Tie beams = 40mm
below natural ground level Floor beams = 40mm (top, bot), 40mm (sides)
Roof beams = 40mm (top, bot), 40mm (sides)
Column = 30mm
Slab = 25mm (top, bot)
1000
Tile floor finish
35mm floor screed
120mm thick hollow Water proof
block exterior masonry
wall with 15mm thick
cement plaster on both
sides
1030
Tile finish
176
SS base plate
250
25mm cement
screed Distribution steel
T10@150 Half-landing
beam
T10@150
15
0
Going = 250
RC NOTE
Rise = 176
Stair waist = 150mm 1. All concrete element design conforms to BS8110.
2. Minimum compressive strength of concrete to be 25 N/sqmm.
3. Concrete mix ratio 1:2:3
STAIR DETAIL 4. Main reinforcement steel to be high strength deformed bars.
SCALE 1:20
5. River sand and granite to be used as aggregates.
6. Use water free of salt and any other impurities.
7. All reinforcement shall be supported in its correct position when
concreting by using spacers.
NOTE
Apply two layers of damp proofing agent 9. Cover to reinforcement as given below unless noted otherwise
to all surfaces of concrete that comes Footing = 50mm
below natural ground level Tie beams = 40mm
Floor beams = 40mm (top, bot), 40mm (sides)
Roof beams = 40mm (top, bot), 40mm (sides)
Column = 30mm
Slab = 25mm (top, bot)
T10@100 c/c
AS GIVEN
T10@100 c/c
NOTE
Apply two layers of damp proofing agent
to all surfaces of concrete that comes
DETAIL A - CANTILEVER SLAB DETAIL below natural ground level
SCALE 1:20
RC NOTE
120mm thick hollow block 6. Use water free of salt and any other impurities.
exterior masonry wall 7. All reinforcement shall be supported in its correct position when
with 15mm thick cement concreting by using spacers.
plaster on both sides
Floor slab 9. Cover to reinforcement as given below unless noted otherwise
Footing = 50mm
Tie beams = 40mm
Floor beams = 40mm (top, bot), 40mm (sides)
Roof beams = 40mm (top, bot), 40mm (sides)
Column = 30mm
DETAIL B - ROOF PARAPET WALL DETAIL Slab = 25mm (top, bot)
SCALE 1:20
20 x 100mm
Timber skirting
150
Road level
20 x 100mm
75mm RC slab Timber skirting
RFMT : R6@300 c/c ( BW)
( single layer )
SCALE 1:20
Note:
RABARUGAS MAGU - 6 GOALHI This foundation protection method is to be followed if
there are buildings adjacent to the plot boundary at the
time of excavation for new foundation.
Adjacent
property
100 X 75 TIMBER BRACING Excavation along the adjacent building shall be done
AT BOTH ENDS in parts so as to prevent loosing of soil from the
bottom of existing foundations. no partial excavation
65 X 65MM ANGLE BAR BRACING
shall exceed a width of 0.6m at a time & masonry retaining
THAT IS TO BE REMOVED BEFORE
wall must be completed immediately after the excavation.
THE BACKFILLING AND CASTING allow at least 24hr intervals between each excavation.
COLUMN
300MM X 6MM MS SHEET
PILED INTO THE GROUND OVER PROTECTION OF EXISTING WALLS ALONG
LAPPING EACH OTHER
EXCAVATED 700MM BELOW NGL
THE PERIMETER OF THE PROPOSED SITE
SCALE 1:50
400MM EMBEDDED
TO THE GROUND
NEW FOUNDATION