Structural Steelwork - On Site Erection CHECKLIST 1102

Project

NO. STANDARD CHECK REMARKS


A DESKTOP STUDY
1 Method of erection and safety precaution approved by OIC Y N NA
2 PE design (including erection stress calculation) & Certificate of
Y N NA
Supervision for temporary structure, support bracings and tie
backs submitted to and approved by OIC
3 Types of crane/lifting equipment approved by OIC Y N NA
B SET UP
1 Obtained OIC's permission to start erecting on site Y N NA
2 Structure alignment, level, plumb & correct : Inspected
Y N NA
foundations for line & level, holding down bolts for position,
protruding length , condition & slackness
3 Verified connecting structures' correct position & alignment for Y N NA
erection
4 Provided temporary guys/bracings , safe work platform & access Y N NA
5 Informed OIC of any defects of detailing or fabrication errors and
Y N NA
obtained approval before starting remedial works
C STRUCTURE DIMENSION & CONDITION
1 Verified all dimensions and orientation Y N NA
2 Verified bolts & holes quantity, level and position
Y N NA
3 Checked joints as per details Y N NA
4 Checked overall steel structure quality is acceptable, clean and Y N NA
ready for erection
5 Protection provided to prevent paint damage Y N NA
D STRUCTURE LIFTING
1 Steel structure lifting equipment in good condition Y N NA
2 Steel fixers provided with proper safety equipment Y N NA
E STRUCTURE ERECTION & FIXING
1 Correct bolts and nuts, material, grade and size Y N NA
2 All bolts properly tightened to correct torque with min 1.5mm Y N NA
thread beyond nut
3 Steel structures erected within construction tolerances Y N NA
4 Seal bolt holes in tubes and other hollow sections with OIC
Y N NA
approved method to prevent access of moisture
5 Grouting installed to the bottom of column plate Y N NA
F CORROSION AND FIRE PROTECTION COATING
1 Specification & thickness of material conforms with approved Y N NA
plan and specifications
2 Corrosion and/or Fire Protection coatings evenly applied with no Y N NA
damage to the coatings

Name of SS: Name of OIC:


Checked & Signed: Reviewed Non-compliance: Verified & Signed: Reviewed Non-compliance:

Date: Date: Date: Date: