Stream number: 1

Job name: simulacion giratoria con resirculacion


Solid flowrate: 10.00 tonne/hr
Water flowrate: 0.00 tonne/h
Slurry flowrate: 2.78 kg/s
Slurry volumetric flowrate: 0.1035E-02 m^3/s
Percent solids by mass: 100.00 %
Percent solids by volume: 100.00 %
Yield of solids: 100.00 %

Simulated size distribution


Number of size classes: 25
80% passing size: 0.622E-02 m
50% passing size: 0.224E-02 m
20% passing size: 0.316E-03 m
Size % passing
meters
0.107E-01 92.472
0.754E-02 85.158
0.535E-02 75.514
0.377E-02 64.577
0.267E-02 53.984
0.188E-02 46.310
0.134E-02 39.246
0.944E-03 33.220
0.667E-03 29.243
0.472E-03 24.070
0.334E-03 20.415
0.236E-03 17.910
0.167E-03 16.096
0.118E-03 14.682
0.834E-04 13.689
0.590E-04 12.898
0.417E-04 12.153
0.295E-04 11.452
0.209E-04 10.790
0.147E-04 10.167
0.104E-04 9.580
0.737E-05 9.027
0.521E-05 8.505
0.369E-05 8.014
0.00 0.000

Stream number: 2
Job name: simulacion giratoria con resirculacion
Solid flowrate: 4.05 tonne/hr
Water flowrate: 0.00 tonne/h
Slurry flowrate: 1.12 kg/s
Slurry volumetric flowrate: 0.4186E-03 m^3/s
Percent solids by mass: 100.00 %
Percent solids by volume: 100.00 %
Yield of solids: 40.46 %

Simulated size distribution


Number of size classes: 25
80% passing size: 0.124E-02 m
50% passing size: 0.461E-03 m
20% passing size: 0.101E-04 m
Size % passing
meters
0.107E-01 100.000
0.754E-02 100.000
0.535E-02 100.000
0.377E-02 100.000
0.267E-02 100.000
0.188E-02 97.266
0.134E-02 82.430
0.944E-03 69.774
0.667E-03 61.420
0.472E-03 50.555
0.334E-03 42.878
0.236E-03 37.617
0.167E-03 33.808
0.118E-03 30.837
0.834E-04 28.753
0.590E-04 27.092
0.417E-04 25.527
0.295E-04 24.053
0.209E-04 22.664
0.147E-04 21.355
0.104E-04 20.122
0.737E-05 18.960
0.521E-05 17.865
0.369E-05 16.833
0.00 0.000

Stream number: 3
Job name: simulacion giratoria con resirculacion
Solid flowrate: 5.95 tonne/hr
Water flowrate: 0.00 tonne/h
Slurry flowrate: 1.65 kg/s
Slurry volumetric flowrate: 0.6160E-03 m^3/s
Percent solids by mass: 100.00 %
Percent solids by volume: 100.00 %
Yield of solids: 59.54 %

Simulated size distribution


Number of size classes: 25
80% passing size: 0.858E-02 m
50% passing size: 0.455E-02 m
20% passing size: 0.250E-02 m
Size % passing
meters
0.107E-01 87.354
0.754E-02 75.069
0.535E-02 58.869
0.377E-02 40.497
0.267E-02 22.703
0.188E-02 11.669
0.134E-02 9.889
0.944E-03 8.371
0.667E-03 7.368
0.472E-03 6.065
0.334E-03 5.144
0.236E-03 4.513
0.167E-03 4.056
0.118E-03 3.699
0.834E-04 3.449
0.590E-04 3.250
0.417E-04 3.062
0.295E-04 2.886
0.209E-04 2.719
0.147E-04 2.562
0.104E-04 2.414
0.737E-05 2.275
0.521E-05 2.143
0.369E-05 2.019
0.00 0.000

Stream number: 4
Job name: simulacion giratoria con resirculacion
Solid flowrate: 11.56 tonne/hr
Water flowrate: 0.00 tonne/h
Slurry flowrate: 3.21 kg/s
Slurry volumetric flowrate: 0.1196E-02 m^3/s
Percent solids by mass: 100.00 %
Percent solids by volume: 100.00 %
Yield of solids: 115.55 %

Simulated size distribution


Number of size classes: 25
80% passing size: 0.572E-02 m
50% passing size: 0.303E-02 m
20% passing size: 0.178E-02 m
Size % passing
meters
0.107E-01 93.486
0.754E-02 87.133
0.535E-02 78.083
0.377E-02 63.987
0.267E-02 42.639
0.188E-02 20.763
0.134E-02 16.487
0.944E-03 13.642
0.667E-03 11.486
0.472E-03 9.250
0.334E-03 7.572
0.236E-03 6.338
0.167E-03 5.411
0.118E-03 4.692
0.834E-04 4.165
0.590E-04 3.756
0.417E-04 3.412
0.295E-04 3.119
0.209E-04 2.867
0.147E-04 2.647
0.104E-04 2.454
0.737E-05 2.282
0.521E-05 2.128
0.369E-05 1.988
0.00 0.000

Stream number: 5
Job name: simulacion giratoria con resirculacion
Solid flowrate: 11.56 tonne/hr
Water flowrate: 0.00 tonne/h
Slurry flowrate: 3.21 kg/s
Slurry volumetric flowrate: 0.1196E-02 m^3/s
Percent solids by mass: 100.00 %
Percent solids by volume: 100.00 %
Yield of solids: 115.55 %

Simulated size distribution


Number of size classes: 25
80% passing size: 0.254E-02 m
50% passing size: 0.142E-02 m
20% passing size: 0.388E-03 m
Size % passing
meters
0.107E-01 100.000
0.754E-02 99.974
0.535E-02 99.268
0.377E-02 94.626
0.267E-02 82.419
0.188E-02 64.420
0.134E-02 47.184
0.944E-03 37.844
0.667E-03 29.822
0.472E-03 23.186
0.334E-03 17.837
0.236E-03 13.612
0.167E-03 10.325
0.118E-03 7.797
0.834E-04 5.868
0.590E-04 4.404
0.417E-04 3.299
0.295E-04 2.468
0.209E-04 1.844
0.147E-04 1.377
0.104E-04 1.027
0.737E-05 0.766
0.521E-05 0.571
0.369E-05 0.426
0.00 0.000

Stream number: 6
Job name: simulacion giratoria con resirculacion
Solid flowrate: 15.61 tonne/hr
Water flowrate: 0.00 tonne/h
Slurry flowrate: 4.34 kg/s
Slurry volumetric flowrate: 0.1615E-02 m^3/s
Percent solids by mass: 100.00 %
Percent solids by volume: 100.00 %
Yield of solids: 156.05 %

Simulated size distribution


Number of size classes: 25
80% passing size: 0.222E-02 m
50% passing size: 0.108E-02 m
20% passing size: 0.239E-03 m
Size % passing
meters
0.107E-01 100.000
0.754E-02 99.981
0.535E-02 99.458
0.377E-02 96.020
0.267E-02 86.979
0.188E-02 72.938
0.134E-02 56.325
0.944E-03 46.125
0.667E-03 38.017
0.472E-03 30.284
0.334E-03 24.331
0.236E-03 19.837
0.167E-03 16.416
0.118E-03 13.772
0.834E-04 11.803
0.590E-04 10.288
0.417E-04 9.064
0.295E-04 8.066
0.209E-04 7.244
0.147E-04 6.558
0.104E-04 5.979
0.737E-05 5.485
0.521E-05 5.056
0.369E-05 4.681
0.00 0.000

Stream number: 7
Job name: simulacion giratoria con resirculacion
Solid flowrate: 5.62 tonne/hr
Water flowrate: 0.00 tonne/h
Slurry flowrate: 1.56 kg/s
Slurry volumetric flowrate: 0.5810E-03 m^3/s
Percent solids by mass: 100.00 %
Percent solids by volume: 100.00 %
Yield of solids: 56.16 %

Simulated size distribution


Number of size classes: 25
80% passing size: 0.328E-02 m
50% passing size: 0.235E-02 m
20% passing size: 0.101E-02 m
Size % passing
meters
0.107E-01 100.000
0.754E-02 99.947
0.535E-02 98.493
0.377E-02 88.936
0.267E-02 63.808
0.188E-02 30.409
0.134E-02 23.483
0.944E-03 19.230
0.667E-03 15.850
0.472E-03 12.626
0.334E-03 10.144
0.236E-03 8.271
0.167E-03 6.844
0.118E-03 5.742
0.834E-04 4.921
0.590E-04 4.289
0.417E-04 3.779
0.295E-04 3.363
0.209E-04 3.020
0.147E-04 2.734
0.104E-04 2.493
0.737E-05 2.287
0.521E-05 2.108
0.369E-05 1.952
0.00 0.000

Stream number: 8
Job name: simulacion giratoria con resirculacion
Solid flowrate: 9.99 tonne/hr
Water flowrate: 0.00 tonne/h
Slurry flowrate: 2.78 kg/s
Slurry volumetric flowrate: 0.1034E-02 m^3/s
Percent solids by mass: 100.00 %
Percent solids by volume: 100.00 %
Yield of solids: 99.89 %

Simulated size distribution


Number of size classes: 25
80% passing size: 0.142E-02 m
50% passing size: 0.657E-03 m
20% passing size: 0.141E-03 m
Size % passing
meters
0.107E-01 100.000
0.754E-02 100.000
0.535E-02 100.000
0.377E-02 100.000
0.267E-02 100.000
0.188E-02 96.839
0.134E-02 74.781
0.944E-03 61.239
0.667E-03 50.474
0.472E-03 40.208
0.334E-03 32.304
0.236E-03 26.338
0.167E-03 21.795
0.118E-03 18.286
0.834E-04 15.671
0.590E-04 13.659
0.417E-04 12.034
0.295E-04 10.709
0.209E-04 9.617
0.147E-04 8.707
0.104E-04 7.939
0.737E-05 7.282
0.521E-05 6.713
0.369E-05 6.215
0.00 0.000