net/publication/261277624
CITATIONS READS
5 162
5 authors, including:
Some of the authors of this publication are also working on these related projects:
All content following this page was uploaded by Caio F. F. C. Cunha on 10 September 2015.
Abstract—This paper describes the recent Brazilian experience specialists: the partial discharge measurement is still a
at on-site Partial Discharges (PD) measurement and analysis in fundamental tool to establish consistent evaluation of electrical
Power Transformers, including the development of IMA-DP performance of the insulation system.
(Instrumentation for Monitoring and Analysis of Partial
Discharges), designed by Eletrobras to monitor High Voltage II. PARTIAL DISCHARGES
Equipment. The proposed system includes high speed digitizer
The occurrence of partial discharges in the insulation
cards on an industrial computer and is designed to operate off-
system of the high voltage (HV) equipment is a symptom of
line or on-line, remotely logging statistical maps of PD over time.
The goal of this project was to evaluate the performance of the the fragility of the dielectric. Its evolution can have serious
operative state of power transformers of 138kV up to 500kV consequences for these equipments and for the whole electric
installed in the Brazilian electric power system. system. The measurement of partial discharges is made in
order to verify if there are discharge activities inside the
Keywords — Partial discharge, power transformers dielectric and, if possible, to quantify it.
Physically, Partial Discharges are the result of an
I. INTRODUCTION ionization process in gaseous environment in the interior of
The PD on-site evaluation on high voltage equipment is a dielectric materials, caused by an intense and located electric
predictive diagnosis tool that can assist in the accomplishment field [1]. From this process, several physical quantities are
generated in the local, like electromagnetic pulses, brightness,
of the maintenance of the equipment. The result of this
acoustic noise, temperature increasing and local chemical
evaluation can lead to the intervention in the equipment before
reactions.
it can suffer more serious damage. A catastrophic failure can
even affect the whole electrical system. Traditionally, PD have been evaluated by the measurement
of the high frequency electric pulses conducted on a specific
The measurement of partial discharges in power measurement circuit, according to the procedures described in
transformers has always caused intensive discussions and IEC 60270 [2], see Fig.1.
differing opinions on specialized technical groups. The state of
the art, which has evolved very little in recent years in terms of On an electromagnetic noisy environment such as electric
effective diagnosis of the machines, fails to produce the substations, signal pre-conditioning is required in order to
desired universal procedures and recommendations. discriminate noises from useful PD signals. The quality of an
on-site PD measurement is directly related with an efficient
The oil-paper insulation of a power transformer can pre-processing of the acquired signals. In order to provide
tolerate partial discharge for a while. Partial discharge activity, effective signal pre-conditioning for IMA-DP (Instrumentation
on the other hand is an indicator for degradation of the for Monitoring and Analysis of Partial Discharges) in such
insulation system. Thus, partial discharge monitoring is an electromagnetic noisy environment, customized analog filters
effective tool to evaluate its insulation system. have been successfully used.
Among reasons for the absence of universal measurement
procedures, we can cite the difficulty to quantify the severity
of the internal problem, since the registered amplitudes are
also functions of the location of the discharges. In this paper,
we presented three cases that can help on the discussion of the
importance of the partial discharge measurement.
The technologic stagnation results on a diversity of
solutions about monitoring and diagnosis according to the
culture and the technical knowledge of each company.
However, there is a common sense of the most part of Fig. 1. PD measurement circuit in laboratory.
1020
2013 IEEE International Conference on Solid Dielectrics, Bologna, Italy, June 30 – July 4, 2013
III. PARTIAL DISCHARGES MEASUREMENT IV. FIELD RESULTS AND CASE STUDIES
Bushing sensors are employed at online electrical PD A. Case 1 - Transformer rating: 145 kV/69 kV – Three Single
measurements. They are installed in the capacitance tap of the Phase Tanks
bushings. Fig. 2 shows a typical bushing sensor that is
installed in the capacitance tap of a high-voltage bushing. These transformers are installed in the substation of the
Brazilian Electric Energy Research Center, CEPEL, in Rio de
Janeiro. It is used by the laboratory for special tests that
require high power. Therefore, it is an important equipment
and must be monitoring continuously. See Fig. 3.
Fig. 5. Power Transformer evaluated Fig. 4. Phased Resolved Partial Discharge of Case A
1021
2013 IEEE International Conference on Solid Dielectrics, Bologna, Italy, June 30 – July 4, 2013
Fig. 4. Power Transformer evaluated – Case 1 Fig. 6. PRPD of the High Voltage A-Phase – Case 3
B. Case 2 – Power Transformer rating: 230 kV/138 kV – The results confirmed PD existence and enabled us to
Three Single Phase Tanks evaluate its severity degree, see Fig. 6.
This is an important equipment of an electric substation in Unfortunately, the appropriate decision has been taken in
Brasil. A failure in this equipment may cause a blackout on time to prevent failure. The consideration of the PD
thousands of consumers in the central region of the country. In measurement as an essential tool to establish a robust
this case, IMA-DP was installed as a standalone system. assessment of electrical performance of the Power
Partial Discharge measurements were made during two days Transformer was not accepted by the company. After a few
continuously. The maximum detected PD was around 450 pC months, the electrical equipment failed, causing great damage
from the high-voltage B-Phase sensor, see Table I. and inconvenience technicians. The most important fact is the
confirmation of what was indicated by the PD measurement.
TABLE I.RESULTS OF PD MEASUREMENT ON POWER TRANSFORMER CASE 2.
Phase A - HV A - LV B - HV B - LV C - HV C - LV
Charge (pC) 300 350 450 350 150 200
1022
2013 IEEE International Conference on Solid Dielectrics, Bologna, Italy, June 30 – July 4, 2013
1023
View publication stats