Professional Documents
Culture Documents
Performance Engineering For Capex & Opex
Performance Engineering For Capex & Opex
$100B’s/year
Engineering
Challenge
Current OPTIMIZED
Operations Operations
OPERATE
Running to the limits
of performance
Asset MAINTAIN
Driving uptime through
Lifecycle actionable insights
DESIGN
Pushing the boundaries A comprehensive, holistic approach achieves
of what’s possible the highest possible financial return over the
entire asset lifecycle
PRODUCTION OPTIMIZATION
PERFORMANCE ASSET
ENGINEERING Monitor& &
Actionable Insights Execute Execution
Automated PERFORMANCE
Collect,visualize,
Collect, visualize,analyze,
analyze,automate
automate MANAGEMENT
Produce to demand
VALUE CHAIN OPTIMIZATION
Distribute
Optimize product
distribution
PRODUCTION OPTIMIZATION
PERFORMANCE ASSET
ENGINEERING Monitor& &
Actionable Insights Execute Execution
Automated PERFORMANCE
Collect,visualize,
Collect, visualize,analyze,
analyze,automate
automate MANAGEMENT
Produce to demand
VALUE CHAIN OPTIMIZATION
Distribute
Optimize product
distribution
Pushing the
boundaries of Plant Digital Twin
Optimize OPEX by mirroring asset
MAINTAIN
Asset Driving Uptime with
Lifecycle Actionable Insights
GAS PLANT
Monitor HX ISOM:
Fouling Optimize operating
conditions
GASOLINE
HYDROTREATER
Update plan GASOLINE
BLENDING
FCC:
KEROSENE
HYDROTREATER0
Evaluate feedstock
Select Catalyst
Update plan DIESEL
HYDROTREATER
FLUID CATALYTIC
CRACKER
Coker:
Predict coke production Hydrocracker:
HYDROCRACKER Evaluate Feedstock DISTILLATE
BLENDING
Optimize operating severity
Update plan
COKER
Plant Improvement
Turnaround Cycle Time Safety Validation
CAPEX
© 2019 Aspen Technology, Inc. All rights reserved. 10
Value from Performance Engineering for Refineries
Energy Optimization Operator Training Emissions Reduction Site Level
Save 2% to 10% Save
Save20
20days
Daysduring
Duringstart-up
Start-up Avoid Liability
Avoid liability
GAS PLANT
Unit Level
$0.02/
BOE NAPTHA
REFORMER
$0.15/
ATMOSPHERIC $0.2/
DISTILLATION
barrel barrel
VACUUM NAPTHA ISOMERIZATION
DISTILLATION HYDROTREATER UNIT
$0.1/
barrel $0.05/
barrel
GASOLINE
HYDROTREATER GASOLINE
BLENDING
KEROSENE
HYDROTREATER0
$0.25/
barrel
DIESEL
HYDROTREATER
FLUID CATALYTIC
CRACKER
$0.05/
barrel
$0.2/
HYDROCRACKER
DISTILLATE
BLENDING
barrel
COKER
Production
R&D
Engineer
Operator
Mechanical
Engineer CAPITAL EFFICIENCY ENERGY EFFICIENCY
Safety
Equipment
Specialist
Specialist
CAPEX
Basic Operator
Engineering Performance Engineering Training
Economic Energy
Evaluation Management
Equipment Safety & Reliability
Design Environmental Analysis
OPEX
Economic Energy
Evaluation Management
Equipment Safety & Reliability
Design Environmental Analysis Demand & supply
Lifecycle economic
side energy
modeling
optimization
OPEX
Equipment Design for Safety,
optimization in asset Reliability &
context Environmental
© 2019 Aspen Technology, Inc. All rights reserved. 16
Performance Engineering: Best Practices Across the Lifecycle
Aligning data and
Accelerate research
to engineering 3 models for sustained
value
Concurrent simulation CAPEX Collaboration across
1 & analyses engineering and
planning
Process Plant Operations
Development Debottlenecking Optimization
Conceptual Planning
Design Update
Economic Energy
Evaluation Management
Equipment Safety & Reliability
Lifecycle economic Design Environmental Analysis Demand & supply
modeling 2 side energy
optimization
OPEX
Equipment Design for Safety,
optimization in asset Reliability &
context Environmental
© 2019 Aspen Technology, Inc. All rights reserved. 17
Performance Engineering: Best Practices Across the Lifecycle
Aligning data and
Conceptual Design 3 models for sustained
value
Concurrent simulation CAPEX
1 & analyses
Operations
Optimization
Energy Management Conceptual
Design
Performance Engineering
Operations Optimization
Energy
Management
Demand & supply
2 side energy
optimization
OPEX
Conceptual Design
Concurrent simulation CAPEX
1 & analyses
Energy Management
Demand & supply
2 side energy
optimization
Performance Engineering
Operations Optimization
Aligning data and
3 models for sustained
value
OPEX
Takes Weeks
Limits Collaboration
Activated Energy
YIELDS INNOVATION
& GHG Analysis
Operations
Optimization
OPERABILITY PROFITABILITY Activated
Exchanger
Design & Rating
Dynamic
Modeling Studies Process Safety
PROJECT EXECUTION
Analysis
SAFETY & ENVIRONMENT
Environmental
Emissions Solids & Polymer
Reduction Modeling
10-30% CAPEX
50% Time Saving
savings in Concept Selection to
via concurrent Accelerate Time to Market
conceptual design
Asset Optimization
Concurrent
Conceptual Eng.
5%-25% CAPEX
Process Optimization
Activated/Integrated Concurrent
Workflows
5%-20% CAPEX
Stand Alone
Simulation
Modeling
5%-10% CAPEX
Conceptual Design
Concurrent simulation & CAPEX
1 analyses
Energy Management
Demand & supply
2 side energy
optimization
Performance Engineering
Operations Optimization
Aligning data and
3 models for sustained
value
OPEX
Utility System
Fuel
Optimize process
Assumes process is given
&
utilities together
Prize: 3-30%
Process Engineer energy Process Process Process Process
A B C D
savings Product
Side- Feed
Product
Product
Plants
100% 75-90%
Demand
$19M+ / yr Profit
$60-80 million energy Improvement through
savings realized demand side energy
via aspenONE Engineering optimization
Asset Optimization
Process Energy
Optimization
3%-20% Savings
Process Optimization
Stand Alone
Simulation/Modeling
3%-10% Savings
Conceptual Design
Concurrent simulation & CAPEX
1 analyses
Energy Management
Demand & supply
2 side energy
optimization
Performance Engineering
Operations Optimization
Aligning data and
3 models for sustained
value
OPEX
Asset Optimization
Online Performance
Monitoring
3% - 8% Savings Process Optimization
Offline On-Demand
Analysis Concurrent
2% - 5% Savings
Stand Alone
Simulation Modeling
2% - 3% Savings
Conceptual Design
Concurrent simulation & CAPEX
1 analyses
Energy Management
OPEX
Production
R&D
Engineer
Process
CAPEX
YIELDS INNOVATION Planner
Engineer
Process Plant Operations
Development Debottlenecking Optimization
Conceptual
OPERABILITY Planning
PROFITABILITY
Design Update
Operator
Mechanical
Basic Operator
Engineer
CAPITAL EFFICIENCY
Engineering Performance Engineering
ENERGY EFFICIENCY
Training
Economic Energy
Evaluation Management
Equipment Safety & Reliability Energy
Cost PROJECT EXECUTION
Design Environmental
SAFETY
Analysis
& ENVIRONMENT Specialist
Estimator
Lost OPEX
Safety
Equipment Opportunity Specialist
Specialist
Process
10-30% CAPEX Saved $550M by
optimizing
Capital savings Planner
Engineer upstream assets
Process Plant Operations
Development Debottlenecking Optimization
Conceptual Planning
Operator
Reduced
performance with
Engineer
less expertise…
in engineering
Performance
efficiency
Basic
Engineering
Engineering
Operator
Training
startup
time for greenfield
Economic Energy
Evaluation Management
Equipment Safety & Reliability Energy
50% Time Saving
Cost Specialist
Design Environmental Analysis $50M/year Energy
Estimator
in concept
selection cost savings
OPEX
$63M benefit due to $30M CAPEX Safety
Equipment savings
debottlenecking Specialist
Specialist & safer design
© 2019 Aspen Technology, Inc. All rights reserved. 37
Pushing the Boundaries of What’s Possible
Performance Engineering