Dynamic Builders & Construction Co. (Phil.), Inc.: Quality Control Program
Dynamic Builders & Construction Co. (Phil.), Inc.: Quality Control Program
PREPARED BY : CHECKED BY :
NOTED BY : VERIFIED :
STATUS OF TEST
Name of Project : Improvement/Widening of Silay-Lantawan Road Segment 1 - K0015+250-K0016+367 / Segment 2 - K0019+000 - K0020+400 Silay City, Negros Occidental
CHECKED BY : NOTED BY :
STATUS OF TEST
Name of Project : Improvement/Widening of Silay-Lantawan Road Segment 1 - K0015+250-K0016+367 / Segment 2 - K0019+000 - K0020+400 Silay City, Negros Occidental
For the Period Ending: June 22, 2016
d. Reinforcing Steel
c. Boulder UW-8
SPL-5 Service Vehicle (Rental of 4x4 Pick Up Truck,3.0 ltrs., 1.00 l.s. IR
Matl's. Engineer -Alfie's Const. & Const. Supply, Inc. Project Engineer -DPWH
CHECKED BY : NOTED BY :
STATUS OF TEST
Name of Project : Improvement/Widening of Silay-Lantawan Road Segment 1 - K0015+250-K0016+367 / Segment 2 - K0019+000 - K0020+400 Silay City, Negros Occidental
For the Period Ending: July 22, 2016
d. Reinforcing Steel
36 mmØmm Plain Bar Q-1;UW-1
c. Boulder UW-8
SPL-5 Service Vehicle (Rental of 4x4 Pick Up Truck,3.0 ltrs., 1.00 l.s. IR
CHECKED BY : NOTED BY :
Name of Project and Location : Improvement/Widening of Silay-Lantawan Road Segment 1 - K0015+250+K0016+367 / Segment 2 - K0019+000 - K0020+400 Silay City, Negros Occidental
Implementing Office : DPWH 1st Neg. Occ. Eng'g. District Name of Contractor : Dynamic Builders & Construction Co., (Phil.), Inc.
Project Duration : DPWH Project Inspector :
a. Date Started : March 15, 2016 Project Accomplishment :
b. Target Completion Date : September 30, 2016 Project cost : P 54,978,936.26
SAMPLED
TESTED
QUANTITY ORIGINAL SOURCE OF KIND OF SPEC'S
LAB. No. KIND OF MATERIALS At REMARKS
REPRESENTED MATERIALS TESTS ITEM No.
(1) (2) (11) (12)
(3) (4) (5) (6) BY DATE BY DATE
IWSLR- 180 Sub Grade - - F.D.T. 105 E. Chua III / G. Vito 6/23/2016 E. Chua III / G. Vito 6/24/2016 Jobsite Satisfactory
IWSLR- 181 Sub Grade - - F.D.T. 105 E. Chua III / G. Vito 6/23/2016 E. Chua III / G. Vito 6/24/2016 Jobsite Satisfactory
IWSLR- 182 Portland Cement 1000 bags Batching Plant FT 311 E. Chua III / G. Vito 6/27/2016 E. Chua III / G. Vito 6/28/2016 Contractor's Lab. Satisfactory
IWSLR- 183 Fine Aggregates 75 m³ Malogo River G 311 E. Chua III / G. Vito 6/27/2016 E. Chua III / G. Vito 6/28/2016 Contractor's Lab. Recommended for use
IWSLR- 184 Coarse Aggregates 75 m³ Malogo River G 311 E. Chua III / G. Vito 6/27/2016 E. Chua III / G. Vito 6/28/2016 Contractor's Lab. Recommended for use
IWSLR- 185 Coarse Aggregates 75 m³ Malogo River G 311 E. Chua III / G. Vito 6/27/2016 E. Chua III / G. Vito 6/28/2016 Contractor's Lab. Recommended for use
IWSLR- 186 Portland Cement 1000 bags Batching Plant FT 311 E. Chua III / G. Vito 6/29/2016 E. Chua III / G. Vito 6/30/2016 Contractor's Lab. Satisfactory
IWSLR- 187 Portland Cement Quality Test Batching Plant FT 311 E. Chua III / G. Vito 6/29/2016 E. Chua III / G. Vito 6/30/2016 Contractor's Lab. Satisfactory
IWSLR- 188 Coarse & Fine Agg. Quality Test Malogo River SGA 311 E. Chua III / G. Vito 6/29/2016 E. Chua III / G. Vito 6/30/2016 Contractor's Lab. Recommended for use
IWSLR- 189 Coarse Aggregates Quality Test Malogo River AL 311 E. Chua III / G. Vito 6/29/2016 E. Chua III / G. Vito 6/30/2016 DPWH Lab. Satisfactory
IWSLR- 190 Reinforcing Steel Bars 290.25 kg. Jobsite U.W. 404 E. Chua III / G. Vito 1/7/2016 E. Chua III / G. Vito 2/7/2016 Contractor's Lab. Satisfactory
IWSLR- 191 Agg. Sub Base 275.40 m³ Malogo River G&P 200 E. Chua III / G. Vito 1/7/2016 E. Chua III / G. Vito 2/7/2016 Contractor's Lab. Satisfactory
IWSLR- 192 Portland Cement 1000 bags Batching Plant FT 311 E. Chua III / G. Vito 4/7/2016 E. Chua III / G. Vito 5/7/2016 Contractor's Lab. Satisfactory
IWSLR- 193 Fine Aggregates 75 m³ Malogo River G 311 E. Chua III / G. Vito 4/7/2016 E. Chua III / G. Vito 5/7/2016 Contractor's Lab. Recommended for use
IWSLR- 194 Coarse Aggregates 75 m³ Malogo River G 311 E. Chua III / G. Vito 4/7/2016 E. Chua III / G. Vito 5/7/2016 Contractor's Lab. Recommended for use
IWSLR- 195 Coarse Aggregates 75 m³ Malogo River G 311 E. Chua III / G. Vito 4/7/2016 E. Chua III / G. Vito 5/7/2016 Contractor's Lab. Recommended for use
IWSLR- 196 Sub Grade - - F.D.T. 105 E. Chua III / G. Vito 6/7/2016 E. Chua III / G. Vito 7/7/2016 Jobsite Satisfactory
Note: 1. Indicate the Name of batching plant as source of ready-mix concrete and hot -bituminuos mix to column (4).
2. Indicate the name of testing laboratories on the sample tested to column (11).
ESMAEL L. CHUA III GENO S. VITO MELECIO B. PACETE JR. ARNEL P. TORREFRANCA
Matl's. Engineer - Dynamic Builders & Construction Matl's. Engineer - DPWH Project Engineer - DPWH Chief, Quality Assurance Secion
DYNAMIC BUILDERS & CONSTRUCTION CO. (PHIL.),INC.
SUMMARY REPORT OF FIELD TEST
For the Month of July 2016
Name of Project and Location : Improvement/Widening of Silay-Lantawan Road Segment 1 - K0015+250+K0016+367 / Segment 2 - K0019+000 - K0020+400 Silay City, Negros Occidental
Implementing Office : DPWH 1st Neg. Occ. Eng'g. District Name of Contractor : Dynamic Builders & Construction Co., (Phil.), Inc.
Project Duration : DPWH Project Inspector :
a. Date Started : March 15, 2016 Project Accomplishment :
b. Target Completion Date : September 30, 2016 Project cost : P 54,978,936.26
SAMPLED
QUANTITY ORIGINAL SOURCE OF KIND OF SPEC'S TESTED
LAB. No. KIND OF MATERIALS At REMARKS
REPRESENTED MATERIALS TESTS ITEM No.
(1) (2) (11) (12)
(3) (4) (5) (6) BY DATE BY DATE
IWSLR- 197 Sub Grade - - F.D.T. 105 E. Chua III / G. Vito 6/7/2016 E. Chua III / G. Vito 7/7/2016 Jobsite Satisfactory
IWSLR- 198 Portland Cement 1000 bags Batching Plant FT 311 E. Chua III / G. Vito 8/7/2016 E. Chua III / G. Vito 9/7/2016 Contractor's Lab. Satisfactory
IWSLR- 199 Fine Aggregates 75 m³ Malogo River G 311 E. Chua III / G. Vito 8/7/2016 E. Chua III / G. Vito 9/7/2016 Contractor's Lab. Recommended for use
IWSLR- 200 Coarse Aggregates 75 m³ Malogo River G 311 E. Chua III / G. Vito 8/7/2016 E. Chua III / G. Vito 9/7/2016 Contractor's Lab. Recommended for use
IWSLR- 201 Coarse Aggregates 75 m³ Malogo River G 311 E. Chua III / G. Vito 8/7/2016 E. Chua III / G. Vito 9/7/2016 Contractor's Lab. Recommended for use
IWSLR- 202 Sub Grade - - F.D.T. 105 E. Chua III / G. Vito 11/7/2016 E. Chua III / G. Vito 12/7/2016 Jobsite Satisfactory
IWSLR- 203 Sub Grade - - F.D.T. 105 E. Chua III / G. Vito 11/7/2016 E. Chua III / G. Vito 12/7/2016 Jobsite Satisfactory
IWSLR- 204 Portland Cement 1000 bags Batching Plant FT 311 E. Chua III / G. Vito 7/13/2016 E. Chua III / G. Vito 7/14/2016 Contractor's Lab. Satisfactory
IWSLR- 205 Fine Aggregates 75 m³ Malogo River G 311 E. Chua III / G. Vito 7/13/2016 E. Chua III / G. Vito 7/14/2016 Contractor's Lab. Recommended for use
IWSLR- 206 Coarse Aggregates 75 m³ Malogo River G 311 E. Chua III / G. Vito 7/13/2016 E. Chua III / G. Vito 7/14/2016 Contractor's Lab. Recommended for use
IWSLR- 207 Coarse Aggregates 75 m³ Malogo River G 311 E. Chua III / G. Vito 7/13/2016 E. Chua III / G. Vito 7/14/2016 Contractor's Lab. Recommended for use
IWSLR- 208 Sub Grade - - F.D.T. 105 E. Chua III / G. Vito 7/15/2016 E. Chua III / G. Vito 7/16/2016 Jobsite Satisfactory
IWSLR- 209 Sub Grade - - F.D.T. 105 E. Chua III / G. Vito 7/15/2016 E. Chua III / G. Vito 7/16/2016 Jobsite Satisfactory
IWSLR- 210 Portland Cement 1000 bags Batching Plant FT 311 E. Chua III / G. Vito 7/18/2016 E. Chua III / G. Vito 7/19/2016 Contractor's Lab. Satisfactory
IWSLR- 211 Fine Aggregates 75 m³ Malogo River G 311 E. Chua III / G. Vito 7/18/2016 E. Chua III / G. Vito 7/19/2016 Contractor's Lab. Recommended for use
IWSLR- 212 Coarse Aggregates 75 m³ Malogo River G 311 E. Chua III / G. Vito 7/18/2016 E. Chua III / G. Vito 7/19/2016 Contractor's Lab. Recommended for use
IWSLR- 213 Coarse Aggregates 75 m³ Malogo River G 311 E. Chua III / G. Vito 7/18/2016 E. Chua III / G. Vito 7/19/2016 Contractor's Lab. Recommended for use
Note: 1. Indicate the Name of batching plant as source of ready-mix concrete and hot -bituminuos mix to column (4).
2. Indicate the name of testing laboratories on the sample tested to column (11).
ESMAEL L. CHUA III GENO S. VITO MELECIO B. PACETE JR. ARNEL P. TORREFRANCA
Matl's. Engineer - Dynamic Builders & Construction Matl's. Engineer - DPWH Project Engineer - DPWH Chief, Quality Assurance Secion
DYNAMIC BUILDERS & CONSTRUCTION CO. (PHIL.),INC.
SUMMARY REPORT OF FIELD TEST
For the Month of July 2016
Name of Project and Location : Improvement/Widening of Silay-Lantawan Road Segment 1 - K0015+250+K0016+367 / Segment 2 - K0019+000 - K0020+400 Silay City, Negros Occidental
Implementing Office : DPWH 1st Neg. Occ. Eng'g. District Name of Contractor : Dynamic Builders & Construction Co., (Phil.), Inc.
Project Duration : DPWH Project Inspector :
a. Date Started : March 15, 2016 Project Accomplishment :
b. Target Completion Date : September 30, 2016 Project cost : P 54,978,936.26
SAMPLED
TESTED
QUANTITY ORIGINAL SOURCE OF KIND OF SPEC'S
LAB. No. KIND OF MATERIALS At REMARKS
REPRESENTED MATERIALS TESTS ITEM No.
(1) (2) (11) (12)
(3) (4) (5) (6) BY DATE BY DATE
IBSAR- 37 Portland Cement 1000 bags Batching Plant FT 311 E. Chua III / G. Vito 7/20/2016 E. Chua III / G. Vito 7/21/2016 Contractor's Lab. Satisfactory
IBSAR- 38 Fine Aggregates 75 m³ Malogo River G 311 E. Chua III / G. Vito 7/20/2016 E. Chua III / G. Vito 7/21/2016 Contractor's Lab. Recommended for use
IBSAR- 39 Coarse Aggregates 75 m³ Malogo River G 311 E. Chua III / G. Vito 7/20/2016 E. Chua III / G. Vito 7/21/2016 Contractor's Lab. Recommended for use
IBSAR- 40 Coarse Aggregates 75 m³ Malogo River G 311 E. Chua III / G. Vito 7/20/2016 E. Chua III / G. Vito 7/21/2016 Contractor's Lab. Recommended for use
IBSAR- 41 Sub Grade - - F.D.T. 105 E. Chua III / G. Vito 7/21/2016 E. Chua III / G. Vito 7/22/2016 Jobsite Satisfactory
IBSAR- 42 Sub Grade - - F.D.T. 105 E. Chua III / G. Vito 7/21/2016 E. Chua III / G. Vito 7/22/2016 Jobsite Satisfactory
Note: 1. Indicate the Name of batching plant as source of ready-mix concrete and hot -bituminuos mix to column (4).
2. Indicate the name of testing laboratories on the sample tested to column (11).
ESMAEL L. CHUA III GENO S. VITO MELECIO B. PACETE JR. ARNEL P. TORREFRANCA
Matl's. Engineer - Dynamic Builders & Construction Matl's. Engineer - DPWH Project Engineer - DPWH Chief, Quality Assurance Secion
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
QUALITY ASSURANCE SECTION
Negros Occidental 1st District Engineering Office
Matab-ang, Talisay City, Negros Occidental
PROJECT : Improvement/Widening of Silay-Lantawan Road Segment 1 - K0015+250-K0016+367 / Segment 2 - K0020+400 Silay City, Negros Occidental
CONTRACTOR : Dynamic Builders & Construction Co.,(Phil),Inc. DATE: May 02, 2016
We hereby certify that we have conducted an inspection and verification of work accomplished on the above mentioned project for the
period April 23 - 30, 2016 ; We further certify that we have found the quality of materials in the following items of work corresponding to
the quantity accomplished conforms with the STANDARD SPECIFICATIONS and Special provisions of the contract viz.
QUANTITY ACCOMPLISHED
%
ITEM NO. DESCRIPTION PROGRAMMED units
TOTAL ACCOMPLISHMENT
THIS WEEK
TO DATE
A.1 Bunkhouse / Field Office for the Engineers 1.00 l.s 1.00 1.00 100%
SPL-2 Provide and Maintain Traffic Control 1.00 l.s 0.50 0.50 50%
SPL-4 Construction Safety and Health 1.00 l.s 0.50 0.50 50%
PROJECT : Improvement/Widening of Silay-Lantawan Road Segment 1 - K0015+250-K0016+367 / Segment 2 - K0020+400 Silay City, Negros Occidental
CONTRACTOR : Dynamic Builders & Construction Co.,(Phil),Inc. DATE: May 08, 2016
We hereby certify that we have conducted an inspection and verification of work accomplished on the above mentioned project for the
period May 02 - 07, 2016 ; We further certify that we have found the quality of materials in the following items of work corresponding to
the quantity accomplished conforms with the STANDARD SPECIFICATIONS and Special provisions of the contract viz.
QUANTITY ACCOMPLISHED
%
ITEM NO. DESCRIPTION PROGRAMMED units TOTAL
THIS WEEK ACCOMPLISHMENT
TO DATE
A.1 Bunkhouse / Field Office for the Engineers 1.00 l.s - 1.00 100%
101(3)a Removal of Existing Concrete Pavement (0.23 m. tk.) 821.40 m² 69.88 69.88 9%
SPL-2 Provide and Maintain Traffic Control 1.00 l.s - 0.50 50%
PROJECT : Improvement/Widening of Silay-Lantawan Road Segment 1 - K0015+250-K0016+367 / Segment 2 - K0020+400 Silay City, Negros Occidental
CONTRACTOR : Dynamic Builders & Construction Co.,(Phil),Inc. DATE: May 16, 2016
We hereby certify that we have conducted an inspection and verification of work accomplished on the above mentioned project for the
period May 08 - 15, 2016 ; We further certify that we have found the quality of materials in the following items of work corresponding to
the quantity accomplished conforms with the STANDARD SPECIFICATIONS and Special provisions of the contract viz.
QUANTITY ACCOMPLISHED
%
ITEM NO. DESCRIPTION PROGRAMMED units
TOTAL ACCOMPLISHMENT
THIS WEEK
TO DATE
A.1 Bunkhouse / Field Office for the Engineers 1.00 l.s - 1.00 100%
SPL-2 Provide and Maintain Traffic Control 1.00 l.s - 0.50 50%
PROJECT : Improvement/Widening of Silay-Lantawan Road Segment 1 - K0015+250-K0016+367 / Segment 2 - K0020+400 Silay City, Negros Occidental
CONTRACTOR : Dynamic Builders & Construction Co.,(Phil),Inc. DATE: May 23, 2016
We hereby certify that we have conducted an inspection and verification of work accomplished on the above mentioned project for the
period May 16 - 22, 2016 ; We further certify that we have found the quality of materials in the following items of work corresponding to
the quantity accomplished conforms with the STANDARD SPECIFICATIONS and Special provisions of the contract viz.
QUANTITY ACCOMPLISHED
%
ITEM NO. DESCRIPTION PROGRAMMED units TOTAL
THIS WEEK ACCOMPLISHMENT
TO DATE
A.1 Bunkhouse / Field Office for the Engineers 1.00 l.s - 1.00 100%
311(1)b.3 PCC Pavement (Plain)-Using Conventional Method, 280mm thk. 17,095.02 m² 331.65 331.65 2%
SPL-2 Provide and Maintain Traffic Control 1.00 l.s - 0.50 50%
PROJECT : Improvement/Widening of Silay-Lantawan Road Segment 1 - K0015+250-K0016+367 / Segment 2 - K0020+400 Silay City, Negros Occidental
CONTRACTOR : Dynamic Builders & Construction Co.,(Phil),Inc. DATE: June 01, 2016
We hereby certify that we have conducted an inspection and verification of work accomplished on the above mentioned project for the
period May 23 - 31, 2016 ; We further certify that we have found the quality of materials in the following items of work corresponding to
the quantity accomplished conforms with the STANDARD SPECIFICATIONS and Special provisions of the contract viz.
QUANTITY ACCOMPLISHED
%
ITEM NO. DESCRIPTION PROGRAMMED units TOTAL
THIS WEEK ACCOMPLISHMENT
TO DATE
A.1 Bunkhouse / Field Office for the Engineers 1.00 l.s - 1.00 100%
311(1)b.3 PCC Pavement (Plain)-Using Conventional Method, 280mm thk. 17,095.02 m² 1030.12 1361.78 8%
SPL-2 Provide and Maintain Traffic Control 1.00 l.s - 0.50 50%
PROJECT : Improvement/Widening of Silay-Lantawan Road Segment 1 - K0015+250-K0016+367 / Segment 2 - K0020+400 Silay City, Negros Occidental
CONTRACTOR : Dynamic Builders & Construction Co.,(Phil),Inc. DATE: June 08, 2016
We hereby certify that we have conducted an inspection and verification of work accomplished on the above mentioned project for the
period June 01 - 07, 2016 ; We further certify that we have found the quality of materials in the following items of work corresponding to
the quantity accomplished conforms with the STANDARD SPECIFICATIONS and Special provisions of the contract viz.
QUANTITY ACCOMPLISHED
%
ITEM NO. DESCRIPTION PROGRAMMED units
TOTAL ACCOMPLISHMENT
THIS WEEK
TO DATE
A.1 Bunkhouse / Field Office for the Engineers 1.00 l.s - 1.00 100%
311(1)b.3 PCC Pavement (Plain)-Using Conventional Method, 280mm thk. 17,095.02 m² 381.90 1743.68 10%
SPL-2 Provide and Maintain Traffic Control 1.00 l.s - 0.50 50%
PROJECT : Improvement/Widening of Silay-Lantawan Road Segment 1 - K0015+250-K0016+367 / Segment 2 - K0020+400 Silay City, Negros Occidental
CONTRACTOR : Dynamic Builders & Construction Co.,(Phil),Inc. DATE: June 16, 2016
We hereby certify that we have conducted an inspection and verification of work accomplished on the above mentioned project for the
period June 08 - 15, 2016 ; We further certify that we have found the quality of materials in the following items of work corresponding to
the quantity accomplished conforms with the STANDARD SPECIFICATIONS and Special provisions of the contract viz.
QUANTITY ACCOMPLISHED
%
ITEM NO. DESCRIPTION PROGRAMMED units TOTAL
THIS WEEK ACCOMPLISHMENT
TO DATE
A.1 Bunkhouse / Field Office for the Engineers 1.00 l.s - 1.00 100%
311(1)b.3 PCC Pavement (Plain)-Using Conventional Method, 280mm thk. 17,095.02 m² 1060.28 2803.95 16%
SPL-2 Provide and Maintain Traffic Control 1.00 l.s - 0.50 50%
PROJECT : Improvement/Widening of Silay-Lantawan Road Segment 1 - K0015+250-K0016+367 / Segment 2 - K0020+400 Silay City, Negros Occidental
CONTRACTOR : Dynamic Builders & Construction Co.,(Phil),Inc. DATE: June 23, 2016
We hereby certify that we have conducted an inspection and verification of work accomplished on the above mentioned project for the
period June 16 - 22, 2016 ; We further certify that we have found the quality of materials in the following items of work corresponding to
the quantity accomplished conforms with the STANDARD SPECIFICATIONS and Special provisions of the contract viz.
QUANTITY ACCOMPLISHED
%
ITEM NO. DESCRIPTION PROGRAMMED units
ACCOMPLISHMENT
TOTAL
THIS WEEK
TO DATE
A.1 Bunkhouse / Field Office for the Engineers 1.00 l.s - 1.00 100%
311(1)b.3 PCC Pavement (Plain)-Using Conventional Method, 280mm thk. 17,095.02 m² 1060.28 3864.23 23%
SPL-2 Provide and Maintain Traffic Control 1.00 l.s - 0.50 50%
PROJECT : Improvement/Widening of Silay-Lantawan Road Segment 1 - K0015+250-K0016+367 / Segment 2 - K0020+400 Silay City, Negros Occidental
CONTRACTOR : Dynamic Builders & Construction Co.,(Phil),Inc. DATE: July 01, 2016
We hereby certify that we have conducted an inspection and verification of work accomplished on the above mentioned project for the
period June 23 - 30, 2016 ; We further certify that we have found the quality of materials in the following items of work corresponding to
the quantity accomplished conforms with the STANDARD SPECIFICATIONS and Special provisions of the contract viz.
QUANTITY ACCOMPLISHED
%
ITEM NO. DESCRIPTION PROGRAMMED units
ACCOMPLISHMENT
TOTAL
THIS WEEK
TO DATE
A.1 Bunkhouse / Field Office for the Engineers 1.00 l.s - 1.00 100%
311(1)b.3 PCC Pavement (Plain)-Using Conventional Method, 280mm thk. 17,095.02 m² 160.80 4025.03 24%
SPL-2 Provide and Maintain Traffic Control 1.00 l.s - 0.50 50%
PROJECT : Improvement/Widening of Silay-Lantawan Road Segment 1 - K0015+250-K0016+367 / Segment 2 - K0020+400 Silay City, Negros Occidental
CONTRACTOR : Dynamic Builders & Construction Co.,(Phil),Inc. DATE: July 08, 2016
We hereby certify that we have conducted an inspection and verification of work accomplished on the above mentioned project for the
period July 01 - 07, 2016 ; We further certify that we have found the quality of materials in the following items of work corresponding to
the quantity accomplished conforms with the STANDARD SPECIFICATIONS and Special provisions of the contract viz.
QUANTITY ACCOMPLISHED
%
ITEM NO. DESCRIPTION PROGRAMMED units
ACCOMPLISHMENT
TOTAL
THIS WEEK
TO DATE
A.1 Bunkhouse / Field Office for the Engineers 1.00 l.s - 1.00 100%
311(1)b.3 PCC Pavement (Plain)-Using Conventional Method, 280mm thk. 17,095.02 m² 613.05 4638.08 27%
SPL-2 Provide and Maintain Traffic Control 1.00 l.s - 0.50 50%
PROJECT : Improvement/Widening of Silay-Lantawan Road Segment 1 - K0015+250-K0016+367 / Segment 2 - K0020+400 Silay City, Negros Occidental
CONTRACTOR : Dynamic Builders & Construction Co.,(Phil),Inc. DATE: July 16, 2016
We hereby certify that we have conducted an inspection and verification of work accomplished on the above mentioned project for the
period July 08 - 15, 2016 ; We further certify that we have found the quality of materials in the following items of work corresponding to
the quantity accomplished conforms with the STANDARD SPECIFICATIONS and Special provisions of the contract viz.
QUANTITY ACCOMPLISHED
%
ITEM NO. DESCRIPTION PROGRAMMED units
ACCOMPLISHMENT
TOTAL
THIS WEEK
TO DATE
A.1 Bunkhouse / Field Office for the Engineers 1.00 l.s - 1.00 100%
311(1)b.3 PCC Pavement (Plain)-Using Conventional Method, 280mm thk. 17,095.02 m² 1095.45 5733.53 34%
SPL-2 Provide and Maintain Traffic Control 1.00 l.s - 0.50 50%
PROJECT : Improvement/Widening of Silay-Lantawan Road Segment 1 - K0015+250-K0016+367 / Segment 2 - K0020+400 Silay City, Negros Occidental
CONTRACTOR : Dynamic Builders & Construction Co.,(Phil),Inc. DATE: July 23, 2016
We hereby certify that we have conducted an inspection and verification of work accomplished on the above mentioned project for the
period July 16 - 22, 2016 ; We further certify that we have found the quality of materials in the following items of work corresponding to
the quantity accomplished conforms with the STANDARD SPECIFICATIONS and Special provisions of the contract viz.
QUANTITY ACCOMPLISHED
%
ITEM NO. DESCRIPTION PROGRAMMED units
ACCOMPLISHMENT
TOTAL
THIS WEEK
TO DATE
A.1 Bunkhouse / Field Office for the Engineers 1.00 l.s - 1.00 100%
311(1)b.3 PCC Pavement (Plain)-Using Conventional Method, 280mm thk. 17,095.02 m² - 5733.53 34%
SPL-2 Provide and Maintain Traffic Control 1.00 l.s - 0.50 50%
INSPECTION REPORT
Name of Project : Construction of Access Road for Himogaan Bridge Bacolod North Road, Sta. 71+035.20 - Sta. 74+557.20
Sagay City, Negros Occidental
QUANTITY
ITEM NO. DESCRIPTION REMARKS
Planned Actual
Spl. 2 Project Billboard 2.00 units 2.00 units The indicated item of works have been
accomplished in accordance with the
plans, specifications and program of
works.
Inspected by:
JOSUE B. CENA
Project Engineer-DPWH Neg. Occ. 1st Eng'g. Dist.
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
MATERIALS AND QUALITY CONTROL SECTION
Negros Occidental 1st District Engineering Office
Matab-ang, Talisay City, Negros Occidental
Contractor /
Administration : Alfies Construction
Date
Item No. Kind of Test No. of Tests Cost per Test Total Cost Cost of rental Remarks
Conducted
310 Abraison Test 1 1/17/2011 P 420.00 P 420.00
405 Abraison Test 1 1/17/2011 P 420.00 P 420.00
XXXX
TOTAL P 840.00
NOTED:
BILL NO. :
DATE :
AFG CONST. & CONST. SUPPLY
(Name of Contractor/Supplier)
BACOLOD CITY, NEG. OCC.
(Address)
XXXXXXXXXXXXXXXXXXXXX
ARNEL P. TORREFRANCA
ENGINEER III