Professional Documents
Culture Documents
Sample of PERT Chart
Sample of PERT Chart
Total =
St. Dev. =
IMMEDIATE T= =
PREDECSESSO
ACTIVITY DESCRIPTION TIME (DAYS) EST EFT LST LFT SLACK SLACK CRITICAL RS u= =
A Purchasing and Testing of Materials 14 0 14 0 14 0 0 YES Probability (Z) =
B Creating and Approval Permit 21 0 21 7 28 7 7 NO Z = 1.55 =
C Fabrication of the Blade 7 14 21 14 21 0 0 YES A 93.94% Probability of Completion
D Construction of the Base 7 14 21 14 21 0 0 YES A
E Assembly of Blade and Base with Generator 7 21 28 21 28 0 0 YES C, D
Wiring of the Charge Controller, Battery & Switch
F 7 21 28 21 28 0 0 YES D
in Metal Enclosure
G Installation of the Streetlight with Pole 7 21 28 28 35 7 7 NO A, B
L Evaluation 14 56 70 56 70 0 0 YES K
M Chapter 4 Composition 14 56 70 70 84 14 14 NO K
N Chapter 5 Composition 14 70 84 70 84 0 0 YES L
O Meeting with Adviser/s 3 84 87 84 87 0 0 YES M, N
P Finalization of product 14 87 101 87 101 0 0 YES O
Q Final Defense 9 101 110 101 110 0 0 YES M, N, P
R Final revision 21 110 131 110 131 0 0 YES Q
Minimum Project Length 131 DAYS
*UPDATED
COMPLEX(1,2I)
M Evaluation H, L 7 14 21 14 M 7 14 21 14 2.333333333
Total = 39.7778
IMMEDIATE St. Dev. = 6.3070
PREDECSESSO
ACTIVITY DESCRIPTION TIME (DAYS) EST EFT LST LFT SLACK SLACK CRITICAL RS T= = 126
A Purchasing and Testing of Materials 21 0 21 0 21 0 0 YES u= = 119
B Creating and Approval Permit 35 0 35 0 35 0 0 YES Probability ( = 1.1099
C Fabrication of the Blade 14 21 35 21 35 0 0 YES A Z = 1.11 = 0.8665
D Construction of the Base 14 21 35 21 35 0 0 YES A 86.65% Probability of Completion
Assembly of Blade and Base with Generator.
E 7 35 42 35 42 0 0 YES B, C, D
Submit permit to Baranggay Hall
33.8889
5.8214
140
131 WEEKS
ACTIVITY DESCRIPTION
1.5460 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
0.9394 A Purchasing and Testing of Materials
.94% Probability of Completion B Creating and Approval Permit
C Fabrication of the Blade
D Construction of the Base
E Assembly of Blade and Base with Generator
Wiring of the Charge Controller, Battery & Switch in
F Metal Enclosure
L Evaluation
M Chapter 4 Composition
N Chapter 5 Composition
O Meeting with Adviser/s
P Finalization of product
Q Final Defense
R Final revision
1
R Final Defense
S Final revision
WEEK 6 WEEK 7 WEEK 8 WEEK 9 WEEK 10 WEEK 11 WEEK 12 WEEK 13 WEEK 14 WEEK 15 WEEK 16
S S M T W TH F S S M T W TH F S S M T W TH F S S M T W TH F S S M T W TH F S S M T W TH F S S M T W TH F S S M T W TH F S S M T W TH F S S M T W TH
WEEK 6 WEEK 7 WEEK 8 WEEK 9 WEEK 10 WEEK 11 WEEK 12 WEEK 13 WEEK 14 WEEK 15 WEEK 16
S S M T W TH F S S M T W TH F S S M T W TH F S S M T W TH F S S M T W TH F S S M T W TH F S S M T W TH F S S M T W TH F S S M T W TH F S S M T W TH
WEEK 16 WEEK 17 WEEK 18 WEEK 19 WEEK 20
F S S M T W TH F S S M T W TH F S S M T W TH F S S M T W TH F S S
F S S M T W TH F S S M T W TH F S S M T W TH F S S M T W TH F S S