IMMEDIATE TIME (DAYS) TIME (DAYS) STD. DEV.

ACTIVITY DESCRIPTION PREDECSESSORS ACTIVITY


O L P EAT A M B EAT (B-A)/6
A Purchasing and Testing of Materials 7 14 21 14 A 7 14 21 14 2.333333333
B Creating and Approval Permit 14 21 28 21 B 14 21 28 21 2.333333333
C Fabrication of the Blade A 6 7 8 7 C 6 7 8 7 0.333333333
D Construction of the Base A 6 7 8 7 D 6 7 8 7 0.333333333
E Assembly of Blade and Base with Generator C, D 6 7 8 7 E 6 7 8 7 0.333333333
Wiring of the Charge Controller, Battery & Switch
F D 6 7 8 7 F 6 7 8 7
in Metal Enclosure 0.333333333
G Installation of the Streetlight with Pole A, B 6 7 8 7 G 6 7 8 7 0.333333333
H Installation of the Wind Turbine, Base and Metal E, F 6 7 8 7 H 6 7 8 7
Enclosure 0.333333333
I Connecting LED Streetlight and Photosensor G, H 6 7 8 7 I 6 7 8 7 0.333333333
J Connecting Wind Turbine to Charge Controller H 2 3 4 3 J 2 3 4 3 0.333333333
K Testing and Gathering Data I, J 7 14 21 14 K 7 14 21 14 2.333333333
L Evaluation K 7 14 21 14 L 7 14 21 14 2.333333333
M Chapter 4 Composition K 7 14 21 14 M 7 14 21 14 2.333333333
N Chapter 5 Composition L 7 14 21 14 N 7 14 21 14 2.333333333
O Meeting with Adviser/s M, N 2 3 4 3 O 2 3 4 3 0.333333333
P Finalization of product O 7 14 21 14 P 7 14 21 14 2.333333333
Q Final Defense M, N, P 7 9 11 9 Q 7 9 11 9 0.666666667
R Final revision Q 14 21 28 21 R 14 21 28 21 2.333333333

Total =
St. Dev. =
IMMEDIATE T= =
PREDECSESSO
ACTIVITY DESCRIPTION TIME (DAYS) EST EFT LST LFT SLACK SLACK CRITICAL RS u= =
A Purchasing and Testing of Materials 14 0 14 0 14 0 0 YES Probability (Z) =
B Creating and Approval Permit 21 0 21 7 28 7 7 NO Z = 1.55 =
C Fabrication of the Blade 7 14 21 14 21 0 0 YES A 93.94% Probability of Completion
D Construction of the Base 7 14 21 14 21 0 0 YES A
E Assembly of Blade and Base with Generator 7 21 28 21 28 0 0 YES C, D
Wiring of the Charge Controller, Battery & Switch
F 7 21 28 21 28 0 0 YES D
in Metal Enclosure
G Installation of the Streetlight with Pole 7 21 28 28 35 7 7 NO A, B

Installation of the Wind Turbine, Base and Metal


H 7 28 35 28 35 0 0 YES E, F
Enclosure

I Connecting LED Streetlight and Photosensor 7 35 42 35 42 0 0 YES G, H


J Connecting Wind Turbine to Charge Controller 3 35 38 39 42 4 4 NO H
K Testing and Gathering Data 14 42 56 42 56 0 0 YES I, J

L Evaluation 14 56 70 56 70 0 0 YES K

M Chapter 4 Composition 14 56 70 70 84 14 14 NO K
N Chapter 5 Composition 14 70 84 70 84 0 0 YES L
O Meeting with Adviser/s 3 84 87 84 87 0 0 YES M, N
P Finalization of product 14 87 101 87 101 0 0 YES O
Q Final Defense 9 101 110 101 110 0 0 YES M, N, P
R Final revision 21 110 131 110 131 0 0 YES Q
Minimum Project Length 131 DAYS

*UPDATED

COMPLEX(1,2I)

IMMEDIATE TIME (DAYS) TIME (DAYS) STD. DEV.


ACTIVITY DESCRIPTION PREDECSESSORS ACTIVITY (B-A)/6
O L P EAT A M B EAT
A Purchasing and Testing of Materials 14 21 28 21 A 14 21 28 21 2.333333333
B Creating and Approval Permit 28 35 42 35 B 28 35 42 35 2.333333333
C Fabrication of the Blade A 7 14 21 14 C 7 14 21 14 2.333333333
D Construction of the Base A 7 14 21 14 D 7 14 21 14 2.333333333
Assembly of Blade and Base with Generator.
E Submit permit to Baranggay Hall B, C, D 6 7 8 7 E 6 7 8 7 0.333333333

F Wiring of the Charge Controller, Battery, Buck C, D 6 7 8 7 F 6 7 8 7 0.333333333


Converter & Switch in Metal Enclosure
G Testing and Trouble Shooting E, F 6 7 8 7 G 6 7 8 7 0.333333333
H Installation of the Streetlight E, G 6 7 8 7 H 6 7 8 7 0.333333333
Installation of the Wind Turbine, Base and Metal
I Enclosure F, G 2 3 4 3 I 2 3 4 3 0.333333333
J Connecting LED Streetlight and Photosensor G 2 3 4 3 J 2 3 4 3 0.333333333
K Connecting Wind Turbine to Charge Controller G 2 3 4 3 K 2 3 4 3 0.333333333

L Testing and Gathering Data I, J, K 7 11 15 11 L 7 11 15 11 1.333333333

M Evaluation H, L 7 14 21 14 M 7 14 21 14 2.333333333

N Chapter 4 Composition L 7 14 21 14 N 7 14 21 14 2.333333333

O Chapter 5 Composition M 7 9 11 9 O 7 9 11 9 0.666666667


P Meeting with Adviser/s N, O 1 2 3 2 P 1 2 3 2 0.333333333
Q Finalization of product P 2 3 4 3 Q 2 3 4 3 0.333333333
R Final Defense N, O, Q 1 7 13 7 R 1 7 13 7 2

S Final revision R 14 21 28 21 S 14 21 28 21 2.333333333

Total = 39.7778
IMMEDIATE St. Dev. = 6.3070
PREDECSESSO
ACTIVITY DESCRIPTION TIME (DAYS) EST EFT LST LFT SLACK SLACK CRITICAL RS T= = 126
A Purchasing and Testing of Materials 21 0 21 0 21 0 0 YES u= = 119
B Creating and Approval Permit 35 0 35 0 35 0 0 YES Probability ( = 1.1099
C Fabrication of the Blade 14 21 35 21 35 0 0 YES A Z = 1.11 = 0.8665
D Construction of the Base 14 21 35 21 35 0 0 YES A 86.65% Probability of Completion
Assembly of Blade and Base with Generator.
E 7 35 42 35 42 0 0 YES B, C, D
Submit permit to Baranggay Hall

F Wiring of the Charge Controller, Battery, Buck 7 35 42 35 42 0 0 YES C, D


Converter & Switch in Metal Enclosure
G Testing and Trouble Shooting 7 42 49 42 49 0 0 YES E, F
H Installation of the Streetlight 7 49 56 56 63 7 7 NO E, G
Installation of the Wind Turbine, Base and Metal
I 3 49 52 49 52 0 0 YES F, G
Enclosure
J Connecting LED Streetlight and Photosensor 3 49 52 49 52 0 0 YES G
K Connecting Wind Turbine to Charge Controller 3 49 52 49 52 0 0 YES G
L Testing and Gathering Data 11 52 63 52 63 0 0 YES I, J, K
M Evaluation 14 63 77 63 77 0 0 YES H, L
N Chapter 4 Composition 14 63 77 72 86 9 9 NO L
O Chapter 5 Composition 9 77 86 77 86 0 0 YES M
P Meeting with Adviser/s 2 86 88 86 88 0 0 YES N, O
Q Finalization of product 3 88 91 88 91 0 0 YES P
R Final Defense 7 91 98 91 98 0 0 YES N, O, Q
S Final revision 21 98 119 98 119 0 0 YES R
Minimum Project Length 119 DAYS
VARIANCE ((B- WEEK 1 WEEK 2 WEEK 3 WEEK 4 WEEK 5 WEEK 6
ACTIVITY DESCRIPTION
A)/6))^2 M T W TH F S S M T W TH F S S M T W TH F S S M T W TH F S S M T W TH F S S M T W TH F
5.44444444444 A Purchasing and Testing of Materials
5.44444444444 B Creating and Approval Permit
0.11111111111 C Fabrication of the Blade
0.11111111111 D Construction of the Base
0.11111111111 E Assembly of Blade and Base with Generator
Wiring of the Charge Controller, Battery & Switch in
F
0.11111111111 Metal Enclosure
0.11111111111 G Installation of the Streetlight with Pole
H Installation of the Wind Turbine, Base and Metal
0.11111111111 Enclosure
0.11111111111 I Connecting LED Streetlight and Photosensor
0.11111111111 J Connecting Wind Turbine to Charge Controller
5.44444444444 K Testing and Gathering Data
5.44444444444 L Evaluation
5.44444444444 M Chapter 4 Composition
5.44444444444 N Chapter 5 Composition
0.11111111111 O Meeting with Adviser/s
5.44444444444 P Finalization of product
0.44444444444 Q Final Defense
5.44444444444 R Final revision

33.8889
5.8214
140
131 WEEKS
ACTIVITY DESCRIPTION
1.5460 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
0.9394 A Purchasing and Testing of Materials
.94% Probability of Completion B Creating and Approval Permit
C Fabrication of the Blade
D Construction of the Base
E Assembly of Blade and Base with Generator
Wiring of the Charge Controller, Battery & Switch in
F Metal Enclosure

G Installation of the Streetlight with Pole

H Installation of the Wind Turbine, Base and Metal


Enclosure
I Connecting LED Streetlight and Photosensor
J Connecting Wind Turbine to Charge Controller

K Testing and Gathering Data

L Evaluation
M Chapter 4 Composition
N Chapter 5 Composition
O Meeting with Adviser/s
P Finalization of product
Q Final Defense
R Final revision
1

SEPTEMBER OCTOBER NOVEMBER DECEMBER JANUARY


ACTIVITY DESCRIPTION
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A Purchasing and Testing of Materials
B Creating and Approval Permit
C Fabrication of the Blade
D Construction of the Base
Assembly of Blade and Base with Generator. Submit
E permit to Baranggay Hall
Wiring of the Charge Controller, Battery, Buck
F
Converter & Switch in Metal Enclosure
G Testing and Trouble Shooting
H Installation of the Streetlight

Installation of the Wind Turbine, Base and Metal


I
Enclosure
J Connecting LED Streetlight and Photosensor
VARIANCE ((B- K Connecting Wind Turbine to Charge Controller
A)/6))^2 L Testing and Gathering Data UT
5.44444444444 M Evaluation
5.44444444444 N Chapter 4 Composition
5.44444444444 O Chapter 5 Composition
5.44444444444 P Meeting with Adviser/s
0.11111111111 Q Finalization of product

0.11111111111 R Final Defense DF BREAK

0.11111111111 S Final revision FT


0.11111111111 1 2 3 4 5 6 7 8 9 10 11 12
0.11111111111
0.11111111111
0.11111111111

1.77777777778 WEEK 1 WEEK 2 WEEK 3 WEEK 4 WEEK 5 WEEK 6


ACTIVITY DESCRIPTION
5.44444444444
M T W TH F S S M T W TH F S S M T W TH F S S M T W TH F S S M T W TH F S S M T W TH F

5.44444444444 A Purchasing and Testing of Materials

0.44444444444 B Creating and Approval Permit


0.11111111111 C Fabrication of the Blade
0.11111111111 D Construction of the Base
Assembly of Blade and Base with Generator. Submit
4 E
permit to Baranggay Hall

5.44444444444 F Wiring of the Charge Controller, Battery, Buck


Converter & Switch in Metal Enclosure
G Testing and Trouble Shooting
H Installation of the Streetlight
I Installation of the Wind Turbine, Base and Metal
Enclosure
J Connecting LED Streetlight and Photosensor
K Connecting Wind Turbine to Charge Controller
L Testing and Gathering Data
M Evaluation
N Chapter 4 Composition
O Chapter 5 Composition
P Meeting with Adviser/s
Q Finalization of product

R Final Defense
S Final revision
WEEK 6 WEEK 7 WEEK 8 WEEK 9 WEEK 10 WEEK 11 WEEK 12 WEEK 13 WEEK 14 WEEK 15 WEEK 16
S S M T W TH F S S M T W TH F S S M T W TH F S S M T W TH F S S M T W TH F S S M T W TH F S S M T W TH F S S M T W TH F S S M T W TH F S S M T W TH

WEEK 6 WEEK 7 WEEK 8 WEEK 9 WEEK 10 WEEK 11 WEEK 12 WEEK 13 WEEK 14 WEEK 15 WEEK 16

S S M T W TH F S S M T W TH F S S M T W TH F S S M T W TH F S S M T W TH F S S M T W TH F S S M T W TH F S S M T W TH F S S M T W TH F S S M T W TH
WEEK 16 WEEK 17 WEEK 18 WEEK 19 WEEK 20
F S S M T W TH F S S M T W TH F S S M T W TH F S S M T W TH F S S

WEEK 16 WEEK 17 WEEK 18 WEEK 19 WEEK 20

F S S M T W TH F S S M T W TH F S S M T W TH F S S M T W TH F S S