Professional Documents
Culture Documents
Form Design 4 Mach - 5019201190 - Reza Aji Nur Pratama
Form Design 4 Mach - 5019201190 - Reza Aji Nur Pratama
INTEGRITY PACT
Rev. 01 Oct/2020
STUDENT DATA:
No. of attempt 1st/2nd/3rd/4th *
Name of Student Reza Aji Nur Pratama NRP of Student 5019201190
Semester Odd / Even* Academic Year 2021/2022
Name of Supervisor Prof. Dr. Ketut Buda Name of Supervisor Dr. Indra Ranu
(machinery) Artana, S.T., M.Sc. (electrical) Kusuma, S.T., M.Sc.
VESSEL’S DATA: (referring to General Arrangement data)
Name of the Vessel MV. ADRIANI Vessel Type Bulk Carrier
Cargo Type Bitumen Cargo Capacity 16500 Ton / kL / TEUs *)
Class Notation ✠ A1 Bulk Carrier (ref to Class Rules Vol 1)
Sailing Area A3 (ref to SOLAS Chapter IV)
Endurance (days) 7 Service Speed (knot) 12.5
LPP (m) 130.44 Lwl (m) 135.56 LoA (m) 139.424
Cb 0.78
B (m) 22.08 H (m) 11.42 T (m) 8.83
Main Engine Spec MAK 8M 32E-8 Cylinder 4400 Kw 750 RPM
Class ABS / BKI / BV / DNV-GL / LR / NK (circle as appropriate)
Flag State Indonesia
NOTES:
1 All documents are to be submitted in English
2 3-D Drawing for system :
Bilge System / OWS System / Ballast System / Fire Fighting System/ Fuel Oil System/
Engine Lubricating System / Engine Cooling System /Compressed Air System/ Engine
Room Ventilation System *
*(circle as appropriate – subject to Supervisor’s approval)
Student,
(Prof. Dr. Ketut Buda Artana, S.T., M.Sc.) (Dr. Indra Ranu Kusuma, S.T., M.Sc.) (Dr. Nurhadi Siswantoro)
NIP. 197109151994121001 NIP. 197903272003121001 NIP. 1992201711049
DESIGN-IV: MACHINERY AND ELECTRICAL SYSTEM
FORM 03B
FORM OF COMPLETION
(ELECTRICAL SYSTEM) Rev. 01 Oct/2020
SUPER- COORDI-
NO NO. DOCUMENT / DRAWING DOCUMENT / DRAWING √ VISOR NATOR
1 Doc.No. 01 - 50 21 IR190 - EL Calculation and Specification of Lightings and Electric Terminals
2 Doc.No. 02 - 50 21 IR190 - EL Specification of Communication and Navigation Equipments
3 Doc.No. 03 - 50 21 IR190 - EL Specification of Emergency Source of Electricity Power (ESEP)
PROGRESS I : WEEK 5
4 Doc.No. 04 - 50 21 IR190 - EL Calculation and Specification of Generator & Shore Connection
5 Dwg.No. 01 - 50 21 IR190 - EL Wiring Diagram: Lighting Panels
6 Dwg.No. 02 - 50 21 IR190 - EL Wiring Diagram: Power Panels
PROGRESS II : WEEK 10 + MIDTERM EXAM
7 Dwg.No. 03 - 50 21 IR190 - EL Wiring Diagram: ESEP Panels
8 Dwg.No. 04 - 50 21 IR190 - EL Wiring Diagram: Main Switch Board
9 Dwg.No. 05 - 50 21 IR190 - EL One-Line Diagram
PROGRESS III : WEEK 16 + FINAL EXAM
VV = year of taking; YY = supervisor initials (electrical); ZZZ = last 3 digits of NRP
Student,
SUPER- COORDI-
NO NO. DOCUMENT / DRAWING DOCUMENT / DRAWING √ VISOR NATOR
1 Doc.No. 01 - 50 21 KB190 - LE List codes of Equipment
2 Doc.No. 02 - 50 21 KB190 - BG Calculation and Specification of Bilge System
3 Doc.No. 03 - 50 21 KB190 - OW Calculation and Specification of Oily-Water Bilge System
4 Dwg.No. 01 - 50 21 KB190 - BG Keyplan of Bilge System + Oily-Water Bilge System
PROGRESS I : WEEK 5
5 Doc.No. 04 - 50 21 KB190 - BL Calculation and Specification of Ballast System
6 Dwg.No. 02 - 50 21 KB190 - BL Keyplan of Ballast System
7 Doc.No. 05 - 50 21 KB190 - FI Calculation and Specification of Fire Main System
8 Dwg.No. 03 - 50 21 KB190 - FI Keyplan and Arrangement of Fire-main System
9 Doc.No. 06 - 50 21 KB190 - FO Calculation and Specification of Fuel Oil System
10 Dwg.No. 04 - 50 21 KB190 - FO Keyplan of Fuel Oil System
11 Doc.No. 07 - 50 21 KB190 - LO Calculation and Specification of Engine Lubricating Oil System
12 Dwg.No. 05 - 50 21 KB190 - LO Keyplan of Engine Lubricating Oil System
13 Doc.No. 08 - 50 21 KB190- CO Calculation and Specification of Engine Cooling System
14 Dwg.No. 06 - 50 21 KB190 - CO Keyplan of Engine Cooling System
PROGRESS II : WEEK 10 + MIDTERM EXAM
15 Doc.No. 09 - 50 21 KB190 - CA Calculation and Specification of Compressed Air System
16 Dwg.No. 7 - 50 21 KB190 - CA Keyplan of Compressed Air System
17 Doc.No. 10 - 50 21 KB190 - DS Calculation and Specification of Domestic System
18 Dwg.No. 8 - 50 21 KB190 - DS Keyplan of Domestic System (FW & SW Supply + Discharge System)
19 Dwg.No. 9 - 50 21 KB190 - ER Engine Room Arrangement (Tank-Top Plan)
20 Dwg.No. 10 - 50 21 KB190 - ER Engine Room Arrangement (Platform Plan).
21 Doc.No. 11 - 50 21 KB190 - VA Calculation and Specification of Engine Room Air Ventilation System
22 Dwg.No. 11 - 50 21 KB190 - VA Engine Room Air Ventilation System
3D Drawing of Bilge / OWS / Ballast / Fire / FO / LO / Cooling Syst /
23 Dwg.No. 12 - 50 21 KB190 - 3D
Compressed Air / Domestic Syst / Compiled Systems *)
PROGRESS III : WEEK 16 + FINAL EXAM
VV = year of taking; WW = supervisor initials (machinery); XXX = last 3 digits of NRP *) 3D Drawing: according to personal assigment decided by the Supervisor
Student,
(Prof. Dr. Ketut Buda Artana, S.T., M.Sc.) (Dr. Nurhadi Siswantoro)
NIP. 197109151994121001 NIP. 1992201711049