Ms For Scaffolding Activities Night Shift
Ms For Scaffolding Activities Night Shift
Ms For Scaffolding Activities Night Shift
Al-Hajri Corporation
Kingdom of Saudi Arabia
TRGC SATORP
CONSTRUC
HSE CONSTRUCTION HSE
TION
NAME
SIGN
DATE
METHOD STATEMENT
FOR SCAFFOLDING ACTIVITIES
TIME EXTENDING UP TO 10:00
PM
Doc. No: JERP-TR-NSH-MS-G-003; Rev.:01, Date : 4/05/2011
CONTENTS
1. INTRODUCTION
2. SCOPE
3. TRAINING
4. REFERENCES
5. ABBREVIATIONS
6. RESPONSIBILITIES
7. WORK PROCEDURES
• PREPARATION PLAN
• EXECUTION
• LIGHTING / ILLUMINATION
1. SAFETY
2. ATTACHMENT
2|Page
JUBAIL EXPORT REFINERY
PROJECT
PACKAGES 1A
METHOD STATEMENT
FOR SCAFFOLDING ACTIVITIES
TIME EXTENDING UP TO 10:00
PM
Doc. No: JERP-TR-NSH-MS-G-003; Rev.:01, Date : 4/05/2011
INTRODUCTION:
SCOPE:
signs.
3|Page
JUBAIL EXPORT REFINERY
PROJECT
PACKAGES 1A
METHOD STATEMENT
FOR SCAFFOLDING ACTIVITIES
TIME EXTENDING UP TO 10:00
PM
Doc. No: JERP-TR-NSH-MS-G-003; Rev.:01, Date : 4/05/2011
TRAININGS:
Department.
REFERENCES
night shift.
4|Page
JUBAIL EXPORT REFINERY
PROJECT
PACKAGES 1A
METHOD STATEMENT
FOR SCAFFOLDING ACTIVITIES
TIME EXTENDING UP TO 10:00
PM
Doc. No: JERP-TR-NSH-MS-G-003; Rev.:01, Date : 4/05/2011
ABBREVIATIONS
SATORP – Saudi Aramco Total Oil Refinery and Petrochemical
Company
JERP – Jubail Export Refinery Project
JERMS – Jubail Export Refinery Materials Specifications
JERES – Jubail Export Refinery Engineering Specifications
MS – Method Statement
ITP – Inspection and Test Plan
RESPONSIBILITIES:
5|Page
JUBAIL EXPORT REFINERY
PROJECT
PACKAGES 1A
METHOD STATEMENT
FOR SCAFFOLDING ACTIVITIES
TIME EXTENDING UP TO 10:00
PM
Doc. No: JERP-TR-NSH-MS-G-003; Rev.:01, Date : 4/05/2011
WORK PROCEDURES:
6|Page
JUBAIL EXPORT REFINERY
PROJECT
PACKAGES 1A
METHOD STATEMENT
FOR SCAFFOLDING ACTIVITIES
TIME EXTENDING UP TO 10:00
PM
Doc. No: JERP-TR-NSH-MS-G-003; Rev.:01, Date : 4/05/2011
Execution Plan
7|Page
JUBAIL EXPORT REFINERY
PROJECT
PACKAGES 1A
METHOD STATEMENT
FOR SCAFFOLDING ACTIVITIES
TIME EXTENDING UP TO 10:00
PM
Doc. No: JERP-TR-NSH-MS-G-003; Rev.:01, Date : 4/05/2011
12.Handrails such as Top rail, mid rail and toe board shall be
provided at every platform.
8|Page
JUBAIL EXPORT REFINERY
PROJECT
PACKAGES 1A
METHOD STATEMENT
FOR SCAFFOLDING ACTIVITIES
TIME EXTENDING UP TO 10:00
PM
Doc. No: JERP-TR-NSH-MS-G-003; Rev.:01, Date : 4/05/2011
sign the Scaffold TAG and placed in all entry points visually see
by all. Placing of Scaffold TAG shall be in accordance to
TR/SATORP Safety requirement using check coupler and
scaffold tubes.
9|Page
JUBAIL EXPORT REFINERY
PROJECT
PACKAGES 1A
METHOD STATEMENT
FOR SCAFFOLDING ACTIVITIES
TIME EXTENDING UP TO 10:00
PM
Doc. No: JERP-TR-NSH-MS-G-003; Rev.:01, Date : 4/05/2011
SAFETY PLAN
23. NSH designated Safety Officer shall be full time at site during
night work and shall ensure that all personnel working at night
are in safe conditioned.
24.Safety Officer shall check all point in checklist prior to sign off
the safety Working Permit.
ATTACHMENT
10 | P a g e