Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 6

MUHAMMAD NAEEM

Mobile No. 0092-306-5853371


0092-342-5943955
Email ID naem1872003@gmail.com
naem1872003@hotmail.com
naem1872003@yahoo.co.in
Objectives
 Seeking for a challenging post where excellent working condition
conducted to character building and development of managerial skills
are provided.

 Working in the best figure of organizations and hope for good career.

Personals
Name : Muhammad Naeem
Father’s Name : Muhammad Hashim
Mother’s Name : Baigum Bi
Date of Birth : 01-01-1964
NIC No. : 37302-1188297-3
Passport No. : BW9952971
Language : English, Arabic, Urdu, Punjabi
Religion : Islam
Nationality : Pakistani

Permanent Address : House No. J-104 New Modern Colony, Khewra,


Tehsil Pind Dadan Khan, Distt. Jhelum, Pakistan.

Qualification
 Matric (Science) B.I.S.E Rawalpindi

Technical Qualification
 Electrical Certificate (6 Months) Govt. of Punjab Training Institute,
Choa Saiden Shah
1983
 DAE (Electrical) Institute of Quaid-e-Azam
1999

Page 1 of 6
WORK EXPERIENCE
Worked with M/s Nazar & Co. (Coal Mine Owner)

Project Coal Project


Position Electrician
Experience Generator Operator, Electrical Line
Maintenance
Single & 3 Phase Wiring.
Period 1st March 1984 to 15th Dec. 1984

Worked with M/s Mushid Builders (Pvt.) Ltd

Project Housing Project


Position Electrician
Experience Step Down Transformer Connection

Cable Control. 120mm, 70mm, 25mm,


70mm

Single & 3 Phase Wiring.

Period 1st March, 1985 to 3rd Feb, 1991

Worked with M/s DAEWOO Corporation Republic of Korea

Project Lahore – Islamabad Motorway


Project
Position Plant Technician
Experience Batching Plant, Tower Cranes & Flood
Light

Maintenance and Control Wiring

Period 1st June, 1992 to 2nd Feb, 1995

Page 2 of 6
Worked with M/s DG Cement Factory Daira Ghazi Khan

Project Plant Expansion Project


Position Electrician
Experience Lime Stone Crasher, Control Wiring & Star
Delta

Panel, Reverse Forward Panel & Cable


Termination

Period 31st April 1995 to 10th October 1998

Worked with Saadhullah Khan & Brothers (SKB)

Project Metropolitan Water Supply


Project (Khanpur)
Position Power Electrician
Experience Star Delta Panel, Reverse Forward Panel &
Cable

Termination, 3 Phase Motor Control.

Period 04th October 1998 to 24th August


1999

Worked with M/s Petracon (Pvt) Ltd

Page 3 of 6
Project Jinnah Navel Base Ormara
(Blouchistan)
Position Electrical Technician
Experience Batching Plant, Over Head Cranes, Control
Wiring,

Flood Lights, Motorize Valves.

Period 20th June 2000 to December 2001

Worked with Libyan iron Steel Company (Libya)

Project Plant Expansion Project


Position Electrical Technician
Experience Overhead Cranes, Step Down
Transformer, Star

Delta Panel, Single & Three Phase Wiring.

Period 01st February 2003 to 02nd June


2004

Worked with M/s Pakistan Associates Construction Lahore

Project Housing Under Hydro Power &


Under Pass
Position Electrical Supervisor
Experience Batching Plant, Tower Cranes, lighting

maintenance, Single & Three phase Motor


Control

Period 04th September 2004 to 25th February


2007

Working with M/s Al Nahr Co Ltd (Libya)

Project Grate Man River Project


Page 4 of 6
Position Electrical Supervisor

Experience Generator P.L.C. S 7 400 P.L.C

Motorize Valves Fire Alarm, Panel


Operating

11
kv

Pump Station LV. HT Control Panel

Period 25th August 2007 to 04th March 2011

Page 5 of 6
Page 6 of 6

You might also like