DATE: 26/ 02 / 2020

JOB SAFETY ANALYSIS


JSA No. REV -0
PROJECT: COMPANY NAME: Sahari Tank
ADDRESS:
LOCATION: Sahari Workshop, Office yard
PHONE:
JOB DESCRIPTION: Loading, Offloading and Shifting of material, Tools and Tackles .Machine

No. Name Signature Position Date No. Name Signature Position Date
1 Khawer Abbas HSE Lead 6
2 7
3 8
4 9
5 10
APPROVAL BY:
Name: Signature: Position Date
Name: Signature: Position HSE Lead Date
REVIEW BY:
Name: Signature: Position Date
Name: Signature: Position Date

JOB STEP DESCRIPTION


POTENTIAL HAZARD
STEP Risk HAZARD CONTROL METHOD Risk RESPONSIBL
List the potential hazards that could
List the steps required to Rank List the control measures required to eliminate or minimise the risk of Rank E
NO. cause injury/damage when the task PERSON
perform the task in the BEFORE injury AFTER
step is performed
sequence they are carried
out
Work setup  Ensure all personnel are briefed on, and utilize Low FIELD
Medium SUPERVISOR
1. appropriate manual lifting techniques; FOREMAN
a) Barricading the
working area WORK
FORCE
b) Unauthorised  Good housekeeping
personnel not allowed a) Manual Handling
inside the work.  Used all proper PPE
b) Slip, Trip, fall.
c) Gathering the tools
JOB STEP DESCRIPTION
POTENTIAL HAZARD
STEP Risk HAZARD CONTROL METHOD Risk RESPONSIBL
List the potential hazards that could
List the steps required to Rank List the control measures required to eliminate or minimise the risk of Rank E
NO. cause injury/damage when the task PERSON
perform the task in the BEFORE injury AFTER
step is performed
sequence they are carried
out

 Utilize appropriate PPE ‘s


2. Setting up crane for
lifting load and attached a) Slip, trip and fall  Maintain good housekeeping in and around work area.
slings. potential.
b) Noise potential.  Personnel don’t put body parts in the line of fire
 Ensure the crane operator and rigger are qualified and
c) Pinch-point potential. FIELD
authorized to complete assigned tasks. SUPERVISOR
Medium Low FOREMAN
d) Tilt of the crane. WORK
 Ensure the crane is placed in a level and compacted area. FORCE
 Crane outrigger must be fully extended.
e) Mechanical break down  Used inspected and good condition equipments.
Hydraulic leak  Spilt kit shall be used in the case of leak.
Transporting of a) Slip, trip and fall, cuts and
material:  Good housekeeping must be done
3. body injuries.  Keep area clean and tidy.
 Area must be barricaded
b) pinch points  All PPE’S must be used FIELD
High Low SUPERVISOR
 Personnel don’t put body parts between the lines of fire. FOREMAN
WORK
c) Falling of load  Certified and competent operator must be involved. FORCE
 Properly secure the load before travel the truck.
d) Failure of lifting gears.
 All lifting gear must be tested and it has valid certificates.

e) Hydraulic leak.  Spilt kit must be used.


 Prepare check list prior to start equipments.
 Use good conditioned and inspected equipments.
JOB STEP DESCRIPTION
POTENTIAL HAZARD
STEP Risk HAZARD CONTROL METHOD Risk RESPONSIBL
List the potential hazards that could
List the steps required to Rank List the control measures required to eliminate or minimise the risk of Rank E
NO. cause injury/damage when the task PERSON
perform the task in the BEFORE injury AFTER
step is performed
sequence they are carried
out
4. LOADING AND OFF
LOADING OF a) Fall of material.  All Load more than 9 ton required separate lifting plan has to
MATERIAL. be approved and sing by RIGGING ENGINEER.
 Do not lift loads exceeding the manufacturer weight capacity
 Working area must be barricading.
 All lifting gear must be tested and it has valid
certificates.
F
Supervisor
b) Fall of tools, tackles and High Work force
Low
personnel.
 All tolls and tackles must use with lanyard.
 Use bag for tools while lifting and lowering.
 Ensure using of the scaffolding is it safe.
 Wear full body harness and make sure 100% tie off.
 Remove any loose material on the scaffolding platform.
 Ensure all loose material is removed from the load

c) Failure of tools, and


equipments.  All lifting gear must be tested and it has valid
certificates.

d) Pinch points.
 Personnel don’t keep body parts in the line of fire.
 Use proper tag lines during lifting the load to prevent
crushing with plant objects.

e) Manual handling
 Utilised manual handling technique.
 Not to lift more than 22.5 kg of weight.
 Before lifting of any material by two persons shall be good
communication between each others.
JOB STEP DESCRIPTION
POTENTIAL HAZARD
STEP Risk HAZARD CONTROL METHOD Risk RESPONSIBL
List the potential hazards that could
List the steps required to Rank List the control measures required to eliminate or minimise the risk of Rank E
NO. cause injury/damage when the task PERSON
perform the task in the BEFORE injury AFTER
step is performed
sequence they are carried
out
5. Closing the work:  Unnecessary material must be removed.
F
medium  Good housekeeping must be done. Low Supervisor
Work force

 Fire watcher should be present at work site at least 60 minutes


after closing the job.

6. Emergency Response: Burn, Shock, Arching, Fire,


 Muster point should be designated(ABF area )
Explosion.
 Ambulance must place in working area in case of an
emergency.
 Workforce should know emergency contact numbers. F
High  Responsible persons contact numbers in emergency. low Supervisor
Work force
Mr.