d) Pinch points.
Personnel don’t keep body parts in the line of fire.
Use proper tag lines during lifting the load to prevent
crushing with plant objects.
e) Manual handling
Utilised manual handling technique.
Not to lift more than 22.5 kg of weight.
Before lifting of any material by two persons shall be good
communication between each others.
JOB STEP DESCRIPTION
POTENTIAL HAZARD
STEP Risk HAZARD CONTROL METHOD Risk RESPONSIBL
List the potential hazards that could
List the steps required to Rank List the control measures required to eliminate or minimise the risk of Rank E
NO. cause injury/damage when the task PERSON
perform the task in the BEFORE injury AFTER
step is performed
sequence they are carried
out
5. Closing the work: Unnecessary material must be removed.
F
medium Good housekeeping must be done. Low Supervisor
Work force