SITE INSPECTION AND TEST RECORD

Description:
Contract no.: Sheet:
REVENUE METER 4400005849 1 of 5
Site: Location no.:
Panel no.: +SW / PQM
SWCC PS-2 380/13.8KV Control Room

1. GENERAL DATA AND INFORMATION

Manufacturer : NEXUS Model : NEXUS-1500


Serial No : 0185486840 Type : 485P-X-6R01-X
VT Ratio : 380000V/110V CT Ratio : 1500/1A
Class : 0.2/0.2s0 Test Kit Used : freja - sr no:1402817

2. MECHANICAL CHECK AND VISUAL INSPECTION

ITEM DESCRIPTION CHECKED


1 Inspect for physical damage / defects. OK
2 Verify connections as per approved drawings. OK
3 Check tightness of all connections. OK
4 Check Ferrules. OK
5 Check function of push button keys OK
6 Check name plate data and verified OK

3. ELECTRICAL TESTS
1) FUNCTION TEST

ITEM DESCRIPTION CHECKED


Test Switch / Plug checked & for correct
1 OK
function

4. TEST EQUIPMENT USED

Date of Test : 19/10/2017

NAME FREJA 300 ZERA MT320


SL.NO 1402817 50042932
CALIBRATION DATE 01-03-2017 11.12.2015
CALIBRATION DUE DATE 01-03-2018 11.12.2017

5. Measurements:
Tested by: NECE Witnessed by: SEC
Name- Engr: RAMADAN FOUAD Name Engr: ALAA OSAMA
SEC ID: NEC-068
Signature: Signature:
SITE INSPECTION AND TEST RECORD

Description:
Contract no.: Sheet:
REVENUE METER 4400005849 2 of 5
Site: Location no.:
Panel no.: +SW / PQM
SWCC PS-2 380/13.8KV Control Room

1. VOLTAGE MEASUREMENTS: 380/√3 / 0.110/√3 KV


Voltage Measurement (KV)
Expected Primary Measured Voltage
Injected Error (%)
Voltage in KV in KV
Value(sec) VR-N VY-N VB-N VR-N VY-N VB-N
VR-N VY-N VB-N
in %      

50% = 31.75V 109.79 109.79 109.79 109.71 109.67 109.69 0.0728 0.1092 0.0911
75%= 47.63V 164.69 164.69 164.69 164.64 164.58 164.58 0.0303 0.0667 0.0667
100%= 63.50V 219.59 219.59 219.59 219.54 219.46 219.46 0.0227 0.0592 0.0592
120%= 76.20V 263.51 263.51 263.51 263.45 263.39 263.39 0.0227 0.0455 0.0455
* Voltage Measurements accuracy = ± 0.25%

2. CURRENT MEASUREMENTS: 1500/1A


Current Measurement (A)

Expected Primary Measured Current


Injected Error (%)
Current in (A) in Amps

IR-N IY-N IB-N IR-N IY-N IB-N


Value(sec) in % IR-N IY-N IB-N
     

50% = 0.5 A 750.0 750.0 750.0 750.160 749.910 749.910 0.0213 0.0120 0.0120
75%= 0.75A 1125 1125 1125 1125.43 1125.22 1125.22 0.0382 0.0195 0.0195
100%= 1 A 1500 1500 1500 1499.5 1499.5 1499.7 0.0333 0.0333 0.0200
120%= 1.2 A 1800 1800 1800 1799.41 1800.33 1800.33 0.0328 0.0183 0.0183
* Current Measurements accuracy = ±0.25%

3. POWER MEASUREMENTS

Tested by: NECE Witnessed by: SEC


Name- Engr: RAMADAN FOUAD Name Engr: ALAA OSAMA
SEC ID: NEC-068
Signature: Signature:
SITE INSPECTION AND TEST RECORD

Description:
Contract no.: Sheet:
REVENUE METER 4400005849 3 of 5
Site: Location no.:
Panel no.: +SW / PQM
SWCC PS-2 380/13.8KV Control Room

a) Active Power Test (P):


* Phase angle Between the Voltage and Current is 0°
Active Power Measurement
Active Power(MW)
I Injected sec
IR-Y-B (A) V Injected sec P
P meas. Error (%)
VRYB-N (V) Expected
50%=0.5 63.50 493.634 492.960 0.13
75%=0.75 63.50 740.451 739.960 0.07
100%=1 63.50 987.268 987.050 0.02
120%=1.2 63.50 1184.72 1183.89 0.07

* Phase angle Between the Voltage and Current is 180°


Active Power Measurement
Active Power(MW)
I Injected sec
IR-Y-B (A) V Injected sec P
P meas. Error (%)
VRYB-N (V) Expected
50%=0.5 63.50 -493.634 -493.010 0.13
75%=0.75 63.50 -740.451 -740.080 0.05
100%=1 63.50 -987.268 -987.080 0.02
120%=1.2 63.50 -1184.72 -1184.02 0.06

Tested by: NECE Witnessed by: SEC


Name- Engr: RAMADAN FOUAD Name Engr: ALAA OSAMA
SEC ID: NEC-068
Signature: Signature:
SITE INSPECTION AND TEST RECORD

Description:
Contract no.: Sheet:
REVENUE METER 4400005849 4 of 5
Site: Location no.:
Panel no.: +SW / PQM
SWCC PS-2 380/13.8KV Control Room

b) Reactive Power Test (Q):


* Phase angle Between the Voltage and Current is 90°
Reactive Power Measurement
I Injected (sec) V Injected (sec) Reactive Power(MVar)
IR-Y-B VRYB-N Q Expected Q meas. Error (%)
50%=0.5 63.50 493.634 493.580 0.01
75%=0.75 63.50 740.451 740.560 0.01
100%=1 63.50 987.268 987.610 0.03
120%=1.2 63.50 1184.72 1184.57 0.01

* Phase angle Between the Voltage and Current is 270°


Reactive Power Measurement
I Injected (sec) V Injected (sec) Reactive Power(MVar)
IR-Y-B VRYB-N Q Expected Q meas. Error (%)
50%=0.5 63.50 -493.634 -493.520 0.02
75%=0.75 63.50 -740.451 -740.352 0.01
100%=1 63.50 -987.268 -987.158 0.01
120%=1.2 63.50 -1184.72 -1184.62 0.00

Tested by: NECE Witnessed by: SEC


Name- Engr: RAMADAN FOUAD Name Engr: ALAA OSAMA
SEC ID: NEC-068
Signature: Signature:
SITE INSPECTION AND TEST RECORD

Description:
Contract no.: Sheet:
REVENUE METER 4400005849 5 of 5
Site: Location no.:
Panel no.: +SW / PQM
SWCC PS-2 380/13.8KV Control Room

4. Energy Test (KWH):

Energy Measurement KWH Injection for 5minits.


Energy(kWh)
V Injected (sec) I Injected (sec)
Angle V & I kWh calc. kWh reading
VRYB-N IR-Y-B Error (%)
Import Export Import Export
63.50 1 0 82272.4 0 82285 0 0.0153
63.50 1 135 0 58175.4 0 58189 0.0233
* KWH Energy accuracy class 0.2S (1.0 %).

5. FREQUENCY MEASUREMENT TEST: Accuracy = ± 0.25%


INJECTED METER
ERROR
VOLTAGE VL-n (V) FREQUENCY READING
63.50 59 59 0.0
63.50 60 60 0.0
63.50 61 61 0.0

NOTE: -
 ERROR %= (Measured Value- Expected Value/ Expected Value) X 100
 Active Power = √3 * VL * IL * cos (ᶲ)
 Reactive power = √3 * VL * IL * sin (ᶲ)
 Energy 5 mints = Energy for 1 hour * (5/60)

Tested by: NECE Witnessed by: SEC


Name- Engr: RAMADAN FOUAD Name Engr: ALAA OSAMA
SEC ID: NEC-068