Site Inspection and Test Record: 1. General Data and Information
Site Inspection and Test Record: 1. General Data and Information
Description:
Contract no.: Sheet:
REVENUE METER 4400005849 1 of 5
Site: Location no.:
Panel no.: +SW / PQM
SWCC PS-2 380/13.8KV Control Room
3. ELECTRICAL TESTS
1) FUNCTION TEST
5. Measurements:
Tested by: NECE Witnessed by: SEC
Name- Engr: RAMADAN FOUAD Name Engr: ALAA OSAMA
SEC ID: NEC-068
Signature: Signature:
SITE INSPECTION AND TEST RECORD
Description:
Contract no.: Sheet:
REVENUE METER 4400005849 2 of 5
Site: Location no.:
Panel no.: +SW / PQM
SWCC PS-2 380/13.8KV Control Room
50% = 31.75V 109.79 109.79 109.79 109.71 109.67 109.69 0.0728 0.1092 0.0911
75%= 47.63V 164.69 164.69 164.69 164.64 164.58 164.58 0.0303 0.0667 0.0667
100%= 63.50V 219.59 219.59 219.59 219.54 219.46 219.46 0.0227 0.0592 0.0592
120%= 76.20V 263.51 263.51 263.51 263.45 263.39 263.39 0.0227 0.0455 0.0455
* Voltage Measurements accuracy = ± 0.25%
50% = 0.5 A 750.0 750.0 750.0 750.160 749.910 749.910 0.0213 0.0120 0.0120
75%= 0.75A 1125 1125 1125 1125.43 1125.22 1125.22 0.0382 0.0195 0.0195
100%= 1 A 1500 1500 1500 1499.5 1499.5 1499.7 0.0333 0.0333 0.0200
120%= 1.2 A 1800 1800 1800 1799.41 1800.33 1800.33 0.0328 0.0183 0.0183
* Current Measurements accuracy = ±0.25%
3. POWER MEASUREMENTS
Description:
Contract no.: Sheet:
REVENUE METER 4400005849 3 of 5
Site: Location no.:
Panel no.: +SW / PQM
SWCC PS-2 380/13.8KV Control Room
Description:
Contract no.: Sheet:
REVENUE METER 4400005849 4 of 5
Site: Location no.:
Panel no.: +SW / PQM
SWCC PS-2 380/13.8KV Control Room
Description:
Contract no.: Sheet:
REVENUE METER 4400005849 5 of 5
Site: Location no.:
Panel no.: +SW / PQM
SWCC PS-2 380/13.8KV Control Room
NOTE: -
ERROR %= (Measured Value- Expected Value/ Expected Value) X 100
Active Power = √3 * VL * IL * cos (ᶲ)
Reactive power = √3 * VL * IL * sin (ᶲ)
Energy 5 mints = Energy for 1 hour * (5/60)