Professional Documents
Culture Documents
Indust Auto Int-1 2022
Indust Auto Int-1 2022
LEVEL L1 L2 L3 L4 L5 L6 TOTAL
% 22.7 31.8 34.1 11.3 - - 100%
5 Given two single-pole switches, write a program that will turn on an output when both 02 AP CO2
switch A and switch B are closed.
6 Why Ladder diagram is the most popular language for programming PLCs? 02 U CO2
PART B (2 × 14 = 28)
Marks BTL COs
Answer the following questions
7 Discuss with neat block diagram the architecture of common PLC. 14 R CO1
OR
8 Explain the I/O Interface modules of PLC in detail. 14 U CO1
9 With neat timing diagram, discuss the on delay timer with an example. 14 AP CO2
OR
10 Write short notes on Function Block Diagram (FBD),Structured Text(ST), Instruction 14 AP CO2
List (IL), Sequential Function Chart (SFC).
PART C (1 × 10 = 10)
Marks BTL COs
Answer the following questions
11 Compare and contrast conventional programming and graphical programming. 10 AN CO1
OR
12 Explain the scan process in detail. 10 U CO1
LEVEL L1 L2 L3 L4 L5 L6 TOTAL
% 22.7 34.1 31.8 11.3 - - 100%
PART B (2 × 14 = 28)
Marks BTL COs
Answer the following questions
7 Discuss the processor memory organization in PLC. 14 R CO1
OR
8 Illustrate the analog and discrete I/O modules in a typical PLC system. 14 U CO1
9 Draw and Implement the AND, OR, NOT, XOR NAND AND NOR Gates using ladder 14 AP CO2
diagram.
OR
10 With neat timing diagram, discuss the off delay timer with an example. 14 AP CO2
PART C (1 × 10 = 10)
Marks BTL COs
Answer the following questions
11 Explain principle of operation of PLC. 10 U CO1
OR
12 Develop a ladder diagram for the bottle filling system. 10 AN CO1