NOTES:-
SCHEDULE OF PLINTH BEAMS 1) All dimensions are in feet & inches,
unless otherwise mentioned on drawing.
PLINTH 2) Contractor has to check and verify all dimensions
C/S @ LHS C/S @ MID SPAN C/S @ RHS
BEAM and levels, before execution of work.
F F
9" 9" 9" 3) Figured dimensions shall be followed.
2Y12 2Y12 2Y12 4) The reinforcement shall be of high yield
PB1 strength deformed bars of grade Fe500
Y8@6" Y8@8" Y8@6"
1'
1'
1'
conforming to IS:1786-1985
2Y16 2Y16 2Y16 5) Concrete shall be of grade M20 conforming to
A B C D E 9" 9" 9" IS 456-2000
6) Minimum lap length shall be 50xdia.
2Y12 2Y12 2Y12
31'-3" PB2 7) Cover for
Y8@6" Y8@8" Y8@6"
1'
1'
1'
(a) Footing : 50mm
8'-9" 2' 8'-9" 11'-9" 2Y16 3Y16 2Y16 (b) Column : 40 mm
(c) Plinth beam : 30 mm
(d) Roof beam : 25 mm
E PB1 PB1 PB1 (e) Roof slab : 20 mm E
4 4
9"x12" 9"x12" 9"x12"
9"x12"
PB1
10'-9"
9"x12"
PB1
9"x12"
9"
PB2
Y8@6"
PB1 2Y10
PB1
6"
3 3 2Y10
9"x12" 9"x12"
9"x12"
FFL TIE BEAM TO DETAIL
PB1
9"x12"
27'-6"
PB1
(+3'0")LVL
6'
D D
PB1 TIE BEAM DETAIL 1.5*D
2 2
9"x12"
9"x12"
PB1
Depth
Y8@4" Y8@4"
PB1
D
CLOSER SPACING OF STIRRUPS CLOSER SPACING OF STIRRUPS
9"x12"
10'-9"
60°
PB1
PLINTH BEAM
A B C D E
DEPTH
DEPTH
Ld
2" LAP -50Ø
B 0.1 L1 0.15 L1 0.15 L2 0.1 L2 B
RHS
℄ ℄ ℄
LHS
A
PYRAMID Structural Consultant TITLE CHECKED BY : Y.B A
No. 2/145, Salem main road, Amman Nagar, PROJECT CONSULTANT
Puduchadram,Namakkal - 637 018, PALATIAL CONSTRUCTION PLINTH BEAM LAYOUT & DETAILS
NAMAKKAL DESIGNED BY : M.R
Tamilnadu, India. PROJECT NO : YB-20002 DRWG NO : ST-03
email: pyramidstrconsultant@gmail.com REVISION
Ph: +91 9597691155 DATE : 15.JUN.2020 SCALE : 1:100 (A3) REVISED BY REVISION DETAILS DRAWN BY : B.D
NO.
1 2 3 4 5 6 7 8 9 10