Safety Requirements & Safety Measures (Blue Bird Project - ANDRITZ)

S.no Description Status Remarks


While doing crane work / JCB activities, hard barrication is needed on both sides near the work
1 location with warning signages / caution boards PROVIDED

All of the team members who involved in the work activities must wear appropriate PPE's
2 PROVIDED
(reflected jacket, safety shoes, safety helmet, cut resistant gloves etc.,)
3 Provide portable hand railing near the open floor areas PROVIDED
4 Proper access must be provided for man movement near to the work location PROVIDED
5 While person carrying any materials, use shoulder pads IN PROGRESS
All the cylinders are need to provide valve caps and after the completion of the work activity,
6 IN PROGRESS
place the cylinders in storage area with a tied chain
Assign a points man / signal man during the shifting activities by using hydra/boom lift (flags
7 PROVIDED
also required)
Check it out the physical conditon of all lifting tools & tackles and full body safety harness
8 YES DOING
periodically, if any cuts / damages are found put it in a rejected list of storage
Walkie talkie must be mandatory at the time of doing the erection activities for the purpose of
9 IN PROGRESS
proper communication between the riggers and operator of the vehicle
At the time of using ladders and scaffolding in the work area, provide inspection tags after the
10 IN PROGRESS
inspection of scaffold inspector
11 Avoid cable joint connections, in place of the joints use plug tops only PLUG TOPS USING IN ALL THE ELECTRICAL EQUIPMENTS.
Painters must wear rubber hand gloves , Safety goggles and nose mask while doing the
12 PROVIDED
activities
Secondary containment is needed for the chemicals / oils to avoid spillage and also need to
13 IN PROGRESS
provide a storage area
All the electrical equipment must be inspected periodically by means of electrical
14 YES DONE
Representative and also put a tag after the inspection
15 At the EOD, the boom of the crane need to be locked YES DONE