Professional Documents
Culture Documents
B737 Pneumatic Sys T.S
B737 Pneumatic Sys T.S
RECOMMENDED ACTION
Operators may wish to use the attached guide for reference while performing
pneumatic system troubleshooting per FIM 36-10, Task 804, Paragraph F.
pages.
F.(10) 5. Supply pneumatic
pressure from
APU or ground
supply (pressure
should be less
than 40 psig)
If no leaks are
found; replace the
precooler control
valve per AMM
36-12-02/400
series pages.
Return pneumatic
system to normal
configuration.
Return airplane to
normal
configuration.