Bill of Supply of Electricity: Rs. 609 Rs. 622

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

www.tpcentralodisha.

com

Bill of Supply of Electricity


Consumer Name : BALARAM PRADHHAN. Rebate Date : 15/04/2022
Due Date : 15/04/2022
Address : SANSARPHAL, SANSARPHAL, KENDRAPARA Consumer A/c 80028146399
Details -754127 Consumer ID : 7-B-013/002
Old Consumer No. : 101S01337824
Bill Number 1205741938
Bill Issue Date : 07/04/2022
Email Id :
Bill Basis : Normal
Mobile No 9441285634 Last Bill Issue Date : 06/03/2022
Bill Month : 2022/04
Area Details Connection Details Supply and Meter Details
Division : BCDD-1 ,KENDRAPARA Tariff Category : Domestic Power Status : Active
Power Factor : 0.00
Sub-Division : SDO 1 Power on Hour : 816
Section : Power House 2 Contract Demand : 2.00 KW Billed Demand : 1.00KW
DT No. : Supply Voltage : 0.23 Meter Sl. No. : LC032287
Pole No. : Own Transformer : Col. Meter No :
MRU No. : BD011012 ED Exemption : NIL Bill Period : 05.03.2022 -
Walking Sequence : Date of : Bill Days/Months : 34/1.1043
Organization : 22/04/2000Security Deposit : Load Factor : 0.00
Connection Type : 557.00 Meter Reading : OK
Metering : LV
Meter Reading Details
Due Date: 15/04/2022
Parameter Prev Reading Current M.F. Diff T.F Loss Total (Immediate for
Reading Arrears)
KWH 2,918.00 3,052.00 1.00 134.00 0.00 134.00 Total Amount Payable
MDI-KW 0.00 0.00 1.00 0.00 0.00 0.00

Last Bill Payment made Rebate Net Arrear in Current bill Adj/Inst Net Payable Amount
Amount Rs. amount
235.00 230.00 -9.22 -3.41 625.97 0.00 Before Rbt. Dt. After Rbt.Dt.
Rs. 609 Rs. 622
Current Bill Details
a. Energy Charges 544.20 1. Sundry Adjustment
Slab 1-55@3.00 165 Debit 0.00
Slab 2-79@4.80 379.2 Credit 0.00
2. Interest on SD(After TDS) 0.00
3. Total Current Bill(Aft Adj/Inst) 625.97
b. Incentive on TOD 0.00 4. Rebate Allowable
Prompt Payment Rebate -13.40
c. Demand Charge / MMFC 20.00
d. Overdrawal penalty 0.00
e. Penalty for Fall in PF 0.00
f. Power Factor Incentive 0.00 5. Net Current payment after Rebate 612.57
g. Colony KwH charge 0.00 6. Cross Subsidy Charges 0.00
h. Load Factor Rebate 0.00 7. Disputed Amount 0.00
i. Electricity Charge 564.20
(a-b+c+d+e-f+g+h) 8a. Payment 1 09.03.2022 230.00
j. Electricity Duty (4%) 21.77 8b. Payment 2 0.00
k. Delayed Payment Surcharge 0.00 8c. Payment 3 0.00
l. Meter Rent 40.00 8d. Payment 4 0.00
m. Customer Service Charge 0.00 9. Total Payment 230.00
n. R.I. Surcharge 0.00 10. Last Rebate Allowed -9.22
o. Tax Collection at Source 0.00
p. Current Total (i+j+k+l+m+n+o) 625.97

Message
1. The connection shall be liable for disconnection on non-payment of all dues including arrears of previous bill(s) by due
date, after notice as per Section 56(1) of the Electricity Act, 2003. 2. Disputed amount is to be finalized on the outcome
of the order of the respected court and the applicable charges. 3. ECS opt-in.4. Now consumer can pay using NEFT/RTGS,
Account No - TPCODL (Followed by CA No without space) e.g. TPCODL8XXXXXXXXXX.
Division Office You Can Pay Using NEFT/RTGS Connect at Contact us
ASST.GENERAL MANAGER Bank Name State Bank of India www.tpcentralodisha.com
(ELECT), BCCD NO-I, PLOT Account No. TPCODL8XXXXXXXXXX
IFSC SBIN0004266 1912
NO 1789/4898, NAYAPALLI, Mobile
NUA SAHI, UNIT-VIII, Branch Corporate Accounts Group Branch, 1800 345 7122
BHUBANESWAR. Address Neville House, JN Heredia Marg, App: 0674-2391110
Ballard Estate, Fort, Mumbai-1 Mail At -
customercare@tpcentralodisha.com

You might also like