Tanggal
No Deskripsi Pekerjaan Personil Sparepart
###28 29 30 1 2 3 4
1 Setting controller untuk capasity of 2nd generator Sydiq, Riki
Bambang, Sydiq, thermocouple type K; transmitter STG
2 Instalasi thermocouple dan Pressure Transitter PTRS
Riki 700; kabel NYY 2x1,5mm
3 Cleaning Computer DCS Suroyo
4 Back up data Server dan PC DCS L Suroyo
I thermis 1x6A; box thermis; rel thermis;
5 Pasang thermis untuk PC DCS B Suroyo, Riki terminal isi 3; wire deck 45x45mm;
U kabel NYY 2x1,5mm
6 Ganti thermowell boiler 01 R Bambang, Sydiq thermowell wear
7 Pindah controller desuperheater ekstraksi turbin All personil
8 Pasang inverter pompa demin Bambang, Sydiq,
Riki inverter ACS580
9 Persiapan start boiler dan turbin All personil