Laporan weekly turbin tanggal 27 september 2021 – 3 oktober 2021.
1. Check equipment turbin & auxiliary setiap pagi & sore
2. Flushing colling water selama 8 jam setiap hari selasa 3. Tanggal 27/09/2021 Jam 09 : 18 start letdowndesuperheater prepare turbin stop karena coal feeder no # 3 boiler # 2 terbakar. Start AOP Jam 19 : 18 stop turbin generator Jam 09 : 42 speed turbin 0 RPM Jam 09 : 43 start LOP,stop AOP & start turning gear Jam 10 : 30 close PCV letdowndesuperheater press boiler # 2 drop sampai 1,14 MPA Jam 12 : 48 stop CWP & CTF no 2 Jam 13 : 51 open PCV letdowndesuperheater untuk supply steam ke proses 4. Tanggal 28/09/2021 Jam 07 : 50 warming up line main steam inlet ke trubin Jam 08 : 15 start CWP & CTF no 2 Jam 08 : 58 start AOP,stop LOP & turning gear Jam 09 : 16 open Emergency trip valve turbin Jam 09 : 20 warming up low speed turbin 500 RPM Jam 09 : 42 speed turbin naik 1000 RPM Jam 10 : 05 speed turbin naik 1500 RPM Jam10 : 26 speed turbin naik 3000 RPM Jam 10 : 30 stop AOP Jam 10 : 34 open MV exhaust steam turbin ke proses Jam10 : 41 syncrone turbin generator Jam 10 : 55 stop letdowndesuperheater 5. Tanggal 29/09/2021 flange by pass valve MV exhaust steam turbin ke proses bocor,untuk repair maintenance mekanik tunggu stop turbin 6. Tanggal 30/09/2021 Scedule change operasi pompa CWP & CTF no 3 start,CWP & CTF no 2 stop Operator group B cleaning area turbin dan elevasi 8 meter. 7. Oksigen content dearator 2 kondisi range abnormal 54 ug/L – 108 ug/L Antisipasi abnormal kanduungan oksigen dearator 2 pembukaan venting sudah di tambah dari 7 % menjadi 17 % ,2nd steam valve & reboiling valve pembukaan di tambah ,& temp dearator 2 di jaga > 125 C dan untuk pembukaan LCV dearator 2 lebih kecil dari LCV dearator 1 8. Melaksanakan training WW 505 ke leader turbin group C saat start up.
TOTAL FLOW STEAM
TOTAL FLOW STEAM INLET TOTAL FLOW STEAM OUTLET TOTAL FLOW STEAM OUTLET TURBIN TURBIN KE PRODUKSI 7222,91 5760,36 6582 Ton Ton Ton