KERALA STATE ELECTRICITY BOARD LTD


Failure report of Distribution Transformer
1 Name of Circle Kalpetta
2 Name of sub Division Mananthavady
3 Name of Section Mananthavady
4 Capacity in KVA and votage 100 KVA ,11000/433 V
5 make TRANSCON INDUSTRIES
6 Makers serial No. 24307
7 EB NO -
8 Name of Locality Kammana
9 Date of installation
10 Date expiry of guarantee -
11 Date and time of failure 10-03-2022
12 Connected load 255 KW
a)Agriculture 10 KW
b)Industrial 10Kw
c)Domestic and commercial 235 KW
d)Street light Nil
13 Weather condition at the time of failure
a)Lightning Nil
b)Rainy Nil

14 Type of protection provided on HT and LT side and their condition before and after failure 3 Nos LA and DO fuse
a)wether LA are provided on the HT and LT side Yes
b)Details of type of fuse and ratings HT 5A
15 a)Insulation Resistance
1) HT to LT 45 Mega ohm
2) HT to earth 35 Mega ohm
3) LT to earth 35 Mega ohm
b)Earth resistance details
d)condition of oil level in transformer Good
e)Tong test details of feeders connected
f)silica gel Good
g)breather Good
16 Nature of fault noticed by physical varification
a)oil leakage Nil
b)condition of bushing OK
c)condition of terminal connection OK
Continuty test on L V winding between
1)A and neutral 0.3 ohm
2)B and neutral 0.3 ohm
3)C and neutral 0.3 ohm
HT winding bwtween
1 )R-Y 12 Ohm
2 )Y-B 20 K Ohm
3)B-R 12 Ohm
17 Probable cause of failure HT winding may be broken
18 Remarks
Sheet1

TECHNICAL SPECIFICATION
1 Make, Place of Installation TRANSCON, Kammana
2 Capacity 100KVA
3 Maker’s Serial No. 24307
4 Year of manufacture 2020
5 Oil Capacity 170 Liter
6 Weight of core and Winding
7 Total Weight 665 Kg
II EXTERNAL CONDITIONS
1 Oil level OK
2 Oil level gauge OK
3 Conservator Tank OK
4 Conservator Pipe OK
5 Conservator filter plug OK
6 Conservator drain plug OK
7 Breather OK
8 HT Bushing OK
9 HT bushing rod materials and conditions OK
10 Materials and No. of HT bushing nuts Brass 2 Nos
11 Arcing rods OK
12 LT bushing OK
13 LT bushing rod materials and conditions OK
14 Materials and No. of LT bushing nuts Brass 3 Nos
15 Filter valve OK
16 Drain valve OK
17 Explosion went OK
18 Tape with handle assembly -
19 Cooling fins -
20 Earth leg OK
21 Transformer tank OK
22 Name plate OK
23 Oil leakage Nil

Copy submitted to
1). Assistant Executive Engineer Electrical Sub Division Mananthavady
2 ) Executive Engineer Electrical Division Mananthavady
3). Assistant Executive Engineer S R Store, Kalpetta.
4). DY. Chief Engineer Electrical Circle Kalpetta.