Experience:
1980's : Survey and layout. Consisted of calculations and staking of subdivision
s, property boundaries, roads, underground utilities, bridges, sewer lagoons,
commercial buildings, forest boundaries, dams, power plants and tunnel work
.
1990's : Employed as Project Engineer on Heavy Highway and Bridge contracts. Cal
culations and staking of all phases of Projects. Also fish screens for severa
l agencies.
Employed as Superintendent on Heavy Highway and Bridge contracts. Projects up
to 20 million dollars. Freeway construction, Underground utilities, Box girder
and bulb-t structures, slab bridges and fish screens.
2000's : Employed as Superintendent / Project Manager on Heavy Highway and Bridg
e contracts. Projects up to 50 million dollars. Freeway construction, Box gird
er and bulb-t structures, slab bridges, light rail bridges, MSE and retaining
walls.
Project is scheduled to be completed in field October 31, 2010. I anticipate my
obligation will be completed December 1, 2010. The following current references
can be contacted at this time without hesitation.
Jeff Howell LCI (503) 316-2147 Cell (503) 580-5668
Kevin Peterson ODOT (541) 957-3511 Cell (541) 784-8862
Rod Tompkins RJT (530) 823-2220 Cell (916) 835-1765
Doug Dearie Liberty Mutual (Safeco Bonding) Cell (206)605-6270
Employers:
October 2008 to Present RJT Construction / Safeco Bonding (Liberty Mutual)
Auburn California Seattle Washington
Project: Oregon Dept. Of Transportation, Shady I-5 Project, Roseburg Oregon

Overview: Project was forced into Bond after Original Contractor was unable to
complete. I was hired to Project Manage in the field as representative of the bo
nding company. Initial tasks involved coordination of the Sate and Completion Co
ntractor and assessing activities to be completed. Meeting and scheduling work t
o be completed involving CORP Railroad, Fish & Game and Douglas County.
Re- scheduling subcontractors and evaluating work left to be completed, reviewi
ng subcontracts and potential new subcontractors. Coordination of ODOT, Completi
on Contractor, Safeco and subcontractors. Weekly and CPM scheduling, daily revie
w and problem solving on the project. Submittal and tracking of all associated c
ontract documents. Review of contractor daily performance and conformance to the
contract specifications. Submittal of In-Water Work Permits, Railroad documents
, state required documents. As Project Representative my main role was to coordi
nate all agencies and contractors, problem solve and complete the project within
the specified time per our takeover agreement.
Project
Cost: $30,000,000.00

June 2008 to Sept. 2008 Truesdell Corp.


Phoenix Arizona
Project: Caltrans - Mt. Shasta, Redding, Stockton & Nevada DOT I-80

Overview: Truesdell is a specialized Company that performs structure maintenance


. Replacement of bridge seals / joints, poly overlays, crack repair, abutment an
d column replacement. Employed as Superintendent in charge of scheduling, coordi
nation with Agency, manpower and equipment.
Project
Cost: $2,000,000.00

March 2006 to April 2008 Adams & Smith, Inc.


Lindon Utah
Project: City of Payson / UDOT
Payson, Utah
Resident Engineer: Scott Hendricks P.E. RB&G Engineering
Overview: Pedestrian and Creek box culverts. Work consisted of excavation and de
mo of original structure, widening of the roadway, architectural barrier and mis
c. underground utilities. Coordinated all aspects of the project in the capacity
of Superintendent / Project Manager.
Project
Cost: $1,000,000.00

Project: UDOT
Milford, Utah
Resident Engineer: Mike Seng P.E. UDOT
Senior Inspector: Daryl Lewis UDOT
Overview: Subcontractor on railroad crossing pre-stressed girder structure on dr
iven pile. Superintendent duties, coordinate with prime and other subs.
Project
Cost: $600,000.00

Project: Tuscany Village


Las Vegas, Nevada
Resident Engineer: County
Overview: Superintendent for sheet piling operation in river and wash for bridge
erection.
Project
Cost: $1,500,000.00

Adams & Smith cont.'d

Project: Mill Creek Bridge Replacement


Moab, Utah
Resident Engineer: Austin Armstrong P.E. Federal Highway Administration
Overview: Demo and replace box girder structure over rock ravine. Superintendent
and Project Manager duties included meetings, purchase of materials, scheduling
of subs. Project included retaining and MSE walls, rip rap.
Project
Cost: $1,100,000.00

Project: Thompson Wash Bridge Replacement


Thompson Springs, Utah
Resident Engineer: Jerry Mecham Horrocks Engineering
Overview: Demo and replace pre-stress girder structure over wash. Superintendent
and Project Manager duties included meetings, purchase of materials, scheduling
of subs. Project included placement of gabion baskets and rip rap, paving, unde
rground utilities.
Project
Cost: $1,100,000.00

Project: Hasseyampa Bridge Replacement


Prescott, Arizona
Resident Engineer: Rory Baldwin Yavapai County Resident Engineer
Overview: In charge demo on structure deck, paving, oversight of subs.
Project
Cost: $1,100,000.00
________________________________________________________________________________
__________________
Jan. 2005 to March 2006 SEMA Construction, Inc.
Los Angeles CA. / Denver CO.
Project: City of El Segundo
Los Angeles, CA.
Resident Engineers: Ivan Benevidez P.E. Caltrop
Tyrone Taylor P.E. Caltrop
Steve Finton P.E. Public Works Director
Overview: Grade crossing under light railway and BNSF railroad. Single box gird
er pedestrian and steel railroad structures. Relocation of existing utilities,
jet fuel, electric, waterline, phone, 48" barrier line.
Construction of retaining walls, CIDH piling, road grade. Coordinated all aspe
cts of project in the capacity of Superintendent / Project Manager, hiring, fi
ring, subcontractors, meetings, layout and day to day superintendence of proj
ect.
Project
Cost: $19,000,000.00

Project: City of Irvine / CalTrans


Irvine, CA.
Resident Engineers: Kal Lambaz P.E. City of Irvine
Dave Ellstrom SCI City of Irvine
Overview: Widening of major artery and structure. CIP bridge, retaining walls,
grading and paving, traffic signals, C&G, sidewalk, extensive rehabilitation
work on I-205, cip box culverts, block walls. Job duties as Superintendent, d
ay to day field, subcontractor scheduling, coordination of company divisions, st
ructure oversight.
Project
Cost: $9,000,000.00

October 2001 to Jan. 2005 MCM Construction Inc.


North Highlands, California
Position: Superintendent / Project Manager
Project: Regional Transit
Sacramento, Calif.
Resident Engineers: Bob Kershaw P.E. Regional Transit Consultant
Brad Reil P.E Nolte Engineering
Overview: 1600 foot single box girder light rail transit structure in downtown S
acramento. Underground utilities for SMUD and various other utility companies.
Coordinated all aspects of project. Hiring, firing, sub contractors, meeting
s, CPM scheduling, layout, day to day superintendence of labor.
Project
Cost: $5,000,000.00
MCM Construction cont.'d
Project: 85/101 South
Valley Transit Authority
San Jose, Calif.
Resident Engineer: Scott Hensler P.E.
Structure Representative: Rafey Kahn P.E.
Overview: Twelve large structures across City, State Highways and Union Pacific
Railroad. Project consisted of widening Route 101 and 85 lanes and existing stru
ctures. Requiring additional signals, underground utilities, PCC and AC paving.
Construction of MSE and sound walls. Construction of widening and new structures
across Coyote Creek riparian corridor, new road construction. Job Duties consis
ted of Daily Superintendence of labor and subcontractors, concrete pours, false
work erection, forming and stripping. Scheduling, coordination of labor, subs a
nd owner. All meetings associated with Project. Project Management of resources,
labor, equipment, ordering material, Extra Work Accounts.
Project
Cost: $45,000,000.00

October 2000 to October 2001 Rudy Construction Inc.


Stayton, Oregon
Owners: Dave Bigje
Steve Hewitt
Project: Monterey Undercrossing
Clackamas County / ODOT
Overview: Box girder structure across Interstate 205, Sound walls, coping, retai
ning walls, drainage inlets in Portland, Oregon. Project Superintendent / Manage
r duties included coordination with sub contractors, prime contractor, superinte
ndence of daily labor, weekly meetings, scheduling.
Project
Cost: $5,000,000.00

October 1996 to October 2000


Weaver Construction
La Grande, Oregon
Owner: Jim Weaver
General Manager: Lavar Bowles
Project: East Idaho Ave.
Oregon Department of Transportation Resident Engineer: Ric Young P.E.
Overview: Box girder structure across Interstate 84 on the Oregon / Idaho borde
r. Project consisted of new and existing road construction, underground utilitie
s, traffic signals, rehabilitation of existing structure and new construction. E
arthwork for new roads and ramps to structure. Grinding and AC paving, sidewalk,
curb and gutter.
Job duties consisted of daily Superintendence of labor, equipment and subs, layo
ut, quantities, staking, Quality Control, scheduling.
Project Cost: $12,000,000.00

Weaver Construction cont'd.


Misc. Projects: Slab Bridges in Burns Oregon Project Manager / Engineer
Slab Bridges in La Grande Oregon Project Manager / Engineer
Fish Screen in Milton-Freewater Oregon Project Engineer
Fish Screen in Prineville Oregon Project Engineer
Road Construction in Pilot Rock Oregon Project Engineer / Manager /QC
Bulb Structure and Road Construction
Echo Oregon Project Engineer / QC
Port of Entry in Hermiston Oregon Project Engineer / QC

January 1991 to 1996 Gaschler & Cummings


Ontario, Oregon

Owners: Albert Gaschler P.E.


Dan Cummings L.S.
Overview: Project Engineer / Chief of Surveys
Projects included subdivisions, underground design, staking and inspection. To
pography and staking of sewer lagoons, forced main sewer, outfalls. Survey for
ALTA, boundaries, improvements, water, sewer, water rights. Calculations and
mapping, subdivision design.

References:
The persons below can be contacted as references. If requested more can be provi
ded.
Daryl Lewis UDOT (435) 896-8561
Scott Hendricks RB&G Engineering (801) 374-5771
Jerry Mecham Horrocks Engineering (801) 691-2337
Richard McCall MCM Construction (916) 334-1221
Kevin Peterson ODOT (541) 784-8862
Rod Tompkins RJT Construction (530) 823-2220
Doug Dearie Liberty Mutual (206) 605-6270
Jeff Howell Legacy Contracting, Inc. (503) 316-2147

You might also like