Professional Documents
Culture Documents
09 Ddc-P2c3-Ecv01-Aln-Dr-C3e-50603-06-A
09 Ddc-P2c3-Ecv01-Aln-Dr-C3e-50603-06-A
U R V
R E
V ISO A1 841mm x 594mm
39+177.796
SC 39+397.146
39+212.796
39+489.325
39+106.141
39+459.325
ULC 17
39+367.146
1
39+200
39+071.14
39+500
5.00
39+300
39+100
39+400
UP LINE
CS
ST
ST
SC
CS
TS
TS
39+000
5
ULC 15
38+913.93
38+863.935
38+832.191
CS
39+178.840
39+200
39+213.840
ST
39+500
ST
39+490.829
SC
39+300
39+107.847
38+900
39+100
CS
39+460.829
39+368.190
TS
SC 39+398.190
DOWN LINE
39+400
TS
39+072.84
5.00
ST
DLC 15
39+000
ST
7
38+915.64
38+900
CS
38+832.875
38+865.641
SC
DLC 14
CURVE DETAILS:-
UP LINE CURVE NO. ULC 15 ULC 16 ULC 17
EASTING 416059.707 416085.990 416073.673
COORDINATE OF APPEX
NORTHING 1422708.329 1422415.352 1422129.234
DEFLECTION ANGLE 11°42'32.285" 7°35'28.274" 5°16'53.222"
+37.500m RADIUS 400.000 805.000 1000.000
TRANSITION LENGTH 50.000 35.000 30.000
Curve LENGTH 31.744 71.655 62.179
+35.000m CANT 110mm 90 30 20
CANT DEFFICIENCY 85mm 77 64 56
DESIGN SPEED 75 80 80
+32.500m EQUILIBRIUM CANT 167 94 76
CANT GRADIENT 556 1167 1500
Time of Travel over
transition Length SEC 2.40 1.58 1.35
+30.000m Rate of change of CANT MM/SEC 37.50 19.05 14.81
PVT 39+361.970
PVC 39+338.030
PVC 39+217.917
PVT 39+242.083
K=19.000 K=30.000
PVI 39+230.000
PVC 38+835.680
+22.500m
PVC 39+037.917
PVT 39+062.083
PVT 38+862.320
Elev 16.993
Elev 16.850
Elev 16.850
Elev 16.753
Elev 16.850
Elev 15.587
Elev 15.497
Elev 15.400
Elev 15.400
+20.000m 1.197%
+17.500m 0.000%
PROPOSED RAIL LEVEL 0.806%
0.000%
+15.000m
HI 39+242.083
LO 39+338.030
PVI 39+350.000
Elev 16.850
+12.500m
Elev 16.850
LO 38+862.320
LO 39+037.917
PVI 38+849.000
PVI 39+050.000
Elev 16.850
Elev 15.400
Elev 15.400
Elev 15.400
Elev 15.400
+10.000m
EXISTING GROUND LEVEL
EL
+7.500m U ND LEV
N G GRO
EXISTI
+5.000m
+2.500m
±0.000m
Level Datum = ±0.000m
HORIZONTAL CURVATURE
VERTICAL ALIGNMENT
LEVEL DIFFERENCE
CHAINAGE
Filename: \\inmaa2pfpsw001\DATA2\Chennai_Metro_Phase2\900-CAD, GIS\910-CAD\910_09_Retender Drawings\ECV01\02 CAD\Part 2\A-HORIZONTAL AND VERTICAL ALIGNMENT DRAWINGS - UP LINE\ DDC-P2C3-ECV01-ALN-DR-C3E-50601-01 TO C3E-50603-17-A.dwg Feb 07, 2022 - 12:33pm SMG