PT.

ENERGI UNGGUL PERSADA


Proyek : POME PLANT 300TPD
Lokasi : Segendris - Bontang Lestari - Kalimantan Timur
Pek . : OSBL Pipe Line
No. Uraina Pekerjaan Q'ty Material Upah

I PRELIMINERIES 1 Lot - -
II OSBL PIPE LINE 1 Lot - -
III INSTALL MACHINERIS 1 Lot - 45,840,000

Total - 45,840,000
Grand Total ( Material + Upah) 45,840,000

Note :
Harap mengisi harga satun pada kotak warna kunig saja
PT. ENERGI UNGGUL PERSADA
Proyek : POME PLANT 300TPD
Lokasi : Segendris - Bontang Lestari - Kalimantan Timur
Pek . : OSBL Pipe Line

No. Uraian Pekerjaan Q'ty Unit Material Upah Jlh. Material Jlh Upah

I PRELIMINERIES
1 Mob. & Demob 1 -

Jumlah I - -
PT. ENERGI UNGGUL PERSADA
Proyek : POME PLANT 300TPD
Lokasi : Segendris - Bontang Lestari - Kalimantan Timur
Pek . : OSBL Pipe Line

No. Uraian Pekerjaan Q'ty Unit Material Upah Jlh. Material Jlh Upah

II OSBL PIPE LINE


A. POME UNLOADING LINE FROM TRUCK TO SUCTION
PUMP
A.1 From Truck Unloading To Pump Suction Header

PIPE SEAMLESS, 6" ND, SCH 40, CS 16 Btg by owner


ELL 90, 6" ND, BW, SCH 40 8 pcs by owner
GATE VALVE, 6" ND, 150 LB, CS 5 pcs by owner
FLANGE SO, 6" ND, 150 LB, CS 5 pcs by owner
GASKET, TOMBO, 6" ND, 3.2 THK 5 pcs by owner
B/N ASTM A193, 3/4 x 4", F. THREADED, CW WASHER 6" 40 pcs by owner

A.2 Pump Suction Header


PIPE SEAMLESS, 8" ND, SCH 40, CS 2 BTG by owner
GATE VALVE, 8" ND, 150 LB, CS 1 pcs by owner
FLANGE SO, 8" ND, 150 LB, CS 5 pcs by owner
FLANGE BLIND, 8" ND, 150 LB, CS 3 pcs by owner
GASKET, TOMBO, 8" ND, 3.2 THK 8 pcs by owner
B/N ASTM A193, 3/4 x 4", F. THREADED, CW WASHER 8" 64 pcs by owner

A.3 Pump Suction Header to Transfer Pump


REDUCER (EXC), 6x2" ND, CARBON STEEL, SCH 40 2 pcs by owner
GATE VALVE, 6" ND, 150 LB, CS 2 pcs by owner
Y-STRAINER, 6" ND, 150 LB, CS 2 pcs by owner
FLANGE SO, 2" ND, 150 LB, CS 2 pcs by owner
FLANGE SO, 6" ND, 150 LB, CS 8 pcs by owner
GASKET, TOMBO, 6" ND, 3.2 THK 8 pcs by owner
GASKET, TOMBO, 2" ND, 3.2 THK 2 pcs by owner
B/N ASTM A193, 3/4 x 4", F. THREADED, CW WASHER 6" 64 pcs by owner
B/N ASTM A193, 5/8 x 3-1/2", F. THREADED, CW WASHER 2" 8 pcs by owner

Jumlah A. - -

B. POME UNLOADING LINE FROM DISCHARGE PUMP TO


1000 MT TANK
B.1 Pump Discharge to Tank1000
PIPE SEAMLESS, 4" ND, SCH 40, CS 6 BTG by owner
REDUCER (EXC), 4x2" ND, CARBON STEEL, SCH 40 2 pcs by owner
REDUCER (CONC), 6"x4" ND, CARBON STEEL, SCH 40 1 pcs by owner
CHECK VALVE, 4" ND, 150 LB, CS 3 pcs by owner
GATE VALVE, 4" ND, 150 LB, CS 3 pcs by owner
FLANGE SO, 4" ND, 150 LB, CS 13 pcs by owner
FLANGE SO, 2" ND, 150 LB, CS 2 pcs by owner
FLANGE BLIND, 4" ND, 150 LB, CS 1 pcs by owner
GASKET, TOMBO, 4" ND, 3.2 THK 14 pcs by owner
GASKET, TOMBO, 2" ND, 3.2 THK 2 pcs by owner
B/N ASTM A193, 5/8 x 3-1/2", F. THREADED, CW WASHER 4" 112 pcs by owner
B/N ASTM A193, 5/8 x 3-1/2", F. THREADED, CW WASHER 2" 8 pcs by owner
PRESSURE GAUGE, WIKA, SS304, 1/2" ND CONNECTOR , MODEL RAKET 3" 2 pcs by owner
SIPHON, 1/2" ND, CS 2 pcs by owner
Ball VALVE 1/2" Screw Con 2 pcs by owner

Jumlah B. - -
PT. ENERGI UNGGUL PERSADA
Proyek : POME PLANT 300TPD
Lokasi : Segendris - Bontang Lestari - Kalimantan Timur
Pek . : OSBL Pipe Line

No. Uraian Pekerjaan Q'ty Unit Material Upah Jlh. Material Jlh Upah

C.
POME LINE FROM 1000 MT TANK TO SUCTION PUMP
C1. Pump Tank 1000 to Suction to PU 001
PIPE SEAMLESS, 4" ND, SCH 40, CS 3 BTG by owner
REDUCER (CONC), 4x2" ND, CARBON STEEL, SCH 40 1 pcs by owner
REDUCER (CONC), 6"x4" ND, CARBON STEEL, SCH 40 1 pcs by owner
GATE VALVE, 4" ND, 150 LB, CS 2 pcs by owner
Y-STRAINER, 4" ND, 150 LB, CS 2 pcs by owner
FLANGE SO, 4" ND, 150 LB, CS 8 pcs by owner
FLANGE SO, 2" ND, 150 LB, CS 1 pcs by owner
FLANGE BLIND, 4" ND, 150 LB, CS 1 pcs by owner
GASKET, TOMBO, 4" ND, 3.2 THK 9 pcs by owner
GASKET, TOMBO, 2" ND, 3.2 THK 1 pcs by owner
B/N ASTM A193, 5/8 x 3-1/2", F. THREADED, CW WASHER 4" 72 pcs by owner
B/N ASTM A193, 5/8 x 3-1/2", F. THREADED, CW WASHER 2" 4 pcs by owner

Jumlah C. - -

D. POME LINE FROM PLAN TO 3000 MT TANK


D.1 Discharege Pump PU 041 To Tank 3000
PIPE SEAMLESS, 3" ND, SCH 40, CS 9 BTG by owner
REDUCER (CONC), 3x2" ND, CARBON STEEL, SCH 40 1 pcs by owner
REDUCER (CONC), 6x3" ND, CARBON STEEL, SCH 40 1 pcs by owner
ELL 90, 3" ND, BW, SCH 40 5 pcs by owner
GATE VALVE, 3" ND, 150 LB, CS 4 pcs by owner
FLANGE SO, 3" ND, 150 LB, CS 9 pcs by owner
FLANGE SO, 2" ND, 150 LB, CS 1 pcs by owner
FLANGE BLIND, 3" ND, 150 LB, CS 1 pcs by owner
GASKET, TOMBO, 3" ND, 3.2 THK 10 pcs by owner
GASKET, TOMBO, 2" ND, 3.2 THK 1 pcs by owner
B/N ASTM A193, 3/4 x 3.5", F. THREADED, CW WASHER 3" 40 pcs by owner
B/N ASTM A193, 5/8 x 3-1/2", F. THREADED, CW WASHER 2" 4 pcs by owner

Jumlah D. - -

E.
POME LINE FROM 3000 MT TANK TO CPO PUMP
SHIPMENT LINE SUCTION (CONNECT TO 5101 OUTLET
NOZZLE LINE)
E.1 From Tank 3000 to Line PFAD Existing
PIPE SEAMLESS, 10" ND, SCH 40, CS 14 BTG by owner
ELL 90, 10" ND, BW, SCH 40 5 pcs by owner
FLANGE SO, 10" ND, 150 LB, CS 5 pcs by owner
FLANGE BLIND, 10" ND, 150 LB, CS 1 pcs by owner
GATE VALVE, 10" ND, 150 LB, CS 2 pcs by owner
GASKET, TOMBO, 10" ND, 3.2 THK 6 pcs by owner
B/N ASTM A193, 7/8 x 4-1/2", F. THREADED, CW WASHER 10" 72 pcs by owner

Jumlah E. - -
PT. ENERGI UNGGUL PERSADA
Proyek : POME PLANT 300TPD
Lokasi : Segendris - Bontang Lestari - Kalimantan Timur
Pek . : OSBL Pipe Line

No. Uraian Pekerjaan Q'ty Unit Material Upah Jlh. Material Jlh Upah

F. STEAM LINE DISTRIBUTION


F.1 Main Line ( From Existing Line to New Tank)
PIPE SEAMLESS, 3" ND, SCH 40, CS 13 BTG by owner
PIPE SEAMLESS, 2" ND, SCH 40, CS 4 BTG by owner

ELL 90, 3" ND, BW, SCH 40 3 pcs by owner


FLANGE SO, 3" ND, 150 LB, CS 1 pcs by owner
FLANGE BLIND, 3" ND, 150 LB, CS 1 pcs by owner
GASKET, TOMBO, 3" ND, 3.2 THK 2 pcs by owner
B/N ASTM A193, 3/4 x 3.5", F. THREADED, CW WASHER 3" 8 pcs by owner

F.2 From New Line to New Tank 3000


ELL 90, 3" ND, BW, SCH 40 3 pcs by owner
GLOVE VALVE, 3" ND, PN 16, DIN, CS 1 pcs by owner
FLANGE SO, 3" ND, 150 LB, CS 4 pcs by owner
FLANGE SO, 2" ND, 150 LB, CS 2 pcs by owner
FLANGE BLIND, 3" ND, 150 LB, CS 2 pcs by owner
GASKET, TOMBO, 3" ND, 3.2 THK 6 pcs by owner
GASKET, TOMBO, 2" ND, 3.2 THK 2 pcs by owner
B/N ASTM A193, 3/4 x 3.5", F. THREADED, CW WASHER 3" 24 pcs by owner
B/N ASTM A193, 5/8 x 3-1/2", F. THREADED, CW WASHER 2" 8 pcs by owner

F.3 From New Line to New Tank 1000


ELL 90, 3" ND, BW, SCH 40 3 pcs by owner
GLOVE VALVE, 3" ND, PN 16, DIN, CS 1 pcs by owner
FLANGE SO, 3" ND, 150 LB, CS 4 pcs by owner
FLANGE SO, 2" ND, 150 LB, CS 2 pcs by owner
FLANGE BLIND, 3" ND, 150 LB, CS 2 pcs by owner
GASKET, TOMBO, 3" ND, 3.2 THK 6 pcs by owner
GASKET, TOMBO, 2" ND, 3.2 THK 2 pcs by owner
B/N ASTM A193, 3/4 x 3.5", F. THREADED, CW WASHER 3" 24 pcs by owner
B/N ASTM A193, 5/8 x 3-1/2", F. THREADED, CW WASHER 2" 8 pcs by owner

F.4 From New Line to Plant


REDUCER (CONC), 3x2.5" ND, CARBON STEEL, SCH 40 2 pcs by owner
ELL 90, 3" ND, BW, SCH 40 3 pcs by owner
GLOVE VALVE, 3" ND, PN 16, DIN, CS 1 pcs by owner
FLANGE SO, 3" ND, 150 LB, CS 4 pcs by owner
FLANGE SO, 2" ND, 150 LB, CS 2 pcs by owner
FLANGE BLIND, 3" ND, 150 LB, CS 2 pcs by owner
GASKET, TOMBO, 3" ND, 3.2 THK 6 pcs by owner
GASKET, TOMBO, 2" ND, 3.2 THK 2 pcs by owner
B/N ASTM A193, 3/4 x 3.5", F. THREADED, CW WASHER 3" 24 pcs by owner
B/N ASTM A193, 5/8 x 3-1/2", F. THREADED, CW WASHER 2" 8 pcs by owner

Jumlah F. - -
PT. ENERGI UNGGUL PERSADA
Proyek : POME PLANT 300TPD
Lokasi : Segendris - Bontang Lestari - Kalimantan Timur
Pek . : OSBL Pipe Line

No. Uraian Pekerjaan Q'ty Unit Material Upah Jlh. Material Jlh Upah

G. CONDENSATE LINE
G.1 From Existing to Main Line
PIPE SEAMLESS, 3" ND, SCH 40, CS SGP Pipe SGP 13 BTG by owner
PIPE SEAMLESS, 2" ND, SCH 40, CS SGP Pipe SGP 6 BTG by owner
PIPE SEAMLESS, 1" ND, SCH 40, CS Pipe SGP 4 BTG by owner

ELL 90, 3" ND, BW, SCH 40 3 pcs by owner


FLANGE SO, 3" ND, 150 LB, CS 1 pcs by owner
FLANGE BLIND, 3" ND, 150 LB, CS 1 pcs by owner
GASKET, TOMBO, 3" ND, 3.2 THK 2 pcs by owner
B/N ASTM A193, 3/4 x 3.5", F. THREADED, CW WASHER 3" 8 pcs by owner

G.2 From Tank Plant to Main Line


ELL 90, 1" ND, BW, SCH 40 3 pcs by owner
FLANGE SO, 1" ND, 150 LB, CS 2 pcs by owner
GLOBE VALVE, 1" ND, PN 16, DIN, CS 1 pcs by owner
GASKET, TOMBO, 1" ND, 3.2 THK 2 pcs by owner
B/N ASTM A193, 1/2 x 2-1/2", F. THREADED, CW WASHER 1" 8 pcs by owner

G.4 From Tank 3000 to Main Line


REDUCER (CONC), 2x1" ND, CARBON STEEL, SCH 40 2 pcs by owner
ELL 90, 1" ND, BW, SCH 40 6 pcs by owner
GLOVE VALVE, 1" ND, PN 16, DIN, CS 6 pcs by owner
BALL FLOATING STEAM TRAP, 1" ND, PN 16, DIN, CS 2 pcs by owner
FLANGE SO, 2" ND, 150 LB, CS 2 pcs by owner
FLANGE SO, 1" ND, 150 LB, CS 16 pcs by owner
GASKET, TOMBO, 2" ND, 3.2 THK 2 pcs by owner
GASKET, TOMBO, 1" ND, 3.2 THK 16 pcs by owner
B/N ASTM A193, 5/8 x 3-1/2", F. THREADED, CW WASHER 2" 8 pcs by owner
B/N ASTM A193, 1/2 x 2-1/2", F. THREADED, CW WASHER 1" 64 pcs by owner

G.5 From Tank 1000 to Main Line


REDUCER (CONC), 2x1" ND, CARBON STEEL, SCH 40 2 pcs by owner
ELL 90, 1" ND, BW, SCH 40 6 pcs by owner
GLOVE VALVE, 1" ND, PN 16, DIN, CS 6 pcs by owner
BALL FLOATING STEAM TRAP, 1" ND, PN 16, DIN, CS 2 pcs by owner
FLANGE SO, 2" ND, 150 LB, CS 2 pcs by owner
FLANGE SO, 1" ND, 150 LB, CS 16 pcs by owner
GASKET, TOMBO, 2" ND, 3.2 THK 2 pcs by owner
GASKET, TOMBO, 1" ND, 3.2 THK 16 pcs by owner
B/N ASTM A193, 5/8 x 3-1/2", F. THREADED, CW WASHER 2" 8 pcs by owner
B/N ASTM A193, 1/2 x 2-1/2", F. THREADED, CW WASHER 1" 64 pcs by owner

Jumlah G. - -
PT. ENERGI UNGGUL PERSADA
Proyek : POME PLANT 300TPD
Lokasi : Segendris - Bontang Lestari - Kalimantan Timur
Pek . : OSBL Pipe Line

No. Uraian Pekerjaan Q'ty Unit Material Upah Jlh. Material Jlh Upah

H. WATER LINE DISTRIBUTION


H.1 From Existing to Main Line
PIPE GALVANISH, 2" ND, SCH 20 11 BTG by owner
PIPE GALVANISH, 1" ND, SCH 20 4 BTG by owner

ELL 90, 2" ND, BW, SCH 40 3 pcs by owner


FLANGE SO, 2" ND, 150 LB, CS 1 pcs by owner
FLANGE BLIND, 2" ND, 150 LB, CS 1 pcs by owner
GASKET, TOMBO, 2" ND, 3.2 THK 2 pcs by owner
B/N ASTM A193, 5/8 x 3-1/2", F. THREADED, CW WASHER 2" 8 pcs by owner

H.2 From Plant to Main Line


REDUCER (CONC), 2x1,5" ND, CARBON STEEL, SCH 40 2 pcs by owner
ELL 90, 1" ND, BW, SCH 40 3 pcs by owner
FLANGE SO, 1" ND, 150 LB, CS 1 pcs by owner
GLOVE VALVE, 1" ND, PN 16, DIN, CS 1 pcs by owner
GASKET, TOMBO, 1" ND, 3.2 THK 1 pcs by owner
B/N ASTM A193, 1/2 x 2-1/2", F. THREADED, CW WASHER 1" 4 pcs by owner

Jumlah H. - -

I. AIR COMPRESSOR LINE


I.1 From Existing to Main Line
PIPE SEAMLESS, 3" ND, SCH 40 16 BTG by owner
PIPE SEAMLESS, 1/2" ND, SCH 40 5 BTG by owner
ELL 90, 3" ND, BW, SCH 40 4 pcs by owner
FLANGE SO, 3" ND, 150 LB, CS 1 pcs by owner
FLANGE BLIND, 3" ND, 150 LB, CS 1 pcs by owner
GASKET, TOMBO, 3" ND, 3.2 THK 2 pcs by owner
B/N ASTM A193, 3/4 x 3.5", F. THREADED, CW WASHER 3" 8 pcs by owner

I.2 From Plant to Main Line


ELL 90, 1" ND, BW, SCH 40 3 pcs by owner
FLANGE SO, 1" ND, 150 LB, CS 1 pcs by owner
GLOVE VALVE, 1" ND, PN 16, DIN, CS 1 pcs by owner
GASKET, TOMBO, 1" ND, 3.2 THK 1 pcs by owner
B/N ASTM A193, 1/2 x 2-1/2", F. THREADED, CW WASHER 1" 4 pcs by owner

Jumlah I. - -

Jumlah II - -
PT. ENERGI UNGGUL PERSADA
Proyek : POME PLANT 300TPD
Lokasi : Segendris - Bontang Lestari - Kalimantan Timur
Pek . : OSBL Pipe Line

No. Q'ty Unit Material Upah Jlh. Material Jlh Upah

III INSTALL MACHINERIS


A. PUMP
PU001 CRUDE OIL PUMP 260 kg by owner 17,000 4,420,000
PU041 DISCHARGE PUMP 260 kg by owner 17,000 4,420,000
PU071 RECOVERED OIL PUMP 230 kg by owner 10,500 2,415,000
PU091 SEPERATOR OPERATING WATER PUMP 80 kg by owner 8,500 680,000
PUXXX Tansfer Pump 520 kg by owner 9,400 4,888,000
B. MIXERS
MX001 WASHING WATER STATIC MIXER 20 kg by owner 18,000 360,000

C. HEAT EXCHANGERS
HE011 CRUDE OIL ECONOMISER 339 kg by owner 28,000 9,492,000
HE012 CRUDE OIL HEATER 195 kg by owner 57,000 11,115,000
-
D. VESSELS / TANKS -
TK041 BUFFER TANK 2300 kg by owner 3,500 8,050,000
TK091 SERVICE WATER TANK FOR SEPERATOR 160 kg by owner -
TK071 SETTLING TANK 4000 kg by owner -
-
E. SEPARATOR -
SP031 WASHING SEPARATOR 2250 kg by owner -
-
F. MISC -
CT001 CLEANING TABLE 850 kg by owner -
ST001 SELF CLEANING STRAINER 300 kg by owner -
ST032 SOLID IMPURITIES CONTAINER/SEPERATOR 800 kg by owner -
SLUDGE BIN SLUDGE COLLECTOR 100 kg by owner -

Jumlah III - 45,840,000.00

270,000,000
Kelompok Sub Kelompok
Kode Nama Barang Jenis Barang Spesifikasi Merk Satuan Mata Uang
Barang Barang

Barang Instalasi Pabrik Kelapa KS-SE3/SEK 50


15013824700 Pompa Crude oil pump Cito Unit Rp.
Pabrik Sawit CA

Barang Instalasi Pabrik Kelapa Desanding pump KS-SE3/SEL


15013824800 Pompa Cito Unit Rp.
Pabrik Sawit (1st stage) 40C CA

Barang Instalasi Pabrik Kelapa KS-SE3/SEK 50


15013824900 Pompa Crude oil pump-2 Cito Unit Rp.
Pabrik Sawit CA

Barang Instalasi Pabrik Kelapa Desanding pump KS-SE3/SEL


15013825000 Pompa Cito Unit Rp.
Pabrik Sawit (2st stage) 40C CA

Barang Instalasi Pabrik Kelapa Sludge pump KS-SE3/SEL


15013825100 Pompa Cito Unit Rp.
Pabrik Sawit (Precleaner) 40C CA
Barang Instalasi Pabrik Kelapa Heavy Phase KS-SE3/SEK 40
15013825200 Pompa Cito Unit Rp.
Pabrik Sawit pump CA
Barang Instalasi Pabrik Kelapa Light Phase KS-SE3/SEK 40
15013825300 Pompa Cito Unit Rp.
Pabrik Sawit pump CA
Barang Instalasi Pabrik Kelapa KS-SE3/SEK 40
15013825400 Pompa Skimed oil pump Cito Unit Rp.
Pabrik Sawit CA
Barang Instalasi Pabrik Kelapa SIHI LPHX
15013825500 Pompa Vacum Pump Cito Unit Rp.
Pabrik Sawit 55316 CA
Dried oil
Barang Instalasi Pabrik Kelapa SIHI CEHA 6102
15013825600 Pompa pump/Tranfer Cito Unit Rp.
Pabrik Sawit CA
pump
Harga Satuan Lihat Kurs

64932500.00 Lihat Kurs


81652500.00 Lihat Kurs
64932500.00 Lihat Kurs
81652500.00 Lihat Kurs
88540000.00 Lihat Kurs
57190000.00 Lihat Kurs
57190000.00 Lihat Kurs
57190000.00 Lihat Kurs
214415000.00 Lihat Kurs
137940000.00 Lihat Kurs

You might also like