Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

08/03/2021

BILL
To,
EI Regalo
Undri, Pune

Respected Sir,

Please find attached material list with specifications.

Date Material Rate Per Brass Measurement Total Amount


07/03/2022 River Sand 7600/- 6.11 Brass 46,436/-
14.4 x 7.9 x 5.6
Chalan # 14

TOTAL AMOUNT 46,436/-

Rs. in words : Fourty Six Thousand Four Hundred & Thirty Six Only.

Thank you.

For Sachin Rajaram Kolekar

M : 8530308509

You might also like