Estimates of Water Supply and Sanitary Works 453

Art. 13-7

w 00'

A N

5 w 00'T

COi

w 09'7
1)
Liquid capacity per assumed as 120 litres.
user is
2) Detention period is taken as 24 hours.
(3)
Sludge storage capacity is taken as 15 litres per capita per year
(4) The tank is
assumed to be cleaned every year
(5) Free board of 30 cm to 45 cm
should be added to find the
actual .
septik tank. deph
7. ESTIMATE OF A
SEPTIC TANK WITH SOAK WELL:
Prepare an estimate of a septic tank with soak well as shown in
general specifications are as follows: Drawing No .

(1) The foundation concrete is to be of


B.B.C.C. (1:6:12).
(2) The brickwork is of 1st class in
c.m. (1:6).
3) The brickwork for soak
pit and baffle wall in septic tank is to be carra
with open joints.
(4) The R.C.C. work is to be carried out in
(5) The 1.P.S. for the
proportion (1:2:4) with machine mis
flooring is to be of proportion (1:2:4).
(6) The sagol finish cement
plaster is to be 12 mm thick and of proportion t
Also work out the
quantity of cement required.
MEASUREMENT
No. Item No. L B D
Qty. Toti
1. Excavation
(a) Upto 1.50 cm depth
.00 Septic tank 1 8.40 3.40|1.50 42.84
.00
0.40
Soak pit 1 (3.60 1.50 15.27
3.40
58.11
CU
(b) From 1.50 m to 3.00 m depth
.08 Septic tank 1 8.40 3.40 0.98 27.99
0.50
.50 Soak pit 1
(3.60)2 1.50 15.27
0.40 43.2
2.48
Cu
-1.50
0.98

(c) Above 3.00 m depth


4.00 Soak pit 1 (3.60)2 1.00 10.18
-3.00 10.
1.00 CU

2. B.B.C.C. (1:6:12) in foundation


1-
Septic tank 8.40 3.40 0.40 11.42 CU
L B D
No. Item No.
Qty. To
3. Brick masonry in c.m. (1:6)
Septic tank
Hor. o/o 2 8.00
0.50 0.50
Vert. i/i 2.00 5.00
Hor. o/o 2 7.80
Vert. i/i 2.00J
0.40 0.50 3.92
Hor. o/o 7.60)
Vert. i/i 2.00 0.30 1.00 5.76
14.8
Brickwork with open joints CU
4.00 Soak pitt (3.3)|0.30 3.92 12.19
-0.08
3.92 Baffle wall in septic tank 2.00 0.20 1.50 0.60
12.
5. Brickbats for soak pit CU

4.00
-0.60
3.40 14(3.00)2| 3.40 24.04|
24
CU
6. 10 cm R.C.C. slab proportion (1:2:4)
Septic tank 1 7.60 2.60 19.76
Soak pit (3.60)2
10.17
Deduct: 29.93
Manhole cover 0.50 0.60 0.30
29.61
7.
Paving of 1.P.S. (1:2:4) sq
(a) Average thickness 50
mm
2.00 2.00 4.00
4.00
(b) Average thickness 60 mm sq
4.80 2.00 9.60
8. 12 9.60
cement
mm
thick sagol finish Sq
plaster in c.m.
(1:4)
Inside 2
7.00
2
2.00 2.00 36.00
Outside 2
Bottom of slab upto first offset 7.60
2.60 1.08 22.03
Septic tank 1
7.00 2.00 14.00
Soak well 1
4 (3.00)2 7.07
79.10
Estimates of Water Supply and
Art. 13-71 Sanitary Works
455

MEASUREMENT

Ttem No. L B D
No. Qty. Total

Deduct:
Sides of baffle wall 0.20 1.50 0.60
M.H. cover .50 .60 .30 net
0.90 78.20
m

Three coats of whitewashing same as item of cement plaster 78.20 78.20


9.
sq m
3 3 nos
10. C.I. steps
11. M a n h o l e cover
(weight upto 0.50 quintal) 1 no
100 mm diameter S.W. pipe
12.
30 Outlet of septic pit 5.60 5.6
5.00 Inlet 2.40 2.40
(assumed) 8.00
0.30
5.60 m

13. 75 mm diameter C.I. vent pipe


(open) (assumed) 12.00 12.00 12.00
m

ABSTRACCT

Item Qty. Per Rate Amount


No.

1. Excavation

(a) Upto 1.50 m depth 58.11 Cu m Rs. 95.00 Rs. 5520.45


(b) From 1.50 m to 3.00 m depth 43.26 Cu m Rs. 140.00 Rs. 6056.40
(c) Above 3.00 m depth 10.18 Cu m Rs. 210.00 Rs. 2137.800
B.B.C.C. (1:6:12) in foundation 11.42 Cu m Rs. 1410.00 Rs. 16102.20
2.
1st class brick masonry in c.m. (1:6) 14.68 Cu m Rs. 1920.00 Rs. 28185.60
3.
12.79 Cu m Rs. 1050.00 Rs. 13429.50
4. Brickwork with open joints
24.04 cu m Rs. 500.00 Rs. 12020.00
5. Brickbats for soak pit
Rs. 620.00 Rs. 18370.60
6. 10 mm R.C.C. slab proportion (1:2:4) 29.63 Sq m

7. Paving of 1.PS. (1:2:4)


880.00
(a) Average thickness 50 mm 4.00 sq m Rs. 220.00 RS.
Rs. 260.00 Rs. 2496.000
(b) Average thickness 60 mm 9.60 Sq m

8. 12 mm thick sagol finish cement


81.00 Rs. 6334.20
plaster in c.m. (1:4) 78.20 sq m RS.
78.20 m Rs. 13.00 Rs. 1016.60
9. Three coats of whitewashing sq
no Rs. 300.00 Rs. 900.00
10. C.I. steps
RS. 450.00 Rs. 450.00
11. Manhole cover of size 50 cm x 60 cm no
Rs. 130.00 Rs. 1040.00
12. 100 mm diameter S.W. pipe 8.00 r m

Rs. 310.00 Rs. 3720.000


13. 12.00 m
75 mm diameter C.I. vent pipe
(open)
Total Rs. 118659.35

Add 5% for contingencies Rs. 5932.97


Grand total Rs.124592.32
Rs.125000.00