Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 3

AHMED NOORI BASRA-IRAQ

07810596868 - 07703163223

JAWAD ahmed.alhussiny@yahoo.com
 Married, Birth date:1983

Construction Lead Site Engineers

. As an Lead Electrical Site Engineers Im direct and oversee electrical engineering projects
at construction sites, resolving issues and ensuring that work is completed according to
specifications. They balance project management and engineering tasks ranging from designing
electrical plans to monitoring contractors. also ensure that plans and work are completed
according to local and national electrical codes. Additionally, electrical site engineers conduct
testing and maintenance on electrical systems, including final inspections prior to job
completion.

. Assure all the Inspections Tests Reports to be completed, and RLMU for the drawings
as per the last and site installation requirements

. Experienced in Generators, VFD, SCR, AC/DC MOTORS, TRANSFORMERS, HV/LV


SWITCHGEARS.

Work experience
Bonatti SPA (Lukoil Lead Site Electrical Engineers
Project) OHL 11Kv,SCHNEIDER MV/LV SWG,MV MOTORS (VFD), ILP PANEL, TRANSMITTERS, MV/LV
TRANSFORMER.
JAN-2018 - Present
Co-ordinate closely within the project team, subcontractors under their control, the client’s
team and facilitate the safe progress of works
. Establish the milestones required to ensure successful progression and
completion and communicate those clearly to the package contractors.
. Ensure that on site instructions from client’s authorised personnel are being recorded
and managed
. Coordinate installation drawings, participate with commissioning and handover, including
defects identification, snagging and closure.
. Manage and monitor performance of engineering staff and specialist sub-contractors,
ensuring completion of electrical related tasks in accordance with construction plans, and
drawings.
. Be pro-active in allocating work ensuring efficient deployment of subcontractors.
. Takes ownership of electrical issues.
. Ensure that safety standards are understood, implemented and maintained by all team
members and contractors.
. Assist the onsite construction team to ensure that subcontractors work to the program
and construction sequence.
. Raise any issues that may affect progress, ensure that quality, benchmarks etc are
maintained and delivered at all times.
Makes sure all the construction (A) ITR's completed for (Cables, Termination, cable
trays, Glandings, Ex Inspection for all Transformers, MV/LV Switchgears, Motors, Instrument
panels. Transmitters
Calibration, troubleshooting, fault diagnosis, repairs of all Fire and gas system (Gas
Detectors, Flame detectors, smoke detectors, heat detector, LHD, MCP, deluge valve system,
Sprinkler system, CO2 system and FM-200 system.
DRILLMEC Technology Company
E&I Engineer
Working on DAQ System (MD TOTCO), maintenance, calibration, troubleshooting, fault
diagnosis, repairs of field instruments, Rig Sense V.03, and Fire and Gas Detection
2016 - 2018 system,electric Reload valve.
Carry out the implementation of regular instrument maintenance work schedules to meet
operational
work programs efficiently. Includes developing preventive maintenance based on
manufacturer’s recommendations, discussing progress reports and determining directional
objectives.
Maintenance and calibration of pneumatic control valves (Weir, Flowserve, Black borough
etc...) and
part turn actuated valves (Bray, Air torque, Flowtek, etc...)
Maintenance and calibration of transmitters PT, LT, TT, DPT (Emerson & ABB)
Maintenance and troubleshooting of flow meters (electromagnetic, orifice plate, variable area,
turbine, ultrasonic..) of ABB
Familiar with all type of fire and gas systems and fire suppression systems
Perform functional test, Calibration, cause and effect (Voting logic) check with all types of F&G
devices as per Lukoil maintenance plan.
Undertakes the implementation and control for the requirements of strategic instrument
spare parts.
Visit work site and identified the hazards related to the job task, Prepare the
Method Statement, JRA,
PTW.
Technical coordination with Instrument and fire and gas system.

Weatherford Drilling Company


Chief Electrician
Rig 840 1500HP,National Oil Well Varco (NOV) including AC Top Drive Varco TDS-11S,
SCR with Rose Hill AC and DC controllers, MTU engines with Baylor generators,
2012 - 2016 and DW with two DC motors as well as all rig electric requirements.
DAQ system (Rig Sense) V.03
PLC S7-300
Bonatti SPA (Lukoil Project)
Construction Electrical Site Engineer
Construction work on LV SWITCH GEARS SCHNIDER, MV/LV TRANSFORMER,
Chmical Injection Skids, ILP panel, Transmitters and Valves, DCS system.
2009 - 2012
Direct Electrical Contractors

directly oversee and manage teams of electrical contractors and


subcontractors. They may direct daily activities, answer questions about
power needs and electrical codes, and guide workers throughout the
construction process. Many electrical site engineers also work on elements
of construction projects themselves in collaboration with electricians and
other contractors.

Resolve Electrical Issues

resolve issues related to electric systems or devices that arise during the
course of construction. Changes to a building’s design or practical concerns
may result in existing electrical plans and blueprints no longer being viable, or
specifications may change requiring a different power configuration, leading
electrical site engineers to quickly revise plans and resolve issues to
prevent delays.

Develop Cost Estimates

Early in the construction planning process, help develop cost estimates for
both material and labor. By analyzing blueprints and site specifications, they
project the amount of wire, fixtures, and other materials the project will
require. They also estimate manpower and timelines, giving project managers
the information needed to consider contractor bids and ensure the project
remains within budget.

Manage Construction Schedules

manage construction schedules related to electrical elements of job sites.


They work closely with both planners and utility providers to determine when
project milestones need to be completed to avoid delays and maintain
profitability.
Frequently, electrical site engineers determine these schedules in collaboration
with subcontractors to ensure that electrical work is completed in tandem
with other elements of the project.

Conduct System Testing


conduct tests of electrical systems throughout the construction process. They
may test individual components or the whole system, including overseeing final
inspections of the job. Electrical site engineers check contractors’ work to
ensure adherence to local and national electrical codes, safe operation of all
devices, and accurate power delivery.

Education
Electrical Engineer
• Power and control Engineering
• Computer courses Windows Office, Windows XP, Excel, and Word.
• Safety course
• Language course (English).

Courses

@ Compex-1 to 4 for all Electrical Equipment oil filed in (Dubai) by ATEX


company @ computer (Word - Excel - Power Point - Outlook)
@ Maintenance of equipment and Operation of
projects @ Rig pass
@ Safe
start @
First Aid
@ Fire Fighting
@ H2S Training course
@ Radar Card & PTW
@ Electrical Equipments maintenance
course @ Strategic planning and Emergency
Training
@ HSE & H2S & ESR & Work at Height & @ Confined Space & PTW Holder (In MAJNOON
Training Center)

Skills
Gas Detection System
Construction, Calibration, Maintenance

Skills
MV/LV Transformers, Switchgears,
VFD, SCR, MCC, ILP
Construction, Maintenance, Testing, fill the
ITR's

Skills
Drawings, Design, SQY, RLMU, MOC،ITR'S

You might also like