Professional Documents
Culture Documents
GUI Project
GUI Project
Tal-Ambegaon, Pune-412405
CERTIFICATE
ACKNOWLEDGEMENT
We have great pleasure and sense of satisfaction in presenting this
micro-project report on “HOTEL MANAGEMENT APPLICATION
SYSTEM" as part of the curriculum of Diploma in Computer
Engineering. Being novice in the field of designing and structuring in this
micro-project, it could have been extremely difficult for us to complete
this micro project on our own. We are very fortunate to be guided by
people with vast and resourceful experience in their respective field of
work.
We express my sincere gratitude to our guide Mrs. Dandale.Mam
for her timely guidance, support and suggestions. We are also thankful for
her sincere help and for making us available all the facilities of the
department. Without her efforts and constant monitoring the micro-
project and documentation would not have been duly completed. Also, we
express our sincere thanks to Mrs.J.R.Hange. (HOD Computer
Department), besides, we take this opportunity to express our sincere
gratitude to the Principal nandanvar sir, G. P. Awsari for providing a good
environment and facilities to complete this micro-project. We would also
like to thank all my colleagues who have directly or indirectly guided and
helped us in the preparation of this micro project.
• GAIKAWAD KANCHAN
• PAWAR SANIKA
• RASAL SAMRUDDHI
• SANGSHETTI NISHA
• Brief Introduction
• Action plan
SR.NO DETAILS OF PLANNED PLANNED NAME OF
ACTIVITY START FINISHED RESPONSIBLE
DATE DATE TEAM
MEMBER
1 Formation of the 01/04/2021 01/04/2021 Sanika pawa
project and
allocation of
project title by the
teacher
2 Conduct 05/04/2021 05/04/2021r
information search
about project of
requirement
anlysis of the
project
3 Acquire the 05/04/2021 29/04/2021
information from
the teacher
4 Select the 29/04/2021 12/05/2021
information from
the book and
internet
5 Actual project 12/05/2021 28/05/2021
assembling
6 Arrange all the 28/05/2021 02/06/2021
data report the
preparation
7 Submission of the 02/06/2021 05/06/2021
project
• Resources Required
S NAME OF SPECIFICATIONS QTY REMARKS
R. RESOURCES/MATERIAL
N
O
.
1 Computer system HP Probook4430s 1
2 Visual Studio Execute the 1
sofware
1.Rationale:
The micro-project “Hotel Management System” is the sample project for
managing hotel details.
This is software for managing the general activity of a hotel like booking of
Room billing etc.
The purpose of this document it to collect anlayze and difinite high level needs
and feature of the hotel management system.it focused on the captivity needed
by the stakeholders and the target user.and why these need exists The details of
how the hotel management system fulfill these needs are details in the use case
and supplmenty specifications. This software is aimed the facilitating the promot
accurate and easy management of a hotel it will be very helpful to the
management on the one hand and to customer as they would be able to get good
and fast service
Hardware limitations: when servers cannot cater to more number of user it takes
time to process
• Course outcome:
CO (a):- Develop programs using VB.NET.
• Literature review:
In this project where it is named as “Hotel Management System”we are performing
various
Here we have described contents of the students and teachers like first of all we have
displayed options of what you want to do in this project.Like similarly user can add his/her
contact details,taking admissiofor course etc.
The development of culture studies in the hotel industry is reviewed. • Pizam's (1993) hierarchy
of cultures was applied as a foundation. • National and organizational cultures were mostly
studied research topics. • Few studies have focused on industry, occupational, and corporate
cultures
.5 Flow Chart
The flowchart shows the steps as boxes of various kinds, and their order by connecting
the boxes with arrows. This diagrammatic representation illustrates a solution model to
a given problem. Flowcharts are used in analyzing, designing, documenting or managing
a process or program in various fields.
6. Actual Methology:
• VB.NET Hotel management system.
Table For Hotel Management System – Hotel Management System is
Evergreen Project for real life as well for engineering students.Visitor or
Client comes in hotel and book his/her room for some duration. Visitor
will provide his own personal detail and will get room number according
to availability. Yeah there will be charge for every room according to
facility. After payment visitor will checkout from the hotel .
Public Class Form1
Private Sub Form1_Load(sender As Object, e As EventArgs)
Handles MyBase.Load
With ComboBox1.Items
.Add("Standard Room with TV And Electric fan (2 person)")
.Add("Family Room with TV And Electric fan (6 person)")
.Add("Deluxe Room with TV And Aircondition (6 person)")
.Add("Single Room with Aircondition (1 person)")
.Add("Squad Room with TV And Aircondition And Ac (1
person)")
.Add("joint Room with TV And Aircondition And Ac (6
person)")
.Add("Appartment style Room with TV And Aircondition And
Ac (1 person)")
End With
End Sub
End Sub
TextBox5.Text = change
Catch ex As Exception
MsgBox(ex.Message)
End Try
End Sub
End Class
• Hardware Requirements:
Sr.no Resources Specifications Quantity
1 Desktop PC • i3 Intel Core 1
Processor
• 4GB RAM(Read
Only Memory)
2 Operating System Windows 7-64 bit 1
• Software Requirements:
• This project told us that how we can store booking details of various persons or or others
in an efficient and effective way.Also this project has supported us to remind us some
basic statements of .NET
• A online booking System is a program that enables you to store and manage
boking information.
• They are essentially databases that tracks all your information and
communication based on your course