Field Instruction: Replace The Chip For 300VFE Controller
Field Instruction: Replace The Chip For 300VFE Controller
Field Instruction: Replace The Chip For 300VFE Controller
1. *Safety Precautions
GENERAL
All work activity must comply with Otis Worldwide Jobsite Safety Standards (WWJSSS)
and local safety rules. Prior to commencement of work, read the entire procedure and
complete a Job Hazard Analysis (JHA). If you are unsure about the work task at hand,
immediately stop work and consult with your supervisor.
1 Hard hat 1
2 Safety-shoes 1
3 Gloves 1
Extractor
5 1
(will be shipped with material)
6 ESD Strap 1
7 Multi-meter 1
3. Material Required
Item Description & Part # Quantity
Chip
1 1
AT27C010_PUI
This work and the information it contains (collectively referred to as ‘Work’) are the confidential property of the Otis Elevator Company (‘Otis’). This Work is delivered
on the express condition that: it will be used or reproduced by Otis employees exclusively for, or on behalf of, Otis; it will not be disclosed, reproduced, or distributed
by or to others, in whole or in part, without the prior written consent of Otis: and, it and any copies will be promptly returned to Otis upon demand or upon termination
of employment. Unpublished Work - © Copyright 2022 Otis Elevator Company, Document number: FLD00001 Revised 11-Jun-2012
Field Instruction OTIS
Change the Chip for 300VFE Controller Tianjin
GeN2 MR/OTIS 3000/ OTIS SKY No.: 79-19-006
Date: 7-Feb-2019
Page: 2 of 4
4. Preparation
4.1 Notify customer of planned work activity.
4.2 Prepare tools and materials.
4.3 Prepare JHA and personal protective equipment (PPE).
4.4 Capture the car, remove from group service.
4.5 Place appropriate signs and barricades to avoid unexpected access.
4.6 Confirm all landing doors are closed, and there is no passenger in car.
4.7 Enter the machine room, power off the main power, test & verify 0 energy, then LOTO.
5. Work Instructions
Ste Tooling
Task Description and Photo(s)
p# Required
Identify the board which should be changed the chip in the controller.
There are two kinds of board need to change the chip.
One is COCO-MCB, another is LMCSS-MCB.
The use and ownership of this work is defined by and subject to the legend contained on the front page of this document. Unpublished Work - © Copyright 2022 Otis
Elevator Company, Document number: FLD00001 Revised 11-Jun-2012
Field Instruction OTIS
Change the Chip for 300VFE Controller Tianjin
GeN2 MR/OTIS 3000/ OTIS SKY No.: 79-19-006
Date: 7-Feb-2019
Page: 3 of 4
The use and ownership of this work is defined by and subject to the legend contained on the front page of this document. Unpublished Work - © Copyright 2022 Otis
Elevator Company, Document number: FLD00001 Revised 11-Jun-2012
Field Instruction OTIS
Change the Chip for 300VFE Controller Tianjin
GeN2 MR/OTIS 3000/ OTIS SKY No.: 79-19-006
Date: 7-Feb-2019
Page: 4 of 4
controller.
Extractor
Remove the chip with
4
extractor. ESD
Strap
6. Final work
6.1 Run the elevator in inspection speed, if there is no problem, turn to normal speed, and
confirm everything is OK.
6.2 Return to service and notify customer.