Download as pdf or txt
Download as pdf or txt
You are on page 1of 6

March 2022

March 2021

The construction update


of your Godrej Home
August
March
June 2022
April2021
March
April 2021
2021

A Beautiful Wait
Owning a dream home is always
special. It is a result of years of
savings that make your dream come
true. And we at Godrej Properties Ltd.
are proud to be the facilitators of that
dream.
As the construction of your dream
home continues in full swing, we
understand how patiently you wait for
your dream to come to fruition. To
make this wait beautiful and
worthwhile, we would like to share with
you comprehensive updates on the
construction of your project so that you
can see your dream taking shape for
yourself.

An address that redefines the skyline of South Delhi. One with the stature that towers far above the rest and a
copper crown that graces its head. One that comes from intricate design and a deep understanding of what
luxury truly is. An address that takes even the air you breathe to a whole new level. An address that serves as
your calling card.

2
August
March
June
March
April 2022
April2021
2021
2021
2021

Project Update-Superstructure

22
20
Floors Constructed

18
16
14
12
10
8
6
4
2
0
Slab Block 1 Slab Block 2 Tower 2

Floors Completed Floors in Progress


Total Floors
Slab Block 1 – 19 floors Slab Block 2 – 23 Floors Tower 2 – 29 Floors

4
September
August
March
April2021
March
April 2021
2022
2021
2021
2021

Project Update-Construction Images

Superstructure (Terrace Floor Slab)


RCC Completed

Basement - 2 RCC work in progress

Actual site photographs


5
August
March
April2021
March
April 2022
2021
2021
2021

Project Update-Construction Images

Superstructure (Terrace Floor Slab)


RCC Completed

6 Actual site photographs


September
August
March
April2021
March
April 2021
2022
2021
2021

Tentative Upcoming Payment Milestones

Upcoming Milestones Tower - 2 Slab Block - 2 Slab Block - 1


Interior Finishes

Completion of Super structure Completed Completed -

Mar’ 22 (19-
Completion of Flooring Completed -
23 floor)
Common Area Development

On Completion of Basement 2 Roof Slab - - Mar ’22