1-TR-al-Ncrw< (GOVERNMENT OF INDIA )

,-1-.410 ,4 (MINISTRY OF RAILWAYS)


.n (RAILWAY BOARD)

N . 2000/RE/161/1 Pt. Ill New Delhi, Dt. 03.11.10


Executive Director/Electrical
RVNL, August Kranti Bhavan
Bhikaji Cama Place
R K Puram, New Delhi

Sub: Standard implantation for new electrification works.

Ref: (i) Your office letter no. RVNUBPUElect/BYT-URK/21 dated 22.09.10.


(ii) This office letter no. 2006/RE138/4 dated 26.02.10.
(iii) ACTM Advance correction slip no. 20 dated 3.11.10:

In continuation to ACTM correction slip no 20, following tabular guidelines regarding


setting distance is given with the approval of. Board (ML):

Implantation on Main line Implantation in Yards


(a) Mast having (a) 2.8 m - if minimum (a) If 2.8 m is not available,
single OHE. formation width in implantation can go down
embankment available is as minimum upto 2.36 m which
per SOD Para 16, 17 schedule shall not require any specific
I, chapter 1. If this formation approval from CEE (open line).
width is not available,
implantation may be permitted
upto 2.5 m without approval of
CEE & upto 2.36 m with
approval of CEE. (ref:- Para •
• 20.1, page 29 of ACTM 1994).
(b) Portal upright, (b) Should not normally be less than 3.0 m which may be
masts carrying more relaxed to 2.8 m, with the personal approval of CEE (open line)
than one OHE & who may prescribe any special precaution as may be
head span masts. considered necessary.

(Mrs. Manju Gupta)


Executive Director/Railway Electrification
Railway Board.

....
of CailwaYs
Copy to:
ard
Chief Electrical Engineer (All Zonal Railways)
2• Director/IRIEEN, Nasik Road
l• Sr. Prof./ElectriCal Railway Staff Qollege;Vadodara
4 • EIJI/Co-ordination, RDSO
5 • LE.E./ cote (a.1- 1) • :.; •
D:\MyDocuments.1\sgoentrd issues\Standard implantatioagg.doetIV't:_—