Daily Worksheet 5010051816-25-Mar 2022

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

ALMANSOORI INSPECTION SERVICES

DAILY WORKSHEET
CREW DATE: 25/03/2022
REMARKS/
EMP.# NAME
O.T. HOURS

9660826 SUMESH.D EXTRA EXPENSES:


CUSTOMER: HALLIBURTON LOCATION: SINO-12 HD009 ABDI 9 TAXI:

CUSTOMER ORDER NO.: ONSHORE/OFFSHORE RIG: ONSHORE HD113 AWAD 9 NO. OF PERSONS

JOB ALLOCATED: 5010051816 OTHERS: AMOUNT

JOB NO.: TIME START: 7:00 AM TIME FINISHED: 5:00:00 PM REASON:

DOWN TIME: 01 HRS

REASON FOR O.T.: FRIDAY REASON FOR DOWN TIME: LUNCH BREAK

VARIOUS SUBS/ TOOL BOX MEETING


DRILL PIPE H/W DRILL PIPE DRILL COLLARS TUBING/CASING SHOP INSPECTION
DOWN HOLE TOOLS (BEFORE JOB COMMENCEMENT)
JOURNEY MANAGEMENT
SERVICE QTY. SERVICE QTY. SERVICE QTY. SERVICE QTY. SERVICE QTY. SERVICE QTY. PRE-POST JOB MEETING WITH CLIENT
OBJECTIVES OF THE JOB
PLAN AND PROCEDURES
4 1/2'' TUBING INSPECTION 30 RESPONSIBILITIES/SUPERVISION
HAZARDS (TASK HAZARD ANALYSIS)
CRITICAL HAZARD ACTIVITIES AND AWARENESS
EMPOWER TO STOP
MANPOWER AND SKILLS REQUIRED

REPORT NO. REPORT NO. REPORT NO. REPORT NO. REPORT NO. REPORT NO. EQUIPMENT TO BE USED
CLEANING NDT SERVICES LIFTING GEAR DROPS ROPE ACCESS OTHERS PERSONAL PROTECTIVE EQUIPMENT
PERMIT TO WORK
SERVICE QTY. SERVICE QTY. SERVICE QTY. SERVICE QTY. SERVICE QTY. SERVICE QTY. WORKSITE ENVIRONMENT
OTHER ACTIVITIES
ISOLATION (LOCK OUT)
ACCESS AND EXIT
NO BLAME CULTURE
CLIENT FEEDBACK (F.1315)

REPORT NO. REPORT NO. REPORT NO. REPORT NO. REPORT NO. REPORT NO. ZERO TOLERANCE RULES
JOB COMMENTS: ENCOURAGE QUESTIONS AND TWO WAY DISCUSSION
CARRIED OUT 4 1/2'' TUBING INSPECTION ON FRIDAY NEW EMPLOYEE OR TRAINEE (GREEN HANDS) PRESENT AT SITE
YES NO
PERSON DIRECTLY REPONSIBLE FOR GREEN HANDS:

NAME
HSEQ/TOOLBOX COMMENTS: CREW INITIALS:

1. SUMESH 2. ABDI
CLIENT COMMENTS:
3. AWAD 4.

5. 6.

SUMESH.
CONDUCTED BY: NAME
VEHICLE USED TOOL BOX
CLIENT NAME & SIGN
Note:
(1) Journey more than 25 K.Ms must have Tool Box Talk conducted by the Team Leader/Supervisor prior to starting.
(2) This form is required to be filled in by the Team Leader every day and submitted to the Supervisor/Superintendent with no exception. If the job is done Offshore/Onshore this form is required to be faxed to the office every day.
(3) Equipment failure need to be reported to the Inspection Superintendent or Technician using the JR Form No.F-448.
(4) This report should be completed in all respect including report number for the job done.
(5) Inspection reporting should be completed the same day the Inspection is done and relevant report numbers given in thisTime Sheet. In case if the reporting cannot be done, explain the reason.
(6)* Specify the type of inspection, volume and charged hours as per Time Sheet in the comments column.

F.488
Rev.06
08.01.2018

You might also like