402 R0-Installation of HVAC Duct-C

You might also like

Download as pdf
Download as pdf
You are on page 1of 8
3rd, Haram Extension Project - Makkah geal vay acgane SAUDI ANTADI GROUP Security Building - Plot 2 TRANSMISSION OF DRAWINGS, DOCUMENTS, SAMPLES, FTC NanTTAL FOR TRANSMITTAL NO H-PLZ-M2 (REV 800) DATE: 1910-2014 froneinreRsON z (omen al [To: Dar AFvandassh enon Coan [atn: Eng, at Abe alin enone 7 Jsvnsecr, Method OF Statement For Installation of HVAC Duet Work And Duct Accessories STRONBMROAEED NOD "ERE HBR TERE OER HPAEATECONER TE MECHANICAL secre ‘wos BL sume | Method OF Statement For instaltion @f HVAC Dust |p ‘Work And Dust Ascesreries Doce PREPARED BY | ‘sunmereD By Eng. Mohamed El-Faham Eng. Ahmed El Ging ape si re Hussein Abdel at sojujzoty f cairmtecnceday S/W Pe Staome crewmen ater JO or Ee Reve 2 Ue con | . a = 7 = Auageull gal y acgoaa © SL SAUDI BINLADIN GROUP : METHOD STATEMENT FOR INSTALLATION OF HVAC DUCT WORK AND DUCT ACCESSORIES BULDINGS “PLOT? King Abdullah Bin Abdul Aziz Project Third Saudi Expansion of Holy Haram Makkah & Surrounding Area in Shamiah Security Building (PLOT 2) ageull yall w 2cgore SAUDI BINLADIN GROUP. King Abdullah Bin Abdul Aziz Project Third Saudi Expansion of Holy Haram Makkah & Surrounding Area in Shamiah Security Building (PLOT 2) CONTENTS | Sr. Subject Page No. 1 Scope 3 20 References 3 3. General 3 Resources 4a Materials, 3 42 Equipment 3 43 Personnel 3 44 Electrical Requirements 3 5 Definitions & Abbreviations 4 Procedure 6. Pre Installation Procedures 4 62 Method of Installation 5-6 70 Quality Control 8.0 Safety THETAL DUCT, DUCT NGULATION. CQUIPHENT INGULATION. METAL UCT, DUCT WSULATION EQUIPMENT INSULATION, 13015, 15081, 15020,0500 '309107-02D-PL00-FD-sPC-1 18-ME-01 NEV 0, S09107-01D-PL00-'0-SPC-120-NE-01 REV $09107-030-PL00-FD-SPe-118-MEOL REV 0, S09107-03-PUOOLPD.SPC-1 LB-MU-DL REV @ ———— dungcuall yall iy dogo20 BINLADIN GROUP King Abdullah Bin Abdul Aziz Project Third Saudi Expansion of Holy Haram Makkah & Surrounding Area in Shamiah Security Building (PLOT 2) 1, SCOPE: - This “Method Statement” covers the onsite installation of HVAC duet work and accessories and the | requirements of checks to be carried out. 2, REFERENCES: Project Specifications, Division 15, Section: 10506,15081,15815, 15820, Approved shop drawings(latest revision) | Approved Project safety plan | ° ° ° © Approved Material Submittal 3. GENERAL: HVAC duct work generally includes all types of Supply Air Duct, Retum Air Duct , Fresh and Exhaust Air Duct and their accessories such as duct elbows, offsets, transformation pieces, branch off pieces, tee connections. access doors, Fire Dampers, Volume Control Dampers. Sound Attenuators, flexible ducting and insulation. 4. RESOURCES: - 4.L, Materials: Approved Material submittals for ~ HVAC duct work and accessories. - Insulation Materials 4.2. Equipment: Portable grinding Machine © Scaffolding Drilling Machine © Duct Erector hand tools Sheet metal Cutting tools and © Testing instruments bender. © Air Compressor | | © Spirit Level | ersonnel: © Project Engineer ( HVAC) © Safety Officer Construction -In-Charge © Ducting Foremen © Site Engineer/Site supervisor © Ducting Technician/Erector © QA/QC Engineer © Helpers tt, Electrical Requirements: © Single Phase/3 Phase Power supply shall be provided. © Ensure adequate lighting is provided in work area, | Tietat oucr.pucr iisucaTion, nquiPMeNT INsucATIon, METAL DUCT: DUCT INSULATION, EQUIEMENT Ti | 309107-010:P100 -sPC-128-08-01 REV 0, $09107-010-PL00-FD-SPC-111-ME-01 RE 0, | $09107-010-PL00,£0-$Pc-118.06-01 REV, S09107-01-PLO0-FO-STC-ALG--1 REV 9 Geogeull ual us ageze S401 SINLADIN GROUP King Abdullah Bin Abdul Aziz Project Third Saudi Expansion of Holy Haram Makkah & Surrounding Area in Shamiah Security Building (PLOT 2) © Safety lighting shall be provided adequately in ease of normal |5. DEFINITIONS & ABBREVIATIONS: - ing failure. MC = Main Contractor Cl - Construction-in-Charge PE = Project Engineer SS - Site Supervisors QCE = Quality Control Engineer FM - Foreman SO - Safety Officer SE - Site Engineer 6. PROCEDURE: - 6.1. Pre installation Procedures: Responsibility 1. Ensure that approved materials are available to carry out the work. PE ISE/ SS 2 Prior to Commencement of work . areas and access will be inspected to Cl/SE/SS confirm that Site is ready to commence the work, Check all the Duct work are pre fabricated with tag number labeled and SE/SS/FM received at site in accordance with specifications and correct dimensions as per approved drawings. 4. All relevant documentation (Drawings) and Material applicable to particular PE/SE/SS scetion of works will be checked by Site Supervisor prior to commencement, of wor 5. The Site engineer/ Site Supervisor will give necessary instructions to — SE/SS tradesmen( Duct erectors) and provide necessary approved construction/shop Drawings of latest revision along with coordinated lay outs. 6. The Site Supervisor/Foremen will also check that proper tools and equipment. SS/FM. are available to carry out the work and are in compliance with contract specification, 7. The Site Supervisor also explains the tradesmen regarding safety precautions SS / SO to be observed. | 8. Prior to Leak: testing, Site Engineer will ensure that light test is available and PE/SE/SS/Q are in good condition. CE facT NGULATION, C0 LATION, QUINT RGULATION, “S¥IS, 15 -FO-SPC-145-RE-04 MEY 0, SO9407-010-PL00-FD-SPC-TIDBAE-O1 REV 0, $09107-9:0-P400-0-SPC-LLE-ME-OL REV 0, S09107-O1D.PL.00.°D-SPC-L1B-HE-04 REY 0 éaagaual yall ys acgase SAUDI BINLADIN GROUP King Abdullah Bin Abdul Aziz Project Third Saudi Expansion of Holy Haram Makkah & Surrounding Area in Shamiah Securi! Building (PLOT 2) 7 10, 6.2, Method of Installation Prior to commencement of work coordination will be done with other services, Determine the position of duct supports as per approved construction drawing, coordinated layouts and specification. Provide marking for duct routing, Drill the holes in slab for fixing support and fix anchors threaded rods and support angles of required size. Prepare and fix the duct supports as per approved construction drawing and specification. Any cut edges of angles, channels or threaded rods will be touch up with Zine rich paint. Transport the Duct pieces and fittings to final location. Pre-assemble the Duct pieces and fittings as per approved shop drawing ensuring the alignment. Acoustic insulation will be carried out wherever required. Raise the duet work on to the supports ensuring that each length is aligned and leveled with preceding length as per dimensions shown on approved shop drawings. Approved duct sealant shall be applied on the joints, Any excess sealant shall be removed so that the joint left in clean and tidy condition, Ensure that duet work is clean and no tools’ construction debris exists within duct work before proceeding to next length All open ends of the duct works shall be temporarily sealed with polythene sheets/ply wood before leaving the job site to prevent moisture and dirt, Ensure that all accessories like Volume control dampers. Fire dampers. quipatenT ETAL bier BUCT AS EDL REV 0, SO9207-01D-P40-FD-SPC-LLB-NE-OT REV 0, MOL NEV, $09107-08b-PLOG-PO-SPG-£30.ME-08 REY 0 Responsibility PE/SE CISE SS/FM CUSS/EM SS/FM SS/FM. CYSS/FM PEISE//SS/ FM SS/FM SS/FM SS/EM SS/FM, aageull yall w acgore SAUDI BINLADIN GROUP | King Abdullah Bin Abdul Aziz Project Third Saudi Expansion of Holy Haram Maldah & | Surrounding Area in Shamiah Security Building (PLOT 2) 13, Access doors. Test points, Sensors are installed in accordance with SE/SS/FM approved shop drawings. 4, Install Sound Attenuators according to approved shop drawings SE/SS/FM | 15, Installation of duct work (complete with accessories) shall be checked CI/SS/QCE before applying insulation at joints. 16. Leak test will be carried out for duct work as per specification and SE/SS/QCE applicable standard. 7 Insulation of duct work will be completed as per manufacturer's CV/SS/FM recommendations. 18, Ensure the duet surface is elean and dry before applying any insulation SE/SS/FM } 19 Ensure the thickness of insulation as per approved shop drawing. SS/FM ae Ensure that all edge joints are closely butted and ends are flush and seated SS/FM properly . | 21. Apply Duct Tape (Self Adhesive Aluminum Foil Laminated on Glass SS/FM fabric) at Joints of insulation. 22. Ensure firm adherence of insulation around ducting by using approved SS/FM adhesive between sheet metal and Insulation material 23. Where insulated duct work passes through fire rated wall/partitions the gap MC I between sleeve and duct work shall be filled with approved fire barrier. | 7. QUALITY: | MET PSULATION, 15015, 150 '09107-010-P.00-FD SPC-1 H-E-01 NEV d, SO9I07-OLD-PL0040SPC-1iH-E.DT REV 509107. 010-PU00-FD-SPCALBME-O4 REV 0, "S0910-1D.PL.00D SPC-LI-NE-OL REY 0 Guageull yall w acgoas “SSE ALOI BINLADIN GROUP King Abdullah Bin Abdul Aziz Project Third Saudi Expansion of Holy Haram Makkah & Surrounding Area in Shamiah Security Building (PLOT 2) L QCE along with Project Engineer and Site Supervisor will monitor that all PE/SS/QCE components are installed as per contract specifications and approved submittals 2. Inspection Request (IR) shall be submitted to Main Contractor’ Consultant. CWSS/QCE for the following stages of work as per ITP attached. © After completion of installation before leak test © Leak testing of Duct work ( as applicable) © After complete insulation Responsibility © Work will commence as per safety regulations laid down in the SS /SO contract specification and project safety plan. © Proper safety harness to be used and secured, if required. SS/FM/SO © All personal protective equipment shall be used as appropriate SS/FM/SO according to the nature of the job. ¢ Housekeeping shall be of good standard and all cut pieces and debris. SS/FM/SO shall be removed. © Good ventilation for duct work insulation shall be ensured, SS/FM/SO STeTAL DUCT UCT HSULATION,«QUIPMENT HGULATION, NETAL-DUCT DUCT HSULATION, EOUIPHENT soo107-030. sr [REV ¢, S09107-010-PL00-#D-SPC-118-ME-01 REV 0, 509107-010-PL00-FD-SPC-11B-MED1 REY 0, $09107-010-PL00-tD-SPC-130-NE-O1 REVO Tens a0

You might also like