DAFTAR HARGA SATUAN PEKERJAAN

TAHUN ANGGARAN 2015


............................................................

HARGA SATUAN (Rp.) JUMLAH


NO. URAIAN PEKERJAAN KODE ANALISA
UPAH BAHAN ALAT (Rp.)
1 2 3 4 5 6 7 = (4+5+6)

PEKERJAAN PERSIAPAN
1 1 BH PEMBUATAN PAPAN NAMA PROYEK DIGITAL PRINTING A.4 35,000.00 216,000.00 - 251,000.00

PEKERJAAN DINDING
1 1 M2 PASANG BATA MERAH TEBAL 1/2 BATA 1 Pc : 5 Ps D.2 35,450.00 69,639.00 - 105,089.00
2 1 M2 PASANG DINDING BATU TEMPEL HITAM D.5 41,255.00 173,971.00 - 215,226.00

PEKERJAAN PLESTERAN
1 1 M2 PLESTERAN 1 Pc : 5 Ps + ACIAN E.3 44,705.00 10,754.00 - 55,459.00
HARGA SATUAN (Rp.) JUMLAH
NO. URAIAN PEKERJAAN KODE ANALISA
UPAH BAHAN ALAT (Rp.)
1 2 3 4 5 6 7 = (4+5+6)
PEKERJAAN LOGAM, PENUTUP LANTAI DAN DINDING -
1 1 M2 PASANG KERAMIK LANTAI PUTIH POLOS 40x40 CM G.8 56,817.50 85,503.50 - 142,321.00

PEKERJAAN PENGECATAN
1 M2 PENGECATAN TEMBOK BARU 1 LAPIS PLAMIR, 1 LAPIS
1 H.1 8,018.50 12,225.00 - 20,243.50
CAT DASAR, 2 LAPIS CAT PENUTUP
2 1 M2 CAT VERNIS BATU ALAM H.9 28,170.00 9,900.00 - 38,070.00

PEKERJAAN ALUMUNIUM
1 1 M2 MEMBUAT DINDING ALUCUBOND J.3 129,900.00 1,105,950.00 - 1,235,850.00

PEKERJAAN INSTALASI LISTRIK


1 1 BH TITIK LAMPU LENGKAP K.1 10,170.00 72,000.00 - 82,170.00
2 1 BH PASANG SAKLAR DOUBLE/SERIE K.2 10,170.00 24,000.00 - 34,170.00
3 1 BH PASANG SAKLAR TUNGGAL K.3 10,170.00 18,000.00 - 28,170.00
4 1 BH PASANG STOP KONTAK K.4 10,170.00 18,000.00 - 28,170.00
5 1 BH PASANG STOP KONTAK AC K.5 10,170.00 65,000.00 - 75,170.00
6 1 BH PASANG BOX MCB K.6 10,170.00 335,000.00 - 345,170.00
7 1 BH PASANG LAMPU PL 5 WATT+DUDUKAN K.7 10,170.00 36,000.00 - 46,170.00
8 1 BH PASANG LAMPU PL 11 WATT+DUDUKAN K.8 10,170.00 39,000.00 - 49,170.00
9 1 BH PASANG LAMPU PL 15 WATT+DUDUKAN K.9 10,170.00 43,000.00 - 53,170.00
10 1 BH PASANG LAMPU PL 18 WATT+DUDUKAN DOWNLIGHT K.10 10,170.00 101,000.00 - 111,170.00
11 1 UNIT PASANG PENANGKAL PETIR K.11 45,875.00 1,405,050.00 - 1,450,925.00

PEKERJAAN ENGSEL DAN KUNCI


1 1 M2 PASANG KACA POLOS T. 5 MM L.12 16,125.00 128,700.00 - 144,825.00

Indramayu, ……………...……2015

CV. DUTA GRAHA Consultant


ANALISA BIAYA KONSTRUKSI
TAHUN ANGGARAN 2015
............................................................

NO HARGA
URAIAN INDEKS SAT. UPAH (RP.) BAHAN (Rp.) JUMLAH (Rp.)
(KODE) SATUAN (Rp.)

1 2 3 4 5 6 = (3 x 5) 7 = (3 x 5) 8=(6+7)
A.4 1 BH PEMBUATAN PAPAN NAMA PROYEK DIGITAL PRINTING
BAHAN
Cetak Nama Digital 1.000 Ls 30,000.00 - 30,000.00 #VALUE!
Kayu Reng 3/4 Kruing 0.006 M3 7,200,000.00 - 43,200.00 #VALUE!
Kayu Kaso 5/7 Kruing 0.028 M3 5,100,000.00 - 142,800.00 #VALUE!
UPAH
Design Cetak Nama Digital 1.000 Ls 15,000.00 15,000.00 - #VALUE!
Ongkos Pasang 1.000 Ls 20,000.00 20,000.00 - #VALUE!
JUMLAH .......................... 35,000.00 216,000.00 #VALUE!
NO HARGA
URAIAN INDEKS SAT. UPAH (RP.) BAHAN (Rp.) JUMLAH (Rp.)
(KODE) SATUAN (Rp.)

1 2 3 4 5 6 = (3 x 5) 7 = (3 x 5) 8=(6+7)
D.2 1 M2 PASANG BATA MERAH TEBAL 1/2 BATA 1 Pc : 5 Ps
BAHAN
Bata Merah Bakar Kelas 1 70.000 Bh 675.00 - 47,250.00 #VALUE!
Semen Pc 9.680 Kg 1,425.00 - 13,794.00 #VALUE!
Pasir Pasang 0.045 M3 191,000.00 - 8,595.00 #VALUE!
UPAH
Pekerja 0.320 Org 75,000.00 24,000.00 - #VALUE!
Tukang Batu 0.100 Org 90,000.00 9,000.00 - #VALUE!
Kepala Tukang 0.010 Org 95,000.00 950.00 - #VALUE!
Mandor 0.015 Org 100,000.00 1,500.00 - #VALUE!
JUMLAH .......................... 35,450.00 69,639.00 #VALUE!
NO HARGA
URAIAN INDEKS SAT. UPAH (RP.) BAHAN (Rp.) JUMLAH (Rp.)
(KODE) SATUAN (Rp.)

1 2 3 4 5 6 = (3 x 5) 7 = (3 x 5) 8=(6+7)
D.5 1 M2 PASANG DINDING BATU TEMPEL HITAM
BAHAN
Batu Tempel Hitam Uk. 10x20 Cm 1.100 M2 145,000.00 - 159,500.00 #VALUE!
Semen PC 6.000 Kg 1,425.00 - 8,550.00 #VALUE!
Pasir Pasang 0.031 M3 191,000.00 - 5,921.00 #VALUE!
UPAH
Pekerja 0.188 Org 75,000.00 14,062.50 - #VALUE!
Tukan Batu 0.225 Org 90,000.00 20,250.00 - #VALUE!
Kepala Tukang 0.038 Org 95,000.00 3,562.50 - #VALUE!
Mandor 0.034 Org 100,000.00 3,380.00 - #VALUE!
JUMLAH .......................... 41,255.00 173,971.00 #VALUE!
NO HARGA
URAIAN INDEKS SAT. UPAH (RP.) BAHAN (Rp.) JUMLAH (Rp.)
(KODE) SATUAN (Rp.)

1 2 3 4 5 6 = (3 x 5) 7 = (3 x 5) 8=(6+7)
E.3 1 M2 PLESTERAN 1 Pc : 5 Ps + ACIAN
BAHAN
Semen Pc 5.000 Kg 1,425.00 - 7,125.00 #VALUE!
Pasir Pasang 0.019 M3 191,000.00 - 3,629.00 #VALUE!
UPAH
Pekerja 0.286 Org 75,000.00 21,450.00 - #VALUE!
Tukang Batu 0.214 Org 90,000.00 19,260.00 - #VALUE!
Kepala Tukang 0.021 Org 95,000.00 1,995.00 - #VALUE!
Mandor 0.020 Org 100,000.00 2,000.00 - #VALUE!
JUMLAH ……………………. 44,705.00 10,754.00 #VALUE!
NO HARGA
URAIAN INDEKS SAT. UPAH (RP.) BAHAN (Rp.) JUMLAH (Rp.)
(KODE) SATUAN (Rp.)

1 2 3 4 5 6 = (3 x 5) 7 = (3 x 5) 8=(6+7)
G.8 1 M2 PASANG KERAMIK LANTAI PUTIH POLOS 40x40 CM
BAHAN
Keramik Putih 40x40 Cm 1.050 M2 65,000.00 - 68,250.00 #VALUE!
Semen PC 8.000 Kg 1,425.00 - 11,400.00 #VALUE!
Pasir Pasang 0.030 M3 191,000.00 - 5,730.00 #VALUE!
Semen Warna 0.013 Kg 9,500.00 - 123.50 #VALUE!
UPAH
Pekerja 0.188 Org 75,000.00 14,062.50 - #VALUE!
Tukang Batu 0.375 Org 90,000.00 33,750.00 - #VALUE!
Kepala Tukang 0.075 Org 95,000.00 7,125.00 - #VALUE!
Mandor 0.019 Org 100,000.00 1,880.00 - #VALUE!
JUMLAH .......................... 56,817.50 85,503.50 #VALUE!
H.1 1 M2 PENGECATAN TEMBOK BARU 1 LAPIS PLAMIR, 1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP
BAHAN
Plamir Tembok 0.100 Kg 17,000.00 - 1,700.00 #VALUE!
Cat Dasar 0.100 Kg 24,500.00 - 2,450.00 #VALUE!
Cat Penutup 2x 0.260 Kg 24,500.00 - 6,370.00 #VALUE!
Roll Cat Tembok 0.010 Bh 20,500.00 - 205.00 #VALUE!
Ampelas 0.500 Lbr 3,000.00 - 1,500.00 #VALUE!
UPAH
Pekerja 0.020 Org 75,000.00 1,500.00 - #VALUE!
Tukang Cat 0.063 Org 90,000.00 5,670.00 - #VALUE!
Kepala Tukang 0.006 Org 95,000.00 598.50 - #VALUE!
Mandor 0.003 Org 100,000.00 250.00 - #VALUE!
JUMLAH .......................... 8,018.50 12,225.00 #VALUE!
NO HARGA
URAIAN INDEKS SAT. UPAH (RP.) BAHAN (Rp.) JUMLAH (Rp.)
(KODE) SATUAN (Rp.)

1 2 3 4 5 6 = (3 x 5) 7 = (3 x 5) 8=(6+7)
H.9 1 M2 CAT VERNIS BATU ALAM
BAHAN
Vernis 0.150 Ltr 65,000.00 - 9,750.00 #VALUE!
Kuas 3" 0.010 Bh 15,000.00 - 150.00 #VALUE!
UPAH
Pekerja 0.160 Org 75,000.00 12,000.00 - #VALUE!
Tukang Cat 0.160 Org 90,000.00 14,400.00 - #VALUE!
Kepala Tukang 0.016 Org 95,000.00 1,520.00 - #VALUE!
Mandor 0.003 Org 100,000.00 250.00 - #VALUE!
JUMLAH .......................... 28,170.00 9,900.00 #VALUE!
J.3 1 M2 MEMBUAT DINDING ALUCUBOND
BAHAN
Plat Alucubon Ex. Australia 1.100 M3 915,000.00 - 1,006,500.00 #VALUE!
Besi Hollo 50/50 0.150 Kg 13,000.00 - 1,950.00 #VALUE!
Perlengkapan 1.000 Ls 97,500.00 - 97,500.00 #VALUE!
UPAH
Pekerja 1.200 Org 75,000.00 90,000.00 - #VALUE!
Tukang Las 0.430 Org 90,000.00 38,700.00 - #VALUE!
Kepala Tukang 0.012 Org 95,000.00 1,140.00 - #VALUE!
Mandor 0.001 Org 100,000.00 60.00 - #VALUE!
JUMLAH .......................... 129,900.00 1,105,950.00 #VALUE!
NO HARGA
URAIAN INDEKS SAT. UPAH (RP.) BAHAN (Rp.) JUMLAH (Rp.)
(KODE) SATUAN (Rp.)

1 2 3 4 5 6 = (3 x 5) 7 = (3 x 5) 8=(6+7)
K.1 1 BH TITIK LAMPU LENGKAP
BAHAN
Kabel 2x2,5 mm 6.000 M' 12,000.00 - 72,000.00 #VALUE!
UPAH
Tukang Listrik 0.063 Org 90,000.00 5,670.00 - #VALUE!
Mandor 0.045 Org 100,000.00 4,500.00 - #VALUE!
JUMLAH .......................... 10,170.00 72,000.00 #VALUE!
K.2 1 BH PASANG SAKLAR DOUBLE/SERIE
BAHAN
Sakelar Serie 1.000 Bh 24,000.00 - 24,000.00 #VALUE!
UPAH
Tukang Listrik 0.063 Org 90,000.00 5,670.00 - #VALUE!
Mandor 0.045 Org 100,000.00 4,500.00 - #VALUE!
JUMLAH .......................... 10,170.00 24,000.00 #VALUE!
K.3 1 BH PASANG SAKLAR TUNGGAL
BAHAN
Sakelar Tunggal 1.000 Bh 18,000.00 - 18,000.00 #VALUE!
UPAH
Tukang Listrik 0.063 Org 90,000.00 5,670.00 - #VALUE!
Mandor 0.045 Org 100,000.00 4,500.00 - #VALUE!
JUMLAH .......................... 10,170.00 18,000.00 #VALUE!
K.4 1 BH PASANG STOP KONTAK
BAHAN
Stop Kontak 1.000 Bh 18,000.00 - 18,000.00 #VALUE!
UPAH
Tukang Listrik 0.063 Org 90,000.00 5,670.00 - #VALUE!
Mandor 0.045 Org 100,000.00 4,500.00 - #VALUE!
JUMLAH .......................... 10,170.00 18,000.00 #VALUE!
K.5 1 BH PASANG STOP KONTAK AC
BAHAN
Stop Kontak AC 1.000 Bh 65,000.00 - 65,000.00 #VALUE!
UPAH
Tukang Listrik 0.063 Org 90,000.00 5,670.00 - #VALUE!
Mandor 0.045 Org 100,000.00 4,500.00 - #VALUE!
JUMLAH .......................... 10,170.00 65,000.00 #VALUE!
K.6 1 BH PASANG BOX MCB
BAHAN
Box MCB (4 grup) 1.000 Bh 55,000.00 - 55,000.00 #VALUE!
MCB 4 buah 4.000 Bh 70,000.00 - 280,000.00 #VALUE!
UPAH
Tukang Listrik 0.063 Org 90,000.00 5,670.00 - #VALUE!
Mandor 0.045 Org 100,000.00 4,500.00 - #VALUE!
JUMLAH .......................... 10,170.00 335,000.00 #VALUE!
K.7 1 BH PASANG LAMPU PL 5 WATT+DUDUKAN
BAHAN
Lampu PL 5 Watt 1.000 Unit 31,000.00 - 31,000.00 #VALUE!
Dudukan Lampu 1.000 Unit 5,000.00 - 5,000.00 #VALUE!
UPAH
Tukang Listrik 0.063 Org 90,000.00 5,670.00 - #VALUE!
Mandor 0.045 Org 100,000.00 4,500.00 - #VALUE!
JUMLAH .......................... 10,170.00 36,000.00 #VALUE!
K.8 1 BH PASANG LAMPU PL 11 WATT+DUDUKAN
BAHAN
Lampu PL 11 Watt 1.000 Bh 34,000.00 - 34,000.00 #VALUE!
Dudukan Lampu 1.000 Bh 5,000.00 - 5,000.00 #VALUE!
UPAH
Tukang Listrik 0.063 Org 90,000.00 5,670.00 - #VALUE!
Mandor 0.045 Org 100,000.00 4,500.00 - #VALUE!
JUMLAH .......................... 10,170.00 39,000.00 #VALUE!
NO HARGA
URAIAN INDEKS SAT. UPAH (RP.) BAHAN (Rp.) JUMLAH (Rp.)
(KODE) SATUAN (Rp.)

1 2 3 4 5 6 = (3 x 5) 7 = (3 x 5) 8=(6+7)
K.9 1 BH PASANG LAMPU PL 15 WATT+DUDUKAN
BAHAN
Lampu PL 15 Watt 1.000 Unit 38,000.00 - 38,000.00 #VALUE!
Dudukan Lampu 1.000 Unit 5,000.00 - 5,000.00 #VALUE!
UPAH
Tukang Listrik 0.063 Org 90,000.00 5,670.00 - #VALUE!
Mandor 0.045 Org 100,000.00 4,500.00 - #VALUE!
JUMLAH .......................... 10,170.00 43,000.00 #VALUE!
K.10 1 BH PASANG LAMPU PL 18 WATT+DUDUKAN DOWNLIGHT
BAHAN
Downlight 6" 1.000 Unit 57,000.00 - 57,000.00 #VALUE!
Lampu PL 18 watt 1.000 Bh 44,000.00 - 44,000.00 #VALUE!
UPAH
Tukang Listrik 0.063 Org 90,000.00 5,670.00 - #VALUE!
Mandor 0.045 Org 100,000.00 4,500.00 - #VALUE!
JUMLAH .......................... 10,170.00 101,000.00 #VALUE!
K.11 1 UNIT PASANG PENANGKAL PETIR
BAHAN
Kawat BC 35 mm 21.300 M' 49,000.00 - 1,043,700.00 #VALUE!
Pipa Tembaga/pentanahan P. 3 m 1.000 Btg 205,000.00 - 205,000.00 #VALUE!
Pipa Tembaga/tombak T. 0,5 m 2.000 Btg 55,000.00 - 110,000.00 #VALUE!
Perlengkapan 15% dari harga bahan 1.000 Ls 46,350.00 - 46,350.00 #VALUE!
UPAH
Pekerja 0.040 Org 75,000.00 3,000.00 - #VALUE!
Tukang Listrik 0.400 Org 90,000.00 36,000.00 - #VALUE!
Kepala Tukang 0.025 Org 95,000.00 2,375.00 - #VALUE!
Mandor 0.045 Org 100,000.00 4,500.00 - #VALUE!
JUMLAH .......................... 45,875.00 1,405,050.00 #VALUE!
NO HARGA
URAIAN INDEKS SAT. UPAH (RP.) BAHAN (Rp.) JUMLAH (Rp.)
(KODE) SATUAN (Rp.)

1 2 3 4 5 6 = (3 x 5) 7 = (3 x 5) 8=(6+7)
L.12 1 M2 PASANG KACA POLOS T. 5 MM
BAHAN
Kaca Polos t. 5 mm 1.100 M2 117,000.00 - 128,700.00 #VALUE!
UPAH
Pekerja 0.015 Org 75,000.00 1,125.00 - #VALUE!
Tukang Kayu 0.150 Org 90,000.00 13,500.00 - #VALUE!
Kepala Tukang 0.015 Org 95,000.00 1,425.00 - #VALUE!
Mandor 0.001 Org 100,000.00 75.00 - #VALUE!
JUMLAH .......................... 16,125.00 128,700.00 #VALUE!
NO HARGA
URAIAN INDEKS SAT. UPAH (RP.) BAHAN (Rp.) JUMLAH (Rp.)
(KODE) SATUAN (Rp.)

1 2 3 4 5 6 = (3 x 5) 7 = (3 x 5) 8=(6+7)
N.4a 1 M2 PASANG PARTISI DOUBLE GRC RANGKA HOLLO
BAHAN
Besi Hollo 40x40x0,34 mm 1.222 Btg 42,000.00 - 51,324.00 #VALUE!
Perlengkapan (35% dari harga hollo) 1.000 Ls 14,700.00 - 14,700.00 #VALUE!
Plat GRC 120x240x4 cm 0.364 Lbr 69,000.00 - 25,116.00 #VALUE!
UPAH
Pekerja 0.054 Org 75,000.00 4,050.00 - #VALUE!
Tukang Las 0.050 Org 90,000.00 4,500.00 - #VALUE!
Kepala Tukang 0.009 Org 95,000.00 855.00 - #VALUE!
Mandor 0.027 Org 100,000.00 2,700.00 - #VALUE!
JUMLAH .......................... 12,105.00 91,140.00 #VALUE!
NO HARGA
URAIAN INDEKS SAT. UPAH (RP.) BAHAN (Rp.) JUMLAH (Rp.)
(KODE) SATUAN (Rp.)

1 2 3 4 5 6 = (3 x 5) 7 = (3 x 5) 8=(6+7)

Indramayu, …………………2015

............................................................
RENCANA ANGGARAN BIAYA
KEGIATAN : PEMBANGUNAN HSRT BANDENG DAN KELENGKAPANNYA
PEKERJAAN : PEMBANGUNAN HATCHERY BANDENG
LOKASI : KECAMATAN JUNTINYUAT
SUMBER DANA DAK TAHUN ANGGARAN 2011

Analisa Harga Satuan Jumlah


No. Uraian Pekerjaan VOLUME
( Rp. ) Pelaksanaan
1 2 3 4 5 6=5x3

I. PEKERJAAN SANITARY
1 Pas. Pipa Suplay PVC dia. 4" SNI 59.00 M' O.13 #N/A #N/A
2 Pas. Pipa untuk Tiang PVC dia. 4" SNI 16.00 M' O.13 #N/A #N/A
3 Pas. Pipa untuk Telur PVC dia. 4" SNI 46.00 M' O.13 #N/A #N/A
4 Pas. Pipa Hisap PVC dia. 3" SNI ( Di Dasar Laut ) 25.00 M' O.12 #N/A #N/A
5 Pas. Stop Kran 4" SNI 10.00 Bh - 160,000.00 1,600,000.00
6 Pas. Pipa Cabut PVC 4" SNI, P. 1 M 3.00 M' O.13 #N/A #N/A
7 Pas. Pipa Cabut PVC 4" SNI, P. 2 M 6.00 M' O.13 #N/A #N/A
8 Pas. Pipa Cabut PVC 4" SNI, P. 3 M 9.00 M' O.13 #N/A #N/A
9 Pek. Besi Tangga Bak dia. 6" mm ( 250x250x350 ) 7.50 Kg F.5 17,990.00 134,925.00
10 Pek. Jaring Pengaman PVC dia. 2" SNI-PE 254.00 M2 - 0.00
11 Pas. Pipa Udara PVC - AW dia. 1/2" 54.50 M' O.10 #N/A #N/A
12 Pas. Stop Kran Pipa Oxigen 1/2" SNI 6.00 Bh - 46,000.00 276,000.00
13 Pas. Stop Kran dia. 6" SNI ( Saluran Ke Laut ) 1.00 Bh - 205,000.00 205,000.00
14 Pas. Dop dia. 4" SNI 1.00 Bh - 0.00
15 Pek. Pipa Galvanis 2" ( Pegangan Pipa 20 ttk, P. 1,5 M ) 30.00 M' O.13a #N/A #N/A
16 Pek. Pipa PVC Hisap Dasar Laut ( Lengkap ) 10" Berlubang 8.00 M' - 345,000.00 2,760,000.00
17 Upah Pemasangan Pipa 10" di Dasar Laut 1.00 Ls - 2,500,000.00 2,500,000.00
18 Pek. Isolasi Busa, Ijuk, Tali 1.00 Ls - 700,000.00 700,000.00
19 Pek. Pipa PVC Hisap Dasar Laut ( Lengkap ) 3" 20.00 M' - 55,000.00 1,100,000.00
20 Pek. Accessories Pipa ( V. Sock T ) 1.00 Ls - 1,500,000.00 1,500,000.00
21 Pek. Bak Air Disinfektan 400x300x15 Cm 2.00 M2 D.2 105,089.00 210,178.00
22 Pek. Bak Air Disinfektan 120x50x15 Cm 12.60 M2 D.2 105,089.00 1,324,121.40
23 Pek. Trap tangga bak telur
- Pas. Bata Merah (Pas 1/2 Bata) 1 Pc : 5 Ps 7.30 M2 D.1 110,817.25 808,965.93
- Pek. Plesteran 1 : 5 + Acian 15.90 M2 E.3 55,459.00 881,798.10
- Urugan Pasir 1.83 M3 B.6 45,625.00 83,493.75
24 Pek. Kanopi kayu Genteng Lama
- Kayu Balok Borneo 0.07 M3 - 4,222,250.00 295,557.50
- Pek. Gording kayu borneo 0.04 M3 Q.22 #N/A #N/A
- Pek Genteng 3.00 M2 M.1a #N/A #N/A
- Pek. Baud Ø 16 mm 4.00 Bh - 5,000.00 20,000.00
- Pek. Baud Ø 12 mm 4.00 Bh - 5,000.00 20,000.00
- Pek Rangka Atap Kayu Borneo 3.00 M2 Q.23 #N/A #N/A
- Pek. Pengecatan 3.60 M2 H.5 66,094.00 237,938.40
- Pek. Plafond GRC 3.00 M2 N.8d #N/A #N/A
JUMLAH I. #N/A

II. PEKERJAAN RUMAH POMPA 2x2x3


1 Pas. Bata Merah ( Pas. 1/2 Bata ) 1 Pc : 5 Ps 25.96 M2 D.1 110,817.25 2,876,815.81
2 Pek. Plesteran Dinding 1 Pc : 5 Ps + Acian 51.92 M2 E.3 55,459.00 2,879,431.28
3 Pas. Rooster Bata 10/20 Cm 1.00 M2 D.2a #N/A #N/A
4 Pek. Kolom Praktis 12/12 0.17 M3 F.3+F.13a33+F.21a33 1,617,625.79 274,996.38
5 Pek. Ring Balk 15/20 0.29 M3 F.3+F.13.a13+F.21.a13 1,293,518.41 375,120.34
6 Pek. Rangka atap Kayu Borneo 7.50 M2 Q.23 #N/A #N/A
7 Pek. Atap Genteng Plentong Lama 7.50 M2 M.1a #N/A #N/A
8 Pek. Bubungan Genteng Plentong 2.50 M2 M.14 #N/A #N/A
9 Pek. Plafond GRC Rangka Kayu Borneo 16.80 M2 N.8d #N/A #N/A
10 Pek. Papan Listplank 3/20 Kayu Kruing 12.00 M' Q.21b #N/A #N/A
Analisa Harga Satuan Jumlah
No. Uraian Pekerjaan VOLUME
( Rp. ) Pelaksanaan
1 2 3 4 5 6=5x3
11 Pek. Titik Lampu 3.00 Titik K.3 0.00
12 Pek. Dudukan Lampu + Lampu PL 11 W 2.00 Bh K.9f 0.00
13 Pek. Stop Kontak 2.00 Bh K.5 0.00
14 Pek. Zakelar 1.00 Bh K.4 0.00
15 Pek. Rabat Beton t. 10 Cm 1.20 M3 F.1 0.00
16 Pek. Kusen + Daun Pintu Allumunium Lengkap 1.00 Ls - 0.00
17 Pek. Pengecatan tembok 51.92 M2 H.1 0.00
18 Pek. Pengecatan Lisplank 5.04 M2 H.1 0.00
19 Pek. Pengecatan plafond 17.39 M2 H.1 0.00
JUMLAH II. #N/A

III. PEKERJAAN REHAB. TPI


1 Pek. Pembuatan Septic Tank + Pipa Air Kotor 3" 1.00 Ls O.19 #N/A #N/A
2 Pek. Balok Gantung 15/25 Teras 0.26 M3 F.3+F.13.a13+F.21.a13 1,293,518.41 336,314.79
3 Pek. Pengecatan Papan Lisplank ( setara glotex ) 13.25 M2 H.5 66,094.00 875,745.50
4 Pek. Talang Jurai Seng BJLS 6.70 M' K.19 #N/A #N/A
5 Pek. Bongkaran kusen lama 1.00 Ls - 1,500,000.00 1,500,000.00
6 Pek. Plesteran dinding 1 Pc : 5 Ps + Acian 140.24 M2 E.3 55,459.00 7,777,570.16
7 Pek. Plafond GRC Rangka Kayu Borneo 114.40 M2 N.8d #N/A #N/A
8 Pek. Papan Listplank 3/10 + 3/20 Kayu Kruing, tumpang sari 53.00 M' Q.21b #N/A #N/A
9 Pas. Kaca Polos t. 5 mm 10.80 M2 L.17 #N/A #N/A
10 Pas. Pintu Vynil 1.00 Bh - 420,000.00 420,000.00
11 Pek. Kunci Pintu Ukuran Besar 2.00 Bh L.1 #N/A #N/A
12 Pas. Engsel Jendela 3" 8.00 Bh L.6 #N/A #N/A
13 Pek. Kunci Slot 8.00 Bh L.11 #N/A #N/A
14 Pek. Hak Angin 8.00 Bh L.9 #N/A #N/A
15 Pek. Pengecatan Dinding Tembok ( Setara Metrolite ) 367.46 M2 H.1 20,243.50 7,438,676.51
16 Pek. Pengecatan Plafond ( Setara Metrolite ) 127.00 M2 H.1 20,243.50 2,570,924.50
17 Pek. Pengecatan Bidang Kayu Yang Tampak ( Setara Glotex 31.72 M2 H.5 66,094.00 2,096,501.68
18 Pas. Dinding Keramik Warna 20/25 Cm KM / WC 11.71 M2 G.13 #N/A #N/A
19 Pas. Lantai Keramik Warna 20/20 Anti Slip KM / WC 2.36 M2 G.14 #N/A #N/A
20 Pas. Closet Jongkok Setara Toto Lengkap 1.00 Bh O.2 #N/A #N/A
21 Floor Drain Plastik KM / WC 3" 1.00 Bh O.16 #N/A #N/A
22 Kran Air 1/2" Stainless 1.00 Bh O.15 #N/A #N/A
23 Dop Plastik Penguras bak d. 3/4" 1.00 Bh - 17,500.00 17,500.00
24 Pek. Dudukan Lampu + Lampu PL 11 W 10.00 Bh K.9f #N/A #N/A
25 Pek. Stop Kontak 2.00 Bh K.5 75,170.00 150,340.00
26 Pek. Zakelar 4.00 Bh K.4 53,300.00 213,200.00
JUMLAH III. #N/A

IV. PEKERJAAN PAGAR KELILING


1 Pek. Pas. Bata 1 : 5 177.70 M2 D.1 110,817.25 19,692,225.33
2 Pek. Plesteran dinding 1 Pc : 5 Ps + Acian 511.86 M2 E.3 55,459.00 28,387,243.74
3 Pek. Beton kolom 15/20, Site Mix 2.82 M3 F.3+F.13a33+F.21a33 1,617,625.79 4,561,704.74
4 Pek. Ring balk beton 15/20, Site Mix 3.32 M3 F.3+F.13.a13+F.21.a13 1,293,518.41 4,294,481.11
5 Pas. Besi siku 50.50.5 159.85 Kg F.5 17,990.00 2,875,701.50
6 Pas. Kawat duri 5 Jalur 118.04 M' - 51,200.00 6,043,648.00
7 Pek. Pengecatan Besi Siku ( Setara Glotek ) 6.36 M2 H.5 66,094.00 420,357.84
8 Pek. Pintu gerbang plat t.2 mm ( 4x2 ) M (Lengkap) 8.00 M2 - 656,700.00 5,253,600.00
JUMLAH IV. 71,528,962.25
Analisa Harga Satuan Jumlah
No. Uraian Pekerjaan VOLUME
( Rp. ) Pelaksanaan
1 2 3 4 5 6=5x3

REKAPITULASI

I. PEKERJAAN SANITARY …………………………………………………… #N/A


II. PEKERJAAN RUMAH POMPA 2x2x3 …………………………………………………… #N/A
III. PEKERJAAN REHAB. TPI …………………………………………………… #N/A
IV. PEKERJAAN PAGAR KELILING …………………………………………………… 71,528,962.25
JUMLAH Rp. #N/A
PPN 10% #N/A
JUMLAH TOTAL Rp. #N/A
DIBULATKAN Rp. #N/A
#N/A
#VALUE!

Mengetahui : Dibuat :
Kepala Dinas Cipta Karya CV. DUTA GRAHA Consultant
Kabupaten Indramayu

Drs. Susanto, BAE Ir. H. Chaerudin Susiyanto


NIP. 19591229 198603 1 011 Direktur

Pengguna Anggaran Pejabat Pembuat Komitmen


Dinas Perikanan dan Kelauta Dinas Perikanan dan Kelautan
Kabupaten Indramayu Kabupaten Indramayu

Ir. H. Abdur Rosyid Hakim Drs. Yudi Rustomo, MSi


NIP. 19600809 198703 1 007 NIP. 19641012 199301 1 001
RENCANA ANGGARAN BIAYA

KEGIATAN : PEMBANGUNAN GEDUNG DAN REVITALISASI PUSKESMAS MAMPU PONED (BANPROV)


PEKERJAAN : PEMBANGUNAN GEDUNG PONED PUSKESMAS PASEKAN
LOKASI : KECAMATAN PASEKAN
TAHUN ANGGARAN 2012

Harga Satuan Jumlah


No. Uraian Pekerjaan Volume Analisa
( Rp. ) Pelaksanaan
1 2 3 4 5 6=3x5
I. PEKERJAAN PERSIAPAN
1 Administrasi dan Dokumentasi 1.00 Ls Ls 2,000,000.00 2,000,000.00
2 Pengukuran dan Pas. Papan Bouwplank 75.00 M' A.2 63,290.00 4,746,750.00
3 Pengadaan listrik dan air kerja 1.00 Ls Ls 1,500,000.00 1,500,000.00
4 Sewa Direksi keet 1.00 Ls Ls 1,500,000.00 1,500,000.00
5 Pemb. papan nama proyek 1M X 1,2 M Digital printin 1.00 Bh A.4 251,000.00 251,000.00
6 Pek. Cerucuk Bambu Ampel P.1 m Ø 8-10 cm 936.00 Ttk A.6 16,190.00 ###

JUMLAH I. ###
II. PEKERJAAN TANAH/PASIR
1 Pek. Galian Tanah 46.64 M3 B.1 34,000.00 1,585,760.00
2 Pek. Urugan Tanah kembali 11.66 M3 B.5 16,300.00 190,058.00
3 Pek. Urugan tanah site 383.93 M3 B.10 89,500.00 ###
4 Pek. Urugan Pasir alas pondasi plat t. 5 cm 5.58 M3 B.7 185,500.00 1,035,090.00
5 Pek. Urugan Pasir alas lantai t. 5 cm 9.91 M3 B.7 185,500.00 1,838,305.00
6 Pek. Urugan Pasir bawah rabat lantai t. 5 cm 1.89 M3 B.7 185,500.00 350,595.00
7 Pek. Urugan tanah peninggian lantai 18.04 M3 B.10 89,500.00 1,614,580.00

JUMLAH II. ###


III. PEKERJAAN PONDASI
1 Pas. Pondasi Batu belah 1 pc : 5 psr 41.58 M3 C.2 700,704.00 ###
2 Pas. Aanstamping 21.12 M3 C.1 385,305.00 8,137,641.60
3 Pas. Pondasi Batu belah 1 pc : 5 psr (Selasar) 0.84 M3 C.2 700,704.00 588,591.36

JUMLAH III. ###


IV. PEKERJAAN DINDING
1 Pek. Pas. 1/2 Bata 1 pc : 5 psr 378.86 M2 D.2 105,089.00 ###
2 Pek. Pas. 1/2 Bata 1 pc : 3 psr 59.35 M2 D.1 110,817.25 6,577,003.79
3 Pek. Pas. Batu alam 10/20 + 10/30 29.11 M2 D.5 215,226.00 6,265,228.86
4 Pek. Pas. Bata sisi rabat 1 pc : 5 psr 22.05 M2 D.2 105,089.00 2,317,212.45

JUMLAH IV. ###


V. PEKERJAAN PLESTERAN
1 Pek. Plesteran dinding 1 Pc : 5 Ps + Acian 692.26 M2 E.3 55,459.00 ###
2 Pek. Plesteran dinding 1 Pc : 3 Ps + Acian 128.30 M2 E.2 59,734.00 7,663,872.20
3 Pek. Plesteran ban 10 cm, t.2cm 43.70 M' E.6 33,437.90 1,461,236.23
4 Pek. Plesteran ban kanopi 71.40 M' E.7 48,675.80 3,475,452.12

JUMLAH V. ###
VI. PEKERJAAN BETON K-175
1 Pek. Pondasi plat 60/60x20 1.89 M3 F.2+F.5a46+F.11a46 4,344,352.56 8,210,826.34
2 Pek. Lantai kerja bawah pondasi plat t.5 cm 0.30 M3 F.1 718,655.00 215,596.50
3 Pek. Sloof 15/20 4.17 M3 F.2+F.5a1+F.11a1 5,261,771.71 ###
4 Pek. Kolom teras 15/25 0.28 M3 F.2+F.5a16+F.11a16 6,407,411.53 1,794,075.23
5 Pek. Kolom praktis 12/12 2.63 M3 F.2+F.5a6+F.11a6 6,462,891.59 ###
6 Pek. Balok Latei 12/15 2.07 M3 F.2+F.5a41+F.11a41 6,462,891.59 ###
7 Pek. Ring Balok 15/20 4.17 M3 F.2+F.5a23+F.11a23 5,261,771.71 ###
8 Pek. Balok teras 15/25 0.26 M3 F.2+F.5a25+F.11a25 5,592,356.27 1,454,012.63
9 Pek. Beton tumbuk lantai dan rabat t. 5cm 11.80 M3 F.1 718,655.00 8,480,129.00
10 Pek. Cor Meja Beton t.10 cm 0.25 M3 F.2+F.5a43+F.11a43 3,920,796.71 980,199.18
11 Pek. Beton kanopi L. 40 cm, T. 8 cm 0.22 M3 F.3+F.5a41+F.11a41 3,678,345.45 809,236.00

JUMLAH VI. ###


Harga Satuan Jumlah
No. Uraian Pekerjaan Volume Analisa
( Rp. ) Pelaksanaan
1 2 3 4 5 6=3x5
VII. PEKERJAAN PENUTUP ATAP
1 Pek. Rangka atap baja ringan Zingallum C t. 1.00 mm 303.80 M2 #REF! #REF! #REF!
2 Pek. Atap genteng metal warna 311.85 M2 #REF! #REF! #REF!
3 Pek. Bubungan genteng metal warna 49.00 M' #REF! #REF! #REF!
4 Pek. Talang jurai (alumunium)t. 0,35 mm 7.60 M' M.12 186,805.00 1,419,718.00

JUMLAH VII. #REF!


VIII. PEKERJAAN LANGIT-LANGIT
1 Pek. Plafond GRC rangka hollo 4x4 (Galvanis),t. 0,6 242.19 M2 N.4 94,131.00 ###
2 Pek. Lisplank GRC tumpang sari (9/300 + 9/100) mm 70.00 M' N.5 57,808.40 4,046,588.00

JUMLAH VIII. ###


IX. PEKERJAAN SANITASI
1 Pas. Pipa Pvc type AW 1/2'' air bersih 58.00 M' O.8 15,050.00 872,900.00
2 Pas. Pipa Pvc type AW 3'' air kotor 38.00 M' O.12 61,767.50 2,347,165.00
3 Pas. Pipa Pvc type AW 4'' air kotor 22.50 M' O.13 78,417.50 1,764,393.75
4 Pas. Stop kran 1/2'' setara san-ei 5.00 Bh O.17 46,268.75 231,343.75
5 Pas. Tempat sabun bahan keramik 4.00 Bh - 42,000.00 168,000.00
6 Pas. Dop plastik/tutup bak air 4.00 Bh - 10,000.00 40,000.00
7 Pas. Floor drain plastik Ø 3'' 4.00 Bh O.18 41,200.00 164,800.00
8 Pas. Washtapel setara toto lengkap acessories 3.00 Bh O.4 684,250.00 2,052,750.00
9 Pas. Spoel hook tipe SK 33 setara Toto 1.00 Bh - 5,000,000.00 5,000,000.00
10 Pas. Closet duduk setara Toto lengkap acessories 4.00 Bh O.1 1,740,595.00 6,962,380.00
11 Pek. Septictank + Rembesan 2,5 x 1,5 x 1,5 2.00Unit O.20 6,444,900.51 ###
12 Pek. Gravel beton terbuka Ø 30 cm + Pasangan bata 63.00 M' O.26 #VALUE! #VALUE!
13 Pek. Pasangan bak bata km/wc lapis keramik kapasitas 4.00 Bh O.5 1,275,142.35 5,100,569.40
14 Pas. Besi pegangan closet Ø 2'' stainless steel 4.00 Set - 120,000.00 480,000.00
15 Pas. Hand rail 2 1/2" di ruang koridor 22.00 M' #REF! #REF! #REF!

JUMLAH IX. #VALUE!


X. PEKERJAAN KAYU DAN ALLUMUNIUM
1 Pek. Kusen Pintu Allumunium Standar 4" 143.25 M' - 112,000.00 ###
2 Pek. Kusen Jendela Allumunium standar 4" 89.40 M' - 112,000.00 ###
3 Pek. Kerangka daun pintu lengkap tanpa kaca 21.00Unit - 1,495,000.00 ###
4 Pek. Kerangka daun jendela lengkap tanpa kaca 8.00Unit - 520,000.00 4,160,000.00
5 Pek. Meja Pendaftaran bahan multiplek finish melamik 1.00Unit - #REF! #REF!
6 Pek. Door closer 5.00 Bh - 225,000.00 1,125,000.00

JUMLAH X. #REF!

XI PEKERJAAN PENUTUP LANTAI


1 Pek. Lantai keramik putih 40/40 cm setara Roman 180.40 M2 G.8 142,321.00 ###
2 Pek. Lantai keramik KM/WC warna anti slip 20/20 cm 11.73 M2 G.6 136,331.00 1,599,162.63
3 Pek. Dinding keramik KM/WC warna 20/25 cm t. 1,5 38.48 M2 G.5 131,093.50 5,044,477.88
4 Pek. Dinding keramik warna 20/25 cm untuk 3 ruang 103.51 M2 G.5 131,093.50 ###
5 Pek. Keramik warna 20/25 di meja beton+dinding 6.48 M2 G.5 131,093.50 849,485.88
6 Pek. Dinding keramik warna 20/25 untuk ruang korido 34.80 M2 G.5 131,093.50 4,562,053.80

JUMLAH XI. ###


XII PEKERJAAN PENGECATAN
1 Pek. Pengecatan dinding tembok setara Vinilex 820.81 M2 H.1 20,243.50 ###
2 Pek. Pengecatan Plafond 242.19 M2 H.8 25,570.00 6,192,797.57
3 Pek. Pengecatan lisplank grc 17.25 M2 H.1 20,243.50 349,200.38
4 Pek. Cat vernis batu alam 29.11 M2 H.9 38,070.00 1,108,217.70
Harga Satuan Jumlah
No. Uraian Pekerjaan Volume Analisa
( Rp. ) Pelaksanaan
1 2 3 4 5 6=3x5
JUMLAH XII. ###
XIII PEKERJAAN INSTALASI LISTRIK
1 Penyambungan daya Listrik PLN 2200 Watt 1.00Unit - 2,722,050.00 2,722,050.00
2 Pas. Box Mcb (4 group)+4 buah Mcb 1.00 Bh K.6 345,170.00 345,170.00
3 Pek. Titik lampu komplit NYM 2x2,5 mm/3x2,5 mm 77.00 Ttk K.1 82,170.00 6,327,090.00
4 Pas. Saklar tunggal setara Broco 11.00 Bh K.3 28,170.00 309,870.00
5 Pas. Saklar double/serie setara Broco 9.00 Bh K.2 34,170.00 307,530.00
6 Pas. Stop Kontak setara Broco 12.00 Bh K.4 28,170.00 338,040.00
7 Pas. Lampu PL 11 watt + dudukan 13.00 Bh K.8 49,170.00 639,210.00
8 Pas. Lampu PL 18 w + Down Light Ø 6'' 16.00 Bh K.10 111,170.00 1,778,720.00
9 Pas. Lampu PL 5 watt + dudukan 13.00 Bh K.7 46,170.00 600,210.00
10 Pas. Penangkal petir lengkap 3.00Unit K.11 1,450,925.00 4,352,775.00
11 Pas. Stop Kontak AC 2.00 Bh K.5 75,170.00 150,340.00
12 Pas. Arde 1.00 Bh - 60,000.00 60,000.00

JUMLAH XIII. ###

XIV PEKERJAAN KACA


1 Pek. Kaca polos t. 5mm 26.63 M2 L.12 144,825.00 3,856,689.75
2 Pek. Kaca es t. 5 mm 17.03 M2 L.13 169,025.00 2,878,495.75

JUMLAH XIV. 6,735,185.50

XV PEKERJAAN JALAN PENGHUBUNG


1 Pek. Pondasi Batu belah 1 pc : 5 ps 3.75 M3 C.2 700,704.00 2,627,640.00
2 Pek. Aanstamping 1.79 M3 C.1 385,305.00 689,695.95
3 Pek. Sloof 15/20 0.64 M3 F.2+F.5a1+F.11a1 5,261,771.71 3,367,533.89
4 Pek. Kolom 15/15 0.79 M3 F.2+F.5a14+F.11a14 7,363,831.59 5,817,426.96
5 Pek. Ring Balok 15/20 0.64 M3 F.2+F.5a23+F.11a23 5,261,771.71 3,367,533.89
6 Pek. Rangka atap baja ringan Zingallum C t. 1.00 mm 98.17 M2 #REF! #REF! #REF!
7 Pek. Genteng metal warna 103.08 M2 #REF! #REF! #REF!
8 Pek. Bubungan genteng metal 21.25 M' #REF! #REF! #REF!
9 Pek. Urugan pasir alas lantai jalan penghubung 3.19 M3 B.7 185,500.00 591,745.00
10 Pek. Beton tumbuk alas lantai jalan penghubung 3.19 M3 F.1 17,990.00 57,388.10
11 Pek. Lisplank GRC tumpang sari (9/300 + 9/100) mm 42.50 M' N.5 57,808.40 2,456,857.00

JUMLAH XIV. #REF!


Harga Satuan Jumlah
No. Uraian Pekerjaan Volume Analisa
( Rp. ) Pelaksanaan
1 2 3 4 5 6=3x5

REKAPITULASI KUANTITAS DAN HARGA

I. PEKERJAAN PERSIAPAN ………………………………………… 25,151,590.00


II. PEKERJAAN TANAH/PASIR ………………………………………… 40,976,123.00
III. PEKERJAAN PONDASI ………………………………………… 37,861,505.28
IV. PEKERJAAN DINDING ………………………………………… 54,973,463.64
V. PEKERJAAN PLESTERAN ………………………………………… 50,992,607.89
VI. PEKERJAAN BETON K-175 ………………………………………… 96,176,989.82
VII. PEKERJAAN PENUTUP ATAP ………………………………………… #REF!
VIII. PEKERJAAN LANGIT-LANGIT ………………………………………… 26,844,174.89
IX. PEKERJAAN SANITASI ………………………………………… #VALUE!
X. PEKERJAAN KAYU DAN ALLUMUNIUM ………………………………………… #REF!
XI PEKERJAAN PENUTUP LANTAI ………………………………………… 51,299,376.78
XII PEKERJAAN PENGECATAN ………………………………………… 24,266,282.88
XIII PEKERJAAN INSTALASI LISTRIK ………………………………………… 17,931,005.00
XIV PEKERJAAN KACA ………………………………………… 6,735,185.50
XV PEKERJAAN JALAN PENGHUBUNG ………………………………………… #REF!

JUMLAH Rp. #REF!


PPN 10% #REF!
JUMLAH TOTAL Rp. #REF!
DIBULATKAN Rp. #REF!

#VALUE!

Mengetahui : Indramayu, ................................ 2012


Kepala Dinas Cipta Karya Dibuat :
Kabupaten Indramayu CV. DUTA GRAHA Consultant

Ir. HERI HELMAN Ir. H. Chaerudin Susiyanto


NIP. 19590313 198803 1 004 Direktur

Plt. Kepala Dinas Kesehatan Selaku Pejabat Pelaksana Teknis Kegiatan (PPTK)
Pejabat Pembuat Komitmen Dinas Kesehatan
Kab. Indramayu Kabupaten Indramayu

dr. H. ARIF YUSUF, M.KEs SUJANA, AMG


Pembina NIP. 19620121 198301 1002
NIP. 1964 0110 198911 1 001
RENCANA ANGGARAN BIAYA

KEGIATAN :
PEKERJAAN :
LOKASI :
SUMBER DANA :

JUMLAH
HARGA
NO. URAIAN PEKERJAAN VOLUME ANALISA PELAKSANAAN
SATUAN (Rp)
(Rp)

1 2 3 4 5 6=3x5

PEKERJAAN LOKET PENDAFTARAN


I. PEKERJAAN PERSIAPAN
1 Pengadaan listrik dan air kerja 1.00 Ls Ls 1,500,000.00 1,500,000.00
2 Pemb. papan nama proyek 1 M X 1,2 M digital printing 1.00 Bh A.4 251,000.00 251,000.00
3 Biaya Administrasi, Dokumentasi dan Pelaporan 1.00 Ls Ls 2,500,000.00 2,500,000.00

JUMLAH I. 4,251,000.00

II. PEKERJAAN DINDING


1 Pek. Pas. 1/2 Bata 1 pc : 5 psr 2.48 M2 D.2 105,089.00 260,620.72
2 Pas. Batu alam 10x20 cm 0.16 M2 D.5 215,226.00 33,898.10
3 Pas. Dinding Pasrtisi 12.00 M2 N.4a #VALUE! #VALUE!
4 Pas. Meja Pendaftaran 1.00 Bh Ls 7,000,000.00 7,000,000.00
5 Pas. Lemari Susun 1.00 Bh Ls 5,000,000.00 5,000,000.00
4 Pas. Papan nama Instansi stainless steel
a. LOKET PEMBAYARAN t. 20 cm 16.00 Bh Ls 80,000.00 1,280,000.00

JUMLAH II. #VALUE!

III. PEKERJAAN PLESTERAN


1 Pek. Plesteran dinding 1 Pc : 5 Ps + Acian 4.96 M2 E.3 55,459.00 275,076.64

JUMLAH III. 275,076.64


JUMLAH
HARGA
NO. URAIAN PEKERJAAN VOLUME ANALISA PELAKSANAAN
SATUAN (Rp)
(Rp)

1 2 3 4 5 6=3x5

IV. PEKERJAAN ALUMUNIUM/KAYU


1 Pek. Kusen pintu, jendela & bouvenlight alumunium Ø 4" 5.05 M' Ls 112,000.00 565,600.00
2 Pas. Daun pintu alumunium alumunium lengkap tanpa kaca 1.00 Unit Ls 1,495,000.00 1,495,000.00
3 Pas. Door Closer 1.00 Unit Ls 300,000.00 300,000.00

JUMLAH IV. 2,360,600.00


JUMLAH
HARGA
NO. URAIAN PEKERJAAN VOLUME ANALISA PELAKSANAAN
SATUAN (Rp)
(Rp)

1 2 3 4 5 6=3x5

V. PEKERJAAN PENUTUP DINDING/LANTAI


1 Pas. Keramik corak batu 40x40 cm (variasi dinding ) 6.50 M2 G.8 142,321.00 925,086.50

JUMLAH V. 925,086.50

VI. PEKERJAAN PENGECATAN


1 Pek. Pengecatan tembok baru 4.96 M2 H.1 20,243.50 100,407.76
2 Pek. Pengecatan batu alam (cat vernis) 0.16 M2 H.9 38,070.00 5,996.03

JUMLAH VI. 106,403.79

VII. PEKERJAAN INSTALASI LISTRIK


1 Pek. Titik lampu komplit NYM 2x2,5 mm/3x2,5 mm 9.00 Ttk K.1 82,170.00 739,530.00
2 Pas. Saklar double/serie 1.00 Bh K.2 34,170.00 34,170.00
3 Pas. Saklar tunggal 1.00 Bh K.3 28,170.00 28,170.00
4 Pas. Stop Kontak 5.00 Bh K.4 28,170.00 140,850.00
5 Pas. Stop Kontak AC 1.00 Bh K.5 #VALUE! #VALUE!
6 Pas. Lampu PL 18 watt + dudukan downLight Ø 6'' 3.00 Bh K.10 111,170.00 333,510.00
7 Pas. AC 1 PK Setara LG 1.00 Bh Ls 5,500,000.00 5,500,000.00

JUMLAH VII. #VALUE!

VIII. PEKERJAAN KACA


1 Pas. Kaca polos t. 5 mm 7.70 M2 L.12 144,825.00 1,115,152.50

JUMLAH VIII. 1,115,152.50

PEKERJAAN LOKET APOTEK


I. PEKERJAAN DINDING
1 Pas. Dinding Pasrtisi 9.50 M2 N.4a #VALUE! #VALUE!
2 Pas. Meja Pendaftaran 1.00 Bh Ls 7,000,000.00 7,000,000.00
3 Pas. Lemari Susun 1.00 Bh Ls 5,000,000.00 5,000,000.00
4 Pas. Papan nama Instansi stainless steel
a. APOTEK t. 20 cm 6.00 Bh Ls 80,000.00 480,000.00

JUMLAH I. #VALUE!

II. PEKERJAAN ALUMUNIUM/KAYU


1 Pek. Kusen pintu, jendela & bouvenlight alumunium Ø 4" 5.05 M' Ls 112,000.00 565,600.00
2 Pas. Daun pintu alumunium alumunium lengkap tanpa kaca 1.00 Unit Ls 1,495,000.00 1,495,000.00
3 Pas. Door Closer 1.00 Unit Ls 300,000.00 300,000.00

JUMLAH II. 2,360,600.00

III. PEKERJAAN INSTALASI LISTRIK


1 Pek. Titik lampu komplit NYM 2x2,5 mm/3x2,5 mm 9.00 Ttk K.1 82,170.00 739,530.00
JUMLAH
HARGA
NO. URAIAN PEKERJAAN VOLUME ANALISA PELAKSANAAN
SATUAN (Rp)
(Rp)

1 2 3 4 5 6=3x5
2 Pas. Saklar double/serie 1.00 Bh K.2 34,170.00 34,170.00
3 Pas. Saklar tunggal 1.00 Bh K.3 28,170.00 28,170.00
4 Pas. Stop Kontak 5.00 Bh K.4 28,170.00 140,850.00
5 Pas. Stop Kontak AC 1.00 Bh K.5 #VALUE! #VALUE!
6 Pas. Lampu PL 18 watt + dudukan downLight Ø 6'' 3.00 Bh K.10 111,170.00 333,510.00
7 Pas. AC 1 PK Setara LG 1.00 Bh Ls 5,500,000.00 5,500,000.00

JUMLAH III. #VALUE!

IV. PEKERJAAN KACA


1 Pas. Kaca polos t. 5 mm 9.00 M2 L.12 144,825.00 1,303,425.00

JUMLAH IV. 1,303,425.00

PEKERJAAN LOKET PEMBAYARAN


I. PEKERJAAN DINDING
1 Pas. Dinding Pasrtisi 14.00 M2 N.4a #VALUE! #VALUE!
2 Pas. Meja Pendaftaran 1.00 Bh Ls 7,000,000.00 7,000,000.00
3 Pas. Lemari Susun 1.00 Bh Ls 5,000,000.00 5,000,000.00
4 Pas. Papan nama Instansi stainless steel
a. LOKET PEMBAYARAN t. 20 cm 15.00 Bh Ls 80,000.00 1,200,000.00

JUMLAH I. #VALUE!

II. PEKERJAAN ALUMUNIUM/KAYU


1 Pek. Kusen pintu, jendela & bouvenlight alumunium Ø 4" 5.05 M' Ls 112,000.00 565,600.00
2 Pas. Daun pintu alumunium alumunium lengkap tanpa kaca 1.00 Unit Ls 1,495,000.00 1,495,000.00
3 Pas. Door Closer 1.00 Unit Ls 300,000.00 300,000.00

JUMLAH II. 2,360,600.00

III. PEKERJAAN INSTALASI LISTRIK


1 Pek. Titik lampu komplit NYM 2x2,5 mm/3x2,5 mm 9.00 Ttk K.1 82,170.00 739,530.00
2 Pas. Saklar double/serie 1.00 Bh K.2 34,170.00 34,170.00
3 Pas. Saklar tunggal 1.00 Bh K.3 28,170.00 28,170.00
4 Pas. Stop Kontak 5.00 Bh K.4 28,170.00 140,850.00
5 Pas. Stop Kontak AC 1.00 Bh K.5 #VALUE! #VALUE!
6 Pas. Lampu PL 18 watt + dudukan downLight Ø 6'' 3.00 Bh K.10 111,170.00 333,510.00
7 Pas. AC 1 PK Setara LG 2.00 Bh Ls 5,500,000.00 11,000,000.00

JUMLAH III. #VALUE!

IV. PEKERJAAN KACA


1 Pas. Kaca polos t. 5 mm 7.30 M2 L.12 144,825.00 1,057,222.50

JUMLAH IV. 1,057,222.50


JUMLAH
HARGA
NO. URAIAN PEKERJAAN VOLUME ANALISA PELAKSANAAN
SATUAN (Rp)
(Rp)

1 2 3 4 5 6=3x5

REKAPITULASI RENCANA ANGGARAN BIAYA

PEKERJAAN LOKET PENDAFTARAN


I. PEKERJAAN PERSIAPAN ……………………………………………… 4,251,000.00
II. PEKERJAAN DINDING ……………………………………………… #VALUE!
III. PEKERJAAN PLESTERAN ……………………………………………… 275,076.64
IV. PEKERJAAN ALUMUNIUM/KAYU ……………………………………………… 2,360,600.00
V. PEKERJAAN PENUTUP DINDING/LANTAI ……………………………………………… 925,086.50
VI. PEKERJAAN PENGECATAN ……………………………………………… 106,403.79
VII. PEKERJAAN INSTALASI LISTRIK ……………………………………………… #VALUE!
VIII. PEKERJAAN KACA ……………………………………………… 1,115,152.50

PEKERJAAN LOKET APOTEK


I. PEKERJAAN DINDING ……………………………………………… #VALUE!
II. PEKERJAAN ALUMUNIUM/KAYU ……………………………………………… 2,360,600.00
III. PEKERJAAN INSTALASI LISTRIK ……………………………………………… #VALUE!
IV. PEKERJAAN KACA ……………………………………………… 1,303,425.00

PEKERJAAN LOKET PEMBAYARAN


I. PEKERJAAN DINDING ……………………………………………… #VALUE!
II. PEKERJAAN ALUMUNIUM/KAYU ……………………………………………… 2,360,600.00
III. PEKERJAAN INSTALASI LISTRIK ……………………………………………… #VALUE!
IV. PEKERJAAN KACA ……………………………………………… 1,057,222.50

JUMLAH Rp. #VALUE!


PPN 10% #VALUE!
JUMLAH TOTAL Rp. #VALUE!
DIBULATKAN Rp. #VALUE!

#VALUE!

Indramayu, ...................... 2015

Diperiksa : Dibuat :
.................................. ..................................

.....................................
.................................. Direktur
NIP :,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,

Disetujui : Mengetahui :
.................................. ......................................

..................................... .....................................
NIP ,,,,,,,,,,,,,,,,,,,,,,, NIP :
Disetujui : Mengetahui :
.................................. ......................................

JUMLAH
HARGA
NO. URAIAN PEKERJAAN VOLUME ANALISA PELAKSANAAN
SATUAN (Rp)
(Rp)

1 .....................................
2 3
.....................................
4 5 6=3x5
NIP ,,,,,,,,,,,,,,,,,,,,,,, NIP :
DAFTAR HARGA UPAH PEKERJA
TAHUN ANGGARAN 2015
............................................................

NO. JENIS PEKERJA UPAH (Rp.) SATUAN KET.

1 2 3 4 5

1 Pekerja 75,000.00 Orang / Hari / 8 Jam


2 Pembantu Tukang 80,000.00 Orang / Hari / 8 Jam
3 Tukang Kayu 90,000.00 Orang / Hari / 8 Jam
4 Tukang Batu 90,000.00 Orang / Hari / 8 Jam
5 Tukang Besi 90,000.00 Orang / Hari / 8 Jam
6 Tukang Cat 90,000.00 Orang / Hari / 8 Jam
7 Tukang Las 90,000.00 Orang / Hari / 8 Jam
8 Tukang Listrik 90,000.00 Orang / Hari / 8 Jam
9 Tukang Besi 90,000.00 Orang / Hari / 8 Jam
10 Kepala Tukang 95,000.00 Orang / Hari / 8 Jam
11 Mandor 100,000.00 Orang / Hari / 8 Jam

Indramayu, …………………2015

............................................................

.................................................
Direktur
DAFTAR HARGA BAHAN BANGUNAN
TAHUN ANGGARAN 2015
CV. DUTA GRAHA Consultant

NO. JENIS BAHAN SATUAN HARGA (Rp.) KET.

1 2 3 4 5

A. BAHAN AGREGAT BERIKUT BAHAN JADINYA


1 Pasir Pasang M3 191,000.00
2 Bata Merah bakar kelas 1 Bh 675.00
3 Batu Tempel Hitam Uk. 10 x 20/20 x 20 M2 145,000.00
4 Batu Tempel Hijau Uk. 10 x 20/10 x 10 M2 139,000.00
5 Batu Tempel Kuning M2 135,000.00
6 Batu Sikat M2 132,000.00
7 Lem kayu (Lem Fox) putih Kg 28,000.00
8 Lem Kuning (Aibbon/fox) Kg 50,000.00
9 Semen Pc (portland) Kg 1,425.00
10 Nat Semen Kg 9,500.00
11 Semen Putih Kg 2,400.00
12 Semen Adhesive Kg 6,000.00
13 Glass block Bh 26,000.00

B. BAHAN KAYU BERIKUT BAHAN JADINYA


1 Bambu Ampel d. 8-10 cm/6 M' Btg 24,000.00
2 Bilik Bambu tanpa kulit M2 18,500.00
3 Tali Ijuk Kg 30,000.00
4 Ijuk Kg 38,000.00
5 Papan Kruing 2/30 Lmb 119,000.00
6 Kayu Terentang (Albasia) M3 2,140,000.00
7 Papan Terentang Albasia M3 2,195,000.00
8 Kayu Jati Jabar, balok M3 11,350,000.00
9 Kayu Jati Jabar, papan M3 12,100,000.00
10 Kayu Kamper, balok M3 9,095,000.00
11 Kayu Kamper, papan M3 10,750,000.00
12 Kayu Borneo, balok M3 4,600,000.00
13 Kayu Borneo, papan M3 5,200,000.00
14 Kayu Kruing, balok M3 6,850,000.00
15 Kayu Kruing, papan M3 7,315,000.00
NO. JENIS BAHAN SATUAN HARGA (Rp.) KET.

1 2 3 4 5
16 Kayu Meranti batu, papan M3 5,200,000.00
17 Kayu Stoot Btg 55,000.00
18 Reng kruing 3/4 M3 7,200,000.00
19 Reng Borneo 2/3 M3 3,775,000.00
20 Reng kruing 2/3 M3 5,290,000.00
21 Kaso Albasia 5/7 M3 2,500,000.00
22 Kaso Borneo 5/7 M3 3,700,000.00
23 kaso Kruing 5/7 M3 5,100,000.00
24 Multiplek 9 mm (120x240) Lmb 135,000.00
25 Multiplek 12 mm (120x240) Lmb 185,000.00
26 Triplek 3 mm Lmb 55,000.00
27 Triplek 4 mm Lmb 66,000.00
28 Triplek 6 mm Lmb 78,000.00
29 List Kayu Profil M' 11,000.00
30 Dolken d. 8-10/400 cm Btg 78,000.00

C. BAHAN LOGAM DAN BAHAN JADINYA


1 Besi Siku 50.50.4 mm Kg 11,000.00
2 Besi Beton BJTD 24 (Polos) Kg 12,000.00
3 Besi Beton BJTD 39 (Ulir) Kg 13,000.00
4 Besi Strip/plat besi d. 3 - 4 mm Kg 11,000.00
5 Besi Hollo 40.40.0,34 mm Btg 42,000.00
6 Besi Tempa untuk teralis M2 550,000.00
7 Besi beton untuk teralis M2 375,000.00
8 Plat Aluminium 90x200 cm Lmb 115,000.00
9 Plat Aluminium t. 0,8 mm Lmb 95,000.00
10 Plat Aluminium t. 0,6 mm Lmb 73,000.00
11 Plat Aluminium t. 0,3 mm Lmb 69,000.00
12 Plat Allucubon Ex. Australia M2 915,000.00
13 Kawat Beton Kg 22,000.00
14 Kawat Harmonika M2 25,000.00
15 Kawat Nyamuk (ram nyamuk hijau) M2 15,000.00
16 Kawat Duri M' 8,500.00
17 Kawat Las Listrik Kg 20,000.00
18 Paku Sekrup Bh 200.00
19 Paku Triplek Kg 25,000.00
20 Paku Asbes Kg 27,500.00
21 Paku Pancing Bh 1,000.00
22 Paku Payung asbes + karet bantalan Bh 1,750.00
23 Paku Biasa 1/2"-1" Kg 20,000.00
24 Paku Biasa 2"-5" Kg 18,000.00
25 Paku Biasa 5"-7" Kg 17,000.00
26 Paku Beton 2-12 cm Kg 36,000.00
27 Paku Gypsum Kg 28,000.00
28 Baud Angkur 12 mm Bh 14,000.00
29 Kusen Aluminium warna doff 4" M' 147,000.00
30 Kusen Aluminium Standar 4" M' 112,000.00
31 Daun Jendela Aluminium silver lengkap tanpa kaca Unit 520,000.00
32 Daun Jendela Aluminium coklat lengkap tanpa kaca Unit 462,000.00
33 Daun Pintu Aluminium silver lengkap tanpa kaca Unit 1,495,000.00
34 Daun Pintu Aluminium coklat lengkap tanpa kaca Unit 1,615,000.00
35 Rangka Atap Baja Ringan Zingallum C (0.75 mm) Reng 38 M2 131,000.00
36 Rangka Atap Baja Ringan Zingallum C (0.75 mm) Reng 32 M2 142,000.00
37 Rangka Atap Baja Ringan Zingallum C (0.75-1.00 mm) Reng 38 M2 164,000.00
NO. JENIS BAHAN SATUAN HARGA (Rp.) KET.

1 2 3 4 5
38 Rangka Atap Baja Ringan Zingallum C (0.75-1.00 mm) Reng 32 M2 179,000.00
39 Polycarbonate Sheet/Twin lite UK. 11,8 x 2,1 Lmb 2,100,000.00
40 Folding Gate (Pintu lipat) M2 480,000.00
NO. JENIS BAHAN SATUAN HARGA (Rp.) KET.

1 2 3 4 5
41 Sliding Door (Pintu geser) Unit 290,000.00
42 Fiber glass (Acyrlic) tebal 5 mm Lmb 1,050,000.00
43 Rolling Door 0.4mm/Grile M2 325,000.00
44 Pagar BRC ulir t. 120 cm, p. 240 cm Lmb 420,000.00
45 Door Closer Bh 225,000.00

D. BAHAN PERPIPAAN, RIOLERING & SANITARY


1 Kloset Jongkok setara INA Bh 151,000.00
2 Kloset duduk setara TOTO lengkap aksesoris Bh 2,225,000.00
3 Kloset duduk setara INA lengkap aksesoris Bh 1,300,000.00
4 Washtafel warna setara INA Unit 460,000.00
5 Bath Tube putih porselen Unit 1,955,000.00
6 Urinoir Unit 1,650,000.00
7 Shower merk Speed/DIVA Bh 198,000.00
8 Tempat sabun porselen Bh 42,000.00
9 Bak Mandi fiber glass standar Bh 305,000.00
10 Pipa GIP medium B d. 1/2" (P. 6 m / btg) M' 15,000.00
11 Pipa GIP medium B d. 3/4" (P. 6 m / btg) M' 25,000.00
12 Pipa GIP medium B d. 1" (P. 6 m / btg) M' 28,000.00
13 Pipa GIP medium B d. 1 1/4" (P. 6 m / btg) M' 39,000.00
14 Pipa GIP medium B d. 1 1/2" (P. 6 m / btg) M' 50,000.00
15 Pipa GIP medium B d. 2" (P. 6 m / btg) M' 60,000.00
16 Pipa GI 1 1/2" M' 18,000.00
17 Pipa Galvanis d. 3" M' 50,000.00
18 Pipa Galvanis d. 2" M' 32,000.00
19 Pipa PVC 1/2" Wavin M' 4,000.00
20 Pipa PVC 3/4" Wavin M' 5,000.00
21 Pipa PVC 1" M' 8,500.00
22 Pipa PVC 1 1/4" M' 12,000.00
23 Pipa PVC 1 1/2" M' 14,000.00
24 Pipa PVC d. 2" M' 15,000.00
25 Pipa PVC d. 3" M' 27,000.00
26 Pipa PVC d. 4" M' 39,000.00
27 Pipa PVC d. 6" M' 78,000.00
NO. JENIS BAHAN SATUAN HARGA (Rp.) KET.

1 2 3 4 5

E. BAHAN LANTAI & PELAPIS DINDING


1 Keramik warna/corak 20x20 cm M2 53,000.00
2 Keramik warna Anti Slip 20x20 cm kw. 1 M2 56,000.00
3 Keramik putih polos 30x30 cm kw. 1 M2 45,000.00
4 Keramik warna/corak 30x30 cm M2 51,000.00
5 Keramik warna anti slip 30x30 cm, kw. 1 M2 54,000.00
NO. JENIS BAHAN SATUAN HARGA (Rp.) KET.

1 2 3 4 5
6 Keramik putih polos 40x40 cm kw. 1 M2 65,000.00
7 Keramik warna/corak 40x40 cm M2 75,000.00
8 Keramik warna/corak 20x25 cm M2 52,000.00
9 Keramik putih polos 20x25 cm M2 48,000.00
10 Granit warna/corak 60x60 cm M2 205,000.00
11 Keramik Essenza 40x40 cm M2 225,000.00
12 Stiffnes Tangga 10x40 Bh 27,000.00
13 Kuku Macan Polos M' 75,000.00
14 Kuku Macan Spiral M' 80,000.00
15 Parquet jati M2 160,000.00

F. BAHAN KACA
1 Kaca polos t. 3 mm M2 70,000.00
2 Kaca polos ES t. 3 mm M2 77,000.00
3 Kaca polos t. 5 mm M2 117,000.00
4 Kaca polos ES t. 5 mm M2 139,000.00
5 Kaca Rayband t. 3 mm M2 83,000.00
6 Kaca Rayband t. 5 mm M2 123,000.00

G. BAHAN FINISING, LABURAN, PENGISI


DAN ALATNYA
1 Plamir Tembok Kg 17,000.00
2 Plamir Kayu Kg 26,000.00
3 Plincote Kg 30,000.00
4 Spirtus Ltr 13,000.00
5 Dempul Halus (IMPRA) Kg 65,000.00
6 Bahan plistur (sirlak) Jengki Kg 112,000.00
7 Melamik Kg 66,000.00
8 Tinner Impala Ltr 26,000.00
9 Minyak Cat Tinner Ltr 17,000.00
10 Terpentin Btl 7,500.00
11 Vernis (Cat Batu) Ltr 65,000.00
12 Ampelas Lbr 3,000.00
13 Meni Besi/kayu Kg 32,000.00
14 Meni Besi Zingchromate Kg 55,000.00
15 Cat Besi/kayu Kg 52,000.00
16 Cat tembok setara Metrolite Kg 24,500.00
17 Cat Duko Kg 88,000.00
18 Aquaproof Kg 65,000.00
19 Cat Besi Pollyuerthane Kg 236,000.00
20 Residu/Ter (Solignium) Kg 42,500.00
21 Prime coat Ltr 8,000.00
22 Soda Api Ltr 26,000.00
23 Bahan Plistur jadi Kg 49,000.00
24 Kuas 3" Bh 15,000.00
25 Roll Cat Tembok Bh 20,500.00

I. BAHAN ALAT PENGGANTUNG & KUNCI


1 Kunci tanam double slaag kecil Bh 135,000.00
2 Kunci tanam double slaag besar Bh 210,000.00
3 Kunci slot (grendel pintu & jendela) Set 8,000.00
4 Engsel pintu 4" Bh 28,000.00
5 Engsel Jendela 3" Bh 17,000.00
6 Kait angin Bh 15,000.00
NO. JENIS BAHAN SATUAN HARGA (Rp.) KET.

1 2 3 4 5
7 Expanolete Ps 105,000.00
NO. JENIS BAHAN SATUAN HARGA (Rp.) KET.

1 2 3 4 5
H. BAHAN ALAT LISTRIK
1 Box MCB ( 4 group ) Bh 55,000.00
2 MCB Bh 70,000.00
3 Saklar tunggal Bh 18,000.00
4 Saklar double Bh 24,000.00
5 Stop Kontak Bh 18,000.00
6 Stop Kontak AC Bh 65,000.00
7 Lampu Pijar 25 watt Bh 15,000.00
8 Lampu PL 5 Watt Bh 31,000.00
9 Lampu PL 11 Watt Bh 34,000.00
10 Lampu PL 18 watt Bh 44,000.00
11 Lampu PL 15 Watt Bh 38,000.00
12 Lampu TL 2 x 20 watt + Kap Bh 95,000.00
13 Lampu TL 1 x 40 watt + Kap Bh 88,000.00
14 Dudukan Lampu TL max. 1x18 W Bh 42,000.00
15 Dudukan Lampu PL Bh 5,000.00
16 Dudukan Lampu downlight bahan stainlesstell 6" Bh 57,000.00
17 Kabel NYM 2 x 1,5 mm M' 11,000.00
18 Kabel NYM 2 x 2,5 mm M' 12,000.00
19 Kabel NYM 3 x 1,5 mm M' 13,000.00
20 Kabel NYM 3 x 2,5 mm M' 14,000.00
21 Kawat BC 25 mm M' 41,000.00
22 Kawat BC 35 mm M' 49,000.00
23 Tombak Tembaga (Arde) Btg 55,000.00
24 Tombak Tembaga (Arde petir) Btg 205,000.00

I. ALAT BANTU
1 Cangkul/sekop Bh 55,000.00
2 Parang Bh 60,000.00
3 Pikulan dan 2 bakul Bh 35,000.00

Indramayu, …………………2015

............................................................
0.00

.................................................
Direktur
Analisa Harga Satuan ini hanya ANALISA HARGA SATUAN
KODE
dipergunakan sebagai dasar/ pendekatan GALIAN TANAH UNTUK KONSTRUKSI
dalam menyusun DASK dan mengevaluasi
Harga Penawaran K.224
(MENGGUNAKAN BURUH)

PROPINSI KODE KABUPATEN KODE DISIAPKAN OLEH : TANGGAL


JAWA BARAT 32 INDRAMAYU 14 CV. DUTA GRAHA Consultant 10 Januari 2011

PROSES : ANGGAPAN :

Pekerjaan ini harus dilaksanakan sesuai : 1. Menggunakan alat berat (40 m3/hari)
2. Kapasitas kerja per orang 1,3 M3/hari
1. Bab satuan pekerjaan ini, spesifikasi umum 3. Kedalaman rata-rata galian sampai dengan 3 m
Jalan Kabupaten, Bina Marga, Maret 1992 4. Umur alat bantu rata-rata 1 bulan / orang / @ 3 set

2. Atau Addendum yang berlaku.

TOTAL VOL UPAH SUB JUMLAH


No. PEKERJA VOL HARI KODE BIAYA (Rp.)
(org.hari) (Rp./org/hari (Rp.)

1 Mandor Lapangan 1 1 L.061 1 #REF! #REF!


2 Buruh Lapangan Tak Terlatih 30 1 L.101 30 #N/A #N/A

PEKERJA #REF!
HARGA SUB JUMLAH
NO. MATERIAL SATUAN KODE TOTAL VOL BIAYA (Rp.)
SATUAN (Rp.) (Rp.)

1 Alat-alat bantu Set M.170 1.20 81,300.00 97,560.00

MATERIAL 97,560.00
HARGA SUB JUMLAH
NO. PERALATAN JUMLAH HARI KERJA KODE JAM KERJA BIAYA (Rp.)
(Rp./Jam) (Rp.)

PERALATAN -
TOTAL (Rp.) #REF!

Analisa Jalan Raya Halaman. ( 36 )


VOLUME : 40 SATUAN : M3 HARGA SATUAN Rp. #REF! PER [M3]

Analisa Jalan Raya Halaman. ( 37 )


Analisa Harga Satuan ini hanya ANALISA HARGA SATUAN
KODE
dipergunakan sebagai dasar/ pendekatan PENIMBUNAN BADAN JALAN
dalam menyusun DASK dan mengevaluasi
Harga Penawaran K.311
(MENGGUNAKAN BURUH)

PROPINSI KODE KABUPATEN KODE DISIAPKAN OLEH : TANGGAL


JAWA BARAT 32 INDRAMAYU 14 CV. DUTA GRAHA Consultant 10 Januari 2011

PROSES : ANGGAPAN :

Pekerjaan ini harus dilaksanakan sesuai : 1. Menggunakan alat berat ( 60 m3/hari )


2. Material pilihan untuk timbunan dikirim ke lokasi pekerjaan sejauh
1. Bab satuan pekerjaan ini, spesifikasi umum 10 Km oleh pemasok
Jalan Kabupaten, Bina Marga, Maret 1992 3. Harga material tergantung harga di lokasi pekerjaan
4. Umur alat bantu rata-rata 1 bulan / orang / set @ 3 alat
2. Atau Addendum yang berlaku.

TOTAL VOL UPAH SUB JUMLAH


No. PEKERJA VOL HARI KODE BIAYA (Rp.)
(org.hari) (Rp./org/hari (Rp.)

1 Mandor Lapangan 1 1 L.061 1 #REF! #REF!


2 Operator Terlatih 2 1 L.081 2 #N/A #N/A
3 Pembantu Operator 2 1 L.089 2 #N/A #N/A
4 Supir Truck 1 1 L.091 1 #REF! #REF!
5 Pembantu Supir 1 1 L.099 1 #N/A #N/A
6 Buruh Lapangan Tak Terlatih 4 1 L.101 4 #N/A #N/A

PEKERJA #REF!
HARGA SUB JUMLAH
NO. MATERIAL SATUAN KODE TOTAL VOL BIAYA (Rp.)
SATUAN (Rp.) (Rp.)

1 Alat-alat bantu Set M.170 0.16 81,300.00 13,008.00


2 Tanah Merah M3 M.050 156.00 #REF! #REF!

MATERIAL #REF!
HARGA SUB JUMLAH
NO. PERALATAN JUMLAH HARI KERJA KODE JAM KERJA BIAYA (Rp.)
(Rp./Jam) (Rp.)

1 Mesin gilas roda karet 8-15 Ton 1 1 E.084 5 176,000.00 880,000.00


2 Truck tangki air 115 HP 1 1 E.182 5 57,400.00 287,000.00
3 Motor Grade 100 HP 1 1 E.010 5 245,200.00 1,226,000.00

PERALATAN 2,393,000.00
TOTAL (Rp.) #REF!

Analisa Jalan Raya Halaman. ( 38 )


VOLUME : 120 SATUAN : M3 HARGA SATUAN Rp. #REF! PER [M3]

Analisa Jalan Raya Halaman. ( 39 )


Analisa Harga Satuan ini hanya ANALISA HARGA SATUAN
KODE
dipergunakan sebagai dasar/ pendekatan GALIAN TANAH DAN PEMBUANGAN
dalam menyusun DASK dan mengevaluasi
Harga Penawaran K.321
(MENGGUNAKAN ALAT)

PROPINSI KODE KABUPATEN KODE DISIAPKAN OLEH : TANGGAL


JAWA BARAT 32 INDRAMAYU 14 CV. DUTA GRAHA Consultant 10 Januari 2011

PROSES : ANGGAPAN :

Pekerjaan ini harus dilaksanakan sesuai : 1. Menggunakan alat berat ( 200 M3/hari )
2. 20 % dibuang di lokasi tanpa diangkut dengan truck
1. Bab satuan pekerjaan ini, spesifikasi umum 3. 80 % dibuang dan diangkut dengan truck
Jalan Kabupaten, Bina Marga, Maret 1992 4. Jarak 1 Rit PP < 2 Km
5. 2,5 Rit PP/Jam/Truck
2. Atau Addendum yang berlaku.

TOTAL VOL UPAH SUB JUMLAH


No. PEKERJA VOL HARI KODE BIAYA (Rp.)
(org.hari) (Rp./org/hari (Rp.)

1 Mandor Lapangan 1 1 L.061 1 #REF! #REF!


2 Operator Terlatih 3 1 L.081 3 #N/A #N/A
3 Pembantu Operator 3 1 L.089 3 #N/A #N/A
4 Supir Truck 4 1 L.091 4 #REF! #REF!
5 Pembantu Supir 4 1 L.099 4 #N/A #N/A
6 Buruh Lapangan Tak Terlatih 6 1 L.101 6 #N/A #N/A

PEKERJA #REF!
HARGA SUB JUMLAH
NO. MATERIAL SATUAN KODE TOTAL VOL BIAYA (Rp.)
SATUAN (Rp.) (Rp.)

1 Alat-alat bantu Set M.170 0.24 81,300.00 19,512.00

MATERIAL 19,512.00
HARGA SUB JUMLAH
NO. PERALATAN JUMLAH HARI KERJA KODE JAM KERJA BIAYA (Rp.)
(Rp./Jam) (Rp.)

1 Buldozer 110 HP 1 1 E.001 5 162,700.00 813,500.00


2 Motor Grade 100 HP 1 1 E.010 5 245,200.00 1,226,000.00
3 Wheel Loader 115 HP 1 1 E.052 5 77,500.00 387,500.00
4 Dump Truck 5 Ton / 145 HP 4 1 E.212 20 65,700.00 1,314,000.00

Analisa Jalan Raya Halaman. ( 40 )


PERALATAN 3,741,000.00
TOTAL (Rp.) #REF!

VOLUME : 200 SATUAN : M3 HARGA SATUAN Rp. #REF! PER [M3]

Analisa Jalan Raya Halaman. ( 41 )


Analisa Harga Satuan ini hanya ANALISA HARGA SATUAN
KODE
dipergunakan sebagai dasar/ pendekatan PENYIAPAN TANAH DASAR
dalam menyusun DASK dan mengevaluasi
Harga Penawaran K.341
(MENGGUNAKAN BURUH)

PROPINSI KODE KABUPATEN KODE DISIAPKAN OLEH : TANGGAL


JAWA BARAT 32 INDRAMAYU 14 CV. DUTA GRAHA Consultant 10 Januari 2011

PROSES : ANGGAPAN :

Pekerjaan ini harus dilaksanakan sesuai : 1. Menggunakan alat berat ( 8 m x 500 m / hari
2. DAMIJA dibersihkan dari semak dll.
1. Bab satuan pekerjaan ini, spesifikasi umum 3. Lebar dasar jalan 8 m
Jalan Kabupaten, Bina Marga, Maret 1992

2. Atau Addendum yang berlaku.

TOTAL VOL UPAH SUB JUMLAH


No. PEKERJA VOL HARI KODE BIAYA (Rp.)
(org.hari) (Rp./org/hari (Rp.)

1 Mandor Lapangan 1 1 L.061 1 #REF! #REF!


2 Operator Terlatih 2 1 L.081 2 #N/A #N/A
3 Pembantu Operator 2 1 L.089 2 #N/A #N/A
4 Buruh Lapangan Tak Terlatih 80 1 L.101 80 #N/A #N/A

PEKERJA #REF!
HARGA SUB JUMLAH
NO. MATERIAL SATUAN KODE TOTAL VOL BIAYA (Rp.)
SATUAN (Rp.) (Rp.)

1 Alat-alat bantu Set M.170 3.20 81,300.00 260,160.00

MATERIAL 260,160.00
HARGA SUB JUMLAH
NO. PERALATAN JUMLAH HARI KERJA KODE JAM KERJA BIAYA (Rp.)
(Rp./Jam) (Rp.)

1 Mesin gilas 3 roda 6 - 8 ton 1 1 E.080 5 77,800.00 389,000.00

Analisa Jalan Raya Halaman. ( 42 )


PERALATAN 389,000.00
TOTAL (Rp.) #REF!

VOLUME : 32 SATUAN : M3 HARGA SATUAN Rp. #REF! PER ARE

Analisa Jalan Raya Halaman. ( 43 )


Analisa Harga Satuan ini hanya ANALISA HARGA SATUAN
KODE
dipergunakan sebagai dasar/ pendekatan PENYIAPAN TANAH DASAR
dalam menyusun DASK dan mengevaluasi
Harga Penawaran K.342
( MENGGUNAKAN ALAT )

PROPINSI KODE KABUPATEN KODE DISIAPKAN OLEH : TANGGAL


JAWA BARAT 32 INDRAMAYU 14 CV. DUTA GRAHA Consultant 10 Januari 2011

PROSES : ANGGAPAN :

Pekerjaan ini harus dilaksanakan sesuai : 1. Menggunakan alat berat ( 8 m x 500 m / hari )
2. DAMIJA dibersihkan dari semak dll.
1. Bab satuan pekerjaan ini, spesifikasi umum 3. Lebar dasar jalan 8 m
Jalan Kabupaten, Bina Marga, Maret 1992 4. Hasil kerja menyiapkan dasar jalan 500 m / hari

2. Atau Addendum yang berlaku.

TOTAL VOL UPAH SUB JUMLAH


No. PEKERJA VOL HARI KODE BIAYA (Rp.)
(org.hari) (Rp./org/hari (Rp.)

1 Mandor Lapangan 1 1 L.061 1 #REF! #REF!


2 Operator Terlatih 2 1 L.081 2 #N/A #N/A
3 Pembantu Operator 2 1 L.089 2 #N/A #N/A
4 Buruh Lapangan Tak Terlatih 4 1 L.101 4 #N/A #N/A

PEKERJA #REF!
HARGA SUB JUMLAH
NO. MATERIAL SATUAN KODE TOTAL VOL BIAYA (Rp.)
SATUAN (Rp.) (Rp.)

1 Alat-alat bantu Set M.170 0.16 81,300.00 13,008.00

MATERIAL 13,008.00
HARGA SUB JUMLAH
NO. PERALATAN JUMLAH HARI KERJA KODE JAM KERJA BIAYA (Rp.)
(Rp./Jam) (Rp.)

1 Motor Grade 100 HP 1 1 E.010 6 245,200.00 1,471,200.00


2 Mesin gilas 3 roda 6 - 8 ton 1 1 E.080 6 77,800.00 466,800.00

PERALATAN 1,938,000.00
TOTAL (Rp.) #REF!

VOLUME : 40 SATUAN : Are HARGA SATUAN Rp. #REF! PER Are

Analisa Jalan Raya Halaman. ( 44 )


Analisa Jalan Raya Halaman. ( 45 )
Analisa Harga Satuan ini hanya ANALISA HARGA SATUAN
KODE
dipergunakan sebagai dasar/ pendekatan PEMBENTUKAN BAHU JALAN KERAS / TANAH
dalam menyusun DASK dan mengevaluasi
Harga Penawaran K.411.A
( MENGGUNAKAN ALAT )

PROPINSI KODE KABUPATEN KODE DISIAPKAN OLEH : TANGGAL


JAWA BARAT 32 INDRAMAYU 14 CV. DUTA GRAHA Consultant 10 Januari 2011

PROSES : ANGGAPAN :

Pekerjaan ini harus dilaksanakan sesuai : 1. Menggunakan alat berat (200 m3/ hari, pemadatan 2000 m bahu jalan/ hari
2. 10 cm timbunan padat dibutuhkan untuk 1 m lebar bahu jalan
1. Bab satuan pekerjaan ini, spesifikasi umum 3. Material timbunan yang termurah dikirim ke lokasi pekerjaan oleh pemasok
Jalan Kabupaten, Bina Marga, Maret 1992 4. Pemasok menimbun material timbunan sepanjang bahu jalan
5. Material disebar dengan grader
2. Atau Addendum yang berlaku. 6. 200 m3 dihampar dan dipadatkan setiap hari
7. Koefisien pemadatan 1,4

TOTAL VOL UPAH SUB JUMLAH


No. PEKERJA VOL HARI KODE BIAYA (Rp.)
(org.hari) (Rp./org/hari (Rp.)

1 Mandor Lapangan 1 1 L.061 1 #REF! #REF!


2 Operator Terlatih 3 1 L.081 3 #N/A #N/A
3 Pembantu Operator 3 1 L.089 3 #N/A #N/A
4 Buruh Lapangan Tak Terlatih 4 1 L.101 4 #N/A #N/A
5 Buruh Lapangan Terlatih 2 1 L.106 2 #N/A #N/A

PEKERJA #REF!
HARGA SUB JUMLAH
NO. MATERIAL SATUAN KODE TOTAL VOL BIAYA (Rp.)
SATUAN (Rp.) (Rp.)

1 Timbunan Pilihan M3 M.050 280.00 21,700.00 6,076,000.00


2 Alat-alat bantu Set M.170 3.84 81,300.00 312,192.00

MATERIAL 6,388,192.00
HARGA SUB JUMLAH
NO. PERALATAN JUMLAH HARI KERJA KODE JAM KERJA BIAYA (Rp.)
(Rp./Jam) (Rp.)

1 Motor Grade 100 HP 1 1 E.010 5 245,200.00 1,226,000.00


2 Mesin Gilas Bergetar 1 Ton 2 1 E.087 10 40,500.00 405,000.00

PERALATAN 1,631,000.00
TOTAL (Rp.) #REF!

Analisa Jalan Raya Halaman. ( 46 )


VOLUME : 200 SATUAN : M3 HARGA SATUAN Rp. #REF! PER [M3]

Analisa Jalan Raya Halaman. ( 47 )


Analisa Harga Satuan ini hanya ANALISA HARGA SATUAN
KODE
dipergunakan sebagai dasar/ pendekatan MEMOTONG BAHU JALAN TINGGI
dalam menyusun DASK dan mengevaluasi
Harga Penawaran K.421
( MENGGUNAKAN ALAT )

PROPINSI KODE KABUPATEN KODE DISIAPKAN OLEH : TANGGAL


JAWA BARAT 32 INDRAMAYU 14 CV. DUTA GRAHA Consultant 10 Januari 2011

PROSES : ANGGAPAN :

Pekerjaan ini harus dilaksanakan sesuai : 1. Menggunakan tenaga manusia (150 M3 / hari )
2. Grader memotong bahu jalan setinggi 10 cm, selebar 1,5 m,
1. Perbaiki bahu jalan yang tingginya sepanjang 1 Km pada satu sisi jalan
melebihi permukaan jalan antara parit 3. Jarak membuang 1 rit PP < 2 Km
dan perkerasan jalan 4. 2,5 Rit PP / jam / truck
2. Menggunakan loader untuj membuat sisa
galian ke dump truck
3. Buang semua sisa galian

TOTAL VOL UPAH SUB JUMLAH


No. PEKERJA VOL HARI KODE BIAYA (Rp.)
(org.hari) (Rp./org/hari (Rp.)

1 Mandor Lapangan 1 1 L.061 1 #REF! #REF!


2 Operator Terlatih 2 1 L.081 2 #N/A #N/A
3 Pembantu Operator 2 1 L.089 2 #N/A #N/A
4 Supir Truck 4 1 L.091 4 #REF! #REF!
5 Pembantu Supir 4 1 L.099 4 #N/A #N/A
6 Buruh Lapangan Tak Terlatih 6 1 L.101 6 #N/A #N/A

PEKERJA #REF!
HARGA SUB JUMLAH
NO. MATERIAL SATUAN KODE TOTAL VOL BIAYA (Rp.)
SATUAN (Rp.) (Rp.)

1 Alat-alat bantu Set M.170 0.24 81,300.00 19,512.00

MATERIAL 19,512.00
HARGA SUB JUMLAH
NO. PERALATAN JUMLAH HARI KERJA KODE JAM KERJA BIAYA (Rp.)
(Rp./Jam) (Rp.)

1 Motor Grade 100 HP 1 1 E.010 5 245,200.00 1,226,000.00


2 Wheel Loader 115 HP 1 1 E.052 6 77,500.00 465,000.00
3 Dump Truck 5 Ton / 145 HP 4 1 E.212 24 65,700.00 1,576,800.00

Analisa Jalan Raya Halaman. ( 48 )


PERALATAN 3,267,800.00
TOTAL (Rp.) #REF!

VOLUME : 150 SATUAN : M3 HARGA SATUAN Rp. #REF! PER [M3]

Analisa Jalan Raya Halaman. ( 49 )


Analisa Harga Satuan ini hanya ANALISA HARGA SATUAN
KODE
dipergunakan sebagai dasar/ pendekatan MEMOTONG BAHU JALAN TINGGI
dalam menyusun DASK dan mengevaluasi
Harga Penawaran K.421.a
( MENGGUNAKAN ALAT )

PROPINSI KODE KABUPATEN KODE DISIAPKAN OLEH : TANGGAL


JAWA BARAT 32 INDRAMAYU 14 CV. DUTA GRAHA Consultant 10 Januari 2011

PROSES : ANGGAPAN :

Pekerjaan ini harus dilaksanakan sesuai : 1. Menggunakan tenaga manusia (150 M3 / hari )
2. Buldozer memotong dan meratakan tanah
1. Perbaiki bahu jalan yang tingginya 3. Koefisien pemadatan tanah = 1,3
melebihi permukaan jalan antara parit
dan perkerasan jalan
2. Menggunakan loader untuk memotong dan
mendorong tanah
3. Pemadatan tanah dengan menggunakan
mesin gilas 3 Roda 6 - 8 ton
4. Buang semua sisa galian

TOTAL VOL UPAH SUB JUMLAH


No. PEKERJA VOL HARI KODE BIAYA (Rp.)
(org.hari) (Rp./org/hari (Rp.)

1 Mandor Lapangan 1 1 L.061 1 #REF! #REF!


2 Operator Terlatih 2 1 L.081 2 #N/A #N/A
3 Pembantu Operator 2 1 L.089 2 #N/A #N/A
4 Buruh Lapangan Tak Terlatih 6 1 L.101 6 #N/A #N/A

PEKERJA #REF!
HARGA SUB JUMLAH
NO. MATERIAL SATUAN KODE TOTAL VOL BIAYA (Rp.)
SATUAN (Rp.) (Rp.)

1 Alat-alat bantu Set M.170 0.24 81,300.00 19,512.00

MATERIAL 19,512.00
HARGA SUB JUMLAH
NO. PERALATAN JUMLAH HARI KERJA KODE JAM KERJA BIAYA (Rp.)
(Rp./Jam) (Rp.)

1 Mesin gilas 3 roda 6 - 8 ton 1 1 E.080 5 77,800.00 389,000.00


2 Buldozer 110 HP 1 1 E.001 5 162,700.00 813,500.00

Analisa Jalan Raya Halaman. ( 50 )


PERALATAN 1,202,500.00
TOTAL (Rp.) #REF!

VOLUME : 150 SATUAN : M3 HARGA SATUAN Rp. #REF! PER [M3]

Analisa Jalan Raya Halaman. ( 51 )


Analisa Harga Satuan ini hanya ANALISA HARGA SATUAN
KODE
dipergunakan sebagai dasar/ pendekatan LPB KLAS C SIRTU
dalam menyusun DASK dan mengevaluasi
Harga Penawaran K.514
(MENGGUNAKAN ALAT)

PROPINSI KODE KABUPATEN KODE DISIAPKAN OLEH : TANGGAL


JAWA BARAT 32 INDRAMAYU 14 CV. DUTA GRAHA Consultant 10 Januari 2011

PROSES : ANGGAPAN :

Pekerjaan ini harus dilaksanakan sesuai : 1. Menggunakan alat berat (150 m3/hari)
2. Material ditimbun sepanjang jalan oleh pemasok
1. Bab satuan pekerjaan ini, spesifikasi umum 3. 6 % sirtu dengan ukuran lebih dipisah pada saat penghamparan
Jalan Kabupaten, Bina Marga, Maret 1992 dengan grander
4. Lapisan pondasi bawah dipadatkan samai tebal padat 15 cm
2. Atau Addendum yang berlaku. 5. Koefisien pemadatan = 1,3

TOTAL VOL UPAH SUB JUMLAH


No. PEKERJA VOL HARI KODE BIAYA (Rp.)
(org.hari) (Rp./org/hari (Rp.)

1 Mandor Lapangan 1 1 L.061 1 #REF! #REF!


2 Operator Terlatih 2 1 L.081 2 #N/A #N/A
3 Pembantu Operator 2 1 L.089 2 #N/A #N/A
4 Supir Truck 1 1 L.091 1 #REF! #REF!
5 Pembantu Supir 1 1 L.099 1 #N/A #N/A
6 Buruh Lapangan Tak Terlatih 6 1 L.101 6 #N/A #N/A

PEKERJA #REF!
HARGA SUB JUMLAH
NO. MATERIAL SATUAN KODE TOTAL VOL BIAYA (Rp.)
SATUAN (Rp.) (Rp.)

1 Sirtu Tidak Tersaring m3 M.012 195.00 #REF! #REF!


2 Alat-alat bantu Set M.170 0.24 81,300.00 19,512.00

MATERIAL #REF!
HARGA SUB JUMLAH
NO. PERALATAN JUMLAH HARI KERJA KODE JAM KERJA BIAYA (Rp.)
(Rp./Jam) (Rp.)

1 Motor Grade 100 HP 1 1 E.010 5 245,200.00 1,226,000.00


2 Mesin gilas 3 roda 6 - 8 ton 1 1 E.080 5 77,800.00 389,000.00
3 Truck tangki air 115 HP 1 1 E.182 5 57,400.00 287,000.00

PERALATAN 1,902,000.00

Analisa Jalan Raya Halaman. ( 52+8 )


TOTAL (Rp.) #REF!

VOLUME : 150 SATUAN : M3 HARGA SATUAN Rp. #REF! PER [M3]

Analisa Jalan Raya Halaman. ( 53+8 )


Analisa Harga Satuan ini hanya ANALISA HARGA SATUAN
KODE
dipergunakan sebagai dasar/ pendekatan KONSTRUKSI LAPIS PONDASI BAWAH ( LPS )
dalam menyusun DASK dan mengevaluasi DENGAN TELFORD
Harga Penawaran K.516

PROPINSI KODE KABUPATEN KODE DISIAPKAN OLEH : TANGGAL


JAWA BARAT 32 INDRAMAYU 14 CV. DUTA GRAHA Consultant 10 Januari 2011

PROSES : ANGGAPAN :

Pekerjaan ini harus dilaksanakan sesuai : 1. Menggunakan tanaga orang


2. Material dikirim ke lokasi pekerjaan oleh suplier
1. Bab satuan pekerjaan ini, spesifikasi umum 3. Material sudah dipecah/ batu pecah
Jalan Kabupaten, Bina Marga, Maret 1992 4. Tanah dasar/ sub grade sudah dipersiapkan
5. Produksi 200 m3 / hari
2. Atau Addendum yang berlaku.

TOTAL VOL UPAH SUB JUMLAH


No. PEKERJA VOL HARI KODE BIAYA (Rp.)
(org.hari) (Rp./org/hari (Rp.)

1 Mandor Lapangan 3 3 L.061 9 #REF! #REF!


2 Operator Terlatih 1 3 L.081 3 #N/A #N/A
3 Pembantu Operator 1 3 L.089 3 #N/A #N/A
4 Buruh Lapangan Tak Terlatih 48 3 L.101 144 #N/A #N/A

PEKERJA #REF!
HARGA SUB JUMLAH
NO. MATERIAL SATUAN KODE TOTAL VOL BIAYA (Rp.)
SATUAN (Rp.) (Rp.)

1 Batu Belah m3 M.020 195.00 203,000.00 39,585,000.00


2 Batu Pecah 5 - 7 cm m3 M.022 43.00 #REF! #REF!
3 Pasir Urug / timbun m3 M.040 70.00 135,000.00 9,450,000.00
4 Alat-alat bantu Set M.170 3.00 81,300.00 243,900.00

MATERIAL #REF!
HARGA SUB JUMLAH
NO. PERALATAN JUMLAH HARI KERJA KODE JAM KERJA BIAYA (Rp.)
(Rp./Jam) (Rp.)

1 Mesin gilas 3 roda 6 - 8 ton 1 3 E.080 15 77,800.00 1,167,000.00

PERALATAN 1,167,000.00

Analisa Jalan Raya Halaman. ( 54+8 )


TOTAL (Rp.) #REF!

VOLUME : 200 SATUAN : M3 HARGA SATUAN Rp. #REF! PER [M3]

Analisa Jalan Raya Halaman. ( 55+8 )


Analisa Harga Satuan ini hanya ANALISA HARGA SATUAN
KODE
dipergunakan sebagai dasar/ pendekatan LAPIS PONDASI ATAS KLAS A AGREGAT PECAH TERSARING
dalam menyusun DASK dan mengevaluasi
Harga Penawaran K.520
(MENGGUNAKAN ALAT)

PROPINSI KODE KABUPATEN KODE DISIAPKAN OLEH : TANGGAL


JAWA BARAT 32 INDRAMAYU 14 CV. DUTA GRAHA Consultant 10 Januari 2011

PROSES : ANGGAPAN :

Pekerjaan ini harus dilaksanakan sesuai : 1. Menggunakan alat berat (150 m3/hari)
2. Material ditimbun sepanjang jalan oleh pemasok
1. Bab satuan pekerjaan ini, spesifikasi umum 3. Dihampar dan dipadatkan sampai tebal padat 10 cm
Jalan Kabupaten, Bina Marga, Maret 1992 4. Koefisien pemadatan = 1,3

2. Atau Addendum yang berlaku.

TOTAL VOL UPAH SUB JUMLAH


No. PEKERJA VOL HARI KODE BIAYA (Rp.)
(org.hari) (Rp./org/hari (Rp.)

1 Mandor Lapangan 1 1 L.061 1 #REF! #REF!


2 Operator Terlatih 2 1 L.081 2 #N/A #N/A
3 Pembantu Operator 2 1 L.089 2 #N/A #N/A
4 Supir Truck 1 1 L.091 1 #REF! #REF!
5 Pembantu Supir 1 1 L.099 1 #N/A #N/A
6 Buruh Lapangan Tak Terlatih 6 1 L.101 6 #N/A #N/A

PEKERJA #REF!
HARGA SUB JUMLAH
NO. MATERIAL SATUAN KODE TOTAL VOL BIAYA (Rp.)
SATUAN (Rp.) (Rp.)

1 Batu Pecah Bergradasi Klas A m3 M.012* 195.00 #REF! #REF!


2 Alat-alat bantu M.170 0.24 81,300.00 19,512.00

MATERIAL #REF!
HARGA SUB JUMLAH
NO. PERALATAN JUMLAH HARI KERJA KODE JAM KERJA BIAYA (Rp.)
(Rp./Jam) (Rp.)

1 Motor Grade 100 HP 1 1 E.010 5 245,200.00 1,226,000.00


2 Mesin gilas 3 roda 6 - 8 ton 1 1 E.080 5 77,800.00 389,000.00
3 Truck tangki air 115 HP 1 1 E.182 5 57,400.00 287,000.00

PERALATAN 1,902,000.00

Analisa Jalan Raya Halaman. ( 56+8 )


TOTAL (Rp.) #REF!

VOLUME : 150 SATUAN : M3 HARGA SATUAN Rp. #REF! PER [M3]

Analisa Jalan Raya Halaman. ( 57+8 )


Analisa Harga Satuan ini hanya ANALISA HARGA SATUAN PEKERJAAN
KODE
dipergunakan sebagai dasar/ pendekatan LABURAN ASPAL DUA LAPIS/ BURDA
dalam menyusun DASK dan mengevaluasi
Harga Penawaran K.617
(MENGGUNAKAN ALAT)

PROPINSI KODE KABUPATEN KODE DISIAPKAN OLEH : TANGGAL


JAWA BARAT 32 INDRAMAYU 14 CV. DUTA GRAHA Consultant 10 Januari 2011

PROSES : ANGGAPAN :

Pekerjaan ini harus dilaksanakan sesuai : 1. Hasil kerja 600 m2/hari


2. Agregat ukuran tunggal 19 mm dan 9,5 mm tersaring unit
1. Bab satuan pekerjaan ini, spesifikasi umum pemecah batu ditimbun dilokasi pekerjaan oleh pemasok
Jalan Kabupaten, Bina Marga, Maret 1992 3. Permukaan yang akan diaspal telah selesai dipadatkan & terikat
dengan binder
2. Atau Addendum yang berlaku. 4. Lapis seal/penutup menggunakan aspal cutback @ 1,5 kg/m2 dan 1,2 kg/m2
5. Agregat ukuran 19 mm dan 9,5 mm dihampar dari dump truck
penghampar 55 m2/m3 dan 120 m2/m3

TOTAL VOL UPAH SUB JUMLAH


No. PEKERJA VOL HARI KODE BIAYA (Rp.)
(org.hari) (Rp./org/hari (Rp.)

1 Mandor Lapangan 1 3 L.061 3 #REF! #REF!


2 Operator Terlatih 1 3 L.081 3 #N/A #N/A
3 Pembantu Operator 1 3 L.089 3 #N/A #N/A
4 Operator Kurang Terlatih 2 3 L.082 6 #REF! #REF!
5 Supir Truck 1 3 L.091 3 #REF! #REF!
6 Pembantu Supir 1 3 L.099 3 #N/A #N/A
7 Buruh Lapangan Tak Terlatih 12 3 L.101 36 #N/A #N/A
8 Buruh Lapangan Terlatih 2 3 L.106 6 #N/A #N/A

PEKERJA #REF!
HARGA SUB JUMLAH
NO. MATERIAL SATUAN KODE TOTAL VOL BIAYA (Rp.)
SATUAN (Rp.) (Rp.)

1 Batu Pecah 1 - 2 cm m3 M.025 33.00 #REF! #REF!


2 Batu Pecah 0,5 - 1 cm m3 M.026 15.00 #REF! #REF!
3 Aspal kg M.061 4,958.00 #REF! #REF!
4 Alat-alat bantu Set M.170 1.44 81,300.00 117,072.00

MATERIAL #REF!
HARGA SUB JUMLAH
NO. PERALATAN JUMLAH HARI KERJA KODE JAM KERJA BIAYA (Rp.)
(Rp./Jam) (Rp.)

1 Mesin gilas roda karet 8-15 Ton 1 3 E.084 15 176,000.00 2,640,000.00


2 Asphalt Sprayer Towed 200 L 2 3 E.154 30 39,000.00 1,170,000.00
3 Dump Truck 3,5 Ton 1 3 E.211 15 67,500.00 1,012,500.00

Analisa Jalan Raya Halaman. ( 58+8 )


4 Blower 1 3 E.... 15 21,000.00 315,000.00

PERALATAN 5,137,500.00
TOTAL (Rp.) #REF!

VOLUME : 1,800 SATUAN : M3 HARGA SATUAN Rp. #REF! PER [M3]

Analisa Jalan Raya Halaman. ( 59+8 )


Analisa Harga Satuan ini hanya ANALISA HARGA SATUAN PEKERJAAN
KODE
dipergunakan sebagai dasar/ pendekatan LAPIS ASPAL RESAP PENGIKAT/ PRIME COAT
dalam menyusun DASK dan mengevaluasi
Harga Penawaran K.619

PROPINSI KODE KABUPATEN KODE DISIAPKAN OLEH : TANGGAL


JAWA BARAT 32 INDRAMAYU 14 CV. DUTA GRAHA Consultant 10 Januari 2011

PROSES : ANGGAPAN :

Pekerjaan ini harus dilaksanakan sesuai : 1. Harga bahan, perangko ( siap dilokasi )
2. Perbandingan aspal dengan minyak tanah = 100 bagian aspal : 100
1. Bab satuan pekerjaan ini, spesifikasi umum bagian minyak tanah, berdasarkan berat
Jalan Kabupaten, Bina Marga, Maret 1992 3. Berat jenis minyak tanah 0,86
4. Berat jenis aspal 1,03
2. Atau Addendum yang berlaku.

TOTAL VOL UPAH SUB JUMLAH


No. PEKERJA VOL HARI KODE BIAYA (Rp.)
(org.hari) (Rp./org/hari (Rp.)

1 Mandor Lapangan 1 1 L.061 1 #REF! #REF!


2 Operator Kurang Terlatih 1 1 L.082 1 #REF! #REF!
3 Buruh Lapangan Tak Terlatih 4 1 L.101 4 #N/A #N/A
4 Buruh Lapangan Terlatih 1 1 L.106 1 #N/A #N/A

PEKERJA #REF!
HARGA SUB JUMLAH
NO. MATERIAL SATUAN KODE TOTAL VOL BIAYA (Rp.)
SATUAN (Rp.) (Rp.)

1 Aspal kg M.061 255.00 #REF! #REF!


2 Minyak Tanah lt M.065 599.00 #REF! #REF!
3 Alat-alat bantu Set M.170 0.16 81,300.00 13,008.00

MATERIAL #REF!
HARGA SUB JUMLAH
NO. PERALATAN JUMLAH HARI KERJA KODE JAM KERJA BIAYA (Rp.)
(Rp./Jam) (Rp.)

1 Asphalt Sprayer Towed 200 L 1 1 E.154 5 39,000.00 195,000.00


2 Blower 1 1 E.... 5 21,000.00 105,000.00

PERALATAN 300,000.00
TOTAL (Rp.) #REF!

Analisa Jalan Raya Halaman. ( 60+8 )


VOLUME : 1,000 SATUAN : M3 HARGA SATUAN Rp. #REF! PER [M3]

Analisa Jalan Raya Halaman. ( 61+8 )


Analisa Harga Satuan ini hanya ANALISA HARGA SATUAN PEKERJAAN
KODE
dipergunakan sebagai dasar/ pendekatan LAPIS ASPAL PELEKAT (TACK COAT)
dalam menyusun DASK dan mengevaluasi
Harga Penawaran K.620

PROPINSI KODE KABUPATEN KODE DISIAPKAN OLEH : TANGGAL


JAWA BARAT 32 INDRAMAYU 14 CV. DUTA GRAHA Consultant 10 Januari 2011

PROSES : ANGGAPAN :

Pekerjaan ini harus dilaksanakan sesuai : 1. Harga bahan, perangko ( siap dilokasi )
2. Perbandingan aspal dengan minyak tanah = 100 bagian aspal : 25
1. Bab satuan pekerjaan ini, spesifikasi umum bagian minyak tanah, berdasarkan berat
Jalan Kabupaten, Bina Marga, Maret 1992 3. Berat jenis minyak tanah 0,86

2. Atau Addendum yang berlaku.

TOTAL VOL UPAH SUB JUMLAH


No. PEKERJA VOL HARI KODE BIAYA (Rp.)
(org.hari) (Rp./org/hari (Rp.)

1 Mandor Lapangan 1 0.5 L.061 0.5 #REF! #REF!


2 Operator Kurang Terlatih 1 0.5 L.082 0.5 #REF! #REF!
3 Buruh Lapangan Tak Terlatih 4 0.5 L.101 2 #N/A #N/A
4 Buruh Lapangan Terlatih 1 0.5 L.106 0.5 #N/A #N/A

PEKERJA #REF!
HARGA SUB JUMLAH
NO. MATERIAL SATUAN KODE TOTAL VOL BIAYA (Rp.)
SATUAN (Rp.) (Rp.)

1 Aspal kg M.061 98.00 #REF! #REF!


2 Minyak Tanah lt M.065 29.00 #REF! #REF!
3 Alat-alat bantu Set M.170 0.08 81,300.00 6,504.00

MATERIAL #REF!
HARGA SUB JUMLAH
NO. PERALATAN JUMLAH HARI KERJA KODE JAM KERJA BIAYA (Rp.)
(Rp./Jam) (Rp.)

1 Asphalt Sprayer Towed 200 L 1 1 E.154 3 39,000.00 117,000.00


2 Blower 1 1 E.... 3 21,000.00 63,000.00
3 Compressor Air 210 M3 1 1 E.301 1 33,000.00 33,000.00

PERALATAN 213,000.00
TOTAL (Rp.) #REF!

Analisa Jalan Raya Halaman. ( 62+8 )


VOLUME : 600 SATUAN : M3 HARGA SATUAN Rp. #REF! PER [M3]

Analisa Jalan Raya Halaman. ( 63+8 )


Analisa Harga Satuan ini hanya ANALISA HARGA SATUAN PEKERJAAN
KODE
dipergunakan sebagai dasar/ pendekatan PENGHAMPARAN LAPIS TIPIS ASPAL BETON/LATASTON
dalam menyusun DASK dan mengevaluasi
Harga Penawaran K.636

PROPINSI KODE KABUPATEN KODE DISIAPKAN OLEH : TANGGAL


JAWA BARAT 32 INDRAMAYU 14 CV. DUTA GRAHA Consultant 10 Januari 2011

PROSES : ANGGAPAN :

Pekerjaan ini harus dilaksanakan sesuai : 1. Menggunakan alat berat 1500 m2/hari
2. Hot Rolled Sheet (Lataston) dikirim ke lokasi pekerjaan oleh
1. Bab satuan pekerjaan ini, spesifikasi umum pemasok dari AMP
Jalan Kabupaten, Bina Marga, Maret 1992 3. Tebal padat rata-rata 3 cm
4. BJ Lataston padat 2,2 ton/m3
2. Atau Addendum yang berlaku. 5. Sesuai spek. B.M. No.12/PT/B/1983 (tebal 3,3) dan rev.Spek.Umum
B.M Maret '89-Buku 3

TOTAL VOL UPAH SUB JUMLAH


No. PEKERJA VOL HARI KODE BIAYA (Rp.)
(org.hari) (Rp./org/hari (Rp.)

1 Mandor Lapangan 1 1 L.061 1 #REF! #REF!


2 Operator Terlatih 3 1 L.081 3 #N/A #N/A
3 Pembantu Operator 3 1 L.089 3 #N/A #N/A
4 Operator Kurang Terlatih 1 1 L.082 1 #REF! #REF!
5 Buruh Lapangan Tak Terlatih 12 1 L.101 12 #N/A #N/A
6 Buruh Lapangan Terlatih 8 1 L.106 8 #N/A #N/A

PEKERJA #REF!
HARGA SUB JUMLAH
NO. MATERIAL SATUAN KODE TOTAL VOL BIAYA (Rp.)
SATUAN (Rp.) (Rp.)

1 H.R.S. (LATASTON) ton - 100.00 1,000,000.00 100,000,000.00


2 Aspal kg M.061 600.00 #REF! #REF!
3 Minyak Tanah lt M.065 150.00 #REF! #REF!
4 Alat-alat bantu Set M.170 0.48 81,300.00 39,024.00

MATERIAL #REF!
HARGA SUB JUMLAH
NO. PERALATAN JUMLAH HARI KERJA KODE JAM KERJA BIAYA (Rp.)
(Rp./Jam) (Rp.)

1 Mesin gilas tandem 6-10 ton 1 1 E.081 5 75,000.00 375,000.00


2 Mesin gilas roda karet 8-15 Ton 1 1 E.084 5 176,000.00 880,000.00
3 Asphalt Sprayer Towed 1000 L 1 1 E.153 5 35,000.00 175,000.00
4 Asphalt Fnisher 1820 mm/30 HP 1 1 E.157 5 261,000.00 1,305,000.00
5 Compressor Air 210 M3 1 1 E.301 4 33,000.00 132,000.00

Analisa Jalan Raya Halaman. ( 64+8 )


PERALATAN 2,867,000.00
TOTAL (Rp.) #REF!

VOLUME : 1,500 SATUAN : M3 HARGA SATUAN Rp. #REF! PER [M3]

Analisa Jalan Raya Halaman. ( 65+8 )


Perhitungan Kerja Alat Berat
Urugan Tanah
Tahun Anggaran 2015

BULLDOZER D.65.D
Kecepatan Alat Dorong / Isi = 2 Km / Jam
Mundur / Dosong = 6 Km / Jam
Kecepatan Rata-rata = 4 Km / Jam
Lebar alat = 2 M'
Banyak Lintasan = 4 Lintasan
Tebal Lapisan = 0.20 M'

Kapasitas per jam untuk mendorong dan meratakan dengan


ketebalan 0,20 M tiap lapisan = 4,000 x 2 x 0.20 = 200.00 M3
8
Effisiensi alat = 75% x 200.00 M3 = 150.00 M3

FIBRO GETAR
Kecepatan Alat Kecepatan Alat Rata-rata = 5 Km / Jam
Lebar alat = 1.5 M'
Banyak Lintasan = 8 Lintasan
Tebal Lapisan = 0.2 M'

Kapasitas per jam = 5,000 x 1.5 x 0.20 = 187.50 M3


8
Effisiensi alat = 75% x 187.50 M3 = 140.63 M3