Project: Pergudangan Puri

VERTICAL CAPACITY OF PILES BASED ON CPT DATA (LCPC METHOD)

Calculated By: Checked By:


Date: Date:
CPT Sounding: C-1 Depth: 4.00 meters
Pile Type: Auger Cast Piles
Category: (1,2,3): 1 (A, B): A
Shaft Diameter: 1.64 feet 0.500 meters
End Area: 2.11 sq.ft. 0.1963 sq. meters
Circum Length: 5.15 feet 1.570 meters
a Value: 2.46 feet 0.750 meters
End Bear F.S.: 3.0 Friction F.S.: 3.0

CPTU SOUNDING DATA LCPC COMPUTATIONS


Depth Qt Qca LCPC Ult. Tip Max qs qs Ult. Frictional Allowable
Z (Meters) (bars) (bars) Fs Class Class kc Capacity (kN) α (bars) (bars) Capacity (kN) Pile Cap. (kN)
0.20 1.00 1.00 3 1 0.4 7.85 30 0.15 0.03 1.05 2.97
0.40 2.00 1.40 3 1 0.4 10.99 30 0.15 0.05 2.51 4.50
0.60 2.00 16.45 3 2 0.35 112.99 40 0.35 0.35 13.51 42.17
0.80 45.00 33.37 9 2 0.35 229.19 40 0.35 0.35 24.50 84.56
1.00 96.00 52.85 9 3 0.45 466.74 60 0.35 0.35 35.49 167.41
1.20 55.00 39.18 9 2 0.35 269.13 40 0.35 0.35 46.48 105.20
1.40 40.00 80.50 9 3 0.45 710.93 60 0.35 0.35 57.48 256.14
1.60 190.00 65.05 9 3 0.45 574.52 60 0.35 0.35 68.47 214.33
1.80 190.00 133.00 9 3 0.45 1174.58 60 0.35 0.35 79.46 418.01
2.00 190.00 87.77 9 3 0.45 775.18 60 0.35 0.35 90.46 288.54
2.20 190.00 133.00 9 3 0.45 1174.58 60 0.35 0.35 101.45 425.34
2.40 190.00 107.27 9 3 0.45 947.36 60 0.35 0.35 112.44 353.27
2.60 190.00 133.00 9 3 0.45 1174.58 60 0.35 0.35 123.43 432.67
2.80 190.00 127.70 9 3 0.45 1127.74 60 0.35 0.35 134.43 420.72
3.00 190.00 133.00 9 3 0.45 1174.58 60 0.35 0.35 145.42 440.00
3.20 190.00 146.77 9 3 0.45 1296.15 60 0.35 0.35 156.41 484.19
3.40 190.00 133.00 9 3 0.45 1174.58 60 0.35 0.35 167.41 447.33
3.60 190.00 157.02 9 3 0.45 1386.74 60 0.35 0.35 178.40 521.71
3.80 190.00 133.00 9 3 0.45 1174.58 60 0.35 0.35 189.39 454.66
4.00 190.00 157.02 9 3 0.45 1386.74 60 0.35 0.35 200.38 529.04

Page 1