Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 3

Exeter College

Centre For Creative Industries


Queens Street,
Exeter,
EX4 3SR

PRODUCTION RISK ASSESSMENT


Section 1
Course UAL Performing and Production arts acting Level 3
Unit or Project Unit 8
Name of Project Romeo and Juliet
Date of period this risk Thursday 28th April
assessment covers
Producer name Name: Dave Stewart Tel:
Location address and Exeter Cathedral Green
contact number
Mobile: 07763225414

Section 2
Tick the hazards identified and refer to the industry standard rules and guidelines
If you are filming a high-risk activity (those marked with a *) please refer to subject teacher and college
policy on safety and approved contractors.

Hazards Hazards Hazards


Aircraft * Hire of lighting equipment Electricity or gas*
Armourers * Scaffolds * Fire/ flammable material*
Costume make up vehicle Smoke effects Fight sequence
Driving operations Stunts * Glass *
Explosive PT fireworks * Access/ egress Hazardous substance *
Hydraulic hoists * Audience public / Heat/ Cold
Lasers Comms Failure Inexperienced performers
Location catering Confined spaces Lifting
Machinery Manual Handling Excavations/caves *
Noise * / Person with special needs Physical exertion
Water * Weather / Working at heights *
Speed * Vehicles/ off road driving * Violence public disorder *
Location lighting * / Derelict building/ structure * Lone working

Section 3
List of experts engaged:
N/A

Section 4
Details of activity:
I am going to be running towards the cathedral in just one shot
Close up of me looking around the area
Exeter College
Centre For Creative Industries
Queens Street,
Exeter,
EX4 3SR

Section 5
Hazards Identified in section 2 Risk assessment and proposed
precaution.
Provide details of hazard identified in What will you do to minimise the risk of the hazard that is
section 2. identified, from happening.

Noise- Public We are filming later on in the day so there


shouldn’t be many people which will minimise
noise.

Location Lighting- Filming at We are going to be filming at sunset so it


sunset should still be somewhat light, just fading inro
darkness.

Audience Public Our filming is later in the day when most


people are at home and not in town.

Weather The weather could change and it could rain but


the weather app doesn’t say it’s supposed to
rain.

Section 6
Exeter College
Centre For Creative Industries
Queens Street,
Exeter,
EX4 3SR
Name of the producer: Dave Print name:
Stewart
Indicate safety training: Signature:

Name of authorising Lecturer: Print name:


Dave Stewart
Indicate safety training: Signature:

You might also like