Material Master Creation FINAL
Material Master Creation FINAL
Material Master Creation FINAL
T codes
MM creation: MM01
MM change: MM02
Display: MM03
BDC to Upload: ZMM01_GST
Views will get selected automatically based on the fields maintained in template.
Points to validate
1. Organizational data
Material code
Industry sector : M (Mechanical engineering)
Material type
1
Plant
Storage location
2. Basic Data 1
Material description will appear based on the template
Base unit of measurement
Material group
3. Basic Data 2
Units of measure
Alternative Units of Measure
4. Classification view
Class type (applicable for all ZROH, forging stage)
2
6. Sales: Sales Org. Data 2
Account assignment group
Item category group should be NORM
NORM Standard item
VERP Packaging
3
9. Purchasing
Purchasing Group
100 IMPORT
200 DOMESTIC
300 SERVICE
400 STOCK TRANSFER
600 MACHINE BUILDING
10. MRP 1
MRP TYPE
PD MRP
ND No planning (for ZPR2 & VERP material type)
VB Manual reorder point planning (for HIBE & ERSA material type)
MRP controller
Plant wise and material type wise MRP controller details are maintained in master template for reference.
Lot size EX :Lot-for-lot order quantity
11. MRP 2
Procurement type
E In-house production
F External procurement
No procurement
X Both procurement types
Production storage location
Storage loc
In-house production Days
Planned delivery time
GR Processing time
Scheduling Margin Key should be 000
4
12. MRP 3
Strategy group
10 Make-to-stock production
21 Make-to-order prod./ project settlement (applicable only for ZPS1 & ZPS2 material type )
Availability check
02 Individ.requirements
13. MRP 4
Individual/ Collective
Individual and collective requirements
1 Individual requirements only
2 Collective requirements only
5
14. Work Scheduling View
Prod.Sched.Profile
6
Material code will be created.