fd CIN : U45203MP2004SGC016758
fa MADHYA PRADESH ROAD DEVELOPMENT CORPORATION LIMITED
MPROG (Govt. of MP. Undertaking) \
OFFICE OF THE DIVISIONAL MANAGER M.PRD.C.LTD, GWALIOR
Office Campus of Chief Engineer P.W.D., ‘hatipur, Gwalior (M.P.) \
E-mail:dmmprdegwi@gmail.com
Web site: www.mprde.nicin,
Phone: 0751-2235297, Fax: 0751-2235297
No. =u MPRDC/20217 Gwalior. Date ../4 [Joo 2)
To,
* (1) Mis Aryavart Tollways Pvt. Ltd. (2) Mis DP. Jain
201, Britesh Park Datia-Bhander toll road project.
Bhopal (M.P.) Pvt. Ltd. Nagpur
+ G)M/s Gangotri Deharda-Isagarh (4) Mis DBL Ashok Nagar-Vidisha
Tollways Pvt. Ltd. Tollway Limited
Lucknow Bhopal
(5) Mis Gwalior Pathways Pvt, Ltd
76, Mall Road Mhow
Distt. Indore,
Sub.:- Financial information of present cost of the BOT (Toll, Toll+Annuity) project on
the basis of escrow’ account statement and audited balance sheet of the
concessionaire company from appointed date till 15" July 2021,
Ref:- General Managar (Fin.) MPRDC Bhopal letter No. 5964/Finance/BOT/ MPRDC/21
Bhopal dt. 06.08.2021,
With reference to the above, please find enclosed herewith the copy of referred letter
vide which directions has been received to submit financial information of present cost of the
Project on the basis of escrow account statement and audited balance sheet of the concessionaire
Company ffom appointed date till 15! July 2021 in prescribed format
Hence please submit the required information within 07 days positively to this office so
thatthe information may be further submitted to the MPRDC Head Office.
Enel :- As above. iy
- ‘i per Divisiona-vfanager
) MPRDC Gwalior
EndtNo. /MPRDC/2021 Gwalior Dated ...
Copy to:- L
1 Chief Engineer (BOT) MPRDC Bhopal,
2. Charted Accountant MPRDC Bhopal.
Divisional Mahager
MPRODC Gwaliorcin: u45203MP2004SGC016758
M.P. Road Development Corporation Ltd.
(M.P. State Highway Authority)
(Govt. of M.P. Undertaking)
45-A, Arera Hills, Bhopal-462013
72643, Website : mprdc.gov.it
Letter No®
Ue
All Divisional Manager,
MPRDC, Bhopal
Sub:- Financial Information of present cost of the BOT (Toll, Toll+Annuit) project on the
basis of Escrow Account Statement and Audited Balance Sheet of the Concessionaire
Company from Appointed Date till 15th July 2021
“With reference to above subject, recently many question has been asked by Honorable
MLA in the current Vidhan Sabha Session regarding cost of the project. It has become extremely
important to know the present cost of the project and ratio of Toll Collection Amount (Fevenue
gencrated from project) to present cost of the project, Therefore, you are directed to coordinate
with the Concessionaire and their Financial Team including Company Auditor and provide the
information in the enclosed format within 7 days positively.
Encl:- Format for information.
ome
General Manager (Fin.)
MPRDC, Bhopal
Endt. No Finance /BOT/MPRDC! 21 Bhopal, Date:
Copy ti
1.P.A. to Managing Director, MPRDC, Bhopal.
2. Chief Engineer (BOT), MPRDC, Bhopal.
3. Chartered Accountant, MPRDC, Bhopal.
— ab
General Manager (Fin.)
MPRDG, Bhopal
_{Rinance/BOT/MPRDC/ 21 Bhopal, Datero6 [pe|2e74. |< insacalInformadon of resent cox ofthe project on the basis of Eserow Account Statement and Audited Balance Shee ofthe Coneessionaire Company from Appointed Date il 15th July 2021,
stascue | “Treectigoeny tere cecal | pean | a ee ee
sna anette |*#90dCcain cee | hte. | ante mt | ttwetetoae rated erin [Eat [eto
toes | ceceneretn | aa | oem. | | Me eeran nt | one ae lore
ote) Sea | tine | Mey | PD aoe i Srcareas ee
aie rnc omen] SR) brett
a @ ae a @ a @ a a ro) @ aa to aa fa