PROJECT REPORT
THIS IS A HOSPITAL PLAN G + 2 BUILDING OF AREA 32400 sq.ft WHICH CONSIST ALL NECESSARY
ROOMS . THE BUILDING AREA IS 13764 sq.ft AND GARDEN AREA IS 3540 sq.m .
Parking Area
General Ward 2
Public Wash Room 2
(Male,Female)
Electricity Room 1
Operation Threater 1
Delivery Room 2
Medical Store 1
Department 142'
Maternity Room 1
Female Doctor 1
Room
lift 1 19'-6"
Stair 2 19'-6"
0" 19' 5' 5'
Waiting Room 1 19' 19' 19' 19'
5' 5'
OPD Room's 4
1'
Hospital Kitchen
ICU Room
1
1
1'
Ventilation 10'-6"
Spaceilist Doctor
(OPD) female
1
10'X10'
Deluxe Room 2
12'
Semi-Deluxe Room 2 Spaceilist Doctor
Ground Floor of Total
Fire Sprinkler
(OPD) for female
10'
10'
Hospital System
Facility in building
OPD-5
Facility
Window
Number
26
Size
6',5'4'
10' 9'-6"
Maternity Rooms
Ventilation 10 5'X5'(2) , 6'6"X4'6"(3),
20'X10'(1),7'6"X7'6"(2 25'6"X27'
21'-6"
), 5'X6'6"(2)
Fire Water pipe 2 3'X3' Semi-deluxe Room-4 OPD-4
sprinkler 19'6"X26'
Corridor 2 (Entry) 7'6", Exit 7
7'
11'
Door 73 3'6",3',2',4',5' (Wide)
12'X26'
2'
2'-6"
Hospital kitchen Doctor Room
Washing Part
Hospital Area in (S.Q. FEET) 10'6"X23'
Name* Size* Area(s.q. feet)
4'
Waiting Room
3'X14'6"
18'6"X26' 6'
Hospital Total area 180'X180' 32400 4'-9"
Building Area 142'X142'-80'X80' 13764 2'-6" 9'-6"
Ventilation
10"
Garden 59'6"X59'6" 3540
6'-6" Emergency
Total Road, Parking 20',18'9",18'6" 15036
2' Room
4'-6"
5'
area margin Different Wide Path 3'-4" 3'-4"
margin
12'X26'
5'
1'-10"
1'-10"
Water fire
Sprinkler
Ventilation
4"
5' 8'-3"
3'X3'
3'-6"
Wall Size
Hospital building Toilet side by side
Boundary wall Inner wall
outer wall wall
0'-6" 1'-0" 0'-6", 1'-0", 0'-0" 0'-4"
height 10' height 11' height 11' height 11'
Delivery Room 1,2
62'
7'
14'9"X26'
Titel plate
Name* Manjeet Singh Bisht 3'-6" 3'-6"
Branch* Civil Engineering
14'-6"
1'-10"
1'-10"
Subject* Final year project 6'-6"
14'-9"
Ventilation
Project* Hospital Designing
3'-4" 3'-4" OPD-1
4'-6"
plan 25'-6"
5'
College Name* Pusa institute of
technology
14'6"X8'6"
Ventilation
8'-6"
Scale using Feet' inches" 5'
6'-8"
Medical Support Ventilation
2'-6"
Dispensary 9'-9"
6'-6"
Waiting Room
13'X26'
Deluxe Room 1 Deluxe Room 2 OPD-2 Or Store
Semi-deluxe Room-3 14'6"X8'6" 4'-6"
15'X26' 15'X26' 25'6"X25'6"
26'-6"
25'-6"
2'-3"
19'6"X26' Operation Room
2'-8"
Changing
Room
14'9"X26'
14'-9"
2'-6"
6'
OPD-3
14'6"X8'6"
8'
Hospital Counter
4'8"X5'4"
26'
4'-9"
Up-Stair Entry
5' 4'
0" 6' 5' 5'
8'-3"
80'
Corridor
Main Gate No.1
10'
7'6" Wide
7'-6"
Electricity Room
10'X14'
Water fire
Sprinkler
3'X3'
7'-6"
142'
180'
2'-4"
20'
Ventilation
5'-6"
Clear Rood 2'-8"
9'-6" 10'-11"
Public Female
20' wide Public Male Wash Room
Wash Room 11'X26'
Parking Area
11'X26'
5'-6"
2'-8"
Ventilation
2'-4"
6'
Clear Rood
20' wide
20'
80'
6'
Hospital Garden
58'6"X58'6"
59'-6"
Ventilation
Ventilation
2'-8"
5'
5'
5'
2'-4"
4"
6'-6" 6'-6"
4"
Head Department
20'X26' Hospital Department
20'
Staff
6'
20'X26'
59'-6"
6'
62'
18'-6"
19'
0" 5'
5' 5'
10'X10' 25'-6"
10'
10'
Room
OPD-11
10' 9'-6"
21'-6"
OPD-10
Semi-deluxe Room-4
19'6"X26'
CT Scan Rooms X-Ray Room
26'
27'
18'6"X26' Lift
ICU 25'6"X27'
11'
7'
12'X26'
2'
2'-6" Nurse Room
10'6"X23'
Waiting Room
4' 3'X14'6"
6'
4'-9"
2'-6" 9'-6"
Ventilation
10"
6'-6" Emergency
2' Room
4'-6"
5'
3'-4" 3'-4"
12'X26'
1'-10"
1'-10"
Water pipe
fire Sprinkler
Ventilation
4"
5' 8'-3"
3'X3'
3'-6"
Surgery Rooms
62'
7'
14'9"X26'
3'-6" 3'-6"
2'-6"
1'-10"
1'-10"
6'-6"
3'-4"
14'-9"
Ventilation
3'-4" 3'-4"
4'-6"
4"
5'
Ventilation
5'
1'-10"
4'-6"
2'-6"
6'-8"
OPD-9 OPD-8 21'
Ventilation
Waiting Room
6'-6"
13'X26'
Deluxe Room 3 Deluxe Room 4
Medical Equipment
15'X26' 15'X26'
26'-6"
Semi-deluxe Room-3
Room 12'-6"
Operation Room
26'
1'-10"
19'6"X26'
18'6"X26' 14'9"X26'
14'-9"
3'-4"
6'
OPD-6
12'-6"
OPD-7 26'
18'-6"
9' 10" 3'-6" 10'-6"
4'-9"
5' 5' 4'
0" 6' 5'
Waiting Room
8'-3"
80'
Doctor Toilet 7'6" Wide
10'
Room
Housekeeping
(Cleaning Department
10'X14'
14'
Water fire
Sprinkler
7'-6" 1'-6" 3'X3'
142'
2'-4"
2'-6"
Ventilation
5'-6"
Department Room Number* 2'-8"
10'-11"
physiotherapist Room 1 Public Female
Wash Room
Hospital Medical 1 Public Male 11'X26'
Laboratory Room
General Ward 2
Wash Room
Public Wash Room 2 11'X26'
(Male,Female)
10'-11"
5'-6"
Cleaner Department 1 2'-8"
(houskeeping) Ventilation
2'-4"
Operation Threater 1
Surgery Room 2
OPD Space 1
X-Ray Room 1
Nurse Room 1
lift 1
Stair 2
Waiting Room 2
OPD Room's 5
6'
Dentist Doctor (OPD) 1
Deluxe Room 2
Semi-Deluxe Room 2
Ground Floor of Total
Hospital
Facility in building
Facility Number Size
Window 26 6',5'4'
Ventilation 10 5'X5'(2) , 6'6"X4'6"(3),
20'X10'(1),7'6"X7'6"(2
), 5'X6'6"(2) General Ward General Ward
Fire Water pipe 2 3'X3'
sprinkler
Corridor 2 (Entry) 7'6", Exit 7 33' 4 14"X26' 33' 4 41"X26'
Bed 42 2'5"X6'6"
80'
Toilet 32 Different Size
Stair Entry/Exit 2 10'X11'
Door 73 3'6",3',2',4',5' (Wide)
6'
Building Area 142'X142'-80'X80' 13764
Wall Size
Hospital building Toilet side by side
Boundary wall Inner wall
outer wall wall
0'-6" 1'-0" 0'-6", 1'-0", 0'-0" 0'-4"
height 10' height 11' height 11' height 11' Ventilation
Ventilation
2'-8"
5'
5'
5'
2'-4"
4"
Titel plate
6'-6" 6'-6"
Name* Manjeet Singh Bisht
Branch* Civil Engineering
Subject* Final year project
Project* Hospital Designing
plan
4"
College Name* Pusa institute of
technology
Scale using Feet' inches"
20'
Laboratory
20'X26' 20'X26'
26'-6"
26'-6"
6'
142'
0" 5'
5'
10'X10'
Spaceilist Doctor Doctor Dress
(OPD) for female
10'
10'
Room
OPD-11 Infection
10' 9'-6"
Semi-deluxe Room-4
OPD-10
Coronary
Care Unit (CCU)
Infection Control
Unite
Care Unite
19'6"X26'
25'6"X27'
26'
27'
Lift
ICU
7'
11'
12'X26'
2'
2'-6"
Waiting Room
4' 3'X14'6" 6'
4'-9" 9'-6"
2'-6"
Ventilation
10"
6'-6" Emergency
2' Room
4'-6"
5'
3'-4" 3'-4"
12'X26'
1'-10"
1'-10"
Water fire
Sprinkler
Ventilation 12'-4"
4"
5' 3'X3'
8'-3"
25'-6"
3'-6"
Nurse Room
10'6"X23'
Operation Rooms
62'
7'
14'9"X26'
3'-6"
2'-6"
1'-10"
1'-10"
6'-6"
3'-4"
14'-9"
Ventilation
3'-4" 3'-4"
4'-6"
4"
OPD-15
5'
Ventilation
5'
1'-10"
4'-6"
2'-6"
6'-8"
OPD-14 21'
Ultrasound Room
Ventilation
6'-6"
M.R.I Room
Deluxe Room 3 Deluxe Room 4
Semi-deluxe Room-3 15'X26' 15'X26' 12'-6"
Operation Room
26'
26'
1'-10"
19'6"X26'
14'9"X26'
14'-9"
3'-4"
6'
12'-6"
OPD-12 OPD-13 26'
13'-9"
13'-9"
10" 3'-6" 10'-6"
4'-9"
0" 6' 5' 5'
Waiting Room
8'-3"
80'
Doctor Toilet 7'6" Wide
10'
Room
142'
2'-4"
2'-6"
Waiting Room
5'-6"
Department Rooms Number* Ventilation 2'-8"
10'-11"
physiotherapist Room 1 13'X26' Public Female
Wash Room
Hospital Medical 1 Public Male 11'X26'
Laboratory Room
General Ward 2
Wash Room
Public Wash Room 2 11'X26'
(Male,Female)
10'-11"
5'-6"
Cleaner Department 1 2'-8"
(houskeeping) Ventilation
2'-4"
Operation Threater 1
Surgery Room 2
OPD Space 1
X-Ray Room 1
Nurse Room 1
lift 1
Stair 2
Waiting Room 2
OPD Room's 5
M.R.I Room 1
ICU Room 1
6'
Dentist Doctor (OPD) 1
Deluxe Room 2
Semi-Deluxe Room 2
Ground Floor of Total
Hospital
Facility in building
Facility Number Size
Window 26 6',5'4'
Ventilation 10 5'X5'(2) , 6'6"X4'6"(3),
20'X10'(1),7'6"X7'6"(2
), 5'X6'6"(2) General Ward General Ward
Fire Water pipe 2 3'X3'
sprinkler
Corridor 2 (Entry) 7'6", Exit 7 33' 4 41"X26' 33' 4 14"X26'
Bed 42 2'5"X6'6"
80'
Toilet 32 Different Size
Stair Entry/Exit 2 10'X11'
Door 73 3'6",3',2',4',5' (Wide)
6'
Building Area 142'X142'-80'X80' 13764
Wall Size
Hospital building Toilet side by side
Boundary wall Inner wall
outer wall wall
0'-6" 1'-0" 0'-6", 1'-0", 0'-0" 0'-4"
height 10' height 11' height 11' height 11' Ventilation
Ventilation
2'-8"
5'
5'
5'
2'-4"
4"
Titel plate
6'-6" 6'-6"
Name* Manjeet Singh Bisht
Branch* Civil Engineering
Subject* Final year project
Project* Hospital Designing
plan
4"
College Name* Pusa institute of
technology
Scale using Feet' inches"
20'
Laboratory
6'
26'
20'X26'
26'
Floor
6'
C1 B1 C2 B2 C3 B3 C4 B4 B5 C6 B6 C7 B7 C8 B8 C9 B9 C10 B10 C11 B11 C12 B12 C13
C5
B23 B25
B21 B22 B24
B15 S8 B16 B17 S19 B18 B19 B20
B13 S1 B14 S2 S12 S23 S25 S30
S20 S28 S33 S35
C14 B26 C15 B27 C16 B28 C17 B52 C18 B30 C19
C19 B31 C20 B32 C21 B33 C22 B34 C23 B35 C24 B36 C25 B37 C26
S3
B53
S13 S14
B46
S31
B39 S9
S26
B63
B64
S34 S36
B43
B38
B57
B62
B51
B42
S7 S29
S21
B56
B59
B60
S4 S24
B54
S22
B55
S15
B40
S6
B41
B49
B48
B47
B44
B86
B85 S75
S37 B84
B77 B78 B79 S39 B82 S43 S46
S38 S40 B81 S41 S42 B83 S44 S45
B80
B88
B92 B93 C43 B94 C44 B95 C45 B96 B97 C47 B98 C48 B99 C49 B100 B101 B89 S80 B90 B91
C41 C42 C46 C50
S81
B87
VENTILATION VENTILATION
B108
B111
S76
B110
B113
B120
B107
B118
B119
B106
S51 S67
B117
B102
S69 S71
S48 VENTILATION
B114
S50 S64
B134
C52 B124 C53 B125 C54 B126 C55 B127 C56 B128 B129 C58 B130 C59 B131 C60 C61 B133
C57 B132
B150
B149
S78
B148
S65
S82 S83
B146
B140
B138
B141
S74
B144
B139
B147
B142
B143
S72
B137
B135
S62 S70
B136
S53 S61
S52 S68
S79
S66
C66 C67 C68 C69 C70 B157 C71 B158 C72 B159 C73 B160 C74 B161 C75
B153 B154 B155 B156
B167
B165
S101 S109
B166
S108
B164
B162
B163
S84
S16 S85
C79 C80 B169 C81 B170 C82 B171 C83 B172 C84
B168
VENTILATION
ELEMENT DIMENSION NO.
SYMBOL S111
S77
B176
B175
B174
B173
B177
B749
B178
B750
B180
S87 S110
S102
VENTILATION
B179
S86 S112
C85 B181 C86 B182 C87 B183 C88 B184 C89 B185 C90
B186
B189
B187
B191
B188
B190
S88 S89 S114
S103 S115
C91 B192 C92 B193 C93 B194 C94 B195 C95 B196 C96
250 mm * 450 mm 33
SECONDARY BEAM
B197
B201
B198
B200
B199
B202
S90 S117
S91 S116
S104
C97 B203 C98 B204 C99 B205 C100 B206 C101 B207 C102
TITLE
B209
S92
S93 S118 S119
B208
B212
B213
B210
B211
CIVIL ENGINEERING
B217
B215
S123 S124
B228
B231
B226
B227
B225
B230
B229
S97 S125
S98 S106
S126
C110 B232 C111 B233 C112 B234 C113 B235 C114 B236 C115
B237
B240
B241
B239
B242
B238
S99 S100
S107 S128
S127
C116 C117 B244 C118 B245 C119 B246 C120 B247 C121
B243
B261
B262
B263
B264
B265
B266
VENTILATION
B267
B268
B269
B270
B271
B272
S129 S131 S132 S137
S130
S134 S136
S133 S139
S138 S140
C14 B273 C15 B274 C16 B275 C17 B276 C18 B277 C19 B278 C20 B279 C21 B280 C22 B281 C23 B282 C24 B283 C25 B284 C26
B296
S141
S150 S154
B291
S146
B286
S161
S158
S145 B295
B285
B289
B290
B300
B301
B302
B303
B305
B306
B308
B309
B310
S155 S156 S160
S157 S163
S164
S142
S151
S143
B288
B287
B292 C27 B297
B304 B307
VENTILATION
B293
B299
B294
B298
C28 B311 C29 B312 C30 B313 C31 B314 C32 B315 C33 B316 C34 B317 C35 B318 C36 B319 C37 B320 C38 B321 C39 B322 C40
S165
S166
B323
B324
B325
B326
B327
B328
B329
B230
B331
B332
B333
B335
B336
B337
S167 S168 S170 S171 S172 S173 S174 S175
S169
B334
B338 C42 B339 C43 B340 C44 B341 C45 B342 C46
C46 B343 C47 B344 C48 B345 C49 B346 C50 B347 S177
C41
S178
VENTILATION VENTILATION
B358
B354
B357
B355
B352
B353
B361
B362
B363
B364
B365
B366
B348
S182
B368
C52 B371 C53 B372 C54 B373 C55 B374 C56 B375 C57 B376 C58 B377 C59 B378 C60 B379 C61 B380
S208
S211
S210
S207 B392
S204
B381
B382
B383
B384
B385
B386
B387
B388
B389
B390
B391
B393
B394
B395
S203 S206
S198 S199 S200 S201
S202
S205
S209
C66 B399 C67 B400 C68 B401 C69 B402 C70 B403 C71
C71 B404 C72 B405 C73 B406 C74 B407 C75
S215
S216
S214
B408
B409
B410
B411
B412
B413
S212 S149 S213
C79 B414 C80 B415 C81 B416 C82 B417 C83 B418 C84
VENTILATION
S221
B419
B420
B421
B422
B424
B427
B747
B748 S197
S218 B225
ELEMENT DIMENSION NO.
SYMBOL S219
S220
B426
S217 S222 VENTILATION
C85 B428 B429 C87 B430 C88 B431 C89 B432 C90
C86
B434
B435
B436
B437
B438
S228
S224
S226 S227
S225
C91 B439 C92 B440 C93 B441 C94 B442 C95 B443 C96
B444
B445
B446
B447
B448
B449
S232
250 mm * 450 mm 31
S229 S230 S231 S233
SECONDARY BEAM
C97 B450 C98 B451 C99 B452 C100 B453 C101 B454 C102
B458
S240 S241
S235
B465
S234
B455
TITLE
B466
B461
B462
S236
B460
S244
B464
S239 S242
S237
ROLL NO. 1908041077
C104 B467 C105 B468 C106 B469 C107 B470 C108 B471 C109
BRANCH CIVIL ENGINEERING
B473
B474
B475
B477
B478
B476
S247
S245 S251
S246
S250
C110 B479 C111 B480 C112 B481 C113 B482 C114 B483 C115
B484
B485
B486
B488
B489
B490
S253
S252
S255
S256
S254
C116 B491 C117 B492 C118 B493 C119 B494 C120 B495 C121
VENTILATION S266
B508
B509
B510
B511
B512
B513
B514
B515
B516
B517
B519
B520
B521
S257 S258 S259 S262 S264 S265 S269
S260 S261 B518 S268
S267
C14 B522 C15 B523 C16 B524 C17 B525 C18 B526 C19 B527 C20 B528 C21 B529 C22 B530 C23 B531 C24 B532 C25 B533 C26
S270
B547
S276 S284 S297
S293
S277
S275 S291
B535 S288
B534
B538
B539
B543
B549
B551
B552
B553
B555
B556
B558
B563
S287
S274 B546 B550 S286 B559
S290
S271
B562
S278
S295
B537
B536
S273 B540 C27 B545 B561
B554
B560
VENTILATION B557
S285 S294 S298
B542
B541
B548
B544
C28 B564 C29 B565 C30 B566 C31 B567 C32 B568 C33 B569 C34 B570 C35 B571 C36 B572 C37 B573 C38 B574 C39 B575 C40
S308
B576
B577
B578
B579
B580
B581
B582
B583
B584
B585
B586
B588
B589
B590
S302 S304 S309
S299 S300 S301 S303
S305 S306 S307
B587
C41 B591 C42 B592 C43 B593 C44 B594 C45 B595 C46 B596 C47 B597 C48 B598 C49 B599 C50 B600 S311
S310
VENTILATION VENTILATION
B607
B609
S329
B611
S321
B613
S322
S317 S320
B603
B605
B606
B614
B615
B616
B617
B618
S325 S327
S316 S326 S328
S313 VENTILATION
B610
S314
B622
C52 B623 C53 B624 C54 B625 C55 B626 C56 B627 C57 B628 C58 B629 C59 B630 C60 B631 B632
C61
S342 S343
B643
S339
B633
B634
B635
B636
B337
B638
B639
B640
B641
B642
B644
B645
B646
S331 S335
S332 S333 S334 S338
S336 S337
S341
C66 B647 C67 B648 C68 B649 C69 B650 C70 B651 C71 B652 C72 B653 C73 B654 C74 B655 C75
B660
B661
B662
B663
B664
S344 S345
S355
C79 B665 C80 B666 C81 B667 C82 B668 C83 B669 C84
VENTILATION
S353
B670
B671
B672
B673
B674
B677
B745
B675
S354 VENTILATION
S349
C85 B678 C86 B679 C87 B680 C88 B681 C89 B682 C90
S357
B683
B684
B685
B686
B687
B688
S356 S360
S358 S359
C91 B689 C92 B690 C93 B691 C94 B692 C95 B693 C96
B694
B695
B696
B697
B698
B699
S364 S365
S361 S362
S363
250 mm * 450 mm 35
SECONDARY BEAM
C97 B700 C98 B701 C99 B702 C100 B703 C101 B704 C102
S375
S367 S372
S366
B705
B707
B711
B712
B715
B716
S371
VENTILATION
B709
S376
S368 S373
S370
B714
B723
B724
S379
B725
B727
B728
S378
S382
C110 B729 C111 B730 C112 B731 C113 B732 C114 B733 C115
B734
B735
B736
B737
B738
B739
S384
S385 S387
S386 S388
C116 B740 C117 B741 C118 B742 C119 B743 C120 B744 C121
LOAD OF SLAB
LOAD OF WALL
= 3 m – 0.45 m = 2.55 m
HEIGHT OF WALL = 1 m
W = 2.81 KN/m2
= 10.18 KN/m
= 10.18 KN/m
= 7.36 KN/m
191. LOAD BY SLAB S174 ON BEAM
LY/LX = 3.23/2.13 (in m)
LY/LX = 1.51 <2
HENCE, IT IS TWO WAY SLAB
= 10.18 KN/m
= 10.18 KN/m
GENERAL SPECIFICATIONS
SELF WEIGHT OF PRIMARY BEAM = 5.48 KN/m
SELF WEIGHT OF SECONDARY BEAM =4.21 KN/m
SELF WEIGHT OF WALLS = 17.59 KN/m
SELF WEIGHT PARAPET WALL = 6.9 KN/m
LOAD(C1 &C2) = (SLAB LOAD + BEAM LOAD + PARAPET WALL LOAD)*(BEAM LENGTH/2)
= 38.99 KN
= 28.85 KN
BY SLAB 270
= 12.71 KN
LOAD(C1 &C14) = (SLAB LOAD + BEAM LOAD + PARAPET WALL LOAD)*(BEAM LENGTH/2)
= 34.7424 KN
= 24.11 KN
BY SLAB 258
= (10.18) * (3.08/2)
= 15.68 KN
LOAD(C3 &C2) = (SLAB LOAD + BEAM LOAD + PARAPET WALL LOAD)*(BEAM LENGTH/2)
= 38.9991KN
= 28.85 KN
BY SLAB 274
= (14.15) * (2.94/2)
= 20.80 KN
= 24.11 KN
BY SLAB 259
= (14.63) * (3.04/2)
= 22.24 KN
= 23.80 KN
BY SLAB 260
= (14.63) * (3.04/2)
= 22.24 KN
BY SLAB 259
LOAD(C3 &C4) = (SLAB LOAD + BEAM LOAD + PARAPET WALL LOAD)*(BEAM LENGTH/2)
= 61.37 KN
= 45.60 KN
BY SLAB 275
= (15.6 ) * (4.57/2)
= 35.65 KN
BY SLAB 260
= 61.37 KN
= 30.56 KN
BY SLAB 261
= 22.24 KN
= 33.71KN
= 24.60 KN
BY SLAB 284
= 14.55 KN
BY SLAB 262
= (10.97) * (3.04/2)
= 25 KN
= 18.81 KN
BY SLAB 264
= (10.75) * (3.04/2)
= 24.66 KN
BY SLAB 287
= (13.18) * (3.04/2)
= 28.36 KN
BY SLAB 264
LOAD = (SLAB LOAD + BEAM LOAD + PARAPET WALL LOAD )*(BEAM LENGTH/2)
= 29.24 KN
BY SLAB 265
= (14.63 ) * (3.04/2)
= 22.24 KN
= 28.5138 KN
BY SLAB 288
= 20.51 KN
BY SLAB 265
LOAD = (SLAB LOAD + BEAM LOAD + PARAPET WALL LOAD )*(BEAM LENGTH/2)
= 45.86 KN
= 33.27 KN
BY SLAB 290
= (17.56) * (3.65/2)
= 32.05 KN
BY SLAB 266
LOAD = (SLAB LOAD + BEAM LOAD + PARAPET WALL LOAD )*(BEAM LENGTH/2)
= 37.82 KN
= 24.35 KN
BY SLAB 291
= (15.56) * (3.23/2)
= 25.13 KN
BY SLAB 268
= 30.57 KN
BY SLAB 268
LOAD = (SLAB LOAD + BEAM LOAD + PARAPET WALL LOAD )*(BEAM LENGTH/2)
= 47.12 KN
= 30.57 KN
BY SLAB 269
= (14.63) * (3.04/2)
= 22.24 KN
= 47.12 KN
BY SLAB 293
= (15.37) * (4.67/2)
= 35.89 KN
BY SLAB 269
LOAD = (SLAB LOAD + BEAM LOAD + PARAPET WALL LOAD )*(BEAM LENGTH/2)
= 37.95 KN
BY SLAB 269
LOAD = (SLAB LOAD + BEAM LOAD + PARAPET WALL LOAD )*(BEAM LENGTH/2)
= 43.08 KN
= 26.94 KN
BY SLAB 297
= 16.35 KN
= 19.52 KN
BY SLAB 300
= (9.84) * (3.04/2)
= 14.96 KN
= 23.17 KN
BY SLAB 303
= (7.68) * (2.71/2)
= 10.41 KN
= 37.75 KN
BY SLAB 287
= (13.65) * (4.57/2)
= 20.66 KN
BY SLAB 287
= (13.18) * (2.78/2)
= 18.32 KN
= 22.13 KN
BY SLAB 289
= (7.29) * (2.92/2)
= 10.64 KN
= 29.64 KN
BY SLAB 290
= (17.56) * (3.65/2)
= 32.05 KN
= 25.23 KN
BY SLAB 292
= (7.36) * (3.23/2)
= 11.89 KN
= 33.22 KN
BY SLAB 298
= 16.91 KN
BY SLAB 299
LOAD = (SLAB LOAD + BEAM LOAD + PARAPET WALL LOAD )*(BEAM LENGTH/2)
= 20.66 KN
= 13.31 KN
= (10.25) * (2.13/2)
= 10.92 KN
= 23.29 KN
BY SLAB 316
= (14.63) * (3.04/2)
= 22.24 KN
BY SLAB 300
= 16.75 KN
BY SLAB 302
= 5.84 KN
BY SLAB 303
= 16.75 KN
= 16.75 KN
BY SLAB 305
= (10.25) * (2.13/2)
= 10.92 KN
= 17.83 KN
BY SLAB 324
= (15.80) * (2.71/2)
= 21.41 KN
= 16.75 KN
BY SLAB 304
= 10.92 KN
= 20.66 KN
BY SLAB 325
= (14.67 ) * (2.78/2)
= 20.39 KN
= 16.75 KN
BY SLAB 306
= 10.92 KN
= 16.75 KN
BY SLAB 307
= 10.92 KN
= 16.75 KN
BY SLAB 308
= 10.92 KN
= 25.23 KN
BY SLAB 328
= (10.25) * (3.23/2)
= 16.55 KN
= 17.43 KN
BY SLAB 331
= (14.63) * (3.04/2)
= 22.24 KN
BY SLAB 332
= (14.63) * (3.04/2)
= 22.24 KN
= 49.95 KN
BY SLAB 333
= (15.93) * (4.57/2)
= 36.40 KN
= 6.22 KN
= 49.95 KN
BY SLAB 334
= (15.93) * (4.57/2)
= 36.40 KN
= 41.41 KN
BY SLAB 336
= (14.67) * ((4.11/2)
= 30.15 KN
= 47.51 KN
BY SLAB 326
= 36.13 KN
= 47.51 KN
BY SLAB 326
= 36.13 KN
= 46.00 KN
BY SLAB 326
= 35.48 KN
= 46.00 KN
BY SLAB 328
= 21.25 KN
= 46.00 KN
BY SLAB 338
= 35.48 KN
= 16.75 KN
BY SLAB 339
= 10.92 KN
BY SLAB 331
LOAD = (SLAB LOAD + BEAM LOAD + PARAPET WALL LOAD )*(BEAM LENGTH/2)
= 49.93 KN
BY SLAB 331
LOAD = (SLAB LOAD + BEAM LOAD + PARAPET WALL LOAD )*(BEAM LENGTH/2)
= 41.06 KN
BY SLAB 331
LOAD = (SLAB LOAD + BEAM LOAD + PARAPET WALL LOAD )*(BEAM LENGTH/2)
= 41.06 KN
= 36.44 KN
BY SLAB 332
= (13.16) * (3.91/2)
= 25.73 KN
= 61.27 KN
BY SLAB 332
= (13.16) * (3.91/2)
= 25.73 KN
= 61.74 KN
BY SLAB 334
= 37.35 KN
BY SLAB 333
LOAD = (SLAB LOAD + BEAM LOAD + PARAPET WALL LOAD )*(BEAM LENGTH/2)
= 55.77 KN
= 47.87 KN
= 37.07 KN
BY SLAB 334
LOAD = (SLAB LOAD + BEAM LOAD + PARAPET WALL LOAD )*(BEAM LENGTH/2)
= 64.69 KN
BY SLAB 335
LOAD = (SLAB LOAD + BEAM LOAD + PARAPET WALL LOAD )*(BEAM LENGTH/2)
= 64.39 KN
BY SLAB 336
LOAD = (SLAB LOAD + BEAM LOAD + PARAPET WALL LOAD )*(BEAM LENGTH/2)
= 55.59 KN
= 47.87 KN
BY SLAB 337
= 36.13 KN
= 46.00 KN
BY SLAB 337
= (18.48) * (3.84/2)
= 35.48 KN
= 46.96 KN
BY SLAB 345
= (11.83) * (3.92/2)
= 23.19 KN
= 16.75 KN
BY SLAB 346
= 10.92 KN
= 53.59 KN
BY SLAB 311
= (15.89) * (5.18/2)
= 41.16 KN
= 46.66 KN
BY SLAB 343
= 35.83 KN
BY SLAB 311
LOAD = (SLAB LOAD + BEAM LOAD + PARAPET WALL LOAD )*(BEAM LENGTH/2)
= 73.22 KN
= 30.04 KN
BY SLAB 310
= 30.04 KN
BY SLAB 311
= 21.79 KN
= 30.04KN
BY SLAB 348
= 21.79 KN
BY SLAB 344
LOAD = (SLAB LOAD + BEAM LOAD + PARAPET WALL LOAD )*(BEAM LENGTH/2)
= 24.10 KN
BY SLAB 345
= (11.26) * (2.34/2)
= 13.17 KN
= 18.40 KN
BY SLAB 345
= (11.26 ) * (2.34/2)
= 13.17 KN
= 24.62 KN
BY SLAB 347
= (15.11) * (3.13/2)
= 23.65 KN
= 26.40 KN
BY SLAB 347
= (15.11) * (3.13/2)
= 23.65 KN
BY SLAB 348
LOAD = (SLAB LOAD + BEAM LOAD + PARAPET WALL LOAD )*(BEAM LENGTH/2)
= 37.20 KN
= 33.93 KN
BY SLAB 350
= (13.85) * (3.92/2)
= 27.15 KN
= 16.75 KN
BY SLAB 351
= 47.84 KN
BY SLAB 352
= (15.51) * (4.67/2)
= 36.22 KN
= 26.74 KN
BY SLAB 353
= (10.61) * (3.17/2)
= 16.82 KN
= 26.83 KN
BY SLAB 350
= (16.12) * (3.35/2)
= 27.00 KN
= 26.73 KN
BY SLAB 350
= (16.12) * (3.35/2)
= 27.00 KN
= 26.73 KN
BY SLAB 352
= (16.22) * (3.35/2)
= 27.17 KN
= 37.89 KN
= (18.86) * (3.92/2)
= 36.97 KN
BY SLAB 351
= 16.75 KN
= 49.01 KN
BY SLAB 359
= (16.72) * (4.67/2)
= 39.04 KN
BY SLAB 356
LOAD = (SLAB LOAD + BEAM LOAD + PARAPET WALL LOAD )*(BEAM LENGTH/2)
= 68.48 KN
= 53.78 KN
= (19.77) * (4.26/2)
= 42.11 KN
= 44.41 KN
BY SLAB 357
= (19.77) * (4.26/2)
= 42.11 KN
= 44.41 KN
BY SLAB 359
= (20.60) * (4.26/2)
= 43.88 KN
= 42.37 KN
BY SLAB 359
= (20.60) * (4.26/2)
= 43.88 KN
BY SLAB 360
LOAD = (SLAB LOAD + BEAM LOAD + PARAPET WALL LOAD )*(BEAM LENGTH/2)
= 57.06 KN
= 47.71 KN
BY SLAB 361
= (12.86) * (3.92/2)
= 25.21 KN
= 47.71 KN
= (12.86) * (3.92/2)
= 25.21 KN
BY SLAB 363
= 16.75 KN
= 51.84 KN
BY SLAB 364
= (13.96) * (4.67/2)
= 32.60 KN
= 32.86 KN
BY SLAB 365
= 17.59 KN
BY SLAB 361
LOAD = (SLAB LOAD + BEAM LOAD + PARAPET WALL LOAD )*(BEAM LENGTH/2)
= 35.02 KN
= 25.56 KN
BY SLAB 362
= 18.06 KN
= 20.34 KN
BY SLAB 362
= 18.06 KN
BY SLAB 364
= 18.06 KN
= 25.56 KN
BY SLAB 364
= 18.06 KN
BY SLAB 365
LOAD = (SLAB LOAD + BEAM LOAD + PARAPET WALL LOAD )*(BEAM LENGTH/2)
= 35.02 KN
= 35.95 KN
BY SLAB 366
= (13.06) * (3.92/2)
= 35.95 KN
BY SLAB 367
= (13.06) * (3.92/2)
= 25.60 KN
= 16.75 KN
BY SLAB 371
= 22.21 KN
= (13.96) *( 4.67/2)
= 45.39 KN
BY SLAB 372
= (14.25) * (4.67/2)
= 33.27 KN
= 26.28 KN
BY SLAB 375
= (11.26) * (3.17/2)
= 17.85 KN
= 27.35 KN
BY SLAB 367
= 19.54 KN
BY SLAB 379
= 27.35 KN
= 22.36 KN
BY SLAB 383
= (11.36) * (3.17/2)
= 18.01 KN
BY SLAB 377
LOAD = (SLAB LOAD + BEAM LOAD + PARAPET WALL LOAD )*(BEAM LENGTH/2)
= 39.81 KN
= 29.53 KN
BY SLAB 378
= 21.37 KN
= 22.89 KN
BY SLAB 378
= 21.37 KN
BY SLAB 383
LOAD = (SLAB LOAD + BEAM LOAD + PARAPET WALL LOAD )*(BEAM LENGTH/2)
= 39.81 KN
= 36.81 KN
BY SLAB 384
= (13.30) * (3.92/2)
= 26.07 KN
= 36.81 KN
BY SLAB 385
= (13.30) * (3.92/2)
= 26.07 KN
= 16.75 KN
BY SLAB 386
= 10.92 KN
= 36.89 KN
BY SLAB 387
= (14.72) * (4.67/2)
= 34.37 KN
= 31.41 KN
= (14.34) * (3.17/2)
= 22.73 KN
BY SLAB 384
LOAD = (SLAB LOAD + BEAM LOAD + PARAPET WALL LOAD )*(BEAM LENGTH/2)
= 39.81 KN
= 29.53 KN
BY SLAB 385
= 21.37 KN
= 23.44 KN
BY SLAB 385
= 23.44 KN
BY SLAB 387
= 21.37 KN
= 29.53 KN
BY SLAB 387
= 21.58 KN
BY SLAB 388
LOAD = (SLAB LOAD + BEAM LOAD + PARAPET WALL LOAD )*(BEAM LENGTH/2)
= 39.81 KN
BY SLAB 384
= 50.33 KN
BY SLAB 385
LOAD = (SLAB LOAD + BEAM LOAD + PARAPET WALL LOAD )*(BEAM LENGTH/2)
= 50.33 KN
BY SLAB 386
LOAD = (SLAB LOAD + BEAM LOAD + PARAPET WALL LOAD )*(BEAM LENGTH/2)
= 24.10 KN
BY SLAB 387
LOAD = (SLAB LOAD + BEAM LOAD + PARAPET WALL LOAD )*(BEAM LENGTH/2)
= 63.28 KN
BY SLAB 388
LOAD = (SLAB LOAD + BEAM LOAD + PARAPET WALL LOAD )*(BEAM LENGTH/2)
= 37.63 KN