MCB VT Trip

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

1 2 3 4 5 6 7 8

= +11MKY02

A A
+1.12S +1.12S
/41.C5 /47.A1
2-220V DC/IT

B B

-K400

A1
C

A
A2
55.34.9.220.0040
220V DC
C -1.12S -1.12S
C
/41.C5 /47.C1
-X2 /64.B7
11 14 -X2 -X2 -X2 -X2

24
23

29

30
12

17

18
11
12
5

21 24
22
31 34
32
41 44
42

D 11MKY02-2-0101 11MKY02-2-0102 11MKY02-2-0103 11MKY02-2-0104 11MKY02-2-0105 D


2

2
1

1
Cu 3x1,5 mm² Cu 3x1,5 mm² Cu 3x1,5 mm² Cu 3x1,5 mm² Cu 3x1,5 mm²

+11BAA01GB001 +11BAC01 +E-05 +E-xx +E-xx


-X5 -X -X -X -X
xx

xx

xx

xx

xx

xx

xx

xx
12
11

-F13 -Fx -Fy -FzA -FzB


41

21

21

21

21
E E
/69.C4 /68.C4 /67.C4 /65.C4 /66.C4
22

22

22

22
42

MCB OF SYNCHR. VOLTAGE MCB OF SYNCHR. VOLTAGE MCB OF SYNCHR. VOLTAGE MCB OF SYNCHR. VOLTAGE MCB OF SYNCHR. VOLTAGE
IS OFF IS OFF IS OFF IS OFF IS OFF

MTB - LV TERMINAL BOX GCB UNIT NET CIRCUIT BREAKER BUSBAR A - VT BUSBAR B - VT

Current circuits wiring - 2,5mm² Control wiring - 1,0mm²


Voltage circuits wiring - 1,5mm² Power wiring - 1,5mm²

C FD - AFTER FAT 15.12.2021 SOUČEK Client: Made by:


SOUČEK This document contains proprietary data Building Site: Project: PALU3_GCP
Revision

B FINAL DESIGN 11.06.2021 MAREK DOOSAN ŠKODA POWER s.r.o. Date:


08/2020 of Siemens, s.r.o. PALU-3 CFSPP (2x50MW) UNIT 1 Siemens, s.r.o.
A DETAIL DESIGN 10.09.2020 SOUČEK Contract No.: Checking:
ČERMÁK No reproduction or use of any part of
Title:
Siemensova 1, 155 00 Prague 13
R Comment Date Name S.42394 Date:
08/2020 this document may be made without Circuit diagram DCC/Drawing: Page/Sheets:

Made with CAD/CAE system ELCAD (R) 2020 SP2 A3


written permission. SUPPLY FOR EXTERNAL CIRCUITS E02 46 / 125

You might also like