12 Mom - 29-06-19

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

THRISSUR DISTRICT LABOUR CONTRACT CO-OPERATIVE

SOCIETY LIMITED No. R. 13589


Door No: 7/505,Nr.Konchery Road,P.O. M.G Kavu, Thiroor,
Thrissur-680581,www.tdlccs.com,email : tdlccsindia@gmail.com, Tel : 04872201060

MINUTES OF MEETING OF DEPARTMENT LEVEL-12

Venue:-TDLCCS Project Office Thrissur

Date of Meeting: 29.06.2019 11:30 AM

Prepared by : AISWARYA K P Dept. Mail id tdlccsstructural@gmail.com

Sl.no Name Mobile No. Mail id Desgn. Repre.

1 Renow Cleetus 9958070731 er.renowcleetus@gmail.com Structural Engineer Head REC

2 Jostin P Jose 9677709068 jostinpjose@gmail.com Structural Engineer JPJ

3 Akhilraj Ullas 9633399558 akr.tdlccs@gmail.com Structural Engineer AKR

4 Aiswarya K P 8281640811 aiswaryastr@gmail.com Structural Engineer AKP

6 Moosa V M 9746617305 mvm.tdlccs@gmail.com Structural Engineer MVM

7 Joy Jacob 9495890473 tdlc.joyjacob@gmail.com Structural Drafting supervisor JJP

8 Nandha K Vijay 9567900625 tdclnandha@gmail.com Structural Drafting NKV

9 Vishnu V S 9846721221 tdlcvishnu@gmail.com Structural Drafting VVS

12 MOM_29-06-19
01/07/2019
1/2 11:07
THRISSUR DISTRICT LABOUR CONTRACT CO-OPERATIVE
SOCIETY LIMITED No. R. 13589
Door No: 7/505,Nr.Konchery Road,P.O. M.G Kavu, Thiroor,
Thrissur-680581,www.tdlccs.com,email : tdlccsindia@gmail.com, Tel : 04872201060

Sl.no Project No. Project Name. Action Actionee Deadline Status Comments

Time booking format (updated) has to be


1 send to Head weekly (Saturday or Next All
available day in office)
Auditorium for Kallampally
2 TDLCCS/TVM/Tourism/149/2018 Durga Devi Temple, GFC drawings. AKR, JJP - Started.
Thiruvananthapuram

TDLCCS_PMM_PRJ_105-P1/2018-19
TDLCCS_PMM_PRJ_105-P3/2018-19 BUDS & Fisheries Revision with pile
3 Ponnani Schools GFC drawings (Foundation) JPJ, MVM, JJP, NKV, AKP - Ongoing
TDLCCS_PMM_PRJ_105-P4/2018-19 option by 3/7/2019
TDLCCS_PMM_PRJ_105-P5/2018-19

Submission date 29/6/19 crossed. Final


4 Manual design of building (Assignment) JPJ, AKP,AKR,MVM - Delay will be counted .
submission date 6/7/19

5 DTPC Hardcopies AKP 29/06/2019

Auditorium forAliyavoor Siva


6 TDLCCS/TVM/Tourism/148/2018 GFC Drawings (All) AKR 03/07/2019 To be issued to site by 4/7/19
Temple, Thiruvananthapuram

7 TDLCCS/TVM/Tourism/148/2018 Kallampally Water Tank Design AKP 02/07/2019

8 LMK - Kottayam TS Meeting REC 03/07/2019

9 Design Note drawing Layout JJP

Design Note has to be prepared for all new


10 JPJ,AKR,AKP,MVM
projects. (in Excel or Word)

12 MOM_29-06-19
01/07/2019
2/2 11:07

You might also like