Professional Documents
Culture Documents
ASSEMBLY
ASSEMBLY
TOTAL WORKER
DATE LINE NUMBER
PRODUCT CODE CHEFF NAME
PRODUCT NAME QUALITY NAME
07-00-07:15
07:15-07:30
07:30-07:45
07:45-08:00
08:00-08:15
08-15-08:30
08:30-08:45
08:45-09:00
09:00-09:15
09:15-09:30
09:30-09:45
09:45-10:00
10:00-10:15
10:15-10:30
10:30-10:45
10:45-11:00
11:00-11:15
11:15-11:30
12:00-12:15
12:15-12:30
12:30-12:45
12:45-13:00
13:00-13:15
13:15-13:30
13:30-13:45
13:45-14:00
14:00-14:15
14:15-14:30
14:30-14:45
14:45-15:00
KUMTEL
ASSEMBLY DEPARTMENT REAL PRODUCTION REPORT
PRODUCT CODE PRODUCT NAME TARGET PLAN REAL PCS DATE
3838 MINI OVEN 1600 572
5360 MINI OVEN 450 336 24-06-19-
up to
60S-04 & 60S-22 STANDING OVEN 600 223 27-06-19
TOTAL 2650 1131
KUMTEK INDUSTRIAL PLC. TOTAL WORKER
DATE 2/27/2019 LINE NUMBER
PRODUCT CODE 55-G40 CHEFF NAME
M-Standing
PRODUCT NAME Oven SHIFT
TIME TARGET/PLAN
07-00-7:30 20
07:30-08:00 20
08:00-08:30 20
08:30-09:00 20
09:00-09:30 20
09:30-10:00 20
10:00-10:30 20
10:30-11:00 20
11:00-11:30 20
LUNCH TIME
11:30-12:00
12:00-12:30 20
12:30-13:00 20
13:00-13:30 20
13:30-14:00 20
14:00-14:30 20
14:30-15:00 20
Total=300
12:00-12:30 16
12:30-13:00 16
13:00-13:30 16
13:30-14:00 16
14:00-14:30 16
14:30-15:00 16
Total=240
KUMTEK INDUSTRIAL PLC. TOTAL WORKER
DATE 2/28/2019 LINE NUMBER
PRODUCT CODE 5320 CHEFF NAME
MO Without
PRODUCT NAME hotplate SHIFT
TIME TARGET/PLAN
07-00-7:30 20
07:30-08:00 20
08:00-08:30 20
08:30-09:00 20
09:00-09:30 20
09:30-10:00 20
10:00-10:30 20
10:30-11:00 20
11:00-11:30 20
11:30-12:00 LUNCH TIME
12:00-12:30 20
12:30-13:00 20
13:00-13:30 20
13:30-14:00 20
14:00-14:30 20
14:30-15:00 20
Total=300
12:00-12:30 20
12:30-13:00 20
13:00-13:30 20
13:30-14:00 20
14:00-14:30 20
14:30-15:00 20
Total=300
12:00-12:30 17
12:30-13:00 17
13:00-13:30 17
13:30-14:00 17
14:00-14:30 17
14:30-15:00 17
Total=255
KUMTEK INDUSTRIAL PLC. TOTAL WORKER
DATE 3/1/2019 LINE NUMBER
PRODUCT CODE 5320 CHEFF NAME
MO Without
PRODUCT NAME hotplate SHIFT
TIME TARGET/PLAN
07-00-7:30 20
07:30-08:00 20
08:00-08:30 20
08:30-09:00 20
09:00-09:30 20
09:30-10:00 20
10:00-10:30 20
10:30-11:00 20
11:00-11:30 20
11:30-12:00 LUNCH TIME
12:00-12:30 20
12:30-13:00 20
13:00-13:30 20
13:30-14:00 20
14:00-14:30 20
14:30-15:00 20
Total=300
12:00-12:30 17
12:30-13:00 17
13:00-13:30 17
13:30-14:00 17
14:00-14:30 17
14:30-15:00 17
Total=255
KUMTEK INDUSTRIAL PLC. TOTAL WORKER
DATE 3/4/2019 LINE NUMBER
PRODUCT CODE 5320 CHEFF NAME
MO Without
PRODUCT NAME hotplate SHIFT
TIME TARGET/PLAN
07-00-7:30 20
07:30-08:00 20
08:00-08:30 20
08:30-09:00 20
09:00-09:30 20
09:30-10:00 20
10:00-10:30 20
10:30-11:00 20
11:00-11:30 20
LUNCH TIME
11:30-12:00
12:00-12:30 20
12:30-13:00 20
13:00-13:30 20
13:30-14:00 20
14:00-14:30 20
14:30-15:00 20
Total=300
12:00-12:30 14
12:30-13:00 14
13:00-13:30 14
13:30-14:00 14
14:00-14:30 14
14:30-15:00 14
Total=210
Total=255
NB:-Out of 71 total products 32 piece
12:00-12:30 20
12:30-13:00 20
13:00-13:30 20
13:30-14:00 20
14:00-14:30 20
14:30-15:00 20
Total=300
12:00-12:30 14
12:30-13:00 14
13:00-13:30 14
13:30-14:00 14
14:00-14:30 14
14:30-15:00 14
Total=210
12:00-12:30 17
12:30-13:00 17
13:00-13:30 17
13:30-14:00 17
14:00-14:30 17
14:30-15:00 17
Total=255
12:00-12:30 20
12:30-13:00 20
13:00-13:30 20
13:30-14:00 20
14:00-14:30 20
14:30-15:00 20
Total=300
KUMTEK INDUSTRIAL PLC. TOTAL WORKER
DATE 3/7/2019 LINE NUMBER
PRODUCT CODE 6700 CHEFF NAME
PRODUCT NAME TOSTER SHIFT
TIME TARGET/PLAN
07-00-7:30 17
07:30-08:00 17
08:00-08:30 17
08:30-09:00 17
09:00-09:30 17
09:30-10:00 17
10:00-10:30 17
10:30-11:00 17
11:00-11:30 17
11:30-12:00 LUNCH TIME
12:00-12:30 17
12:30-13:00 17
13:00-13:30 17
13:30-14:00 17
14:00-14:30 17
14:30-15:00 17
Total=255
Total=300
12:00-12:30 20
12:30-13:00 20
13:00-13:30 20
13:30-14:00 20
14:00-14:30 20
14:30-15:00 20
Total=300
12:00-12:30 17
12:30-13:00 17
13:00-13:30 17
13:30-14:00 17
14:00-14:30 17
14:30-15:00 17
Total=255
Total=390
12:00-12:30 20
12:30-13:00 20
13:00-13:30 20
13:30-14:00 20
14:00-14:30 20
14:30-15:00 20
Total=300
12:00-12:30 17
12:30-13:00 17
13:00-13:30 17
13:30-14:00 17
14:00-14:30 17
14:30-15:00 17
Total=255
12:00-12:30 20
12:30-13:00 20
13:00-13:30 20
13:30-14:00 20
14:00-14:30 20
14:30-15:00 20
Total=300
12:00-12:30 26
12:30-13:00 26
13:00-13:30 26
13:30-14:00 26
14:00-14:30 26
14:30-15:00 26
Total=390
Total=255
12:00-12:30 26
12:30-13:00 26
13:00-13:30 26
13:30-14:00 26
14:00-14:30 26
14:30-15:00 26
Total=390
KUMTEK INDUSTRIAL PLC. TOTAL WORKER
DATE 3/13/2019 LINE NUMBER
PRODUCT CODE 3560 CHEFF NAME
MO With
PRODUCT NAME hotplate SHIFT
TIME TARGET/PLAN
07-00-7:30 20
07:30-08:00 20
08:00-08:30 20
08:30-09:00 20
09:00-09:30 20
09:30-10:00 20
10:00-10:30 20
10:30-11:00 20
11:00-11:30 20
LUNCH TIME
11:30-12:00
12:00-12:30 20
12:30-13:00 20
13:00-13:30 20
13:30-14:00 20
14:00-14:30 20
14:30-15:00 20
Total=300
Total=255
12:00-12:30 26
12:30-13:00 26
13:00-13:30 26
13:30-14:00 26
14:00-14:30 26
14:30-15:00 26
Total=390
12:00-12:30 26
12:30-13:00 26
13:00-13:30 26
13:30-14:00 26
14:00-14:30 26
14:30-15:00 26
Total=390
12:00-12:30 33
12:30-13:00 33
13:00-13:30 33
13:30-14:00 33
14:00-14:30 33
14:30-15:00 33
Total=500
12:00-12:30 33
12:30-13:00 33
13:00-13:30 33
13:30-14:00 33
14:00-14:30 33
14:30-15:00 33
Total=500
Total=390
313 + 65 PIECE LUXCEL
TOTAL PIECE=378
12:00-12:30 26
12:30-13:00 26
13:00-13:30 26
13:30-14:00 26
14:00-14:30 26
14:30-15:00 26
Total=390
12:00-12:30 33
12:30-13:00 33
13:00-13:30 33
13:30-14:00 33
14:00-14:30 33
14:30-15:00 33
Total=500
KUMTEK INDUSTRIAL PLC. TOTAL WORKER
DATE 3/19/2019 LINE NUMBER
PRODUCT CODE 5320 CHEFF NAME
MO Without
PRODUCT NAME hotplate SHIFT
TIME TARGET/PLAN
07-00-7:30 26
07:30-08:00 26
08:00-08:30 26
08:30-09:00 26
09:00-09:30 26
09:30-10:00 26
10:00-10:30 26
10:30-11:00 26
11:00-11:30 26
LUNCH TIME
11:30-12:00
12:00-12:30 26
12:30-13:00 26
13:00-13:30 26
13:30-14:00 26
14:00-14:30 26
14:30-15:00 26
Total=390
12:00-12:30 20
12:30-13:00 20
13:00-13:30 20
13:30-14:00 20
14:00-14:30 20
14:30-15:00 20
Total=300
12:00-12:30 33
12:30-13:00 33
13:00-13:30 33
13:30-14:00 33
14:00-14:30 33
14:30-15:00 33
Total=500
12:00-12:30 26
12:30-13:00 26
13:00-13:30 26
13:30-14:00 26
14:00-14:30 26
14:30-15:00 26
Total=390
12:00-12:30 20
12:30-13:00 20
13:00-13:30 20
13:30-14:00 20
14:00-14:30 20
14:30-15:00 20
Total=300
KUMTEK INDUSTRIAL PLC. TOTAL WORKER
DATE 3/21/2019 LINE NUMBER
PRODUCT CODE 5320 CHEFF NAME
MO Without
PRODUCT NAME hotplate SHIFT
TIME TARGET/PLAN
07-00-7:30 26
07:30-08:00 26
08:00-08:30 26
08:30-09:00 26
09:00-09:30 26
09:30-10:00 26
10:00-10:30 26
10:30-11:00 26
11:00-11:30 26
11:30-12:00 LUNCH TIME
12:00-12:30 26
12:30-13:00 26
13:00-13:30 26
13:30-14:00 26
14:00-14:30 26
14:30-15:00 26
Total=390
KUMTEK INDUSTRIAL PLC. TOTAL WORKER
DATE 3/21/2019 LINE NUMBER
PRODUCT CODE 3576 CHEFF NAME
MO With
PRODUCT NAME hotplate SHIFT
TIME TARGET/PLAN
07-00-7:30 20
07:30-08:00 20
08:00-08:30 20
08:30-09:00 20
09:00-09:30 20
09:30-10:00 20
10:00-10:30 20
10:30-11:00 20
11:00-11:30 20
LUNCH TIME
11:30-12:00
12:00-12:30 20
12:30-13:00 20
13:00-13:30 20
13:30-14:00 20
14:00-14:30 20
14:30-15:00 20
Total=300
12:00-12:30 26
12:30-13:00 26
13:00-13:30 26
13:30-14:00 26
14:00-14:30 26
14:30-15:00 26
Total=390
12:00-12:30 33
12:30-13:00 33
13:00-13:30 33
13:30-14:00 33
14:00-14:30 33
14:30-15:00 33
Total=500
12:00-12:30 26
12:30-13:00 26
13:00-13:30 26
13:30-14:00 26
14:00-14:30 26
14:30-15:00 26
Total=390
12:00-12:30 20
12:30-13:00 20
13:00-13:30 20
13:30-14:00 20
14:00-14:30 20
14:30-15:00 20
Total=300
12:00-12:30 33
12:30-13:00 33
13:00-13:30 33
13:30-14:00 33
14:00-14:30 33
14:30-15:00 33
Total=500
12:00-12:30 20
12:30-13:00 20
13:00-13:30 20
13:30-14:00 20
14:00-14:30 20
14:30-15:00 20
Total=300
12:00-12:30 20
12:30-13:00 20
13:00-13:30 20
13:30-14:00 20
14:00-14:30 20
14:30-15:00 20
Total=300
12:00-12:30 26
12:30-13:00 26
13:00-13:30 26
13:30-14:00 26
14:00-14:30 26
14:30-15:00 26
Total=390
12:00-12:30 33
12:30-13:00 33
13:00-13:30 33
13:30-14:00 33
14:00-14:30 33
14:30-15:00 33
Total=500
12:00-12:30 26
12:30-13:00 26
13:00-13:30 26
13:30-14:00 26
14:00-14:30 26
14:30-15:00 26
Total=390
12:00-12:30 33
12:30-13:00 33
13:00-13:30 33
13:30-14:00 33
14:00-14:30 33
14:30-15:00 33
Total=500
Total=390
71 46 32
KUMTEK INDUSTRIAL PLC. TOTAL WORKER
DATE 3/30/2019 LINE NUMBER
PRODUCT CODE LX-3151 CHEFF NAME
PRODUCT NAME Mini Oven With Plate SHIFT
TIME TARGET/PLAN
07-00-7:30 20
07:30-08:00 20
08:00-08:30 20
08:30-09:00 20
09:00-09:30 20
09:30-10:00 20
10:00-10:30 20
10:30-11:00 20
11:00-11:30 20
LUNCH TIME
11:30-12:00
12:00-12:30 20
12:30-13:00 20
13:00-13:30 20
13:30-14:00 20
14:00-14:30 20
14:30-15:00 20
Total=300
KUMTEK INDUSTRIAL PLC. TOTAL WORKER
DATE 4/1/2019 LINE NUMBER
PRODUCT CODE 5370 CHEFF NAME
PRODUCT NAME Standing Oven SHIFT
TIME TARGET/PLAN
07-00-7:30 15
07:30-08:00 15
08:00-08:30 15
08:30-09:00 15
09:00-09:30 15
09:30-10:00 15
10:00-10:30 15
10:30-11:00 15
11:00-11:30 15
11:30-12:00 LUNCH TIME
12:00-12:30 15
12:30-13:00 15
13:00-13:30 15
13:30-14:00 15
14:00-14:30 15
14:30-15:00 15
Total=225
20:00-20:30 20
20:30-21:00 20
21:00-21:30 20
21:30-22:00 20
22:00-22:30 20
22:30-23:00 20
Total=300
12:00-12:30 20
12:30-13:00 20
13:00-13:30 20
13:30-14:00 20
14:00-14:30 20
14:30-15:00 20
Total=300
20:00-20:30 33
20:30-21:00 33
21:00-21:30 33
21:30-22:00 33
22:00-22:30 33
22:30-23:00 33
Total=500
12:00-12:30 40
12:30-13:00 40
13:00-13:30 40
13:30-14:00 40
14:00-14:30 40
40
14:30-15:00
Total=600
12:00-12:30 33
12:30-13:00 33
13:00-13:30 33
13:30-14:00 33
14:00-14:30 33
14:30-15:00 33
Total=500
12:00-12:30 40
12:30-13:00 40
13:00-13:30 40
13:30-14:00 40
14:00-14:30 40
40
14:30-15:00
Total=600
20:00-20:30 20
20:30-21:00 20
21:00-21:30 20
21:30-22:00 20
22:00-22:30 20
22:30-23:00 20
Total=300
KUMTEK INDUSTRIAL PLC. TOTAL WORKER
DATE 4/11/2019 LINE NUMBER
PRODUCT CODE 3858 CHEFF NAME
PRODUCT NAME MINI OVEN WITH PLATE SHIFT
TIME TARGET/PLAN
15:00-15:30 20
15:30-16:00 20
16:00-16:30 20
16:30-17:00 20
17:00-17:30 20
17:30-18:00 20
18:00-18:30 20
18:30-19:00 20
19:00-19:30 20
LUNCH TIME
19:30-20:00
20:00-20:30 20
20:30-21:00 20
21:00-21:30 20
21:30-22:00 20
22:00-22:30 20
22:30-23:00 20
Total=300
12:00-12:30 15
12:30-13:00 15
13:00-13:30 15
13:30-14:00 15
14:00-14:30 15
14:30-15:00 15
Total=225
20:00-20:30 20
20:30-21:00 20
21:00-21:30 20
21:30-22:00 20
22:00-22:30 20
22:30-23:00 20
Total=300
20:00-20:30 20
20:30-21:00 20
21:00-21:30 20
21:30-22:00 20
22:00-22:30 20
22:30-23:00 20
Total=300
KUMTEK INDUSTRIAL PLC. TOTAL WORKER
DATE 4/13/2019 LINE NUMBER
PRODUCT CODE 60S40 CHEFF NAME
PRODUCT NAME Standing Oven SHIFT
TIME TARGET/PLAN
07-00-7:30 15
07:30-08:00 15
08:00-08:30 15
08:30-09:00 15
09:00-09:30 15
09:30-10:00 15
10:00-10:30 15
10:30-11:00 15
11:00-11:30 15
LUNCH TIME
11:30-12:00
12:00-12:30 15
12:30-13:00 15
13:00-13:30 15
13:30-14:00 15
14:00-14:30 15
14:30-15:00 15
Total=225
12:00-12:30 20
12:30-13:00 20
13:00-13:30 20
13:30-14:00 20
14:00-14:30 20
14:30-15:00 20
Total=300
20:00-20:30 20
20:30-21:00 20
21:00-21:30 20
21:30-22:00 20
22:00-22:30 20
22:30-23:00 20
Total=300
20:00-20:30 20
20:30-21:00 20
21:00-21:30 20
21:30-22:00 20
22:00-22:30 20
22:30-23:00 20
Total=300
12:00-12:30 20
12:30-13:00 20
13:00-13:30 20
13:30-14:00 20
14:00-14:30 20
14:30-15:00 20
Total=300
KUMTEK INDUSTRIAL PLC. TOTAL WORKER
DATE 4/18/2019 LINE NUMBER
PRODUCT CODE LX-3858 CHEFF NAME
PRODUCT NAME MINI OVEN WITH PLATE SHIFT
TIME TARGET/PLAN
15:00-15:30 20
15:30-16:00 20
16:00-16:30 20
16:30-17:00 20
17:00-17:30 20
17:30-18:00 20
18:00-18:30 20
18:30-19:00 20
19:00-19:30 20
LUNCH TIME
19:30-20:00
20:00-20:30 20
20:30-21:00 20
21:00-21:30 20
21:30-22:00 20
22:00-22:30 20
22:30-23:00 20
Total=300
20:00-20:30 20
20:30-21:00 20
21:00-21:30 20
21:30-22:00 20
22:00-22:30 20
22:30-23:00 20
Total=300
12:00-12:30 14
12:30-13:00 14
13:00-13:30 14
13:30-14:00 14
14:00-14:30 14
14:30-15:00 14
200
KUMTEK INDUSTRIAL PLC. TOTAL WORKER
DATE 4/19/2019 LINE NUMBER
PRODUCT CODE LX-3858 CHEFF NAME
PRODUCT NAME MINI OVEN WITH PLATE SHIFT
TIME TARGET/PLAN
15:00-15:30 14
15:30-16:00 14
16:00-16:30 14
16:30-17:00 14
17:00-17:30 14
17:30-18:00 14
18:00-18:30 14
18:30-19:00 14
19:00-19:30 14
LUNCH TIME
19:30-20:00
20:00-20:30 14
20:30-21:00 14
21:00-21:30 14
21:30-22:00 14
22:00-22:30 14
22:30-23:00 14
Total=200
20:00-20:30 14
20:30-21:00 14
21:00-21:30 14
21:30-22:00 14
22:00-22:30 14
22:30-23:00 14
Total=200
12:00-12:30 14
12:30-13:00 14
13:00-13:30 14
13:30-14:00 14
14:00-14:30 14
14:30-15:00 14
Total=200
12:00-12:30 14
12:30-13:00 14
13:00-13:30 14
13:30-14:00 14
14:00-14:30 14
14:30-15:00 14
Total=200
20:00-20:30 14
20:30-21:00 14
21:00-21:30 14
21:30-22:00 14
22:00-22:30 14
22:30-23:00 14
Total=200
20:00-20:30 14
20:30-21:00 14
21:00-21:30 14
21:30-22:00 14
22:00-22:30 14
22:30-23:00 14
Total=200
12:00-12:30 14
12:30-13:00 14
13:00-13:30 14
13:30-14:00 14
14:00-14:30 14
14:30-15:00 14
Total=200
12:00-12:30 14
12:30-13:00 14
13:00-13:30 14
13:30-14:00 14
14:00-14:30 14
14:30-15:00 14
Total=200
20:00-20:30 14
20:30-21:00 14
21:00-21:30 14
21:30-22:00 14
22:00-22:30 14
22:30-23:00 14
Total=200
TOTAL 75+73=148
12:00-12:30 7
12:30-13:00 7
13:00-13:30 7
13:30-14:00 7
14:00-14:30 7
14:30-15:00 7
100
NOT INCASE OF
NB PACKED PHYSICAL
60S-04 20 32
TOTAL 52
12:00-12:30 10
12:30-13:00 10
13:00-13:30 10
13:30-14:00 10
14:00-14:30 10
14:30-15:00 10
Total=150
20:00-20:30 14
20:30-21:00 14
21:00-21:30 14
21:30-22:00 14
22:00-22:30 14
22:30-23:00 14
Total=200
TOTAL 93
12:00-12:30 7
12:30-13:00 7
13:00-13:30 7
13:30-14:00 7
14:00-14:30 7
14:30-15:00 7
100
TOTAL 35
20:00-20:30 10
20:30-21:00 10
21:00-21:30 10
21:30-22:00 10
22:00-22:30 10
22:30-23:00 10
Total=150
20:00-20:30 14
20:30-21:00 14
21:00-21:30 14
21:30-22:00 14
22:00-22:30 14
22:30-23:00 14
Total=200
12:00-12:30 14
12:30-13:00 14
13:00-13:30 14
13:30-14:00 14
14:00-14:30 14
14:30-15:00 14
Total=200
12:00-12:30 14
12:30-13:00 14
13:00-13:30 14
13:30-14:00 14
14:00-14:30 14
14:30-15:00 14
Total=200
12:00-12:30 14
12:30-13:00 14
13:00-13:30 14
13:30-14:00 14
14:00-14:30 14
14:30-15:00 14
Total=200
KUMTEK INDUSTRIAL PLC. TOTAL WORKER
DATE 5/10/2019 LINE NUMBER
PRODUCT CODE KF-5360 CHEFF NAME
PRODUCT NAME MINI OVEN WITH PLATE SHIFT
TIME TARGET/PLAN
07-00-7:30 14
07:30-08:00 14
08:00-08:30 14
08:30-09:00 14
09:00-09:30 14
09:30-10:00 14
10:00-10:30 14
10:30-11:00 14
11:00-11:30 14
11:30-12:00 LUNCH TIME
12:00-12:30 14
12:30-13:00 14
13:00-13:30 14
13:30-14:00 14
14:00-14:30 14
14:30-15:00 14
Total=200
12:00-12:30 7
12:30-13:00 7
13:00-13:30 7
13:30-14:00 7
14:00-14:30 7
14:30-15:00 7
100
12:00-12:30 14
12:30-13:00 14
13:00-13:30 14
13:30-14:00 14
14:00-14:30 14
14:30-15:00 14
Total=200
KUMTEK INDUSTRIAL PLC. TOTAL WORKER
DATE 5/11/2019 LINE NUMBER
PRODUCT CODE KF-5360 CHEFF NAME
PRODUCT NAME MINI OVEN WITH PLATE SHIFT
TIME TARGET/PLAN
07-00-7:30 14
07:30-08:00 14
08:00-08:30 14
08:30-09:00 14
09:00-09:30 14
09:30-10:00 14
10:00-10:30 14
10:30-11:00 14
11:00-11:30 14
11:30-12:00 LUNCH TIME
12:00-12:30 14
12:30-13:00 14
13:00-13:30 14
13:30-14:00 14
14:00-14:30 14
14:30-15:00 14
Total=200
20:00-20:30 14
20:30-21:00 14
21:00-21:30 14
21:30-22:00 14
22:00-22:30 14
22:30-23:00 14
Total=200
20:00-20:30 14
20:30-21:00 14
21:00-21:30 14
21:30-22:00 14
22:00-22:30 14
22:30-23:00 14
Total=200
20:00-20:30 14
20:30-21:00 14
21:00-21:30 14
21:30-22:00 14
22:00-22:30 14
22:30-23:00 14
Total=200
12:00-12:30 7
12:30-13:00 7
13:00-13:30 7
13:30-14:00 7
14:00-14:30 7
14:30-15:00 7
100
20:00-20:30 14
20:30-21:00 14
21:00-21:30 14
21:30-22:00 14
22:00-22:30 14
22:30-23:00 14
Total=200
20:00-20:30 14
20:30-21:00 14
21:00-21:30 14
21:30-22:00 14
22:00-22:30 14
22:30-23:00 14
Total=200
12:00-12:30 14
12:30-13:00 14
13:00-13:30 14
13:30-14:00 14
14:00-14:30 14
14:30-15:00 14
Total=200
20:00-20:30 14
20:30-21:00 14
21:00-21:30 14
21:30-22:00 14
22:00-22:30 14
22:30-23:00 14
Total=200
12:00-12:30 14
12:30-13:00 14
13:00-13:30 14
13:30-14:00 14
14:00-14:30 14
14:30-15:00 14
Total=200
20:00-20:30 24
20:30-21:00 24
21:00-21:30 24
21:30-22:00 24
22:00-22:30 24
22:30-23:00 24
Total=360
12:00-12:30 7
12:30-13:00 7
13:00-13:30 7
13:30-14:00 7
14:00-14:30 7
14:30-15:00 7
100
12:00-12:30 14
12:30-13:00 14
13:00-13:30 14
13:30-14:00 14
14:00-14:30 14
14:30-15:00 14
Total=200
20:00-20:30 24
20:30-21:00 24
21:00-21:30 24
21:30-22:00 24
22:00-22:30 24
22:30-23:00 24
Total=360
12:00-12:30 7
12:30-13:00 7
13:00-13:30 7
13:30-14:00 7
14:00-14:30 7
14:30-15:00 7
100
12:00-12:30 14
12:30-13:00 14
13:00-13:30 14
13:30-14:00 14
14:00-14:30 14
14:30-15:00 14
Total=200
20:00-20:30 24
20:30-21:00 24
21:00-21:30 24
21:30-22:00 24
22:00-22:30 24
22:30-23:00 24
Total=360
12:00-12:30 7
12:30-13:00 7
13:00-13:30 7
13:30-14:00 7
14:00-14:30 7
14:30-15:00 7
TOTAL TARGET =100
TIME TARGET/PLAN
15-00-16:00 28
16:00-17:00 28
17:00-18:00 28
18:00-19:00 28
19:00-19:30 14
19:30-20:00 LUNCH TIME
20:00-21:00 28
21:00-22:00 28
22:00-23:00 28
TARGET=210
TIME TARGET/PLAN
07-00-08:00 14
08:00-09:00 14
09:00-10:00 14
10:00-11:00 14
11:00-11:30 7
12:00-13:00 14
13:00-14:00 14
14:00-15:00 14
TARGET=100
TIME TARGET/PLAN
07-00-08:00 28
08:00-09:00 28
09:00-10:00 28
10:00-11:00 14
11:00-11:30 28
12:00-13:00 28
13:00-14:00 28
14:00-15:00 28
TARGET=200
TIME TARGET/PLAN
07-00-08:00 28
08:00-09:00 28
09:00-10:00 28
10:00-11:00 28
11:00-11:30 14
12:00-13:00 28
13:00-14:00 28
14:00-15:00 28
TARGET=200
KUMTEK INDUSTRIAL PLC. TOTAL WORKER
15-00-16:00 28
16:00-17:00 28
17:00-18:00 28
18:00-19:00 28
19:00-19:30 14
20:00-21:00 28
21:00-22:00 28
22:00-23:00 28
TARGET=210
NB
Product code Product name Amount
KF-5360 Mini oven with plate 87
KF-5320 Mini oven with out plate 25
total= 112
TIME TARGET/PLAN
15-00-16:00 28
16:00-17:00 28
17:00-18:00 28
18:00-19:00 28
19:00-19:30 14
20:00-21:00 28
21:00-22:00 28
22:00-23:00 28
TARGET=210
KUMTEK INDUSTRIAL PLC. TOTAL WORKER
DATE 5/23/2019 LINE NUMBER
TIME TARGET/PLAN
07-00-08:00 14
08:00-09:00 14
09:00-10:00 14
10:00-11:00 14
11:00-11:30 7
12:00-13:00 14
13:00-14:00 14
14:00-15:00 14
TARGET=100
TIME TARGET/PLAN
07-00-08:00 28
08:00-09:00 28
09:00-10:00 28
10:00-11:00 14
11:00-11:30 28
12:00-13:00 28
13:00-14:00 28
14:00-15:00 28
TARGET=200
07-00-08:00 28
08:00-09:00 28
09:00-10:00 28
10:00-11:00 28
11:00-11:30 14
12:00-13:00 28
13:00-14:00 28
14:00-15:00 28
TARGET=200
TIME TARGET/PLAN
15-00-16:00 28
16:00-17:00 28
17:00-18:00 28
18:00-19:00 28
19:00-19:30 14
20:00-21:00 28
21:00-22:00 28
22:00-23:00 28
TARGET=210
NB
Product code Product name Amount
KF-5360 Mini oven with plate 5
KF-3900 Middle oven 8
total= 13
TIME TARGET/PLAN
07-00-08:00 14
08:00-09:00 14
09:00-10:00 14
10:00-11:00 14
11:00-11:30 7
12:00-13:00 14
13:00-14:00 14
14:00-15:00 14
TARGET=100
TIME TARGET/PLAN
07-00-08:00 28
08:00-09:00 28
09:00-10:00 28
10:00-11:00 14
11:00-11:30 28
12:00-13:00 28
13:00-14:00 28
14:00-15:00 28
TARGET=210
TIME TARGET/PLAN
07-00-08:00 28
08:00-09:00 28
09:00-10:00 28
10:00-11:00 28
11:00-11:30 14
12:00-13:00 28
13:00-14:00 28
14:00-15:00 28
TARGET=210
Mini oven
PRODUCT NAME SHIFT
TIME TARGET/PLAN
15-00-16:00 28
16:00-17:00 28
17:00-18:00 28
18:00-19:00 28
19:00-19:30 14
20:00-21:00 28
21:00-22:00 28
22:00-23:00 28
TARGET=210
KUMTEK INDUSTRIAL PLC. TOTAL WORKER
TIME TARGET/PLAN
07-00-08:00 28
08:00-09:00 28
09:00-10:00 28
10:00-11:00 28
11:00-11:30 14
12:00-13:00 28
13:00-14:00 28
14:00-15:00 28
TARGET=210
KUMTEK INDUSTRIAL PLC. TOTAL WORKER
TIME TARGET/PLAN
07-00-08:00 14
08:00-09:00 14
09:00-10:00 14
10:00-11:00 14
11:00-11:30 7
12:00-13:00 14
13:00-14:00 14
14:00-15:00 14
TARGET=100
KUMTEK INDUSTRIAL PLC. TOTAL WORKER
TIME TARGET/PLAN
07-00-08:00 28
08:00-09:00 28
09:00-10:00 28
10:00-11:00 14
11:00-11:30 28
12:00-13:00 28
13:00-14:00 28
14:00-15:00 28
TARGET=210
TIME TARGET/PLAN
07-00-08:00 14
08:00-09:00 14
09:00-10:00 14
10:00-11:00 14
11:00-11:30 7
13:00-14:00 14
14:00-15:00 14
TARGET=100
TIME TARGET/PLAN
07-00-08:00 28
08:00-09:00 28
09:00-10:00 28
10:00-11:00 14
11:00-11:30 28
11:30-12:00 LUNCH TIME
12:00-13:00 28
13:00-14:00 28
14:00-15:00 28
TARGET=210
TIME TARGET/PLAN
15-00-16:00 28
16:00-17:00 28
17:00-18:00 28
18:00-19:00 28
19:00-19:30 14
19:30-20:00 DINNER TIME
20:00-21:00 28
21:00-22:00 28
22:00-23:00 28
TARGET=210
Mini oven
PRODUCT NAME SHIFT
TIME TARGET/PLAN
15-00-16:00 28
16:00-17:00 28
17:00-18:00 28
18:00-19:00 28
19:00-19:30 14
21:00-22:00 28
22:00-23:00 28
TARGET=210
TIME TARGET/PLAN
07-00-08:00 14
08:00-09:00 14
09:00-10:00 14
10:00-11:00 14
11:00-11:30 7
12:00-13:00 14
13:00-14:00 14
14:00-15:00 14
TARGET=100
TIME TARGET/PLAN
07-00-08:00 28
08:00-09:00 28
09:00-10:00 28
10:00-11:00 14
11:00-11:30 28
12:00-13:00 28
13:00-14:00 28
14:00-15:00 28
TARGET=210
TIME TARGET/PLAN
15-00-16:00 28
16:00-17:00 28
17:00-18:00 28
18:00-19:00 28
19:00-19:30 14
20:00-21:00 28
21:00-22:00 28
22:00-23:00 28
TARGET=210
Mini oven
PRODUCT NAME SHIFT
TIME TARGET/PLAN
15-00-16:00 28
16:00-17:00 28
17:00-18:00 28
18:00-19:00 28
19:00-19:30 14
20:00-21:00 28
21:00-22:00 28
22:00-23:00 28
TARGET=210
TIME TARGET/PLAN
07-00-08:00 14
08:00-09:00 14
09:00-10:00 14
10:00-11:00 14
11:00-11:30 7
12:00-13:00 14
13:00-14:00 14
14:00-15:00 14
TARGET=100
total PRODUCT = 49
KUMTEK INDUSTRIAL PLC. TOTAL WORKER
TIME TARGET/PLAN
07-00-08:00 28
08:00-09:00 28
09:00-10:00 28
10:00-11:00 14
11:00-11:30 28
12:00-13:00 28
13:00-14:00 28
14:00-15:00 28
TARGET=210
NB
Product code Product name Amount
KF-5360 Mini oven with plate 71
KF-5320 Mini oven with plate 6
total= 77
TIME TARGET/PLAN
15-00-16:00 28
16:00-17:00 28
17:00-18:00 28
18:00-19:00 28
19:00-19:30 14
21:00-22:00 28
22:00-23:00 28
TARGET=210
Mini oven
PRODUCT NAME SHIFT
TIME TARGET/PLAN
15-00-16:00 28
16:00-17:00 28
17:00-18:00 28
18:00-19:00 28
19:00-19:30 14
19:30-20:00 DINNER TIME
20:00-21:00 28
21:00-22:00 28
22:00-23:00 28
TARGET=210
TIME TARGET/PLAN
07-00-08:00 14
08:00-09:00 14
09:00-10:00 14
10:00-11:00 14
11:00-11:30 7
13:00-14:00 14
14:00-15:00 14
TARGET=100
New Production
Product code Product name Packed
TIME TARGET/PLAN
07-00-08:00 28
08:00-09:00 28
09:00-10:00 28
10:00-11:00 14
11:00-11:30 28
12:00-13:00 28
13:00-14:00 28
14:00-15:00 28
TARGET=210
TIME TARGET/PLAN
15-00-16:00 28
16:00-17:00 28
17:00-18:00 28
18:00-19:00 28
19:00-19:30 14
20:00-21:00 28
21:00-22:00 28
22:00-23:00 28
TARGET=210
KUMTEK INDUSTRIAL PLC. TOTAL WORKER
Mini oven
PRODUCT NAME SHIFT
TIME TARGET/PLAN
15-00-16:00 28
16:00-17:00 28
17:00-18:00 28
18:00-19:00 28
19:00-19:30 14
20:00-21:00 28
21:00-22:00 28
22:00-23:00 28
TARGET=210
26
4
Yosef Birhanu & Assefa Bekele
A
REAL PSC. PROBLEM FACED
0
0
0
8
10
12
13
10
10
28
7
TOTOBA TESFAYE
A
REAL PSC. PROBLEM FACED
0 PROBLEM ON SERIGRAPH
0 TERMOSTAT PROBLEM
11
11
13
13
18
11
9
18
14 LABEL PROBLEM
18
20
16
19
191 working time =5:30
loss time=2:00
ieces packed
28
1
Megersa Dessale
A
REAL PSC. PROBLEM FACED
10
10
16
16
14
14
12
8 Rotery problem
8 Cable Problem
10
10
12
12
10
14
176 working time =6:00
loss time=1:30
22
2
Dejene Bayisa
A
REAL PSC. PROBLEM FACED
6
5 lack of person
6
6
5
6
6
5
6
6
5 Air problem
6
5 Air problem
6
6
85 working time =5:30
loss time=2:00
27
8
Totoba & Werkinesh
A
REAL PSC. PROBLEM FACED
14 Cable + Jamp Problem
18
15 Cable Problem
11 Cable Problem
18
11 Cable Problem
12
15 Rotery problem
20 Back Cover Problem
20
13 Air Problem
20
15
5 Jamp Problem
5 Jamp Problem
15
7
Assefa & Yosef
A
REAL PSC. PROBLEM FACED
0 Serigraph problem
0 Body Problem
0 Serigraph problem
0 Body Problem
0 Serigraph problem
0 Body Problem
0 Serigraph problem
0 Body Problem
0 Body Problem
0 Serigraph problem
0 Body Problem
0 Serigraph problem
0 Body Problem
12 Jamp Problem
12 Jamp Problem
28
1
MEGERSA DESSALE
A
REAL PSC. PROBLEM FACED
12
12
15
15
16
14
5 Govde problem
5 Govde problem
15
12
14
10 Air problem
10 Air problem
12
18
185 working time =6:30
loss time=1:00
22
2
Dejene Bayisa
A
REAL PSC. PROBLEM FACED
3 LACK OF RAW MATERIAL
6 LACK OF RAW MATERIAL
7 LACK OF RAW MATERIAL
0 NO TEFLON
0 NO CABLE
0 KNOB PROBLEM
0 NO TEFLON
0 NO CABLE
0 KNOB PROBLEM
10
15
11
13
13 Air problem
13
91 working time =5:00
loss time=2:30
28
8
Totoba & Werkinesh
A
REAL PSC. PROBLEM FACED
11 AIR PROBLEM
10 AIR PROBLEM
16
20
12 AIR PROBLEM
15 TIMER PROBLEM
19 TERMOSTAT
11 TIMER PROBLEM
18
14
6 AIR PROBLEM + SOCKET +TIMER PROBLEM
6 SOCKET +TIMER PROBLEM
9 AIR PROBLEM + SOCKET
16 SOCKET +TIMER PROBLEM
12
195 working time =4:30
loss time=3:00
16
7
Assefa & Yosef
A
REAL PSC. PROBLEM FACED
6
5
5 CABLE PROBLEM
3 CABLE PROBLEM
7 CABLE PROBLEM
0 CABLE PROBLEM
0 CABLE PROBLEM
13
5
6
5 CABLE PROBLEM
7
6
4 CABLE PROBLEM
5
77 working time =5:15
loss time=2:15
28
1
MEGERSA DESSALE
A
REAL PSC. PROBLEM FACED
8 CABLE PROBLEM
12 CABLE PROBLEM
20
15
15
15
13 COVER PROBLEM
14
13 COVER PROBLEM
10
8 CABLE PROBLEM
11
10
10
10
184 working time =5:15
loss time=2:15
20
2
Dejene Bayisa
A
REAL PSC. PROBLEM FACED
3 CABLE PROBLEM
4 CABLE PROBLEM
0 NO TEFLON
0 NO TEFLON
0 NO TEFLON
0 NO TEFLON
0 NO TEFLON
0 NO TEFLON
0 NO TEFLON
15
15
15
15
0 Lack of Body Cover
0 Lack of Body Cover
A
REAL PSC. PROBLEM FACED
8 Shortage of Manpower
10
9
10
15
15
15
13
10 TERMOSTAT PROBLEM/QUALITY PROBLEM
15
15
0 TERMOSTAT PROBLEM/QUALITY PROBLEM
0 TERMOSTAT PROBLEM/QUALITY PROBLEM
0 TERMOSTAT PROBLEM/QUALITY PROBLEM
0 TERMOSTAT PROBLEM/QUALITY PROBLEM
13
7
Assefa & Yosef
A
REAL PSC. PROBLEM FACED
10 label
8 CABLE PROBLEM
7 CABLE PROBLEM
8 CABLE PROBLEM
9 CABLE PROBLEM
12
11
10
5 Nut / Vida/ Problem
15
12
11
5 CABLE PROBLEM
8 CABLE PROBLEM
6 CABLE PROBLEM
20
1
MEGERSA DESSALE
A
REAL PSC. PROBLEM FACED
0 CABLE PROBLEM
16
11
8 RESISTANCE PROBLEM
7 RESISTANCE PROBLEM
0 RESISTANCE PROBLEM
5 RESISTANCE PROBLEM
6 CABLE PROBLEM
9
0 CABLE PROBLEM
17
12 CABLE PROBLEM
20
0 TERMOSTAT PROBLEM
0 TERMOSTAT PROBLEM
19
2
Dejene Bayisa
A
REAL PSC. PROBLEM FACED
0 NO TEFLON
0 NO TEFLON
0 NO TEFLON
0 NO TEFLON
0 NO TEFLON
10 knob problem
10 knob problem
16
0 Air Problem
15
5 LACK OF TEFLON
5 LACK OF TEFLON
5 LACK OF TEFLON
5 LACK OF TEFLON
0 NO TEFLON
25
8
Totoba & Werkinesh
A
REAL PSC. PROBLEM FACED
0 TERMOSTAT PROBLEM
15 AIR PROBLEM
18
20
17
14 TERMOSTAT PROBLEM
16 CABLE PROBLEM
20
12 AIR PROBLEM
20
20
18 PANEL PROBLEM + CABLE PROBLEM
20
20
10 PANEL PROBLEM
26
1
MEGERSA DESSALE
A
REAL PSC. PROBLEM FACED
10 AIR + KULPU PROBLEM
10 TERMOSTAT PROBLEM
17 DOOR/NO HANDLE
10 TERMOSTAT PROBLEM
20
7 JUMPER/HANDLE/ TERMOSTAT PROBLEM
0
10 TERMOSTAT + ROTERY PROBLEM
10 ROTERY + AIR PROBLEM
15
15
12 LAMP
15
0
0
151 working time =5:00
loss time=2:30
14
7
Assefa & Yosef
A
REAL PSC. PROBLEM FACED
0 CABLE PROBLEM
7 BODY PROBLEM
8 SERIGRAPH PROBLEM
14
15
12
6 SERIGRAPH PROBLEM
9 SERIGRAPH PROBLEM
0 SERIGRAPH PROBLEM
0 Repair Working
0 Repair Working
0 Repair Working
0 Repair Working
0 Repair Working
0 Repair Working
18
2
Dejene Bayisa
A
REAL PSC. PROBLEM FACED
3 knob problem
5 knob problem
5 knob problem
3 knob problem
3 knob problem
3 knob problem
3 knob problem
3 knob problem
3 knob problem
8 knob problem
7 knob problem
6 knob problem
7 knob problem
6 knob problem
5 knob problem
25
8
Totoba & Werkinesh
A
REAL PSC. PROBLEM FACED
0 PANEL PROBLEM
15 PANEL PROBLEM
14 PANEL PROBLEM
0 PANEL PROBLEM
0 PANEL PROBLEM
0 PANEL PROBLEM
10 LAMP CABLE + TERMOSTAT PROBLEM
10 TERMOSTAT PROBLEM
5 BACK COVER + SERIGRAPHY +TERMOSTAT PROBLEM
1
MEGERSA DESSALE
A
REAL PSC. PROBLEM FACED
10
16
15
15
0 CABLE PROBLEM
12
10
15
10
16
0 NO PANEL
0 NO PANEL
20
10
17
166 working time =6:00
loss time=1:30
18
2
Dejene Bayisa
A
REAL PSC. PROBLEM FACED
3 Quality Controller Machine Problem
7 Socket Problem
7 Quality Controller Machine Problem
7 Socket Problem
5 Teflon Problem
5 Teflon Problem
3 knob Problem
3 knob Problem
5 Teflon Problem
5 Teflon Problem
8
7
5
5
5
80 working time =4:30
loss time=3:00
31
8
Totoba & Werkinesh
A
REAL PSC. PROBLEM FACED
8 PANEL + TERMOSTAT PROBLEM
8 PANEL + TERMOSTAT PROBLEM
4 PANEL + TERMOSTAT PROBLEM
10 PANEL + AIR PROBLEM
12 PANEL + TERMOSTAT PROBLEM
20 PANEL + SERIGRAPHY PROBLEM
13 PANEL + SERIGRAPHY + SOCKET PROBLEM
12 PANEL + SOCKET PROBLEM
15 SOCKET PROBLEM
24 AIR PROBLEM
26
26
26
18 AIR PROBLEM + TERMOSTAT PROBLEM
11 AIR PROBLEM
1
MEGERSA DESSALE
A
REAL PSC. PROBLEM FACED
3 CABLE PROBLEM
5 CABLE PROBLEM
10
20
20
20
20
20
20
25
20
20
20
20
45
288 working time =7:30
loss time=0:00
22
2
Dejene Bayisa
A
REAL PSC. PROBLEM FACED
7
5
8
8
7
3 Serigraphy Problem
3 Serigraphy Problem
10
7
6
6
8
8
10
9
105 working time =5:00
loss time=2:30
32
8
Totoba & Werkinesh
A
REAL PSC. PROBLEM FACED
12 AIR PROBLEM
12 AIR PROBLEM
11 AIR PROBLEM
11 TERMOSTAT PROBLEM
20
8 TERMOSTAT PROBLEM
27
26
32
24
14
12 TERMOSTAT PROBLEM
22
20
16
267 working time =6:30
loss time=1:00
24
1
MEGERSA DESSALE
A
REAL PSC. PROBLEM FACED
12
10 Resistance Problem
10 Resistance Problem
12
10 Resistance Problem
10 Resistance Problem
13
9 CABLE PROBLEM
12
10 Resistance Problem
12 CABLE + PANEL PROBLEM
10 NO PANEL
10 NO CABLE
10
9
159 working time =5:00
loss time=2:30
18
7
Yosef Birhanu
A
REAL PSC. PROBLEM FACED
0 Lamp Cable Problem
0 Kapak Problem
0 Lamp Cable Problem
10
15
15
11
29
4 Lamp Cable Problem
5
7
4 Lamp Cable Problem
6
23
9
138 working time =5:30
loss time=2:00
16
2
Dejene Bayisa
A
REAL PSC. PROBLEM FACED
2 Shortage of Manpower(Worker)
3 Shortage of Manpower(Worker)
5 Shortage of Manpower(Worker)
7
3 Shortage of Manpower(Worker)
5 Shortage of Manpower(Worker)
5 Shortage of Manpower(Worker)
5 Shortage of Manpower(Worker)
5 Shortage of Manpower(Worker)
0 Serigraphy Problem
0 Serigraphy Problem
5
6
6
9
66 working time =4:30
loss time=3:00
25
1
MEGERSA DESSALE
A
REAL PSC. PROBLEM FACED
1 Quality Problem
20
5 Panel + No Quality Person
10
6 Panel Problem
1 Resistance /Handle /Problem
5 Quality Problem
5 Quality Problem
10
8
12
15
20
13
12
143 working time =4:00
loss time=3:30
15
7
Yosef Birhanu
A
REAL PSC. PROBLEM FACED
3 Quality Problem
5 Quality Problem
4 Quality Problem
5 Quality Problem
9 Quality Problem
8 Quality Problem
8 Kapak Problem
10
7 Lamp Cable Problem
10
8 Lamp Cable Problem
18
7 Kapak Problem
10
7 Kapak Problem
24
1
MEGERSA DESSALE
A
REAL PSC. PROBLEM FACED
3 PANEL PROBLEM
7 PANEL PROBLEM
10 ROTERY PROBLEM
10 ROTERY PROBLEM
10 ROTERY PROBLEM
10 ROTERY PROBLEM
10 ROTERY PROBLEM
10 ROTERY PROBLEM
10 ROTERY PROBLEM
10 ROTERY PROBLEM
13 ROTERY PROBLEM
4 PANEL PROBLEM
11 PANEL PROBLEM
3 PANEL PROBLEM
5 PANEL PROBLEM
26
8
Totoba & Werkinesh
A
REAL PSC. PROBLEM FACED
0 No Panel
0 No Panel
26
26
0 No Panel
0 No Panel
0 No Panel
0 No Panel
9
14 AIR PROBLEM
14 AIR PROBLEM
17 Quality + Panel Problem
16 Panel Problem
18 Panel Problem
5 Panel Problem
17
2
Dejene Bayisa
A
REAL PSC. PROBLEM FACED
4 Materials didn't appread at a time
4 Materials didn't appread at a time
4 Materials didn't appread at a time
5 Materials didn't appread at a time
5 Materials didn't appread at a time
6 Materials didn't appread at a time
7 Materials didn't appread at a time
5 Materials didn't appread at a time
7 Materials didn't appread at a time
30
8
Totoba & Werkinesh
A
REAL PSC. PROBLEM FACED
11
18
20
18
23
17
19
16
20
A
REAL PSC. PROBLEM FACED
8 Shortage of Panel
9 Shortage of Panel
4 Cable Problem
10
8 Shortage of Panel
7 Tabla Problem
8 Tabla Problem
10
7 Panel + Tabla Problem
22
2
Dejene Bayisa
A
REAL PSC. PROBLEM FACED
5
4
6
0 Serigraphy Problem on Body Toster
8 Serigraphy Problem on Body Toster
8
8
8
5 No Lamp Light Cable
7
8
8
7 No Lamp Light Cable
9
4
95 working time =5:00
loss time=2:30
31
8
Totoba & Werkinesh
A
REAL PSC. PROBLEM FACED
10 Cam Kulpu Problem
15 Cam Kulpu Problem
10 Cam Kulpu Problem
9 Cam Kulpu Problem
11 Cam Kulpu Problem
4 Cam Kulpu Problem
4 Cam Kulpu Problem + Air Problem
0 Cam Kulpu Problem + Air Problem
18
13 Cam Kulpu Problem + Air Problem
24 Cam Kulpu Problem
10 Cam Kulpu Problem
20 Cam Kulpu Problem
0 Cam Kulpu Problem
45
193 working time =5:00
loss time=2:30
26
1
ASSEFA BEKELE
A
REAL PSC. PROBLEM FACED
10 Cable + Tabla Problem
11 Cable + Tabla Problem
11 Cable + Tabla Problem
11
8 Tabla Problem
7 Tabla Problem
10
9 Cable Problem
11
28
8
Totoba & Werkinesh
A
REAL PSC. PROBLEM FACED
17 Air Problem
20 Cam Kulpu Problem
20 Cam Kulpu Problem
25 Cam Kulpu Problem
10
10
15
26
20
21
13 Air + Govde Problem
15 Air + Govde Problem
15 Air + Govde Problem
13 Air + Govde Problem
30
270 working time =6:00
loss time=1:30
25
1
ASSEFA BEKELE
A
REAL PSC. PROBLEM FACED
8 Cable + Tabla + Panel Problem
12 Cable + Tabla + Panel Problem
10 Cable + Tabla + Panel Problem
10 Cable + Tabla + Panel Problem
10 Cable + Tabla + Panel Problem
15 Cable + Tabla + Panel Problem
15 Cable + Tabla + Panel Problem
10 Cable + Tabla + Panel Problem
13 Cable + Tabla + Panel Problem
22
2
Dejene
A
REAL PSC. PROBLEM FACED
6 work another product (Toster)
6 work another product (Toster)
0 Lack of Body of Heater
0 Lack of Body of Heater
0 Lack of Body of Heater
0 Lack of Body of Heater
0 Lack of Body of Heater
12
11
24
1
ASSEFA BEKELE
A
REAL PSC. PROBLEM FACED
18 ALT UST SACI PROBLEM
15 ALT UST SACI PROBLEM
9 ALT UST SACI PROBLEM
7 ALT UST SACI PROBLEM
10 ALT UST SACI PROBLEM
8 ALT UST SACI PROBLEM
15 ALT UST SACI PROBLEM
15 ALT UST SACI PROBLEM
10 ALT UST SACI PROBLEM
20
2
Dejene
A
REAL PSC. PROBLEM FACED
10
12
15
15
15
6
16
11
13
8
19
18
25
15
20
218 working time =6:30
loss time=1:00
30
8
Totoba & Werkinesh
A
REAL PSC. PROBLEM FACED
20
20
18 Govde Problem
12 Govde Problem
18 Govde Problem
20
24
30
18 Govde Problem
18 Air Problem
18 Govde Problem
24 Govde Problem + Air Problem
12 Govde Problem
36
25
313 working time =6:00
XCEL loss time=1:30
28
8
Totoba & Werkinesh
A
REAL PSC. PROBLEM FACED
0 ELECTRIC PROBLEM
0 ELECTRIC PROBLEM
0 ELECTRIC PROBLEM
0 ELECTRIC PROBLEM
0 ELECTRIC PROBLEM
15
19
18 Govde Problem
22 Govde Problem
16 Govde Problem
34
10 Govde Problem
23 Govde Problem
23 Govde Problem
0 Govde Problem
27
1
MEGERSA DESSALE
A
REAL PSC. PROBLEM FACED
0 ELECTRIC PROBLEM
0 ELECTRIC PROBLEM
0 ELECTRIC PROBLEM
0 ELECTRIC PROBLEM
10
10
6
11
8 NO CABLE
2 NO CABLE
7 NO CABLE
6 NO CABLE
10 NO CABLE
8 NO CABLE
0 NO CABLE
20
2
Dejene
A
REAL PSC. PROBLEM FACED
0 ELECTRIC PROBLEM
0 ELECTRIC PROBLEM
0 ELECTRIC PROBLEM
0 ELECTRIC PROBLEM
15
14
16
18
16
17
21
22
20
12
10
181 working time =5:30
loss time=2:00
30
8
Totoba & Werkinesh
A
REAL PSC. PROBLEM FACED
13 Govde Problem
14 Govde Problem
5 Govde Problem
18 Govde Problem
15 Panel Problem
23 Govde Problem
23 Govde Problem
27 Govde Problem
0 Quality Problem
0 Electric Problem
0 Electric Problem
0 Electric Problem
0 Electric Problem
0 Electric Problem
0 Electric Problem
24
1
MEGERSA DESSALE
A
REAL PSC. PROBLEM FACED
8 NO ALT IC SACI
12 NO MATERIAL
9 NO ALT IC SACI
11 ELECTRIC PROBLEM
12 NO MATERIAL
8 NO ALT IC SACI
15 ELECTRIC PROBLEM
5 NO MATERIAL
3 NO ALT IC SACI
5 ELECTRIC PROBLEM
6 NO MATERIAL
2 NO ALT IC SACI
4 NO MATERIAL
0 ELECTRIC PROBLEM
0 ELECTRIC PROBLEM
26
2
Dejene
A
REAL PSC. PROBLEM FACED
15
10
8 CABLE PROBLEM
1 CABLE PROBLEM
3 CABLE PROBLEM
4 CABLE PROBLEM
8 CABLE PROBLEM
4 CABLE PROBLEM
3 CABLE PROBLEM
5 CABLE PROBLEM
0 ELECTRIC PROBLEM
0 ELECTRIC PROBLEM
0 ELECTRIC PROBLEM
0 ELECTRIC PROBLEM
0 ELECTRIC PROBLEM
28
8
Totoba & Werkinesh
A
REAL PSC. PROBLEM FACED
5 Air Problem
10 Air Problem
10 Air Problem
30
11 Air Problem
10 Air Problem
15
11
12
0 Electric Problem
0 Electric Problem
0 Electric Problem
0 Electric Problem
0 Electric Problem
0 Electric Problem
22
1
MEGERSA DESSALE
A
REAL PSC. PROBLEM FACED
10 ELECTRIC PROBLEM
5 NO RAW MATERIAL
5 ELECTRIC PROBLEM
6 NO RAW MATERIAL
4 ELECTRIC PROBLEM
0 NO RAW MATERIAL
0 ELECTRIC PROBLEM
0 NO RAW MATERIAL
0 NO RAW MATERIAL
0 ELECTRIC PROBLEM
0 NO RAW MATERIAL
0 ELECTRIC PROBLEM
0 NO RAW MATERIAL
0 ELECTRIC PROBLEM
0 NO RAW MATERIAL
A
REAL PSC. PROBLEM FACED
16
16
16
16
16
16
16
16
17
20
11 Govde Problem
15
10 Govde Problem
13 Govde Problem + Air Problem
21
235 working time =4:30
loss time=3:00
22
1
MEGERSA DESSALE
A
REAL PSC. PROBLEM FACED
3 Panel + Tabla + Rotery Problem
1 Panel + Tabla + Rotery Problem
4 Panel + Tabla + Rotery Problem
6 Panel + Tabla + Rotery Problem
10 Panel + Tabla + Rotery Problem
5 Panel + Tabla + Rotery Problem
5 Panel + Tabla + Rotery Problem
6 Panel + Tabla + Rotery Problem
10 Panel + Tabla + Rotery Problem
25
2
Dejene Bayisa
A
REAL PSC. PROBLEM FACED
0 Rework
7 Rework
14
10
14
12
17
25
17
17
18
13
23
45
45
277 working time =6:00
loss time=1:30
28
8
Totoba & Werkinesh
A
REAL PSC. PROBLEM FACED
18 Govde Problem
10 Govde Problem
0 Arka Kapak Problem
0 Tepsi Sivama Problem + Air Problem
0 Govde Problem + Air Problem
0 Govde Problem + Air Problem
0 Govde Problem + Air Problem
0 Govde Problem + Air Problem
0 Govde Problem + Air Problem
0 Govde Problem + Air Problem
0 Govde Problem + Air Problem
0 Govde Problem + Air Problem
0 Govde Problem + Air Problem
0 Govde Problem + Air Problem
0 Govde Problem + Air Problem
18
1
MEGERSA DESSALE
A
REAL PSC. PROBLEM FACED
0 Shortage of Raw Materials
0 Shortage of Raw Materials
0 Shortage of Raw Materials
0 Shortage of Raw Materials
10 Shortage of Raw Materials
18 Shortage of Raw Materials
19 Shortage of Raw Materials
10 Shortage of Raw Materials
15 Shortage of Raw Materials
18
2
Dejene Bayisa
A
REAL PSC. PROBLEM FACED
20
12
35
18
22
0 No Air
32
5 No Air
7 No Air
8 No Air
12
16
15
10
10
222 working time =4:30
loss time=3:00
22
8
Totoba & Werkinesh
A
REAL PSC. PROBLEM FACED
0 Tepsi Problem
0 Tepsi Problem
0 Tepsi Problem
0 Tepsi Problem
0 Tepsi Problem
15
12
4 Tepsi Problem
13
24
1
MEGERSA DESSALE
A
REAL PSC. PROBLEM FACED
6 PANEL PROBLEM
16
7 PANEL PROBLEM
16
10
15
10
11 WINDOW (GLASS) + TEPSI PROBLEM
14
13 AIR PROBLEM
20 TEPSI PROBLEM
18 TEPSI PROBLEM
12 WINDOW (GLASS) + TEPSI PROBLEM
14 TEPSI PROBLEM
20
202 working time =6:00
loss time=1:30
19
2
Dejene Bayisa
A
REAL PSC. PROBLEM FACED
0 No Cable
16
13
17
12
14
8 No Air
10
13
12
12
14
8
14
26
189 working time =4:30
loss time=3:00
32
1
MEGERSA DESSALE
A
REAL PSC. PROBLEM FACED
0
0
16
15
13
8
14
11
15
16
16
0 Tabla Problem
0 Tabla Problem
0 Tabla Problem
0 Tabla Problem
27
10
0 No Cam Kulpu /No Handle/
0 No Cam Kulpu /No Handle/
0 No Cam Kulpu /No Handle/
0 No Cam Kulpu /No Handle/
15
7
Yosef Birhanu
A
REAL PSC. PROBLEM FACED
Body Problem
Kapak Problem
Lamp Cable Problem
Body Problem
Kapak Problem
Body Problem
Kapak Problem
Lamp Cable Problem
Lamp Cable Problem
Body Problem
Kapak Problem
Lamp Cable Problem
Body Problem
Kapak Problem
Lamp Cable Problem
24
1
MEGERSA DESSALE
A
REAL PSC. PROBLEM FACED
0 new plan
0 new plan
0 new plan
0 new plan
0 new plan
0 new plan
0 new plan
0 new plan
0 new plan
12
13
12
12
12
15
76 working time =3:00
loss time=4:30
20
2
Dejene Bayisa
A
REAL PSC. PROBLEM FACED
0 No Cam Kulpu /No Handle/
0 No Cam Kulpu /No Handle/
31
32
40
28
32
30
34
35
31
34
40
26
16
409 working time =6:00
loss time=1:30
15
7
Yosef Birhanu
A
REAL PSC. PROBLEM FACED
3
8
13
8
0 Shortage of Body and Kapak Problem
0 Shortage of Body and Kapak Problem
0 Shortage of Body and Kapak Problem
0 Shortage of Body and Kapak Problem
0 Shortage of Body and Kapak Problem
22
8
Totoba & Werkinesh
A
REAL PSC. PROBLEM FACED
0 Cover + Tepsi Problem
10 Arka Kapak Problem
14 Cover Problem
10 Cover Problem
14 Cover Problem
10 Arka Kapak Problem
14 Cover Problem
0 Cover + Hazne Problem
0 Cover + Hazne Problem
6 Cover Problem
5 Cover Problem
0 No Cover and Hazne
0 No Cover and Hazne
0 No Cover and Hazne
17
100 working time =3:00
loss time=4:30
24
1
MEGERSA DESSALE
A
REAL PSC. PROBLEM FACED
5 Shortage of Cable + Rotery Problem
5 Shortage of Cable + Rotery Problem
8 Shortage of Tepsi
10 Shortage of Tepsi
7 Shortage of Cable + Tepsi
12 Shortage of Tepsi
12
12 Shortage of Cable + Tepsi
10
22
2
Dejene Bayisa
A
REAL PSC. PROBLEM FACED
15 Shortage of Cable + Glass +Heater Side Cover
15 Shortage of Cable + Glass +Heater Side Cover
15 Shortage of Cable + Glass +Heater Side Cover
16 Shortage of Cable + Glass +Heater Side Cover
17 Shortage of Cable + Glass +Heater Side Cover
13 Shortage of Cable + Glass +Heater Side Cover
14 Shortage of Cable + Glass +Heater Side Cover
10 Shortage of Cable + Glass +Heater Side Cover
14 Shortage of Cable + Glass +Heater Side Cover
28
8
Totoba & Werkinesh
A
REAL PSC. PROBLEM FACED
10 Tepsi Problem
10 Tepsi Problem
10 Tepsi Problem
10 Tepsi Problem
10 Tepsi Problem
10 Tepsi Problem
10 Hazne Problem
10 Hazne Problem
3 Tepsi Problem
0 Hazne Problem
0 Govde Problem
0 Govde Problem
0 Hazne Problem
0 Hazne Problem
0 Hazne Problem + Electric Problem
83 working time =3:00
loss time=4:30
20
2
Dejene Bayisa
A
REAL PSC. PROBLEM FACED
15
15
11
0 No Izgara
20
18
10
0 No Cable
17
0 No Cable
15
16
17
15
7
176 working time =4:30
loss time=3:00
22
8
Totoba & Werkinesh
A
REAL PSC. PROBLEM FACED
16 5320-> Hazne Problem
16 5320- Hazne Problem + Govde Problem
10 5430- Hazne Problem + Govde Problem
18 5430- Hazne Problem + Govde Problem
9 5430- Hazne Problem + Govde Problem
14 5320-> Govde Problem
15 5430-> Govde Problem
8 5430-> Govde Problem
0 5430-> Govde Problem
TOTAL PIECE
149
24
1
MEGERSA DESSALE
A
REAL PSC. PROBLEM FACED
10 Shortage of Panel
10 Shortage of Panel
10 Shortage of Panel
10
10
0 Shortage of Panel +Cable
10
8 Shortage of Panel +Cable
11
9
9
10
11 Shortage of Cable
9 Shortage of Cable
0 Shortage of Cable
7 Knob Problem
3 Knob Problem
10 Knob Problem
9 Knob Problem
6 Panel Problem
2 Panel Problem
24
1
MEGERSA DESSALE
B
REAL PSC. PROBLEM FACED
5 Shortage of Panel +Cable
4 Shortage of Panel +Cable
6 Shortage of Panel +Cable
11
5 Shortage of Handle Panel +Cable
7 Shortage of Panel +Cable
10
6 Shortage of Panel +Cable
4 Shortage of Rotery + Panel +Cable
16
7
TOTOBA TESAFYE
A
REAL PSC. PROBLEM FACED
0 Arrange Materials
0 Arrange Material & WorKers
0 Cable Problem
0 Cable Problem
0 Cable Problem
0 Cable Problem
15 Physical Problem
10 Physical Problem
10 Physical Problem
0 Physical Problem
0 Physical Problem
0 Physical Problem
0 Physical Problem
0 Physical Problem
0 Physical Problem
27
4
YOSEF BIRHANU
A
REAL PSC. PROBLEM FACED
0 TABLA PROBLEM (IT'S QUALITY)
0 MUSLUK PROBLEM (IT'S QUALITY)
4 SERIGRAPHY PROBLEM ON KNOB MATERIALS
6 TABLA PROBLEM (IT'S QUALITY)
4 MUSLUK PROBLEM (IT'S QUALITY)
9 SERIGRAPHY PROBLEM ON KNOB MATERIALS
4 TABLA PROBLEM (IT'S QUALITY)
6 MUSLUK PROBLEM (IT'S QUALITY)
0 SERIGRAPHY PROBLEM ON KNOB MATERIALS
21
2
Dejene Bayisa
B
REAL PSC. PROBLEM FACED
17 Terminal Problem
18 Izgara Problem
23
18 Terminal Problem
18 Izgara Problem
18 Terminal Problem
23
17 Terminal Problem
17 Izgara Problem
16 Terminal Problem
18 Izgara Problem
17 Terminal Problem
19
16 Terminal Problem
17 Izgara Problem
ONLY 58 PACKED
16
7
TOTOBA
A
REAL PSC. BRAND PROBLEM FACED
29
0 CABLE LIGHT PROBLEM
35 CABLE LIGHT PROBLEM
32 CABLE LIGHT PROBLEM
39
LUXCEL
CABLE LIGHT PROBLEM
39 CABLE LIGHT PROBLEM
0 CABLE LIGHT PROBLEM
25 CABLE LIGHT PROBLEM
33 CABLE LIGHT PROBLEM
0 NUT PROBLEM
34
16 CABLE LIGHT PROBLEM
16
7
TOTOBA
A
REAL PSC. PROBLEM FACED
34
34
34
34
34
37
0 BODY PROBLEM
0 BODY PROBLEM
0 BODY PROBLEM
20
29
22
22
0 BODY PROBLEM
0 BODY PROBLEM
18
2
DEJENE
A
REAL PSC. PROBLEM FACED
0 NO GRILL
0 NO GRILL
0 NO GRILL
0 NO GRILL
0 NO GRILL
0 NO GRILL
0 NO GRILL
0 NO GRILL
0 NO GRILL
0 NO GRILL
0 NO GRILL
0 NO GRILL
0 NO GRILL
18
0 NO GRILL
0 NO GRILL
29
5&6
ASSEFA ,MEGERSA & GARESU
A
REAL PSC. PROBLEM FACED
0
0
0
0
4
3
5
6
7
5 SOCKET PROBLEM
5 SOCKET + PANEL SERIGRAPHY PROBLEM
5 SOCKET + PANEL SERIGRAPHY PROBLEM
2 SOCKET + PANEL SERIGRAPHY PROBLEM
0 SOCKET + PANEL SERIGRAPHY PROBLEM
0 SOCKET + PANEL SERIGRAPHY PROBLEM
30
5
MEGERSA
A
REAL PSC. PROBLEM FACED
0 Panel + Hazne Problem
0 Tabla + Hazne Problem
0 Chefchefe + Hazne Problem
2 Tabla + Hazne Problem
4 Tabla + Hazne Problem
1 Tabla + Hazne Problem
0 Tabla + Hazne Problem
0 Panel + Tabla + Hazne Problem
5 Panel + Tabla + Hazne Problem
CKED AT OVERTIME
32
1
YOSEF
B
REAL PSC. PROBLEM FACED
5
5
0 LIGHT CABLE PROBLEM
0 ELECTRIC PROBLEM
0 TERMOSTAT PROBLEM
0 BODY(GOVDE) CHANGED
5
10
5
7
10
10
5 HOT PLATE COVER METAL PROBLEM
5 HOT PLATE COVER METAL PROBLEM
13
80 working time =5:30
loss time=2:00
13
7
Dejene
A
REAL PSC. PROBLEM FACED
0 NUT PROBLEM
0 NUT PROBLEM
0 NUT PROBLEM
0 NUT PROBLEM
0 NUT PROBLEM
0 NUT PROBLEM
15
14
7
8
35
28
20
13
0 LINE STOPED INCASE OF PRODUCTION CHANGED
26
5
Assefa & Garasu
A
REAL PSC. PROBLEM FACED
4 Shortage of Izgara Problem
3
3
5 Shortage of Izgara Problem
4 Shortage of Izgara Problem
0 Shortage of Izgara Problem
4
12 Shortage of Izgara Problem
4
8
7 Shortage of Tabla Problem
4 Shortage of Tabla Problem
6 Shortage of Tabla Problem
6
12
82 working time =5:00
loss time=2:30
RTIME
32
1
YOSEF
B
REAL PSC. PROBLEM FACED
5
6 TERMOSTAT PROBLEM
5 TERMOSTAT PROBLEM
6
5
10 PLASTIC PROBLEM
11 CABLE PROBLEM
5 CABLE PROBLEM
5 HANDLE/CAM KULPU/ PROBLEM
10
10
11
5
5
12
111 working time =5:30
loss time=2:00
32
1
YOSEF
B
REAL PSC. PROBLEM FACED
5
5
10
5 CABLE PROBLEM
5 CABLE PROBLEM
1 CABLE PROBLEM
3
2
1
5 CABLE PROBLEM
5 CABLE PROBLEM
5 CABLE PROBLEM
5 CABLE PROBLEM
3 CABLE PROBLEM
0 CABLE PROBLEM
33
5
Assefa & Garasu
A
REAL PSC. PROBLEM FACED
0 Tabla Problem
0 Tabla Problem
0 Tabla Problem
6 Tabla Problem
7 Tabla Problem
3 Tabla Problem
10
4 Tabla Problem
3 Tabla Problem
3
1
2
0
3
3
45 working time =5:00
loss time=2:30
33
5
Assefa & Garasu
A
REAL PSC. PROBLEM FACED
0 CABLE TERMINAL PROBLEM
0 CABLE TERMINAL PROBLEM
0 CABLE TERMINAL PROBLEM
1 TABAN SACI PROBLEM
4 CABLE TERMINAL PROBLEM
5 TABAN SACI PROBLEM
6 CABLE TERMINAL PROBLEM
2 TABAN SACI PROBLEM
1 TABAN SACI PROBLEM
15
1
YOSEF
B
REAL PSC. PROBLEM FACED
5 MANUAL PROBLEM
5 CARTON PROBLEM
5 CARTON PROBLEM
15
5
5
5
10
3
6 PLASTIC PROBLEM
5 PLASTIC PROBLEM
10 PLASTIC PROBLEM
5 PLASTIC PROBLEM
20 PLASTIC PROBLEM
5
109 working time =5:30
loss time=2:00
30
8
TOTOBA
B
REAL PSC. PROBLEM FACED
0 QUALITY PROBLEM
0 QUALITY PROBLEM
0 QUALITY PROBLEM
0 QUALITY PROBLEM
0 CABLE TERMINAL PROBLEM
0 CABLE TERMINAL PROBLEM
0 CABLE TERMINAL PROBLEM
0 HAZNE PROBLEM
0 HAZNE PROBLEM
0 HAZNE PROBLEM
0 HAZNE PROBLEM
3 HAZNE PROBLEM
3 HAZNE PROBLEM
3 HAZNE PROBLEM
0 HAZNE PROBLEM
8
8
MEGERSA
A
REAL PSC. PROBLEM FACED
25 REWORKING /REPAIR/
29
8
TOTOBA
B
REAL PSC. PROBLEM FACED
0 kulpu /Handle problem
0 kulpu /Handle problem
0 kulpu /Handle problem
5
5
0 Cable problem
5 Terminal problem
5
0
4
6
0
0 High voltage problem incase of cable
5 Terminal problem
4 Terminal problem
15
1
YOSEF
B
REAL PSC. PROBLEM FACED
8
9
8
10
0 Quality Controller Machine Problem & Not repaired on time
0 Quality Controller Machine Problem & Not repaired on time
0 Quality Controller Machine Problem & Not repaired on time
0 Quality Controller Machine Problem & Not repaired on time
11
10
13
10
0 Quality Controller Machine Problem
0 Quality Controller Machine Problem
5
84 working time =4:30
loss time=3:00
28
8
TOTOBA
A
REAL PSC. PROBLEM FACED
0 Shortage of Ground Cable Problem
2 Shortage of Ground Cable Problem
0 Shortage of Ground Cable Problem
0 Tabla Problem + Shortage of Cable
2 Tabla Problem + Shortage of Cable
0 Tabla Problem + Shortage of Cable
2 Tabla Problem + Shortage of Cable
2 Tabla Problem + Shortage of Cable
0 Shortage of Cable
3 Shortage of Cable
3 Shortage of Cable
3 Shortage of Cable
1 Shortage of Resistance
0 Shortage of Resistance
1 Shortage of Resistance
27
5
Yoseph
A
REAL PSC. PROBLEM FACED
0 ELECTRIC PROBLEM
0 ELECTRIC PROBLEM
0 ELECTRIC PROBLEM
0 ELECTRIC PROBLEM
0 ELECTRIC PROBLEM
0 ELECTRIC PROBLEM
2 CABLE PROBLEM
2 CABLE PROBLEM
2 CABLE PROBLEM
2 CABLE PROBLEM
2 CABLE PROBLEM
2 CABLE PROBLEM
5 CABLE PROBLEM
5 CABLE PROBLEM
3 CABLE PROBLEM
28
8
TOTOBA
A
REAL PSC. PROBLEM FACED
0 Electric Problem
0 Electric Problem
0 Electric Problem
0 Electric Problem
0 Electric Problem
0 Electric Problem
0 Cable Problem
0 Cable Problem
3 Shortage of Ground Cable Problem
3 Cable Problem
3 Cable Problem
4 Cable Problem
2 Cable Problem + Hazne Problem
3 Hazne Problem
2 Hazne Problem
29
1
MEGERSA
B
REAL PSC. PROBLEM FACED
0 Panel + Cable + Handle Problem
4 Panel + Cable + Handle Problem
3 Cable + Handle + Tabla Problem
3 Cable + Tabla Problem
1 Cable + Handle + Tabla Problem
2 Tabla Problem + Resistance High Voltage
4 Tabla Problem + Resistance High Voltage
6 Tabla Problem + Resistance High Voltage
4 Tabla Problem + Resistance High Voltage
19
8
DEJENE & ASSEFA
B
REAL PSC. PROBLEM FACED
0 Hazne Problem
0 Hazne Problem
1 Hazne Problem
2 Hazne Problem
2 Hazne Problem
5
1
9
4
4
0 Ground Cable Problem
5
7
5
5
50 working time =4:00
loss time=3:30
20
5
Yoseph
A
REAL PSC. PROBLEM FACED
5
5
3
5
0 CABLE PROBLEM
0 CABLE PROBLEM
0 CABLE PROBLEM
5
3 CABLE PROBLEM
5
5
5
0 CABLE PROBLEM
0 CABLE PROBLEM
0 CABLE PROBLEM
28
8
TOTOBA
A
REAL PSC. PROBLEM FACED
4 CABLE + GROUND CABLE PROBLEM
0 CABLE PROBLEM + PANEL PROBLEM
0 CABLE PROBLEM + PANEL PROBLEM
5 CABLE PROBLEM
2 CABLE +RESISTANCE + GROUND CABLE PROBLEM
0 CABLE +RESISTANCE + GROUND CABLE PROBLEM
0 CABLE +RESISTANCE + GROUND CABLE PROBLEM
4 CABLE +RESISTANCE + GROUND CABLE PROBLEM
0 CABLE +RESISTANCE + GROUND CABLE PROBLEM
17
8
DEJENE & ASSEFA
B
REAL PSC. PROBLEM FACED
1 CABLE PROBLEM
1 CABLE PROBLEM
1 CABLE PROBLEM
4 CABLE PROBLEM
4 CABLE PROBLEM
3 CABLE PROBLEM
5 CABLE PROBLEM
1 GOVDE PROBLEM
2 GOVDE PROBLEM
1 GOVDE PROBLEM
1 GOVDE PROBLEM
4 GOVDE PROBLEM
0 GOVDE PROBLEM
0 GOVDE PROBLEM
0 GOVDE PROBLEM
20
5
Yoseph
A
REAL PSC. PROBLEM FACED
0 CABLE PROBLEM
0 CABLE PROBLEM
6
6
7 CABLE PROBLEM
0 CABLE PROBLEM
5
5
7
28
8
TOTOBA
A
REAL PSC. PROBLEM FACED
6 RESISTANCE PROBLEM
0 CABLE PROBLEM + RESISTANCE PROBLEM
0 CABLE PROBLEM
0 CABLE PROBLEM
0 CABLE PROBLEM
0 CABLE PROBLEM
0 RESISTANCE PROBLEM
0 RESISTANCE PROBLEM
6 RESISTANCE PROBLEM
6
6
6
6
6
3
45 working time =4:00
loss time=3:30
25
1
MEGERSA & GERESU
B
REAL PSC. PROBLEM FACED
1
1
. LL
M TA
4
LE S A
5
OB R'
PR KE
LE R
4
D WO
H R&
3
AN
& E
M AD
4 LE LE
OB N E
1
PR F LI
3
TE O
LI M
E LE
BL B
CA PRO
5
SO A
AL IS
1
IS E
E ER
ER T H
3
TH Y
T ALL
2
BU OT
2
T
2
41 working time =2:00
loss time=5:30
27
8
DEJENE & ASSEFA
B
REAL PSC. PROBLEM FACED
0
0
1
2
3
4
4
4
3
3
0
2
5
4
1
36 working time =4:00
loss time=3:30
28
8
TOTOBA
A
REAL PSC. PROBLEM FACED
0 RESISTANCE PROBLEM
3 CABLE PROBLEM
3 GOVDE PROBLEM
3 GOVDE PROBLEM
3 GOVDE PROBLEM
2 GOVDE PROBLEM
3 GOVDE PROBLEM
3 GOVDE PROBLEM
4 GOVDE PROBLEM
4 GOVDE PROBLEM
0 GOVDE PROBLEM
7 GOVDE PROBLEM
7 GOVDE PROBLEM
4 GOVDE PROBLEM
4 GOVDE PROBLEM
24
5
Yoseph
A
REAL PSC. PROBLEM FACED
0
0
PRODUCT CHANGED &
0 LACK OF WORKER
0
0
0 IZGARA PROBLEM
0 IZGARA PROBLEM
0 IZGARA PROBLEM
0 IZGARA PROBLEM
3
4
3
3
6
12
31 working time =2:30
loss time=5:00
TOTAL=52
24
1
MEGERSA & GERESU
B
REAL PSC. PROBLEM FACED
0 NO CABLE LITE
0 NO CABLE LITE
0 NO CABLE LITE
0 NO CABLE LITE
10
4 LACK of CABLE LITE
5 LACK of CABLE LITE
6 LACK of CABLE LITE
3 LACK of CABLE LITE
27
8
DEJENE & ASSEFA
B
REAL PSC. PROBLEM FACED
0 LACK OF BODY
0 LACK OF BODY
0 LACK OF BODY
3 CABLE PROBLEM
3 CABLE PROBLEM
0 CABLE PROBLEM
3
3
1 CABLE PROBLEM
0 CABLE PROBLEM
24
1
MEGERSA & GERESU
A
REAL PSC. PROBLEM FACED
2 LACK OF CABLE
4 SHORTAGE OF BODY
2 SHORTAGE OF BODY
2 SHORTAGE OF BODY
5 SHORTAGE OF HANDLE
4 SHORTAGE OF HANDLE
24
8
DEJENE & ASSEFA
A
REAL PSC. PROBLEM FACED
3 LACK OF MAN-POWER
1 LACK OF MAN-POWER
0 CABLE PROBLEM
6
5
4 LACK OF MAN-POWER
2 CABLE PROBLEM
7
6
8
9
3 CABLE PROBLEM
3 CABLE PROBLEM
3 CABLE PROBLEM
2 CABLE PROBLEM
30
5
Yoseph
B
REAL PSC. PROBLEM FACED
0 CABLE PROBLEM
0 CABLE PROBLEM
0 CABLE PROBLEM
0 CABLE PROBLEM
0 CABLE PROBLEM
0 CABLE PROBLEM
0 DILENDIRME PROBLEM
0 DILENDIRME PROBLEM
0 DILENDIRME PROBLEM
5
5
8
0 CABLE PROBLEM
0 TABLA PROBLEM
0 TABLA PROBLEM
10
10
10
10
10
3
70 working time =4:00
loss time=3:30
23
1
MEGERSA & GERESU
A
REAL PSC. PROBLEM FACED
0 CABLE LITE PROBLEM
7 HANDLE PROBLEM
8
0 CABLE LITE PROBLEM
23
8
DEJENE & ASSEFA
A
REAL PSC. PROBLEM FACED
0 CABLE PROBLEM
0 CABLE PROBLEM
0 CABLE PROBLEM
0 CABLE PROBLEM
0 CABLE PROBLEM
0 HAZNE PROBLEM
0 HAZNE PROBLEM
0 CABLE PROBLEM
17 HAZNE PROBLEM
4 CABLE PROBLEM
4 HAZNE PROBLEM
6
6
3 CABLE PROBLEM + HAZNE PROBLEM
3 CABLE PROBLEM + HAZNE PROBLEM
27
5
Yoseph
B
REAL PSC. PROBLEM FACED
5
5
13
7
0 CABLE PROBLEM
0 CABLE PROBLEM
0 CABLE PROBLEM
0 CABLE PROBLEM
0 CABLE PROBLEM
0 TABLA PROBLEM
0 TABLA + CABEL PROBLEM
0 TABLA + CABEL PROBLEM
0 TABLA + KAPAK PROBLEM
0 TABLA + KAPAK PROBLEM
0 TABLA + KAPAK PROBLEM
0 CABLE PROBLEM
6 CABLE PROBLEM
0 CABLE PROBLEM
3 CABLE PROBLEM
22
1
MEGERSA & GERESU
A
REAL PSC. PROBLEM FACED
0 CABLE LITE + TABLA + SOCKET PROBLEM
0 CABLE LITE + TABLA + SOCKET PROBLEM
7 BODY PROBLEM
7 BODY PROBLEM
23
8
DEJENE & ASSEFA
A
REAL PSC. PROBLEM FACED
0 CABLE PROBLEM
0 CABLE PROBLEM
6
6
2 CABLE PROBLEM
2 CABLE PROBLEM
0 HAZNE PROBLEM
0 HAZNE PROBLEM
0 HAZNE PROBLEM
2 CABLE PROBLEM
2 CABLE PROBLEM
8
6
4 CABLE PROBLEM
2 CABLE PROBLEM
19
5
Yoseph
B
REAL PSC. PROBLEM FACED
0 PANEL + TABLA PROBLEM
0 TABLA + HAZNE PROBLEM
0 TABLA + HAZNE PROBLEM
0 SHORTAGE OF CABLE INCASE OF LACK OF TERMINAL PROBLEM
0 SHORTAGE OF CABLE INCASE OF LACK OF TERMINAL PROBLEM
0 SHORTAGE OF CABLE INCASE OF LACK OF TERMINAL PROBLEM
0 SHORTAGE OF CABLE INCASE OF LACK OF TERMINAL PROBLEM
0 SHORTAGE OF CABLE INCASE OF LACK OF TERMINAL PROBLEM
0 SHORTAGE OF CABLE INCASE OF LACK OF TERMINAL PROBLEM
10
10
10
5
5
10
50 working time =2:30
loss time=5:00
25
8
TOTOBA
B
REAL PSC. PR.TYPE PROBLEM FACED
3 CABLE PROBLEM
3 CABLE PROBLEM
3 BODY PROBLEM
Pi 5
e
26 36
ec
3 BODY PROBLEM
=> F-5
K
3 BODY PROBLEM
3 BODY PROBLEM
8 BODY PROBLEM
3 CABLE + TERMOSTAT PROBLEM
61
28
0 CABLE PROBLEM
S
K
5 CABLE PROBLEM
6 CABLE PROBLEM
24
1
MEGERSA & GERESU
A
REAL PSC. PROBLEM FACED
0 CABLE + HANDLE + TABLA PROBLEM
10 HANDLE PROBLEM
14
9 TABLA + HANDLE
12
11
11
10 HANDLE PROBLEM
9 HANDLE PROBLEM
9 HANDLE PROBLEM
20
8
DEJENE & ASSEFA
A
REAL PSC. PROBLEM FACED
0 CABLE PROBLEM
0 ROTERY PROBLEM
2 CABLE PROBLEM
5 CABLE PROBLEM
6 CABLE PROBLEM
1 CABLE PROBLEM
2 CABLE PROBLEM
2 CABLE PROBLEM
1 CABLE PROBLEM
CABLE PROBLEM
0 CABLE PROBLEM
0 CABLE PROBLEM
4 CABLE PROBLEM
3 CABLE PROBLEM
1 CABLE PROBLEM
0 CABLE + SOCKET PROBLEM
20
5
Yoseph
A
REAL PSC. PROBLEM FACED
5
5
5
5
5
0 CABLE PROBLEM
0 CABLE PROBLEM
0 CABLE PROBLEM
0 CABLE PROBLEM
5
5
5
5
5
0 CABLE PROBLEM
50 working time =2:30
loss time=5:00
28
7
TOTOBA
A
REAL PSC. PROBLEM FACED
4 IZGARA PROBLEM
4 IZGARA PROBLEM
4 IZGARA PROBLEM
4 IZGARA PROBLEM
4 IZGARA PROBLEM
2 CABLE PROBLEM
2 CABLE PROBLEM
2 CABLE PROBLEM
0 CABLE PROBLEM
5 CABLE PROBLEM
6 CABLE PROBLEM
0 ELECTRIC PROBLEM
4 CABLE PROBLEM
0 CABLE PROBLEM
2 CABLE PROBLEM
22
1
MEGERSA & GERESU
B
REAL PSC. PROBLEM FACED
0 CABLE PROBLEM
6
3 CABLE PROBLEM
10
5 CABLE PROBLEM
9
0 CABLE PROBLEM
16
8
DEJENE & ASSEFA
B
REAL PSC. PROBLEM FACED
0 WORKER + CABLE PROBLEM
3 WORKER + CABLE PROBLEM
5 WORKER + CABLE PROBLEM
6
5
7
3
4
3 RAW MATERIAL PROBLEM
20
5
Yoseph
A
REAL PSC. PROBLEM FACED
0 CABLE PROBLEM
0 CABLE PROBLEM
0 TABLA PROBLEM
0 CABLE PROBLEM
5 CABLE PROBLEM
2 CABLE PROBLEM
0 CABLE PROBLEM
3 CABLE PROBLEM
3 CABLE PROBLEM
7
0 CABLE PROBLEM
0 SHORTAGE OF YANDUVAR PROBLEM
0 SHORTAGE OF YANDUVAR PROBLEM
0 SHORTAGE OF YANDUVAR PROBLEM
0 SHORTAGE OF YANDUVAR PROBLEM
28
7
TOTOBA
A
REAL PSC. PROBLEM FACED
6
6
6
6
6
6
7
7
0 LACK OF BODY
0 LACK OF BODY
4 SHORTAGE OF BODY
6 SHORTAGE OF BODY
6 SHORTAGE OF BODY
4 SHORTAGE OF BODY
3 SHORTAGE OF BODY
22
1
MEGERSA & GERESU
B
REAL PSC. PROBLEM FACED
0 CABLE + TABLA PROBLEM
9 TABLA PROBLEM
10
6 CABLE + TABLA PROBLEM
13
10
7 CABLE + TABLA PROBLEM
CABLE PROBLEM
18
1
MEGERSA & GERESU
A
REAL PSC. PROBLEM FACED
0 CABLE + TABLA PROBLEM
8
8
19
7
10
8
6
4 CABLE + TABLA PROBLEM
24
8
DEJENE & ASSEFA
A
REAL PSC. PROBLEM FACED
0 WORKER PROBLEM
2 WORKER PROBLEM
2 AIR PROBLEM
3 CABLE PROBLEM
0 CABLE PROBLEM
3 CABLE PROBLEM
3 CABLE PROBLEM
3 CABLE PROBLEM
4 CABLE PROBLEM
6 CABLE PROBLEM
7 CABLE PROBLEM
5 CABLE PROBLEM
3 CABLE PROBLEM
0 CABLE PROBLEM
5 CABLE PROBLEM
20
5
Yoseph
A
REAL PSC. PROBLEM FACED
0 CABLE PROBLEM
0 CABLE PROBLEM
0 CABLE PROBLEM
0 CABLE PROBLEM
0 CHEFCHEFE PROBLEM
0 CHEFCHEFE PROBLEM
0 CHEFCHEFE PROBLEM
7 CHEFCHEFE PROBLEM
0 CHEFCHEFE PROBLEM
0
0 CHEFCHEFE PROBLEM
0 CHEFCHEFE PROBLEM
0 CHEFCHEFE PROBLEM
0 CHEFCHEFE PROBLEM
0 CHEFCHEFE PROBLEM
22
7
TOTOBA
B
REAL PSC. PRODUCT TYPE PROBLEM FACED
3 CABLE + SHORTAGE OF BODY + SERIGRAPH PROBLE
3 KS-2861 SERIGRAPH PROBLEM
=> 15 Piece
3 SERIGRAPH PROBLEM
6 SERIGRAPH PROBLEM
0 CABLE + ARKA KAPAK PRESS PROBLEM
3
5
0 CABLE PROBLEM
KF-5360
=>31 Piece
6
KF-5360
=>31 Piece
6
0 CABLE PROBLEM
3 TEPSI PROBLEM
3 TEPSI PROBLEM
2 TEPSI PROBLEM
3 CABLE PROBLEM
20
1
MEGERSA & GERESU
A
REAL PSC. PROBLEM FACED
3 CABLE + TABLA PROBLEM
0 ELECTRIC PROBLEM
0 ELECTRIC PROBLEM
0 ELECTRIC PROBLEM
0 ELECTRIC PROBLEM
0 ELECTRIC PROBLEM
24
8
DEJENE & ASSEFA
A
REAL PSC. PROBLEM FACED
0 Material Problem
5 CABLE PROBLEM
6 CABLE PROBLEM
5
7
5
3 CABLE PROBLEM
0 CABLE PROBLEM
3
6
7
6
0 CABLE PROBLEM
0 CABLE PROBLEM
14
67 working time =4:00
loss time=3:30
20
5
Yoseph
A
REAL PSC. PROBLEM FACED
0 CHEFCHEFE PROBLEM
0 KAPAK PROBLEM
0 CHEFCHEFE PROBLEM
0 CHEFCHEFE PROBLEM
0 KAPAK PROBLEM
0 KAPAK PROBLEM
0 CABLE PROBLEM
0 CABLE PROBLEM
0 CABLE PROBLEM
5
5
5
5
5
5
30 working time =2:30
loss time=5:00
25
7
TOTOBA
B
REAL PSC. PROBLEM FACED
3 CABLE PROBLEM
2 CABLE PROBLEM
0 CABLE + RESISTANCE + HAZNE PROBLEM
0 TABLA PHYSICAL + CABLE PROBLEM
10 CABLE PROBLEM
5 CABLE PROBLEM
5 CABLE PROBLEM
10 AIR + TEPSI PROBLEM
9 IZGARA PROBLEM
3 CABLE PROBLEM
6 CABLE PROBLEM
7 CABLE PROBLEM
4 CABLE PROBLEM
0 CABLE PROBLEM
4 CABLE PROBLEM
68 working time =4:00
loss time=3:30
25
1
MEGERSA & GERESU
A
REAL PSC. PROBLEM FACED
0 CABLE + TABLA PROBLEM
10
2 CABLE + TABLA PROBLEM
5 CABLE PROBLEM
8 CABLE PROBLEM
6 CABLE PROBLEM
4 CABLE PROBLEM
3 CABLE PROBLEM
5 CABLE PROBLEM
20
5
Yoseph
A
REAL PSC. PROBLEM FACED
0 CABLE PROBLEM
0 CABLE PROBLEM
0 CABLE PROBLEM
0 CABLE PROBLEM
6
7
0 CHEFCHEFE PROBLEM
0 KAPAK PROBLEM
0 CABLE PROBLEM
7
6
8
14
12
4
64 working time =2:30
loss time=5:00
25
7
TOTOBA
B
REAL PSC. PROBLEM FACED
3 CABLE + BODY PROBLEM
3 CABLE + BODY PROBLEM
4 CABLE + BODY PROBLEM
0 BODY PROBLEM
0 BODY PROBLEM
0 BODY PROBLEM
6 BODY PROBLEM
7 BODY PROBLEM
5 BODY PROBLEM
6 CABLE PROBLEM
6 BODY PROBLEM
6 BODY PROBLEM
6 CABLE PROBLEM
8 BODY PROBLEM
4 BODY PROBLEM
64 working time =3:30
loss time=4:00
25
1
MEGERSA & GERESU
A
REAL PSC. PROBLEM FACED
0 SHORTAGE OF CABLE PROBLEM
5
0 DEPO PERSONNEL PROBLEM
0 DEPO PERSONNEL PROBLEM
0 TABLA + DEPO PERSONNEL PROBLEM
0 TABLA + DEPO PERSONNEL PROBLEM
0 TABLA + DEPO PERSONNEL PROBLEM
20
5
Yoseph
A
REAL PSC. PROBLEM FACED
3
3
3
3
5
0 CABLE PROBLEM
0 CABLE PROBLEM
0 CABLE PROBLEM
0 CABLE PROBLEM
7
6
0 CABLE PROBLEM
0 CABLE PROBLEM
0 CABLE PROBLEM
0 CABLE PROBLEM
25
7
TOTOBA
B
REAL PSC. PROBLEM FACED
0
0
0
BUT THERE IS 50 PIECE SEMI-FINISHED PRODUCTS WHICH
0 DIDN'T COMPLETED INCASE OF TABLA PROBLEM
0
0
0
448 PIECE
OF HAZNE PROBLEM
REWORK
448 PIECE
OF HAZNE PROBLEM
REWORK
PRODUCTS
20
1
MEGERSA & GERESU
A
REAL PSC. PROBLEM FACED
0 LACK OF CABLE PROBLEM
12
6
6
24 working time =1:30
loss time=6:00
23
8
DEJENE & ASSEFA
A
REAL PSC. PROBLEM FACED
0 TABLA + HAZNE + CABLE PROBLEM
0 TABLA + HAZNE + CABLE PROBLEM
0 TABLA + HAZNE + CABLE PROBLEM
0 TABLA + HAZNE + CABLE PROBLEM
0 TABLA + HAZNE + CABLE PROBLEM
0 TABLA + HAZNE + CABLE PROBLEM
0 TABLA + HAZNE + CABLE PROBLEM
0 TABLA + HAZNE + CABLE PROBLEM
0 TABLA + HAZNE + CABLE PROBLEM
20
5
Yoseph
A
REAL PSC. PROBLEM FACED
0 CABLE PROBLEM
0 CABLE PROBLEM
0 CABLE PROBLEM
0 CABLE PROBLEM
0 CABLE PROBLEM
0 CABLE PROBLEM
5
5
5
5
0 CABLE PROBLEM
0 CHEFCHEFE PROBLEM
0 HAZNE PROBLEM
0 HAZNE PROBLEM
0 HAZNE PROBLEM
20
8
TOTOBA
B
REAL PSC. PROBLEM FACED
0 TABLA + CABLE PROBLEM
0 TABLA + CABLE PROBLEM
0 TABLA + CABLE PROBLEM
0 TABLA PROBLEM
0 CABLE PROBLEM
0 TABLA PROBLEM
7 TABLA PROBLEM
7 TABLA PROBLEM
6 TABLA PROBLEM
4 TABLA PROBLEM
4 TABLA PROBLEM
4 TABLA PROBLEM
4 TABLA PROBLEM
4 TABLA PROBLEM
3 TABLA PROBLEM
26
1
MEGERSA & GERESU
A
REAL PSC. PROBLEM FACED
2 CABLE HEIGHT PROBLEM
13 KAPAK PROBLEM
13 KAPAK PROBLEM
14 KAPAK PROBLEM
27
5
Yoseph
A
REAL PSC. PROBLEM FACED
0 LACK OF CABLE PROBLEM
0 LACK OF CABLE PROBLEM
0 LACK OF CABLE PROBLEM
0 LACK OF CABLE PROBLEM
0 LACK OF HAZNE PROBLEM
6 LACK OF CABLE PROBLEM
3 LACK OF HAZNE PROBLEM
1 LACK OF HAZNE PROBLEM
0 LACK OF HAZNE + YANDUVAR PROBLEM
24
8
TOTOBA
B
REAL PSC. PROBLEM FACED
0 CABLE PROBLEM
0 CABLE PROBLEM
0 CABLE PROBLEM
5 CABLE PROBLEM
7
8
5
10
5 CABLE PROBLEM
10
4 HAZNE + TABLA PROBLEM
0 HAZNE + TABLA PROBLEM
0 HAZNE + TABLA PROBLEM
0 HAZNE + TABLA PROBLEM
0 HAZNE + TABLA PROBLEM
18
3
WERKINESH
A
REAL PSC. PROBLEM FACED
0 MATERIAL ORGANIZATION
3 SHORTAGE OF HANDLE PROBLEM
4
5
3
5
5
3
2
3
4
5
5
3
1
51 working time =4:30
loss time=3:00
25
1
MEGERSA & GERESU
B
REAL PSC. PROBLEM FACED
0 SHORTAGE CABLE LITE + HANDLE PROBLEM
10
8
8 SHORTAGE CABLE + HANDLE PROBLEM
10
10
116 working time =5:00
loss time=2:30
20
8
DEJENE & ASSEFA
B
REAL PSC. PROBLEM FACED
0 ORGANIZING MATERIALS
0 CABLE PROBLEM
0 HAZNE PROBLEM
2 CABLE PROBLEM
4 TABLA PROBLEM
5 TABLA PROBLEM
4 TABLA PROBLEM
5 HAZNE PROBLEM
1 TABLA + HAZNE PROBLEM
4
2 TABLA PROBLEM
3 TABLA PROBLEM
4 TABLA PROBLEM
3 TABLA PROBLEM
3 TABLA PROBLEM
25
5
Yoseph
A
REAL PSC. PROBLEM FACED
3 LACK OF PANEL & CABLE PROBLEM
3 LACK OF PANEL & CABLE PROBLEM
2 LACK OF PANEL & CABLE PROBLEM
3 LACK OF PANEL & CABLE PROBLEM
3 LACK OF TABLA & CABLE PROBLEM
4 LACK OF TABLA & CABLE PROBLEM
4 LACK OF TABLA & CABLE PROBLEM
6 LACK OF TABLA & CABLE PROBLEM
6 LACK OF TABLA & CABLE PROBLEM
22
8
WERKINESH
B
REAL PSC. PROBLEM FACED
0 CABLE PROBLEM
0 TABLA PROBLEM
2 CABLE PROBLEM
3 HOT PLATE CABLE SYSTEM PROBLEM
5
5 PERSONALEL PROBLEM
5 TABLA PHYSICAL PROBLEM
0 TABLA + HAZNE PROBLEM
4 TABLA +TEPSI PROBLEM
5
4 TABLA +GROUND CABLE PROBLEM
5 TABLA + HAZNE PROBLEM
2 TABLA + HAZNE PROBLEM
3 TABLA PROBLEM
3 TABLA PROBLEM
18
3& 8
DEJEN E & ASSEFA
B
REAL PCS. PRODUCT TYPE PROBLEM FACED
0
5
5 KAFES PROBLEM
6
LX-2820
6 => 22 Piece
0 LINE PROBLEM
0 LINE PROBLEM
0 LINE DIDN'T GET SOLUTION THROUGH ELECTRCIAN
0 LINE CHANGED & ORGANIZING MATERIALS
1 CABLE PROBLEM
2 CABLE PROBLEM
3 KF-5360
1 => 10 Piece CABLE PROBLEM
1 CABLE PROBLEM
2 CABLE PROBLEM
32 working time =3:30
loss time=4:00
26
1
MEGERSA & GERESU
B
REAL PSC. PROBLEM FACED
10
10
10
10
6 CABLE PROBLEM
11
7 PANEL + TABLA PROBLEM
31
5
Yoseph
A
REAL PSC. PROBLEM FACED
0 CABLE PROBLEM
0 CABLE PROBLEM
0 CABLE PROBLEM
0 CABLE PROBLEM
0 CABLE PROBLEM
0 CABLE PROBLEM
5 CABLE PROBLEM
5 CABLE PROBLEM
0 TABLA PROBLEM
0 TABLA PROBLEM
5
5
5
5
3
33 Working time =3:00 Loss time=4:30
23
8
WERKINESH
A
REAL PSC. PROBLEM FACED
8 CABLE PROBLEM
6
3 TABLA PROBLEM
6
8
4 TABLA + HAZNE PROBLEM
4 HAZNE PROBLEM
7 HAZNE PROBLEM
8 HAZNE PROBLEM
8
4 TABLA + HAZNE PROBLEM
6 TABLA + HAZNE PROBLEM
8
12
8
100 working time =5:30 loss time=2:00
16
8
DEJEN E & ASSEFA
B
REAL PCS. PROBLEM FACED
18
10
0 HAZNE PROBLEM
0 HAZNE PROBLEM
0 TABLA PROBLEM
6
0 HAZNE PROBLEM
6
4
0 HAZNE PROBLEM
0 HAZNE PROBLEM
13
0 TABLA PROBLEM
0 TABLA PROBLEM
0 TABLA PROBLEM
26
1
MEGERSA & GERESU
B
REAL PSC. PROBLEM FACED
0 TABLA + CABLE PROBLEM
5 TABLA PROBLEM
6 TABLA PROBLEM
4 TABLA PROBLEM
5 TABLA PROBLEM
4 TABLA PROBLEM
31
5
Yoseph
A
REAL PSC. PROBLEM FACED
0 LACK OF HAZNE PROBLEM
0 LACK OF TABLA & PANEL PROBLEM
0 LACK OF TABLA & PANEL PROBLEM
0 LACK OF HAZNE + TABLA & PANEL PROBLEM
0 LACK OF HAZNE + TABLA & PANEL PROBLEM
0 LACK OF HAZNE PROBLEM
0 LACK OF TABLA PROBLEM
0 LACK OF PANEL PROBLEM
0 LACK OF PANEL PROBLEM
8 TABLA PROBLEM
2 TABLA + HAZNE PROBLEM
2 TABLA + HAZNE PROBLEM
5 TABLA + HAZNE PROBLEM
6 TABLA + HAZNE PROBLEM
6 TABLA + HAZNE PROBLEM
26
1
MEGERSA & GERESU
B
REAL PSC. PROBLEM FACED
0 NO QUALITY PERSON
10
10
7 SHORTAGE OF SOCKET CABLE + CABLE PROBLEM
10
10
10
6 SHORTAGE OF SOCKET CABLE + CABLE PROBLEM
16
3
DEJEN E & ASSEFA
B
REAL PCS. PROBLEM FACED
0 ORGANIZING MATERIALS
10
9 SHORTAGE KAFES PROBLEM
11
13
16
9 SHORTAGE KAFES PROBLEM
0 SHORTAGE KAFES PROBLEM
10
31
5
Yoseph
A
REAL PSC. PROBLEM FACED
0 CABLE PROBLEM
0 CABLE PROBLEM
0 CABLE PROBLEM
0 CABLE PROBLEM
0 CABLE PROBLEM
0 HAZNE PROBLEM
0 HAZNE PROBLEM
0 HAZNE PROBLEM
3 HAZNE PROBLEM
5 HAZNE PROBLEM
3 HAZNE PROBLEM
5 HAZNE PROBLEM
10
2
2
30 Working time =3:30 Loss time=4:00
TOTAL=41
25
7
WERKINESH & TOTOBA
A
REAL PSC. PROBLEM FACED
6 TABLA PHYSICAL PROBLEM
8 TABLA PHYSICAL PROBLEM
7 TABLA PHYSICAL PROBLEM
6 TABLA PHYSICAL PROBLEM
6 TABLA PHYSICAL PROBLEM
6 TABLA PHYSICAL PROBLEM
8 TABLA PHYSICAL PROBLEM
7 TABLA PHYSICAL PROBLEM
8 TABLA PHYSICAL PROBLEM
10
12
11
6 TABLA + CABLE PROBLEM
10
7 TABLA + SOCKET PROBLEM
10
6 TABLA + SOCKET PROBLEM
10
10
9 SOCKET PROBLEM
16
3
DEJEN E & ASSEFA
B
REAL PCS. PROBLEM FACED
0 ORGANIZING MATERIALS
10
17
0 SHORTAGE KAFES PROBLEM
6 SHORTAGE KAFES PROBLEM
22
0 SHORTAGE HANDLE PROBLEM
18
0 SHORTAGE HANDLE PROBLEM
30
5
Yoseph
A
REAL PSC. PROBLEM FACED
2 CABLE PROBLEM
2 CABLE PROBLEM
2 CABLE PROBLEM
2 ROTARY PROBLEM
3 ROTARY PROBLEM
3 ROTARY PROBLEM
3 CHEFCHEFE PROBLEM
6 CHEFCHEFE PROBLEM
0 CABLE PROBLEM
0 CABLE PROBLEM
3 CABLE PROBLEM
6 CABLE PROBLEM
3 LACK OF YANDUVAR PROBLEM
0 LACK OF YANDUVAR PROBLEM
0 LACK OF YANDUVAR PROBLEM
25
7
WERKINESH & TOTOBA
A
REAL PSC. PROBLEM FACED
4 TABLA PROBLEM
6 CABLE PROBLEM
10 LEG PROBLEM
10 CABLE PROBLEM
10 SOCKET PROBLEM
5 SOCKET PROBLEM
10 TABLA PROBLEM
10 TABLA PROBLEM
5 TABLA PROBLEM
4 TABLA PROBLEM
3 TABLA PROBLEM
9 TABLA PROBLEM
10 TABLA PROBLEM
9 TABLA PROBLEM
5 TABLA PROBLEM
20
1
MEGERSA & GERESU
B
REAL PSC. PROBLEM FACED
5 TABLA + CABLE LITE PROBLEM
9
8 CABLE PROBLEM
15
11
11
12
10
10
6 TABLA + CABLE PROBLEM
13
122 working time =4:30 loss time=3:00
14
3 ,7 & 5
DEJEN E & ASSEFA
B
REAL PCS. PRODUCT TYPE PROBLEM FACED
15 2820 HEATER FINISHING ORDER
0
0
9
11
0 HAZNE PROBLEM
KF -5360
0 41 Piece. HAZNE PROBLEM
10
0 HAZNE PROBLEM
7
4
0
0 REWORK of 4E
STANDING OVEN
0 BUT NOT PACKED
0
56 working time =3:00 loss time=4:30
40
5
Yoseph
A
REAL PSC. PROBLEM FACED
2 TABLA PROBLEM
2 TABLA PROBLEM
2 TABLA PROBLEM
2 GROUND CABLE SIZE PROBLEM
2 TABLA PROBLEM
6 SHORTAGE OF POWER CABLE PROBLEM
5 SHORTAGE OF HAZNE PROBLEM
3 SHORTAGE OF HAZNE PROBLEM
2 CABLE PROBLEM
25
1
MEGERSA & GERESU
A
REAL PSC. PROBLEM FACED
0 AIR + PERSON PROBLEM
10
10
10
10
7 TABLA +CABLE LITE + SOCKET PROBLEM
9
6 TABLA + CABLE PROBLEM
20
7
12 HAZNE PROBLEM
17 HAZNE PROBLEM
31
5
YOSEF B
3 * Hazne problem
3 * Hazne problem
5 * Hazne problem
6 * Hazne problem
4 * Hazne problem
23
7
10 * Hazne Problem
0 * Hazne Problem
5 *Cable Problem
0 * Hazne Problem
15
15 *Cable Problem
2 *Cable Problem
22
1
MEGERSA
20
15 * Body Problem
16 * Cable Problem
16 * Cable Problem
15 HAZNE PROBLEM
16 HAZNE PROBLEM
16 HAZNE PROBLEM
18 HAZNE PROBLEM
9 HAZNE PROBLEM
13 HAZNE PROBLEM
13 HAZNE PROBLEM
12 HAZNE PROBLEM
25
7
0 GOVDE PROBLEM
0 GOVDE PROBLEM
0 GOVDE PROBLEM
0 GOVDE PROBLEM
0 GOVDE PROBLEM
0 GOVDE PROBLEM
0 GOVDE PROBLEM
59 HAZNE PROBLEM
YOSEF B
25
7
19
1
MEGERSA
A
REAL PSC. BRAND PROBLEM FACED
16 * Tabla Problem
25
3&7
Remark
Real piece
Not Packed
31
5
YOSEF B
14
25
7
DEJENE BAYISA
20
MEGERSA
A
22
7
10 Cable Problem
20
25
10
MEGERSA
13 * Tabla Problem
10 * Tabla Problem
10 * Tabla Problem
10 * Tabla Problem
YOSEF B
DEJENE BAYISA
6 Govde Problem
17 Govde Problem
27
5
6 * Lack of Hazne problem.
28
7 CABLE PROBLEM
12 TABLA PROBLEM
0 RESISTANCE PROBLEM
20
MEGERSA
7 * Tabla Problem
21
7
8 TABLA PROBLEM
6 TABLA PROBLEM
6 GOVDE PROBLEM
2 GOVDE PROBLEM
0 GOVDE + CABLE + HAZNE + SOCKET CABLE PRO
FO
Not Packed
Incase of
Lack of
Tepsi
26
7
29
10
10
11
11
25
13
15
15
20
16
14
27
25
9 * Air Problem
24
8 Govde problem
7 Govde problem
4 Air Problem
31
0 * Hazne problem
0 * Hazne problem
FO
Not Packed
Incase of
Lack of
Chefchefe
39
9
25
20
77 working time =4:00 loss time=3:30
Remark
Real piece
Real piece
23
16 * Tabla Problem
23
10 Govde problem
11
27
15 * Hazne problem
10 * Hazne problem
FO
Yesterday
Not Packed
Incase of
Lack of
Chefchefe
But Today
Packed
29
5
27
23
0 Reparing Product
5 Reparing Product
10 Govde problem
15 Hazne Problem
16
16
LEM FACED
of TABLA PRODUCT
of TABLA PRODUCT
of TABLA PRODUCT
LEM FACED
ON SERIGRAPH
TAT PROBLEM
L PROBLEM
LEM FACED
y problem
e Problem
LEM FACED
of person
problem
problem
esh
LEM FACED
amp Problem
e Problem
e Problem
e Problem
y problem
over Problem
Problem
p Problem
p Problem
LEM FACED
ph problem
y Problem
ph problem
y Problem
ph problem
y Problem
ph problem
y Problem
y Problem
ph problem
y Problem
ph problem
y Problem
p Problem
p Problem
LE
LEM FACED
e problem
e problem
problem
problem
LEM FACED
RAW MATERIAL
RAW MATERIAL
RAW MATERIAL
TEFLON
CABLE
PROBLEM
TEFLON
CABLE
PROBLEM
problem
esh
LEM FACED
PROBLEM
PROBLEM
PROBLEM
R PROBLEM
MOSTAT
R PROBLEM
LEM FACED
E PROBLEM
E PROBLEM
E PROBLEM
E PROBLEM
E PROBLEM
E PROBLEM
E PROBLEM
LE
LEM FACED
E PROBLEM
E PROBLEM
R PROBLEM
R PROBLEM
E PROBLEM
LEM FACED
E PROBLEM
E PROBLEM
TEFLON
TEFLON
TEFLON
TEFLON
TEFLON
TEFLON
TEFLON
Body Cover
Body Cover
esh
LEM FACED
of Manpower
LEM/QUALITY PROBLEM
LEM/QUALITY PROBLEM
LEM/QUALITY PROBLEM
LEM/QUALITY PROBLEM
LEM/QUALITY PROBLEM
LEM FACED
abel
E PROBLEM
E PROBLEM
E PROBLEM
E PROBLEM
da/ Problem
E PROBLEM
E PROBLEM
E PROBLEM
LE
EM FACED
E PROBLEM
NCE PROBLEM
NCE PROBLEM
NCE PROBLEM
NCE PROBLEM
E PROBLEM
E PROBLEM
E PROBLEM
TAT PROBLEM
TAT PROBLEM
LEM FACED
TEFLON
TEFLON
TEFLON
TEFLON
TEFLON
b problem
b problem
Problem
OF TEFLON
OF TEFLON
OF TEFLON
OF TEFLON
TEFLON
esh
LEM FACED
TAT PROBLEM
PROBLEM
TAT PROBLEM
E PROBLEM
PROBLEM
M + CABLE PROBLEM
L PROBLEM
LE
EM FACED
LPU PROBLEM
TAT PROBLEM
NO HANDLE
TAT PROBLEM
TERMOSTAT PROBLEM
ROTERY PROBLEM
+ AIR PROBLEM
LAMP
LEM FACED
E PROBLEM
PROBLEM
PH PROBLEM
PH PROBLEM
PH PROBLEM
PH PROBLEM
r Working
r Working
r Working
r Working
r Working
r Working
LEM FACED
b problem
b problem
b problem
b problem
b problem
b problem
b problem
b problem
b problem
b problem
b problem
b problem
b problem
b problem
b problem
esh
LEM FACED
L PROBLEM
L PROBLEM
L PROBLEM
L PROBLEM
L PROBLEM
L PROBLEM
ERMOSTAT PROBLEM
TAT PROBLEM
PHY +TERMOSTAT PROBLEM
EM FACED
E PROBLEM
PANEL
PANEL
LEM FACED
ler Machine Problem
et Problem
ler Machine Problem
et Problem
n Problem
n Problem
b Problem
b Problem
n Problem
n Problem
esh
LEM FACED
MOSTAT PROBLEM
MOSTAT PROBLEM
MOSTAT PROBLEM
AIR PROBLEM
MOSTAT PROBLEM
GRAPHY PROBLEM
HY + SOCKET PROBLEM
CKET PROBLEM
T PROBLEM
PROBLEM
ERMOSTAT PROBLEM
PROBLEM
LE
EM FACED
E PROBLEM
E PROBLEM
LEM FACED
phy Problem
phy Problem
esh
LEM FACED
PROBLEM
PROBLEM
PROBLEM
TAT PROBLEM
TAT PROBLEM
TAT PROBLEM
LE
EM FACED
nce Problem
nce Problem
nce Problem
nce Problem
E PROBLEM
nce Problem
ANEL PROBLEM
PANEL
O CABLE
LEM FACED
able Problem
k Problem
able Problem
able Problem
able Problem
LEM FACED
anpower(Worker)
anpower(Worker)
anpower(Worker)
anpower(Worker)
anpower(Worker)
anpower(Worker)
anpower(Worker)
anpower(Worker)
phy Problem
phy Problem
LE
EM FACED
y Problem
Quality Person
l Problem
Handle /Problem
y Problem
y Problem
LEM FACED
y Problem
y Problem
y Problem
y Problem
y Problem
y Problem
k Problem
able Problem
able Problem
k Problem
k Problem
LE
EM FACED
L PROBLEM
L PROBLEM
Y PROBLEM
Y PROBLEM
Y PROBLEM
Y PROBLEM
Y PROBLEM
Y PROBLEM
Y PROBLEM
Y PROBLEM
Y PROBLEM
L PROBLEM
L PROBLEM
L PROBLEM
L PROBLEM
esh
LEM FACED
o Panel
o Panel
o Panel
o Panel
o Panel
o Panel
PROBLEM
PROBLEM
Panel Problem
l Problem
l Problem
l Problem
LEM FACED
't appread at a time
't appread at a time
't appread at a time
't appread at a time
't appread at a time
't appread at a time
't appread at a time
't appread at a time
't appread at a time
esh
LEM FACED
ulpu Problem
ulpu Problem
u + Air Problem
u + Air Problem
u + Air Problem
LE
EM FACED
ge of Panel
ge of Panel
e Problem
ge of Panel
a Problem
a Problem
abla Problem
abla Problem
a Problem
a Problem
LEM FACED
blem on Body Toster
blem on Body Toster
p Light Cable
p Light Cable
esh
LEM FACED
lpu Problem
lpu Problem
lpu Problem
lpu Problem
lpu Problem
lpu Problem
oblem + Air Problem
oblem + Air Problem
oblem + Air Problem
lpu Problem
lpu Problem
lpu Problem
lpu Problem
EM FACED
abla Problem
abla Problem
abla Problem
a Problem
a Problem
e Problem
abla Problem
abla Problem
abla Problem
esh
LEM FACED
Problem
ulpu Problem
ulpu Problem
ulpu Problem
ovde Problem
ovde Problem
ovde Problem
ovde Problem
E
EM FACED
a + Panel Problem
a + Panel Problem
a + Panel Problem
a + Panel Problem
a + Panel Problem
a + Panel Problem
a + Panel Problem
a + Panel Problem
a + Panel Problem
a + Panel Problem
a + Panel Problem
a + Panel Problem
a + Panel Problem
a + Panel Problem
a + Panel Problem
EM FACED
r product (Toster)
r product (Toster)
ody of Heater
ody of Heater
ody of Heater
ody of Heater
ody of Heater
ody of Heater
ody of Heater
EM FACED
SACI PROBLEM
SACI PROBLEM
SACI PROBLEM
SACI PROBLEM
SACI PROBLEM
SACI PROBLEM
SACI PROBLEM
SACI PROBLEM
SACI PROBLEM
SACI PROBLEM
SACI PROBLEM
SACI PROBLEM
SACI PROBLEM
SACI PROBLEM
SACI PROBLEM
EM FACED
esh
LEM FACED
de Problem
de Problem
de Problem
de Problem
Problem
de Problem
em + Air Problem
de Problem
esh
LEM FACED
IC PROBLEM
IC PROBLEM
IC PROBLEM
IC PROBLEM
IC PROBLEM
de Problem
de Problem
de Problem
de Problem
de Problem
de Problem
de Problem
LE
EM FACED
IC PROBLEM
IC PROBLEM
IC PROBLEM
IC PROBLEM
O CABLE
O CABLE
O CABLE
O CABLE
O CABLE
O CABLE
O CABLE
EM FACED
IC PROBLEM
IC PROBLEM
IC PROBLEM
IC PROBLEM
esh
LEM FACED
de Problem
de Problem
de Problem
de Problem
l Problem
de Problem
de Problem
de Problem
ty Problem
ic Problem
ic Problem
ic Problem
ic Problem
ic Problem
ic Problem
LE
EM FACED
LT IC SACI
MATERIAL
LT IC SACI
IC PROBLEM
MATERIAL
LT IC SACI
IC PROBLEM
MATERIAL
LT IC SACI
IC PROBLEM
MATERIAL
LT IC SACI
MATERIAL
IC PROBLEM
IC PROBLEM
EM FACED
E PROBLEM
E PROBLEM
E PROBLEM
E PROBLEM
E PROBLEM
E PROBLEM
E PROBLEM
E PROBLEM
IC PROBLEM
IC PROBLEM
IC PROBLEM
IC PROBLEM
IC PROBLEM
esh
LEM FACED
Problem
Problem
Problem
Problem
Problem
ic Problem
ic Problem
ic Problem
ic Problem
ic Problem
ic Problem
LE
EM FACED
IC PROBLEM
W MATERIAL
IC PROBLEM
W MATERIAL
IC PROBLEM
W MATERIAL
IC PROBLEM
W MATERIAL
W MATERIAL
IC PROBLEM
W MATERIAL
IC PROBLEM
W MATERIAL
IC PROBLEM
W MATERIAL
esh
LEM FACED
de Problem
de Problem
em + Air Problem
LE
EM FACED
+ Rotery Problem
+ Rotery Problem
+ Rotery Problem
+ Rotery Problem
+ Rotery Problem
+ Rotery Problem
+ Rotery Problem
+ Rotery Problem
+ Rotery Problem
+ Rotery Problem
+ Rotery Problem
+ Rotery Problem
+ Rotery Problem
+ Rotery Problem
+ Rotery Problem
EM FACED
ework
ework
esh
LEM FACED
e Problem
e Problem
apak Problem
oblem + Air Problem
em + Air Problem
em + Air Problem
em + Air Problem
em + Air Problem
em + Air Problem
em + Air Problem
em + Air Problem
em + Air Problem
em + Air Problem
em + Air Problem
em + Air Problem
LE
EM FACED
f Raw Materials
f Raw Materials
f Raw Materials
f Raw Materials
f Raw Materials
f Raw Materials
f Raw Materials
f Raw Materials
f Raw Materials
f Raw Materials
f Raw Materials
f Raw Materials
f Raw Materials
f Raw Materials
f Raw Materials
EM FACED
No Air
No Air
No Air
No Air
esh
LEM FACED
i Problem
i Problem
i Problem
i Problem
i Problem
i Problem
m + Air Problem
m + Tepsi Problem
de Problem
de Problem
de Problem
de Problem
LE
EM FACED
L PROBLEM
L PROBLEM
S) + TEPSI PROBLEM
PROBLEM
PROBLEM
PROBLEM
S) + TEPSI PROBLEM
PROBLEM
EM FACED
o Cable
No Air
LE
EM FACED
a Problem
a Problem
a Problem
a Problem
EM FACED
pu /No Handle/
pu /No Handle/
pu /No Handle/
pu /No Handle/
pu /No Handle/
pu /No Handle/
LEM FACED
y Problem
k Problem
able Problem
y Problem
k Problem
y Problem
k Problem
able Problem
able Problem
y Problem
k Problem
able Problem
y Problem
k Problem
able Problem
LE
EM FACED
w plan
w plan
w plan
w plan
w plan
w plan
w plan
w plan
w plan
EM FACED
pu /No Handle/
pu /No Handle/
LEM FACED
esh
LEM FACED
Tepsi Problem
apak Problem
r Problem
r Problem
r Problem
apak Problem
r Problem
Hazne Problem
Hazne Problem
r Problem
r Problem
r and Hazne
r and Hazne
r and Hazne
LE
EM FACED
le + Rotery Problem
le + Rotery Problem
ge of Tepsi
ge of Tepsi
of Cable + Tepsi
ge of Tepsi
of Cable + Tepsi
EM FACED
Glass +Heater Side Cover
Glass +Heater Side Cover
Glass +Heater Side Cover
Glass +Heater Side Cover
Glass +Heater Side Cover
Glass +Heater Side Cover
Glass +Heater Side Cover
Glass +Heater Side Cover
Glass +Heater Side Cover
esh
LEM FACED
i Problem
i Problem
i Problem
i Problem
i Problem
i Problem
e Problem
e Problem
i Problem
e Problem
e Problem
e Problem
e Problem
e Problem
m + Electric Problem
EM FACED
o Izgara
o Cable
o Cable
esh
LEM FACED
azne Problem
blem + Govde Problem
blem + Govde Problem
blem + Govde Problem
blem + Govde Problem
ovde Problem
ovde Problem
ovde Problem
ovde Problem
ovde Problem
ovde Problem
ovde Problem
e Problem
e Problem
e Problem
LE
EM FACED
ge of Panel
ge of Panel
ge of Panel
of Panel +Cable
of Panel +Cable
ge of Cable
ge of Cable
ge of Cable
U
EM FACED
rkers & Materials
ge Materials
l Problem
l Problem
l Problem
l Problem
l Problem
l Problem
l Problem
b Problem
b Problem
b Problem
b Problem
l Problem
l Problem
LE
EM FACED
of Panel +Cable
of Panel +Cable
of Panel +Cable
of Panel +Cable
tery + Panel +Cable
of Panel +Cable
tery + Panel +Cable
tery + Panel +Cable
YE
LEM FACED
e Materials
terial & WorKers
e Problem
e Problem
e Problem
e Problem
al Problem
al Problem
al Problem
al Problem
al Problem
al Problem
al Problem
al Problem
al Problem
EM FACED
EM (IT'S QUALITY)
LEM (IT'S QUALITY)
EM ON KNOB MATERIALS
EM (IT'S QUALITY)
LEM (IT'S QUALITY)
EM ON KNOB MATERIALS
EM (IT'S QUALITY)
LEM (IT'S QUALITY)
EM ON KNOB MATERIALS
EM (IT'S QUALITY)
LEM (IT'S QUALITY)
EM ON KNOB MATERIALS
EM (IT'S QUALITY)
LEM (IT'S QUALITY)
EM ON KNOB MATERIALS
EM FACED
nal Problem
a Problem
nal Problem
a Problem
nal Problem
nal Problem
a Problem
nal Problem
a Problem
nal Problem
nal Problem
a Problem
EM FACED
Aluminium Cover
of Cam Kulpu
Aluminium Cover
of Cam Kulpu
Aluminium Cover
of Cam Kulpu
of Cam Kulpu
Aluminium Cover
Aluminium Cover
of Cam Kulpu
Aluminium Cover
of Cam Kulpu
Aluminium Cover
of Cam Kulpu
PROBLEM FACED
NUT PROBLEM
EM FACED
PROBLEM
PROBLEM
PROBLEM
PROBLEM
PROBLEM
EM FACED
O GRILL
O GRILL
O GRILL
O GRILL
O GRILL
O GRILL
O GRILL
O GRILL
O GRILL
O GRILL
O GRILL
O GRILL
O GRILL
O GRILL
O GRILL
GARESU
EM FACED
T PROBLEM
ERIGRAPHY PROBLEM
ERIGRAPHY PROBLEM
ERIGRAPHY PROBLEM
ERIGRAPHY PROBLEM
ERIGRAPHY PROBLEM
EM FACED
L + NO BODY COVER
L + NO BODY COVER
L + NO BODY COVER
L + NO BODY COVER
L + NO BODY COVER
L + NO BODY COVER
L + NO BODY COVER
F GRILL PROBLEM
F GRILL PROBLEM
F GRILL PROBLEM
F GRILL PROBLEM
F GRILL PROBLEM
F GRILL PROBLEM
F GRILL PROBLEM
O GRILL
EM FACED
azne Problem
azne Problem
Hazne Problem
azne Problem
azne Problem
azne Problem
azne Problem
a + Hazne Problem
a + Hazne Problem
a + Panel Problem
a + Panel Problem
a + Panel Problem
a + Panel Problem
a + Panel Problem
a + Panel Problem
LEM FACED
BLE PROBLEM
IC PROBLEM
TAT PROBLEM
VDE) CHANGED
ER METAL PROBLEM
ER METAL PROBLEM
EM FACED
PROBLEM
PROBLEM
PROBLEM
PROBLEM
PROBLEM
PROBLEM
OF PRODUCTION CHANGED
EM FACED
Izgara Problem
Izgara Problem
Izgara Problem
Izgara Problem
Izgara Problem
f Tabla Problem
f Tabla Problem
f Tabla Problem
LEM FACED
TAT PROBLEM
TAT PROBLEM
C PROBLEM
PROBLEM
PROBLEM
KULPU/ PROBLEM
LEM FACED
PROBLEM
PROBLEM
PROBLEM
PROBLEM
PROBLEM
PROBLEM
PROBLEM
PROBLEM
PROBLEM
u
EM FACED
a Problem
a Problem
a Problem
a Problem
a Problem
a Problem
a Problem
a Problem
EM FACED
MINAL PROBLEM
MINAL PROBLEM
MINAL PROBLEM
ACI PROBLEM
MINAL PROBLEM
ACI PROBLEM
MINAL PROBLEM
ACI PROBLEM
ACI PROBLEM
MINAL PROBLEM
ACI PROBLEM
MINAL PROBLEM
ACI PROBLEM
MINAL PROBLEM
ACI PROBLEM
EM FACED
AL PROBLEM
N PROBLEM
N PROBLEM
C PROBLEM
C PROBLEM
C PROBLEM
C PROBLEM
C PROBLEM
LEM FACED
TY PROBLEM
TY PROBLEM
TY PROBLEM
TY PROBLEM
MINAL PROBLEM
MINAL PROBLEM
MINAL PROBLEM
E PROBLEM
E PROBLEM
E PROBLEM
E PROBLEM
E PROBLEM
E PROBLEM
E PROBLEM
E PROBLEM
u
EM FACED
E PROBLEM
E PROBLEM
E PROBLEM
IDE PROBLEM
IDE PROBLEM
IDE PROBLEM
E PROBLEM
PROBLEM
EM FACED
ING /REPAIR/
LEM FACED
andle problem
andle problem
andle problem
e problem
nal problem
EM FACED
Problem & Not repaired on time
Problem & Not repaired on time
Problem & Not repaired on time
Problem & Not repaired on time
er Machine Problem
er Machine Problem
LEM FACED
ound Cable Problem
ound Cable Problem
ound Cable Problem
+ Shortage of Cable
+ Shortage of Cable
+ Shortage of Cable
+ Shortage of Cable
+ Shortage of Cable
age of Cable
age of Cable
age of Cable
age of Cable
of Resistance
of Resistance
of Resistance
EM FACED
IC PROBLEM
IC PROBLEM
IC PROBLEM
IC PROBLEM
IC PROBLEM
IC PROBLEM
E PROBLEM
E PROBLEM
E PROBLEM
E PROBLEM
E PROBLEM
E PROBLEM
E PROBLEM
E PROBLEM
E PROBLEM
LEM FACED
ic Problem
ic Problem
ic Problem
ic Problem
ic Problem
ic Problem
e Problem
e Problem
ound Cable Problem
e Problem
e Problem
e Problem
m + Hazne Problem
e Problem
e Problem
EM FACED
+ Handle Problem
+ Handle Problem
e + Tabla Problem
Tabla Problem
e + Tabla Problem
Resistance High Voltage
Resistance High Voltage
Resistance High Voltage
Resistance High Voltage
LEM FACED
e Problem
e Problem
e Problem
e Problem
e Problem
able Problem
EM FACED
E PROBLEM
E PROBLEM
E PROBLEM
E PROBLEM
E PROBLEM
E PROBLEM
E PROBLEM
LEM FACED
ND CABLE PROBLEM
M + PANEL PROBLEM
M + PANEL PROBLEM
E PROBLEM
GROUND CABLE PROBLEM
GROUND CABLE PROBLEM
GROUND CABLE PROBLEM
GROUND CABLE PROBLEM
GROUND CABLE PROBLEM
RESISTANCE PROBLEM
RESISTANCE PROBLEM
RESISTANCE PROBLEM
RESISTANCE PROBLEM
PROBLEM
PROBLEM
PROBLEM
LEM FACED
E PROBLEM
E PROBLEM
E PROBLEM
E PROBLEM
E PROBLEM
E PROBLEM
E PROBLEM
E PROBLEM
E PROBLEM
E PROBLEM
E PROBLEM
E PROBLEM
E PROBLEM
E PROBLEM
E PROBLEM
EM FACED
E PROBLEM
E PROBLEM
E PROBLEM
E PROBLEM
HANGED TO 60S-22
A + TABLA PROBLEM
A + TABLA PROBLEM
A + TABLA PROBLEM
A + TABLA PROBLEM
A + TABLA PROBLEM
LEM FACED
NCE PROBLEM
RESISTANCE PROBLEM
E PROBLEM
E PROBLEM
E PROBLEM
E PROBLEM
NCE PROBLEM
NCE PROBLEM
NCE PROBLEM
A
L E OR
ESU
PR KE
OB R'S
LE A
M TA
EM FACED
EM FACED
. LL
EM FACED
NCE PROBLEM
PROBLEM
E PROBLEM
E PROBLEM
E PROBLEM
E PROBLEM
E PROBLEM
E PROBLEM
E PROBLEM
E PROBLEM
E PROBLEM
E PROBLEM
E PROBLEM
E PROBLEM
E PROBLEM
EM FACED
T CHANGED &
OF WORKER
A PROBLEM
A PROBLEM
A PROBLEM
A PROBLEM
ESU
EM FACED
ABLE LITE
ABLE LITE
ABLE LITE
ABLE LITE
CABLE LITE
CABLE LITE
CABLE LITE
CABLE LITE
E of CABEL LITE
E of CABEL LITE
E of CABEL LITE
E of CABEL LITE
E of CABEL LITE
E of CABEL LITE
A
EM FACED
OF BODY
OF BODY
OF BODY
3858 PRODUCT
PROBLEM
PROBLEM
PROBLEM
PROBLEM
PROBLEM
ESU
EM FACED
A
EM FACED
MAN-POWER
MAN-POWER
PROBLEM
MAN-POWER
PROBLEM
PROBLEM
PROBLEM
PROBLEM
PROBLEM
EM FACED
PROBLEM
PROBLEM
PROBLEM
PROBLEM
PROBLEM
PROBLEM
RME PROBLEM
RME PROBLEM
RME PROBLEM
PROBLEM
A PROBLEM
A PROBLEM
EM FACED
PROBLEM
PROBLEM
PROBLEM
PROBLEM
TE PROBLEM
PROBLEM
PROBLEM
PROBLEM
LE PROBLEM
ESU
EM FACED
A
EM FACED
PROBLEM
PROBLEM
PROBLEM
PROBLEM
PROBLEM
E PROBLEM
E PROBLEM
PROBLEM
E PROBLEM
PROBLEM
E PROBLEM
M + HAZNE PROBLEM
M + HAZNE PROBLEM
EM FACED
PROBLEM
PROBLEM
PROBLEM
PROBLEM
PROBLEM
A PROBLEM
ABEL PROBLEM
ABEL PROBLEM
APAK PROBLEM
APAK PROBLEM
APAK PROBLEM
PROBLEM FACED
CABLE PROBLEM
CABLE PROBLEM
CABLE PROBLEM
CABLE PROBLEM
CABLE PROBLEM
CABLE PROBLEM
CABLE PROBLEM
CABLE PROBLEM
CABLE PROBLEM
ESU
EM FACED
A
EM FACED
PROBLEM
PROBLEM
PROBLEM
PROBLEM
PROBLEM
PROBLEM
PROBLEM
PROBLEM
PROBLEM
PROBLEM
PROBLEM
EM FACED
ABLA PROBLEM
AZNE PROBLEM
AZNE PROBLEM
OF LACK OF TERMINAL PROBLEM
OF LACK OF TERMINAL PROBLEM
OF LACK OF TERMINAL PROBLEM
OF LACK OF TERMINAL PROBLEM
OF LACK OF TERMINAL PROBLEM
OF LACK OF TERMINAL PROBLEM
PROBLEM FACED
CABLE PROBLEM
CABLE PROBLEM
BODY PROBLEM
BODY PROBLEM
BODY PROBLEM
BODY PROBLEM
BODY PROBLEM
LE + TERMOSTAT PROBLEM
CABLE + TERMOSTAT PROBLEM
ESU
EM FACED
EM FACED
PROBLEM
Y PROBLEM
PROBLEM
PROBLEM
PROBLEM
PROBLEM
PROBLEM
PROBLEM
PROBLEM
PROBLEM
PROBLEM
PROBLEM
PROBLEM
PROBLEM
PROBLEM
CKET PROBLEM
EM FACED
PROBLEM
PROBLEM
PROBLEM
PROBLEM
PROBLEM
EM FACED
A PROBLEM
A PROBLEM
A PROBLEM
A PROBLEM
A PROBLEM
PROBLEM
PROBLEM
PROBLEM
PROBLEM
PROBLEM
PROBLEM
IC PROBLEM
PROBLEM
PROBLEM
PROBLEM
ESU
EM FACED
EM FACED
ABLE PROBLEM
ABLE PROBLEM
ABLE PROBLEM
RIAL PROBLEM
RIAL PROBLEM
RIAL PROBLEM
PROBLEM
PROBLEM
PROBLEM
PROBLEM
EM FACED
PROBLEM
PROBLEM
PROBLEM
PROBLEM
PROBLEM
PROBLEM
PROBLEM
PROBLEM
PROBLEM
PROBLEM
ANDUVAR PROBLEM
ANDUVAR PROBLEM
ANDUVAR PROBLEM
ANDUVAR PROBLEM
EM FACED
OF BODY
OF BODY
GE OF BODY
GE OF BODY
GE OF BODY
GE OF BODY
GE OF BODY
ESU
EM FACED
A
EM FACED
R PROBLEM
R PROBLEM
R PROBLEM
PROBLEM
PROBLEM
PROBLEM
T CHANGED
PROBLEM
MEL PROBLEM
MEL PROBLEM
PROBLEM
PROBLEM
PROBLEM
PROBLEM
ESU
EM FACED
A
EM FACED
R PROBLEM
R PROBLEM
PROBLEM
PROBLEM
PROBLEM
PROBLEM
PROBLEM
PROBLEM
PROBLEM
PROBLEM
PROBLEM
PROBLEM
PROBLEM
PROBLEM
PROBLEM
EM FACED
PROBLEM
PROBLEM
PROBLEM
PROBLEM
FE PROBLEM
FE PROBLEM
FE PROBLEM
FE PROBLEM
FE PROBLEM
FE PROBLEM
FE PROBLEM
FE PROBLEM
FE PROBLEM
FE PROBLEM
PROBLEM FACED
RTAGE OF BODY + SERIGRAPH PROBLEM
SERIGRAPH PROBLEM
SERIGRAPH PROBLEM
SERIGRAPH PROBLEM
E + ARKA KAPAK PRESS PROBLEM
CABLE PROBLEM
CABLE PROBLEM
TEPSI PROBLEM
TEPSI PROBLEM
TEPSI PROBLEM
CABLE PROBLEM
ESU
EM FACED
A
EM FACED
al Problem
PROBLEM
PROBLEM
PROBLEM
PROBLEM
PROBLEM
PROBLEM
EM FACED
FE PROBLEM
K PROBLEM
FE PROBLEM
FE PROBLEM
K PROBLEM
K PROBLEM
E PROBLEM
E PROBLEM
E PROBLEM
EM FACED
PROBLEM
PROBLEM
NCE + HAZNE PROBLEM
L + CABLE PROBLEM
PROBLEM
PROBLEM
PROBLEM
PSI PROBLEM
A PROBLEM
PROBLEM
PROBLEM
PROBLEM
PROBLEM
PROBLEM
PROBLEM
ESU
EM FACED
A
EM FACED
PROBLEM
PROBLEM
PROBLEM
PROBLEM
PROBLEM
PROBLEM
PROBLEM
PROBLEM
PROBLEM
PROBLEM
PROBLEM
PROBLEM
PROBLEM
PROBLEM
PROBLEM
EM FACED
E PROBLEM
E PROBLEM
E PROBLEM
E PROBLEM
FE PROBLEM
K PROBLEM
E PROBLEM
EM FACED
ODY PROBLEM
ODY PROBLEM
ODY PROBLEM
PROBLEM
PROBLEM
PROBLEM
PROBLEM
PROBLEM
PROBLEM
PROBLEM
PROBLEM
PROBLEM
PROBLEM
PROBLEM
PROBLEM
ESU
EM FACED
A
EM FACED
E PROBLEM
PROBLEM
PROBLEM
PROBLEM
PROBLEM
NNEL PROBLEM
NNEL PROBLEM
ERSONNEL PROBLEM
ERSONNEL PROBLEM
ERSONNEL PROBLEM
EM FACED
E PROBLEM
E PROBLEM
E PROBLEM
E PROBLEM
E PROBLEM
E PROBLEM
E PROBLEM
E PROBLEM
EM FACED
E PROBLEM
E PROBLEM
ESU
EM FACED
A
EM FACED
+ CABLE PROBLEM
+ CABLE PROBLEM
+ CABLE PROBLEM
+ CABLE PROBLEM
+ CABLE PROBLEM
+ CABLE PROBLEM
+ CABLE PROBLEM
+ CABLE PROBLEM
+ CABLE PROBLEM
AZNE PROBLEM
AZNE PROBLEM
AZNE PROBLEM
AZNE PROBLEM
AZNE PROBLEM
AZNE PROBLEM
EM FACED
E PROBLEM
E PROBLEM
E PROBLEM
E PROBLEM
E PROBLEM
E PROBLEM
E PROBLEM
EFE PROBLEM
E PROBLEM
E PROBLEM
E PROBLEM
EM FACED
ABLE PROBLEM
ABLE PROBLEM
ABLE PROBLEM
PROBLEM
PROBLEM
PROBLEM
PROBLEM
PROBLEM
PROBLEM
PROBLEM
PROBLEM
PROBLEM
PROBLEM
PROBLEM
PROBLEM
ESU
EM FACED
A
EM FACED
EM FACED
ABLE PROBLEM
ABLE PROBLEM
ABLE PROBLEM
ABLE PROBLEM
AZNE PROBLEM
ABLE PROBLEM
AZNE PROBLEM
AZNE PROBLEM
YANDUVAR PROBLEM
EM FACED
PROBLEM
PROBLEM
PROBLEM
PROBLEM
PROBLEM
ABLA PROBLEM
ABLA PROBLEM
ABLA PROBLEM
ABLA PROBLEM
ABLA PROBLEM
EM FACED
ORGANIZATION
HANDLE PROBLEM
ESU
EM FACED
M
M
M
M
EM FACED
NG MATERIALS
PROBLEM
PROBLEM
PROBLEM
PROBLEM
PROBLEM
PROBLEM
PROBLEM
ZNE PROBLEM
PROBLEM
PROBLEM
PROBLEM
PROBLEM
PROBLEM
EM FACED
L & CABLE PROBLEM
L & CABLE PROBLEM
L & CABLE PROBLEM
L & CABLE PROBLEM
A & CABLE PROBLEM
A & CABLE PROBLEM
A & CABLE PROBLEM
A & CABLE PROBLEM
A & CABLE PROBLEM
LEL PROBLEM
SICAL PROBLEM
AZNE PROBLEM
EPSI PROBLEM
ND CABLE PROBLEM
AZNE PROBLEM
AZNE PROBLEM
PROBLEM
PROBLEM
FA
PROBLEM FACED
KAFES PROBLEM
LINE PROBLEM
LINE PROBLEM
T GET SOLUTION THROUGH ELECTRCIAN
CABLE PROBLEM
CABLE PROBLEM
CABLE PROBLEM
CABLE PROBLEM
CABLE PROBLEM
ESU
EM FACED
EM FACED
PROBLEM
PROBLEM
PROBLEM
PROBLEM
PROBLEM
PROBLEM
PROBLEM
PROBLEM
PROBLEM
PROBLEM
me=4:30
EM FACED
PROBLEM
PROBLEM
AZNE PROBLEM
PROBLEM
E PROBLEM
E PROBLEM
AZNE PROBLEM
AZNE PROBLEM
me=2:00
FA
EM FACED
PROBLEM
PROBLEM
PROBLEM
PROBLEM
PROBLEM
PROBLEM
PROBLEM
PROBLEM
PROBLEM
me=3:00
ESU
EM FACED
me=4:00
EM FACED
AZNE PROBLEM
A & PANEL PROBLEM
A & PANEL PROBLEM
BLA & PANEL PROBLEM
BLA & PANEL PROBLEM
AZNE PROBLEM
ABLA PROBLEM
PANEL PROBLEM
PANEL PROBLEM
ABLA PROBLEM
ABLA PROBLEM
me=5:00
EM FACED
PROBLEM
PROBLEM
PROBLEM
PROBLEM
PROBLEM
AZNE PROBLEM
AZNE PROBLEM
AZNE PROBLEM
AZNE PROBLEM
AZNE PROBLEM
me=4:00
ESU
EM FACED
BLEM
BLEM
BLEM
BLEM
BLEM
BLEM
BLEM
BLEM
BLEM
me=3:00
FA
EM FACED
NG MATERIALS
KAFES PROBLEM
KAFES PROBLEM
KAFES PROBLEM
KAFES PROBLEM
KAFES PROBLEM
KAFES PROBLEM
me=4:00
EM FACED
PROBLEM
PROBLEM
PROBLEM
PROBLEM
PROBLEM
PROBLEM
PROBLEM
PROBLEM
PROBLEM
PROBLEM
PROBLEM
PROBLEM
me=4:00
OBA
EM FACED
SICAL PROBLEM
SICAL PROBLEM
SICAL PROBLEM
SICAL PROBLEM
SICAL PROBLEM
SICAL PROBLEM
SICAL PROBLEM
SICAL PROBLEM
SICAL PROBLEM
SICAL PROBLEM
PROBLEM
PROBLEM
PROBLEM
PROBLEM
AL PROBLEM
me=3:30
ESU
EM FACED
me=2:30
FA
EM FACED
NG MATERIALS
KAFES PROBLEM
KAFES PROBLEM
ANDLE PROBLEM
ANDLE PROBLEM
ANDLE PROBLEM
PROBLEM
PROBLEM
me=3:30
EM FACED
PROBLEM
PROBLEM
PROBLEM
Y PROBLEM
Y PROBLEM
Y PROBLEM
FE PROBLEM
FE PROBLEM
PROBLEM
PROBLEM
PROBLEM
PROBLEM
DUVAR PROBLEM
DUVAR PROBLEM
DUVAR PROBLEM
me=5:00
OBA
EM FACED
PROBLEM
PROBLEM
PROBLEM
PROBLEM
T PROBLEM
T PROBLEM
PROBLEM
PROBLEM
PROBLEM
PROBLEM
PROBLEM
PROBLEM
PROBLEM
PROBLEM
PROBLEM
me=5:00
ESU
EM FACED
me=3:00
FA
PROBLEM FACED
FINISHING ORDER
HAZNE PROBLEM
HAZNE PROBLEM
HAZNE PROBLEM
me=4:30
EM FACED
PROBLEM
PROBLEM
PROBLEM
LE SIZE PROBLEM
PROBLEM
WER CABLE PROBLEM
F HAZNE PROBLEM
F HAZNE PROBLEM
E PROBLEM
F HAZNE PROBLEM
F HAZNE PROBLEM
F HAZNE PROBLEM
F HAZNE PROBLEM
F HAZNE PROBLEM
F HAZNE PROBLEM
me=4:00
ESU
EM FACED
me=4:00
NESH
PROBLEM FACED
HAZNE PROBLEM
HAZNE PROBLEM
me=3:00
PROBLEM FACED
quality problem.
blem
me=5:00
EFA
PROBLEM FACED
me=4:30
PROBLEM FACED
Problem
Problem
Problem
Problem
me=3:30
NESH
PROBLEM FACED
HAZNE PROBLEM
HAZNE PROBLEM
HAZNE PROBLEM
HAZNE PROBLEM
HAZNE PROBLEM
HAZNE PROBLEM
HAZNE PROBLEM
HAZNE PROBLEM
me=3:30
NESH
PROBLEM FACED
GOVDE PROBLEM
GOVDE PROBLEM
GOVDE PROBLEM
GOVDE PROBLEM
GOVDE PROBLEM
GOVDE PROBLEM
GOVDE PROBLEM
HAZNE PROBLEM
me=4:30
PROBLEM FACED
problem.
problem.
problem.
me=5:00
EFA
PROBLEM FACED
Problem
Problem
Problem
Problem
Problem
me=5:30
PROBLEM FACED
em
le Socket Problem
em
em
le Socket Problem
em
me=4:30
NESH
PROBLEM FACED
Material + Back Cover Problem
me=5:30
PROBLEM FACED
problem.
problem.
problem.
problem.
problem.
problem.
me=4:30
SA
PROBLEM FACED
m
em
em
em
em
me=5:30
PROBLEM FACED
Problem
Problem
Problem
et Problem
et Problem
me=4:30
NESH
PROBLEM FACED
Cable Problem
me=2:00
PROBLEM FACED
me=4:30
PROBLEM FACED
problem.
+ Cable problem.
me=5:00
SA
PROBLEM FACED
Govde Problem
Govde Problem
me=3:30
MA D
PROBLEM FACED
roblem
blem.
blem.
blem.
blem.
blem.
me=4:30
NESH .B
PROBLEM FACED
CABLE PROBLEM
TABLA PROBLEM
RESISTANCE PROBLEM
me=3:30
PROBLEM FACED
e Problem
e Problem
e Problem
em
em
e Problem
me=4:30
EFA
PROBLEM FACED
TABLA PROBLEM
TABLA PROBLEM
GOVDE PROBLEM
GOVDE PROBLEM
+ HAZNE + SOCKET CABLE PROBLEM
me=4:30
MA D
PROBLEM FACED
er (Arka kapak) design problem
NESH .B
PROBLEM FACED
me=2:30
RESU
PROBLEM FACED
me=2:30
EFA
PROBLEM FACED
Govde problem
Govde problem
Air Problem
me=4:30
MA D
PROBLEM FACED
problem
problem
Termostat problem
problem
Hazne problem
Hazne problem
me=5:00
NESH .B
PROBLEM FACED
RESU
PROBLEM FACED
Cable Problem
Problem
Cable Problem
Cable Problem
me=4:30
EFA
PROBLEM FACED
Govde problem
me=3:30
MA D
PROBLEM FACED
problem
problem
problem
problem
lem
problem
me=2:30
NESH .B
PROBLEM FACED
GOVDE +TABLA PROBLEM
me=4:30
RESU
PROBLEM FACED
Problem
Problem
em
em
Problem
Problem
Problem
me=2:30
EFA
PROBLEM FACED
Reparing Product
Reparing Product
Govde problem
Hazne Problem
me=3:00
KUMTEK INDUSTRIAL PLC. TOTAL WORKER
DATE LINE NUMBER
PRODUCT CODE CHEFF NAME
PRODUCT NAME SHIFT
TIME TARGET/PLAN REAL PSC. PROBLEM FACED
07-00-7:30
07:30-08:00
08:00-08:30
08:30-09:00
09:00-09:30
09:30-10:00
10:00-10:30
10:30-11:00
11:00-11:30
LUNCH TIME
11:30-12:00
12:00-12:30
12:30-13:00
13:00-13:30
13:30-14:00
14:00-14:30
14:30-15:00
Total= working time =
loss time=
15:00-15:30
15:30-16:00
16:00-16:30
16:30-17:00
17:00-17:30
17:30-18:00
18:00-18:30
18:30-19:00
19:00-19:30
LUNCH TIME
19:30-20:00
20:00-20:30
20:30-21:00
21:00-21:30
21:30-22:00
22:00-22:30
22:30-23:00
Total= working time =
loss time=
KUMTEK INDUSTRIAL PLC.
DATE 4/1/2019
PRODUCT CODE KF-5320/5430/3125
PRODUCT NAME Mini Oven
PRODUCT CODE PRODUCT NAME
KF-3125 Mini Oven
ONLY PACKING
KF-5320 Mini Oven
PRODUCTION
KF-5430 Mini Oven
TOTAL
TOTAL
EUROTEC &SINGLE
PRODUCT NAME HOT PLATE
PRODUCT CODE PRODUCT NAME
TIMELY LX-3570 EUROTEC
PRODUCTION LX-7011 SINGLE HOT PLATE
TOTAL
KUMTEK INDUSTRIAL PLC.
DATE 4/4/2019
PRODUCT CODE LX-3858 & LX-3577
PRODUCT NAME Mini Oven With Plate
PRODUCT CODE PRODUCT NAME
TIMELY LX-3858 Mini Oven With Plate
PRODUCTION LX-3577 Mini Oven With Plate
TOTAL
TOTAL
TOTAL
TOTAL WORKER 10
LINE NUMBER 8
CHEFF NAME Totoba & Werkinesh
SHIFT A
TOTAL PACKED PIECE
142 working time =7:00
54
61
loss time=0:30'
257
TOTAL WORKER 25
LINE NUMBER 1
CHEFF NAME MEGERSA DESSALE
SHIFT B
TOTAL PACKED PIECE working time =5:00
113
48 loss time=2:30
161
TOTAL WORKER 16
LINE NUMBER 7
CHEFF NAME TOTOBA TESFAYE
SHIFT A
TOTAL PACKED PIECE
working time =3:30
30
233
loss time=4:00
263
TOTAL WORKER 28
LINE NUMBER 1
CHEFF NAME MEGERSA DESSALE
SHIFT B
TOTAL PACKED PIECE working time =4:30
91
11 loss time=3:00
102
TOTAL WORKER 28
LINE NUMBER 1
CHEFF NAME MEGERSA DESSALE
SHIFT B
TOTAL PACKED PIECE working time =3:30
78
16 loss time=4:00
94
TOTAL WORKER 24
LINE NUMBER 1
CHEFF NAME MEGERSA DESSALE
SHIFT B
TOTAL WORKER 16
LINE NUMBER 2
CHEFF NAME DEJENE BAYISA
SHIFT B
TOTAL PACKED PIECE working time =4:30
172
loss time=3:00
172
TOTAL WORKER 10
LINE NUMBER 3&7
CHEFF NAME WERKINESH
SHIFT B
TOTAL PACKED PIECE working time =4:00
67
45 loss time=3:30
112
0
00
30
PROBLEM
FACED
Body Problem
Cable Problem
30 Cam Kulpu Problem
Machine Dril Problem
PROBLEM
FACED
PANEL Problem
30 Cable Problem
Machine Dril Problem
PROBLEM
FACED
Quality Control Machine/
Warranty/Check Person
Problem
30 Cable Problem
Shortage of Dril Problem
Shortage of Man Power
PROBLEM
FACED
30
Serigraphy Problem
PROBLEM
FACED
00
KUMTEL
MONTHLY/WEEKLY CONTAINER BALANCE
Container Container
DATE DATE DATE
Balance Balance
11/4/2019 0.603715035 11/11/2019 0.60838675214 11/18/2019
11/5/2019 1.1593385781 11/12/2019 1.10977564103 11/19/2019
7
-4
-4
K
K
11/6/2019 1.2488296426 11/13/2019 1.13194444444 11/20/2019
EE
EE
W
W
11/7/2019 0.4108585859 11/14/2019 1.1875 11/21/2019
11/8/2019 0.8951000389 11/15/2019 1.1952457265 11/22/2019
11/9/2019 0.6944444444 11/16/2019 1.56181 11/23/2019
TOTAL CONTAINER 5.01228632478632 TOTAL CONTAINER 6.79466256410256 TOTAL CONTAINER
KUMTEL
MONTHLY/WEEKLY CONTAINER BALANCE
Container Container
DATE DATE DATE
Balance Balance
12/2/2019 0.8675925926 10/9/2019 0.11111111111 12/16/2019
0
1
12/3/2019 0.6577457265 10/10/2019 0.41111111111 12/17/2019
-5
-5
K
K
12/4/2019 0.4569444444 10/11/2019 0.05 12/18/2019
EE
EE
W
W
12/5/2019 0.4087606838 10/12/2019 0.26367521368 12/19/2019
12/6/2019 0.1041666667 10/13/2019 0.35961538462 12/20/2019
12/7/2019 0.3680555556 10/14/2019 0.31346153846 12/21/2019
TOTAL CONTAINER 2.86326566951567 TOTAL CONTAINER 1.50897435897436 TOTAL CONTAINER
BALANCE
TH
N
O
Container Container
M
DATE
R
Balance Balance
PE
1.02938 11/25/2019 0.9347222
1.219444444 11/26/2019 1.0381944
9
-4
-4
K
K
1.610416667 EE 11/27/2019 1.3680556
EE
W TOTAL
W
1.285416667 11/28/2019 1.6664352 CONTAINER
1.184722222 11/29/2019 1.6699074
1.39931 11/30/2019 1.58333
7.72869 TOTAL CONTAINER 8.26064481481482 27.7962837037
BALANCE
TH
N
O
Container Container
M
DATE
R
Balance Balance
PE
0.213461538 12/23/2019 0.4163462
2
3
0.255769231 12/24/2019 1.0346154
-5
-5
K
K
0.827136752 12/25/2019 1.1995192
EE
EE
TOTAL
W
7/17/2019 A 5 YOSEF & HOMA 60S-13 STANDING OVEN (1G+3E) 100 65 65%
7/17/2019 A 1 MEGERSA & GERESU 3838 KH-3838 MINI OVEN 200 140 70%
7/17/2019 A 3 DEJENE & ASSEFA 3901 KF-3901 MIDDLE OVEN 100 45 45%
7/17/2019 B 1 TOTOBA 3838 KH-3838 MINI OVEN 200 115 58%
TOTAL 365
AVERAGE PERFORMANCE
59%
7/22/2019 A 5 YOSEF & HOMA 60S-22 STANDING OVEN (2G+2E) 100 86 86%
7/22/2019 A 1 TOTOBA 3837 KH-3837 MINI OVEN 200 130 65%
7/22/2019 A 3 DEJENE & ASSEFA 3901 KF-3901 MIDDLE OVEN 100 50 50%
7/22/2019 B 1 MEGERSA & GERESU 3837 KH-3837 MINI OVEN 200 121 61%
TOTAL 387
AVERAGE PERFORMANCE
65%
7/24/2019 A 5 YOSEF & HOMA 60S-22 STANDING OVEN (2G+2E) 100 92 92%
7/24/2019 A 1 TOTOBA 3837 KH-3837 MINI OVEN 200 106 53%
7/24/2019 A 3 DEJENE & ASSEFA 3901 KF-3901 MIDDLE OVEN 100 50 50%
7/24/2019 B 1 MEGERSA & GERESU 3837 KH-3837 MINI OVEN 200 120 60%
TOTAL 368
AVERAGE PERFORMANCE
64%
8/15/2019 A 1 MEGERSA & GERESU 3837 KH-3837 MINI OVEN 200 135 68% 13525 10
100
8/15/2019 A 5 YOSEF & HOMA 60S-22 STANDING OVEN (2G+2E) 80 80% 3120 72
100 77
8/15/2019 B 3 DEJENE & ASSEFA 3901 KF-3901 MIDDLE OVEN 77% 13520 50
13520/70/75/25 200 206
8/15/2019 B 8 TOTOBA & 3120/5320 c KF-13520 MINI OVEN 103% 5320 C 38
TOTAL 498 13570 31
AVERAGE PERFORMANCE
82% 13575 5
8/26/2019 A 1 MEGERSA & GERESU 5320 KF-5320 MINI OVEN 50 77 154% 0 77 Lack of Carton
150 0
8/26/2019 A 1 MEGERSA & GERESU 3576 KF-3576 MINI OVEN 23 15% 23 Lack of Carton
200 131 59
8/26/2019 B 8 TOTOBA & TILAHUN 5320 C KF-5320 C MINI OVEN 66% 72
8/26/2019 B 3 DEJENE & HOMA 3902 KF-3902 MIDDLE OVEN 100 75 75% 75 0
TOTAL 396 total packed=191
AVERAGE PERFORMANCE
80% total none packed =205
KUMTEL ASSEMBLY DEPARTMENT DAILY REAL PRODUCTION REPORT REMARK
TARGET Reason
DATE SHIFT LINE NO. LINE CHIEF NAME PRODUCT CODE PRODUCT NAME REAL PCS DAILY EFFICIENCY packed not packed
PLAN
100
8/27/2019 A 5 ASSEFA & YOSEF 60S-22 STANDING OVEN (2G+2E) 12 12% 12 68
100
8/27/2019 A 1 MEGERSA & GERESU 5320 KF-5320 MINI OVEN 83 83% 83
200
8/27/2019 A 1 MEGERSA & GERESU 3576 KF-3576 MINI OVEN 37 19% 37 58
300 205
8/27/2019 B 8 TOTOBA & TILAHUN 5320 C KF-5320 C MINI OVEN 68% 205
100 28
8/27/2019 B 3 DEJENE & HOMA 3902 KF-3902 MIDDLE OVEN 28% 28 60
TOTAL 365 total packed=365
AVERAGE PERFORMANCE
42% total none packed =186
100
8/29/2019 A 5 ASSEFA & YOSEF 60S-22 STANDING OVEN (2G+2E) 110 110% 110
25
8/29/2019 A 1 MEGERSA & GERESU 5320 KF-5320 MINI OVEN 14 56% 14
75
8/29/2019 A 1 MEGERSA & GERESU 3576 KF-3576 MINI OVEN 42 56% 42 Lack of Carton
100
8/29/2019 A 1 MEGERSA & GERESU 3577 KF-3577 MINI OVEN 78 78% 78 Lack of Carton
300 278
8/29/2019 B 8 TOTOBA & TILAHUN 5320 C KF-5320 C MINI OVEN 93% 218 60
100 87
8/29/2019 B 3 DEJENE & HOMA 3902 KF-3902 MIDDLE OVEN 87% 44 43 Lack of Tepsi
TOTAL 609 total packed=386
AVERAGE PERFORMANCE
80% total none packed =223
100
8/30/2019 A 5 ASSEFA & YOSEF 60S-22 STANDING OVEN (2G+2E) 96 96% 30 66
200
8/30/2019 A 1 MEGERSA & GERESU 5320 KF-5320 MINI OVEN 161 81% 161
200
8/30/2019 A 1 MEGERSA & GERESU 3576 KF-3576 MINI OVEN 164 82% 164
50
8/30/2019 A 1 MEGERSA & GERESU 3577 KF-3577 MINI OVEN 6 12% 6
300 140
8/30/2019 B 8 TOTOBA & TILAHUN 5320 KF-5320 MINI OVEN 47% 49 91 Lack of C/Tepsi
100 46
8/30/2019 B 3 DEJENE & HOMA 3902 KF-3902 MIDDLE OVEN 46% 26 20
100
8/31/2019 A 5 ASSEFA & YOSEF 60S-22 STANDING OVEN (2G+2E) 86 86% 71 15 Lack of Upper Izgara
200
8/31/2019 A 1 MEGERSA & GERESU 3576 KF-3576 MINI OVEN 147 74% 107 40 Lack of C/Tepsi
300 147
8/31/2019 B 8 TOTOBA & TILAHUN 5320 KF-5320 MINI OVEN 49% 54 93 Lack of C/Tepsi
100 91
8/31/2019 B 3 DEJENE & HOMA 3902 KF-3902 MIDDLE OVEN 91% 34 57 Lack of C/Tepsi
TOTAL 471 total packed=266
AVERAGE PERFORMANCE
75% total none packed =205
100 60 60%
9/2/2019 A 5 ASSEFA & YOSEF 60S-22 STANDING OVEN (2G+2E)
150 110 73%
9/2/2019 A 3 DEJENE 3902 KF-3902 MIDDLE OVEN
200 102 51%
9/2/2019 A 1 HOMA 3576/77 KF-3576/77 MINI OVEN
300 112 37%
9/2/2019 A 8 TOTOBA & TILAHUN 5320 KF-5320 MINI OVEN
200 76 38%
9/2/2019 B 1 MEGERSA & GERESU 3576/77 KF-3576/77 MINI OVEN
100 32 32%
9/2/2019 B 1 MEGERSA & GERESU 5320 KF-5320 MINI OVEN
TOTAL 492
52%
AVERAGE PERFORMANCE
100 65 65%
9/3/2019 A 5 ASSEFA & YOSEF 60S-22 STANDING OVEN (2G+2E)
100 75 75%
9/3/2019 A 3 DEJENE & HOMA 3902 KF-3902 MIDDLE OVEN
300 263 88%
9/3/2019 A 8 TOTOBA & TILAHUN 5320 KF-5320 MINI OVEN
200 154 77%
9/3/2019 B 1 MEGERSA & GERESU 3576 KF-3576 MINI OVEN
TOTAL 557
76%
AVERAGE PERFORMANCE
100 93 93%
9/4/2019 A 5 ASSEFA & YOSEF 60S-22 STANDING OVEN (2G+2E)
100 48 48%
9/4/2019 A 3 DEJENE & HOMA 3902 KF-3902 MIDDLE OVEN
300 300 100%
9/4/2019 A 8 TOTOBA & TILAHUN 5320 KF-5320 MINI OVEN
25 14 56%
9/4/2019 B 1 MEGERSA & GERESU 3576 KF-3576 MINI OVEN
175 167 95%
9/4/2019 B 1 MEGERSA & GERESU 3560 KF-3560 MINI OVEN
TOTAL 622
74%
AVERAGE PERFORMANCE
100 80 80%
9/5/2019 A 5 ASSEFA & YOSEF 60S-22 STANDING OVEN (2G+2E)
100 35 35%
9/5/2019 A 3 DEJENE & HOMA 3902 KF-3902 MIDDLE OVEN
300 180 60%
9/5/2019 A 8 TOTOBA & TILAHUN 5320 KF-5320 MINI OVEN
300 236 79%
9/5/2019 B 1 MEGERSA & GERESU 3576/60 KF-3576/60 MINI OVEN
TOTAL 531
63%
AVERAGE PERFORMANCE
100 83 83%
9/6/2019 A 5 ASSEFA & YOSEF 60S-22 STANDING OVEN (2G+2E)
100 23 23%
9/6/2019 A 3 DEJENE & HOMA 3902 KF-3902 MIDDLE OVEN
200 73 37%
9/6/2019 B 1 MEGERSA & GERESU 3576/77 KF-3576/77 MINI OVEN
TOTAL 678
69%
AVERAGE PERFORMANCE
TOTAL 444
54%
AVERAGE PERFORMANCE
9/9/2019 A 5 ASSEFA & YOSEF 60S-22 STANDING OVEN (2G+2E) 200 175 88% 3560
175
9/9/2019 A 1 MEGERSA & GERESU 3560/77/76 & 5320 KF-3560/77/76/ &5320 MINI OVEN 300 232 77% 3577
232
9/9/2019 A 8 TOTOBA & TILAHUN 5320 KF-5320 MINI OVEN 200 80 40% 3576
80
9/9/2019 B 3 DEJENE & HOMA 3902 KF-3902 MIDDLE OVEN 100 81 81% 5320
52 29 Lack of Izgara
9/10/2019 A 5 ASSEFA & YOSEF 60S-22 STANDING OVEN (2G+2E) 150 104 69%
0 104 Lack of Carton
9/10/2019 A 1 MEGERSA & GERESU 3560 KF-3560 MINI OVEN 200 161 81%
161 0
9/10/2019 B 3 DEJENE & HOMA 3902 KF-3902 MIDDLE OVEN 100 80 80%
17 63 Lack of Both Izgara
TOTAL 366
total packed=178
63%
AVERAGE PERFORMANCE total none packed =188
9/11/2019 B 3 DEJENE & HOMA 3902 KF-3902 MIDDLE OVEN 100 80 80% 17 63 Lack of Both Izgara
TOTAL 366 total packed=178
AVERAGE PERFORMANCE
63% total none packed =188
9/13/2019 B 3 DEJENE & HOMA 3902 KF-3902 MIDDLE OVEN 100 42 42%
34 8
9/14/2019 A 5 ASSEFA & YOSEF 60S-22 STANDING OVEN (2G+2E) 150 84 56%
0 84 Lack of Carton
9/14/2019 A 1 MEGERSA & GERESU 3576 KF-3576 MINI OVEN 200 167 84%
157 10
9/14/2019 A 8 TOTOBA & TILAHUN 5320 KF-5320 MINI OVEN 200 140 70%
0 140 lack of man-power
9/14/2019 B 3 DEJENE & HOMA 3902 KF-3902 MIDDLE OVEN 100 93 93%
12 81 Lack of Carton & Upper Izgara
TOTAL 484 total packed=169
AVERAGE PERFORMANCE
76% total none packed =315
9/16/2019 A 5 ASSEFA & YOSEF 60S-22 STANDING OVEN (2G+2E) 150 31 21%
0 31 Lack of Carton
9/16/2019 A 3 DEJENE & HOMA 3902 KF-3902 MIDDLE OVEN 100 64 64%
21 43 Lack of Carton
9/16/2019 A 8 TOTOBA & TILAHUN 5320 KF-5320 MINI OVEN 200 120 83%
83 37 lack of Izgara
9/16/2019 B 1 MEGERSA & GERESU 3576 KF-3576 MINI OVEN 300 220 73%
220 0
9/17/2019 A 5 ASSEFA & YOSEF 60S-22 STANDING OVEN (2G+2E) 150 149 99%
149
9/17/2019 A 3 DEJENE & HOMA 3902 KF-3902 MIDDLE OVEN 100 70 70%
0 70 Lack of Carton
9/17/2019 A 8 TOTOBA & TILAHUN 5320 KF-5320 MINI OVEN 300 235 83%
235 0
9/17/2019 B 1 MEGERSA & GERESU 3576 KF-3576 MINI OVEN 300 173 58%
173 0
9/18/2019 A 5 ASSEFA & YOSEF 60S-22 STANDING OVEN (2G+2E) 100 40 40%
40
9/18/2019 A 5 ASSEFA & YOSEF 60S-13 STANDING OVEN (1G+3E) 100 59 59%
59
9/18/2019 A 3 DEJENE & HOMA 3902 KF-3902 MIDDLE OVEN 100 75 75%
0 75 Lack of Carton
9/18/2019 A 8 TOTOBA & TILAHUN 3800 3800 ROUND OVEN 100 56 56%
56 0
9/18/2019 B 1 MEGERSA & GERESU 3560 KF-3560 MINI OVEN 300 195 65%
195 0
9/20/2019 A 5 ASSEFA & YOSEF 60S-22 STANDING OVEN (2G+2E) 100 74 74%
74 Rework
9/20/2019 A 5 ASSEFA & YOSEF 60S-13 STANDING OVEN (1G+3E) 100 90 90%
90
9/20/2019 A 5 ASSEFA & YOSEF 60S-04 STANDING OVEN (4E) 100 6 6%
6
9/20/2019 A 3 DEJENE & HOMA 3902 KF-3902 MIDDLE OVEN 100 21 21%
21 Lack of Tepsi
9/20/2019 A 8 TOTOBA & TILAHUN 3800 3800 ROUND OVEN 100 70 70%
70
9/20/2019 B 1 MEGERSA & GERESU 3560/76 KF-3560 /76 MINI OVEN 300 182 61%
182
TOTAL 800 443 total packed=443
54%
AVERAGE PERFORMANCE total none packed =0
9/21/2019 A 5 ASSEFA & YOSEF 60S-22 STANDING OVEN (2G+2E) 100 60 60%
60 0
9/21/2019 A 5 ASSEFA & YOSEF 60S-04 STANDING OVEN (4E) 100 73 73%
73 0
9/21/2019 A 3 DEJENE & HOMA 3902 KF-3902 MIDDLE OVEN 100 55 55%
30 25 Lack of Upper Izgara
9/21/2019 A 8 TOTOBA & TILAHUN 3800 3800 ROUND OVEN 100 25 25%
25 0
9/21/2019 B 1 MEGERSA & GERESU 3560/76 KF-3560 /76 MINI OVEN 300 222 74%
222
TOTAL 700 435 total packed=410
AVERAGE PERFORMANCE
57% total none packed =25
9/23/2019 A 5 HOMA & YOSEF 60S-04 STANDING OVEN (4E) 100 58 58%
57 1
9/23/2019 A 1 MEGERSA & GERESU 3560 KF-3560 MINI OVEN 300 147 49%
147 0
9/23/2019 A 9 TOTOBA & TILAHUN 3800 3800 ROUND OVEN 100 30 30%
30 0
9/25/2019 A 5 HOMA & YOSEF 60S-04 STANDING OVEN (4E) 100 90 90%
77 13 Lack of tray & door
9/25/2019 A 1 MEGERSA & GERESU 3560 KF-3560 MINI OVEN 300 154 51%
72 82 Lack of tray
9/25/2019 A 9 TOTOBA & TILAHUN 3800 3800 ROUND OVEN 100 36 36%
25 11 Lack of tray
9/26/2019 A 5 HOMA & YOSEF 60S-04 STANDING OVEN (4E) 150 117 78%
117 0
9/26/2019 A 1 MEGERSA & GERESU 3576/60 KF-3576/60 MINI OVEN 300 275 92%
275 0
9/26/2019 A 9 TOTOBA & TILAHUN 3800 3800 ROUND OVEN 100 56 56%
52 4
9/27/2019 A 5 HOMA & YOSEF 60S-04 STANDING OVEN (4E) 100 80 80%
63 17 Lack of Door
9/27/2019 A 1 MEGERSA & GERESU 3576 KF-3576 MINI OVEN 300 170 57%
170 0
9/27/2019 A 9 TOTOBA & TILAHUN 3800 3800 ROUND OVEN 100 35 35%
12 23 Lack of Izgara
9/27/2019 A 8 ASSEFA 13570/75 Lx-1357/75 MINI OVEN 200 30 15%
25 5
9/30/2019 A 5 HOMA & YOSEF 60S-04 STANDING OVEN (4E) 100 90 90%
90 0
9/30/2019 A 9 TOTOBA & TILAHUN 3800 3800 ROUND OVEN 100 44 44%
26 18 Lack of Round Tray
9/30/2019 B 1 MEGERSA & GERESU 3576 KF-3576 MINI OVEN 300 175 58%
175 0
TOTAL 600 351 total packed=291
AVERAGE PERFORMANCE
59% total none packed =60
10/2/2019 A 5 HOMA & YOSEF 60S-04 STANDING OVEN (4E) 150 103 69% 98 5 Lack of door/on kapak/
10/2/2019 A 3 DEJENE 3900 KF-3900 MIDDLE OVEN 100 83 83% 38 45 Lack of Upper Izgara & Round Tray
10/2/2019 A 9 TOTOBA & TILAHUN 3800 3800 ROUND OVEN 100 60 60% 36 24 Lack of Round Tray
10/2/2019 A 8 ASSEFA 13575 Lx-13575 MINI OVEN 200 26 13% 26 0
10/2/2019 B 1 MEGERSA & GERESU 3576 KF-3576 MINI OVEN 300 186 62% 186 0
TOTAL 850 458 total packed=291
AVERAGE PERFORMANCE
57% total none packed =60
10/3/2019 A 5 HOMA & YOSEF 60S-04 STANDING OVEN (4E) 150 91 61%
91 0
10/3/2019 A 9 TOTOBA & TILAHUN 3800 3800 ROUND OVEN 100 62 62%
49 13 Lack of Round Tray
10/3/2019 B 1 MEGERSA & GERESU 3576 KF-3576 MINI OVEN 300 191 64%
191 0
TOTAL 850 447 total packed=384
AVERAGE PERFORMANCE
55% total none packed =63
10/4/2019 A 5 HOMA & YOSEF 60S-04 STANDING OVEN (4E) 150 103 69%
87 16 Lack of Round Tray
10/4/2019 A 3 DEJENE 3900 KF-3900 MIDDLE OVEN 100 70 70%
21 49 Lack of Upper Izgara & Round Tray
10/4/2019 A 9 TOTOBA & TILAHUN 3800 3800 ROUND OVEN 100 50 50%
23 27 Lack of Round Tray
10/4/2019 B 1 MEGERSA & GERESU 3576 KF-3576 MINI OVEN 300 180 60%
180 0
TOTAL 650 403 total packed=311
62%
AVERAGE PERFORMANCE total none packed =92
10/7/2019 A 5 HOMA & YOSEF 60S-04 STANDING OVEN (4E) 100 80 80%
80
10/7/2019 A 1 MEGERSA & GERESU 3576 KF-3576 MINI OVEN 300 174 58%
174
10/7/2019 A 9 TOTOBA & TILAHUN 3800 3800 ROUND OVEN 100 38 38%
26 12 Lack of Round Tray
10/7/2019 B 3 DEJENE 3900 KF-3900 MIDDLE OVEN 100 53 53%
0 53 Lack of Upper Izgara & Round Tray
TOTAL 600 345 total packed=280
57%
AVERAGE PERFORMANCE total none packed =65
10/8/2019 A 5 HOMA & YOSEF 60S-04 STANDING OVEN (4E) 100 70 70%
70
10/8/2019 A 1 MEGERSA & GERESU 3576 KF-3576 MINI OVEN 300 160 53%
160
10/8/2019 A 9 TOTOBA & TILAHUN 3800 3800 ROUND OVEN 100 21 21%
0 21 Lack of Round Tray
10/9/2019 A 5 HOMA & YOSEF 60S-04 STANDING OVEN (4E) 100 76 76%
76
10/9/2019 A 1 MEGERSA & GERESU 3576 KF-3576 MINI OVEN 300 200 67%
200
10/9/2019 A 9 TOTOBA & TILAHUN 3800 3800 ROUND OVEN 100 55 55%
15 40 Lack of Round Tray
10/9/2019 B 3 DEJENE 3900 KF-3900 MIDDLE OVEN 100 54 54%
18 36 Lack of Upper Izgara & Round Tray
TOTAL 600 385 total packed=309
AVERAGE PERFORMANCE
63% total none packed =76
KUMTEL ASSEMBLY DEPARTMENT DAILY REAL PRODUCTION REPORT REMARK
Reason
DATE SHIFT LINE NO. LINE CHIEF NAME PRODUCT CODE PRODUCT NAME TARGET REAL PCS DAILY EFFICIENCY Packed Not packed
PLAN
### A 5 HOMA & YOSEF 60S-04 STANDING OVEN (4E) 100 71 71%
71 0
### A 1 MEGERSA & GERESU 3576 KF-3576 MINI OVEN 300 212 71%
212 0
### A 9 TOTOBA & TILAHUN 3800 3800 ROUND OVEN 100 58 58%
0 58 Lack of Round Tray
### B 3 DEJENE 3900 KF-3900 MIDDLE OVEN 100 32 32%
12 20 Lack of Upper Izgara & Round Tray
### A 5 HOMA & YOSEF 60S-04 STANDING OVEN (4E) 150 156 104%
156 0
### A 1 MEGERSA & GERESU 3576/60 KF-3576/60 MINI OVEN 300 212 71%
212 0
### A 9 TOTOBA & TILAHUN 3800 3800 ROUND OVEN 100 23 23%
0 23 Lack of Round Tray
### B 3 DEJENE 3900 KF-3900 MIDDLE OVEN 100 32 32%
0 32 Lack of Upper Izgara & Round Tray
TOTAL 650 423 total packed=368
57%
AVERAGE PERFORMANCE total none packed =55
### A 5 HOMA & YOSEF 60S-04 STANDING OVEN (4E) 100 90 90%
90 0
### A 1 MEGERSA & GERESU 3576/60 KF-3576/60 MINI OVEN 300 189 63%
164 25 Lack of glass
### A 9 TOTOBA & TILAHUN 200 Lx- 200 EUROTEC 200 52 26%
52 0
### A 5 HOMA & YOSEF 60S-04 STANDING OVEN (4E) 100 82 82%
56 26 0.388888888889
### A 3 DEJENE 3900 KF-3900 MIDDLE OVEN 100 38 38%
0 38 0 Lack of Round Tray
### A 9 TOTOBA & TILAHUN 200 Lx- 200 EUROTEC 200 67 34%
67 0 0.022333333333
### B 1 MEGERSA & GERESU 3576 KF-3576 MINI OVEN 300 265 88%
265 0 0.552083333333
### A 5 HOMA & YOSEF 60S-04 STANDING OVEN (4E) 150 132 88%
40 92 0.277777777778 Lack of door
### A 3 DEJENE 3900 KF-3900 MIDDLE OVEN 100 40 40%
17 23 0.047222222222 Lack of Round Tray
### A 9 TOTOBA & TILAHUN 200 Lx- 200 EUROTEC 200 94 47%
94 0 0.031333333333
### B 1 MEGERSA & GERESU 3576/60 KF-3576/60 MINI OVEN 300 230 77%
230 0 0.479166666667
### A 5 ASSEFA & YOSEF 60S-04 STANDING OVEN (4E) 100 90 90%
30 60 0.208333333333 Lack of Carton
### A 3 DEJENE & HOMA 3900 KF-3900 MIDDLE OVEN 100 32 32%
0 32 0 Lack of Round Tray
### A 9 TOTOBA & TILAHUN 200 Lx- 200 EUROTEC 200 33 17%
33 0 0.011
### B 1 MEGERSA & GERESU 3576 KF-3576 MINI OVEN 300 186 62%
186 0 0.3875
### A 5 ASSEFA & YOSEF 60S-13 STANDING OVEN (3E+1G) 100 100 100%
0 100 0 Lack of Carton
### A 3 DEJENE & HOMA 3900 KF-3900 MIDDLE OVEN 100 50 50%
50 0 0.138888888889
### A 9 TOTOBA & TILAHUN 3800 3800 ROUND OVEN 100 40 40%
13 27 0.024436090226 Lack of Round Tray
### B 1 MEGERSA & GERESU 3576/60 KF-3576/60 MINI OVEN 300 242 81%
242 0 0.504166666667
### A 5 ASSEFA & YOSEF 60S-13 STANDING OVEN (3E+1G) 100 100 100%
30 70 0.208333333333 Lack of Carton
### A 3 DEJENE & HOMA 3900 KF-3900 MIDDLE OVEN 100 48 48%
28 20 0.077777777778 Lack of Upper Izgara
### A 9 TOTOBA & TILAHUN 3800 3800 ROUND OVEN 100 45 45%
45 0 0.084586466165
### B 1 MEGERSA & GERESU 3576/60 KF-3576/60 MINI OVEN 300 232 77%
232 0 0.483333333333
### A 5 ASSEFA & YOSEF 60S-22 STANDING OVEN (2G+2E) 100 90 90%
0 90 0 Lack of Carton
### A 3 DEJENE & HOMA 3900 KF-3900 MIDDLE OVEN 100 43 43%
7 36 0.019444444444 Lack of Upper Izgara
### A 9 TOTOBA & TILAHUN 3800 3800 ROUND OVEN 100 47 47%
47 0 0.088345864662
### B 1 MEGERSA & GERESU 3560 KF-3560 MINI OVEN 300 201 67%
201 0.41875
### A 5 ASSEFA & YOSEF 60S-22 STANDING OVEN (2G+2E) 100 75 75%
0 75 0 Lack of Carton
### A 1 MEGERSA & GERESU 3560 KF-3560 MINI OVEN 300 201 67%
63 138 0.13125 Lack of Carton
### A 9 TOTOBA & TILAHUN 3800 3800 ROUND OVEN 100 57 57%
47 10 0.088345864662 Shortage of Round Tray
### B 3 DEJENE & HOMA 3900 KF-3900 MIDDLE OVEN 100 23 23%
0 23 0 Lack of Upper Izgara
### A 5 ASSEFA & YOSEF 60S-22 STANDING OVEN (2G+2E) 100 35 35%
0 35 0 Lack of Carton
### A 1 MEGERSA & GERESU 3560 KF-3560 MINI OVEN 300 193 64%
0 193 0 Lack of Carton
### A 9 TOTOBA & TILAHUN 3800 3800 ROUND OVEN 100 44 44%
24 20 0.045112781955
### B 3 DEJENE & HOMA 3900 KF-3900 MIDDLE OVEN 100 61 61%
45 16 0.125 Lack of Upper Izgara
### A 5 ASSEFA & YOSEF 50s50 MIDDLE STANDING OVEN (50*50) 100 19 19%
19 0 0.07196969697
### A 1 MEGERSA & GERESU 3560 KF-3560 MINI OVEN 300 135 45%
0 135 0 Lack of Carton
### A 9 TOTOBA & TILAHUN 3800 3800 ROUND OVEN 100 26 26%
26 0 0.048872180451
### A 5 ASSEFA & YOSEF 50s50 MIDDLE STANDING OVEN (50*50) 100 40 40%
0 40 0 Lack of Carton
### A 1 MEGERSA & GERESU 3560 KF-3560 MINI OVEN 300 124 41%
0 124 0 Lack of Carton
### A 9 TOTOBA & TILAHUN 3800 3800 ROUND OVEN 100 64 64%
64 0 0.12030075188
### B 3 DEJENE & HOMA 3900 KF-3900 MIDDLE OVEN 100 118 118%
55 63 0.152777777778 Lack of Upper Izgara
### A 5 ASSEFA & YOSEF 60s-22 STANDING OVEN (2G+2E) 100 20 20%
0 20 0 Lack of Carton
### A 1 MEGERSA & GERESU 3560 KF-3560 MINI OVEN 300 188 63%
0 188 0 Lack of Carton
### A 9 TOTOBA & TILAHUN 3800 3800 ROUND OVEN 100 40 40%
28 12 0.052631578947
### B 3 DEJENE & HOMA 3900 KF-3900 MIDDLE OVEN 100 85 85%
64 21 0.177777777778 Lack of Upper Izgara
### A 5 ASSEFA & YOSEF 60s-22 STANDING OVEN (2G+2E) 100 95 95%
55 40 0.381944444444 Lack of Door
### A 3 DEJENE & HOMA 3900 KF-3900 MIDDLE OVEN 100 90 90%
67 23 0.186111111111
### A 9 TOTOBA & TILAHUN 3800 3800 ROUND OVEN 100 40 40%
11 29 0.021153846154 Lack of Round Tray
### B 1 MEGERSA & GERESU 3560 KF-3560 MINI OVEN 300 330 110%
330 0 0.6875
### A 5 ASSEFA & YOSEF 60s-22 STANDING OVEN (2G+2E) 100 95 95%
95 0 0.659722222222
### A 3 DEJENE & HOMA 3900 KF-3900 MIDDLE OVEN 100 90 90%
70 20 0.194444444444
### A 9 TOTOBA & TILAHUN 3800 3800 ROUND OVEN 100 50 50%
27 23 0.051923076923 Lack of Round Tray
### A 1 GERESU ASSEFA 3560 KF-3560 MINI OVEN 300 256 85%
256 0 0.533333333333
### B 1 MEGERSA & GERESU 3576/60 KF-3576/60 MINI OVEN 300 271 90%
271 0 0.564583333333
### A 5 ASSEFA & YOSEF 50-S50 MIDDLE STANDING OVEN (50*50) 100 41 41%
32 9 0.121212121212
### A 3 DEJENE & HOMA 3900 KF-3902 MIDDLE OVEN 100 53 53%
40 13 0.111111111111 Lack of Round Tray
### A 9 TOTOBA & TILAHUN 3800 3800 ROUND OVEN 100 66 66%
32 34 0.061538461538 Shortage of Izgara
### A 1 GERESU ASSEFA 3560 KF-3560 MINI OVEN 300 140 47%
140 0 0.291666666667
### B 1 MEGERSA & GERESU 3576 KF-3576 MINI OVEN 300 213 71%
213 0 0.44375
### A 3 DEJENE & HOMA 3900 KF-3902 MIDDLE OVEN 100 68 68%
48 20 0.133333333333
### A 9 TOTOBA & TILAHUN 3800 3800 ROUND OVEN 100 58 58%
20 38 0.038461538462 Lack of Round Tray
### A 1 GERESU ASSEFA 3560 KF-3560 MINI OVEN 300 222 74%
222 0 0.4625
### B 1 MEGERSA & GERESU 3576 KF-3576 MINI OVEN 300 269 90%
269 0 0.560416666667
11/1/2019 A 5 ASSEFA BEKELE 50-S50 MIDDLE STANDING OVEN (50*50) 100 84 84%
78 6 0.295454545455
11/1/2019 A 3 DEJENE & HOMA 3900 KF-3902 MIDDLE OVEN 100 70 70%
45 25 0.125
11/1/2019 A 9 TOTOBA & TILAHUN 3800 3800 ROUND OVEN 100 60 60%
0 60 0 Lack of Round Tray
11/1/2019 B 1 MEGERSA & GERESU 3576 KF-3576 MINI OVEN 300 257 86%
257 0 0.535416666667
11/2/2019 A 5 ASSEFA BEKELE 50-S50 MIDDLE STANDING OVEN (50*50) 100 80 80%
80 0 0.30303030303
11/2/2019 A 3 DEJENE & HOMA 3900 KF-3902 MIDDLE OVEN 100 82 82%
51 31 0.141666666667
11/2/2019 A 9 TOTOBA & TILAHUN 3800 3800 ROUND OVEN 100 40 40%
0 40 0 Lack of Round Tray
11/2/2019 B 1 MEGERSA & GERESU 3576 KF-3576 MINI OVEN 300 181 60%
181 0 0.377083333333
TOTAL 650 416 total packed=345
AVERAGE PERFORMANCE
66% total none packed =71
1.0509469697
11/4/2019 A 5 ASSEFA BEKELE 50-S50 MIDDLE STANDING OVEN (50*50) 100 60 60%
60 0 0.227272727273
11/4/2019 A 1 MEGERSA & GERESU 3576 KF-3576 MINI OVEN 300 114 38%
85 29 0.177083333333
11/4/2019 A 9 TOTOBA & TILAHUN 3800 3800 ROUND OVEN 100 31 31%
17 14 0.032692307692 Lack of Round Tray
11/4/2019 B 3 DEJENE & HOMA 3900 KF-3900 MIDDLE OVEN 100 60 60%
60 0 0.166666666667
11/5/2019 A 9 TOTOBA & TILAHUN 3800 3800 ROUND OVEN 100 40 40%
2 38 0.003846153846 Lack of Round Tray
11/5/2019 A 3 DEJENE & HOMA 3900 KF-3900 MIDDLE OVEN 100 72 72%
72 0 0.2
11/5/2019 B 3 DEJENE & HOMA 3900 KF-3900 MIDDLE OVEN 100 114 114%
93 21 0.258333333333 Shortgae of Upper Izgara
11/6/2019 A 5 ASSEFA BEKELE 50-S50 MIDDLE STANDING OVEN (50*50) 100 82 82%
76 6 0.287878787879
11/6/2019 A 1 MEGERSA & GERESU 3576 KF-3576 MINI OVEN 300 167 56%
167 0 0.347916666667
11/6/2019 A 9 TOTOBA & TILAHUN 3800 3800 ROUND OVEN 100 56 56%
14 42 0.026923076923 Lack of Round Tray
11/6/2019 A 3 DEJENE & HOMA 3900 KF-3900 MIDDLE OVEN 100 35 35%
35 0 0.097222222222
11/6/2019 B 3 DEJENE & HOMA 3900 KF-3900 MIDDLE OVEN 100 91 91%
91 0 0.252777777778
NB:- 35 piece of Middle oven & 34 piece of standing oven product is rework
/repacked /product through over time
11/7/2019 A 5 ASSEFA BEKELE 50-S50 MIDDLE STANDING OVEN (50*50) 100 82 82%
63 19 0.238636363636
11/7/2019 A 9 TOTOBA & TILAHUN 3800 3800 ROUND OVEN 100 34 34%
0 34 0 Lack of Round Tray
11/7/2019 B 3 DEJENE & HOMA 3900 KF-3900 MIDDLE OVEN 100 62 62%
62 0 0.172222222222
### A 9 TOTOBA & TILAHUN 3800 3800 ROUND OVEN 100 14 14% Lack of Round Tray
4 10 0.007692307692
### A 3 DEJENE & HOMA 3902 KF-3902 MIDDLE OVEN 100 10 10%
10 0 0.027777777778
### B 1 MEGERSA & GERESU 5365 KF-5365 MINI OVEN 200 80 40% Lack of Handle
65 15 0.135416666667
### A 5 ASSEFA BEKELE 60s-22 STANDING OVEN (2G+2E) 150 103 69%
103 0 0.715277777778
### A 9 TOTOBA & TILAHUN 3800 3800 ROUND OVEN 100 37 37% Lack of Round Tray
4 33 0.007692307692
### A 3 DEJENE & HOMA 3902 KF-3902 MIDDLE OVEN 100 35 35%
29 6 0.080555555556
### B 1 MEGERSA & GERESU 5365 KF-5365 MINI OVEN 200 147 74%
147 0 0.30625
### A 5 ASSEFA BEKELE 60s-22 STANDING OVEN (2G+2E) 150 110 73%
100 10 0.694444444444
### A 9 TOTOBA & TILAHUN 3800 3800 ROUND OVEN 100 61 61% Lack of Round Tray
0 61 0
### A 3 DEJENE & HOMA 3902 KF-3902 MIDDLE OVEN 100 72 72%
72 0 0.2
### B 1 MEGERSA & GERESU 5365 KF-5365 MINI OVEN 200 114 57%
114 0 0.2375
### A 5 ASSEFA BEKELE 60s-22 STANDING OVEN (2G+2E) 150 106 71%
106 0 0.736111111111
### A 9 TOTOBA & TILAHUN 3800 3800 ROUND OVEN 100 80 80% Lack of Round Tray
0 80 0
### A 3 DEJENE & HOMA 3902 KF-3902 MIDDLE OVEN 100 65 65%
65 0 0.180555555556
### B 1 MEGERSA & GERESU 5365 KF-5365 MINI OVEN 200 130 65%
130 0 0.270833333333
TOTAL 550 381 total packed=301
70% 1.1875
AVERAGE PERFORMANCE total none packed =80
KUMTEL ASSEMBLY DEPARTMENT DAILY REAL PRODUCTION REPORT REMARK
TARGET Container Reason
DATE SHIFT LINE NO. LINE CHIEF NAME PRODUCT CODE PRODUCT NAME
PLAN
REAL PCS DAILY EFFICIENCY Packed Not packed Balance
### A 5 ASSEFA BEKELE 60s-22 STANDING OVEN (2G+2E) 150 115 77%
115 0 0.798611111111
### A 9 TOTOBA & TILAHUN 3800 3800 ROUND OVEN 100 96 96% Lack of Round Tray
8 88 0.015384615385
### A 3 DEJENE & HOMA 3902 KF-3902 MIDDLE OVEN 100 60 60%
60 0 0.166666666667
### B 1 MEGERSA & GERESU 5365 KF-5365 MINI OVEN 200 117 59%
103 14 0.214583333333
### A 9 TOTOBA & TILAHUN 3800 3800 ROUND OVEN 100 72 72% Lack of Round Tray
0 72 0
### A 3 DEJENE & HOMA 3902 KF-3902 MIDDLE OVEN 100 42 42%
36 6 0.1
### B 1 MEGERSA & GERESU 3576 KF-3576 MINI OVEN 300 215 72%
215 0 0.447916666667
TOTAL 700 475 total packed=397
66% 1.56180555556
AVERAGE PERFORMANCE total none packed =78
### A 9 TOTOBA & TILAHUN 3800 3800 ROUND OVEN 100 81 81% Lack of Round Tray
3 78 0.005769230769
### A 1 MEGERSA & GERESU 3576 KF-3576 MINI OVEN 300 158 53%
158 0 0.329166666667
### B 3 DEJENE & HOMA 3902 KF-3902 MIDDLE OVEN 100 75 75% Lack of Round Tray
20 55 0.055555555556
TOTAL 650 406 total packed=266
68% 1.02938034188
AVERAGE PERFORMANCE total none packed =133
### A 5 ASSEFA BEKELE 60s-22 STANDING OVEN (2G+2E) 150 108 72%
108 0 0.75
### A 9 TOTOBA & TILAHUN 3800 3800 ROUND OVEN 100 64 64% Lack of Round Tray
0 64 0
### A 1 MEGERSA & GERESU 3576 KF-3576 MINI OVEN 300 188 63%
188 0 0.391666666667
### B 3 DEJENE & HOMA 3902 KF-3902 MIDDLE OVEN 100 77 77% Lack of Round Tray
28 49 0.077777777778
### A 5 ASSEFA BEKELE 60s-22 STANDING OVEN (2G+2E) 150 110 73%
110 0 0.763888888889
### A 9 TOTOBA & TILAHUN 3800 3800 ROUND OVEN 200 101 51% Lack of Round Tray
0 101 0
### A 1 MEGERSA & GERESU 3576 KF-3576 MINI OVEN 350 173 49%
173 0 0.360416666667
### B 3 DEJENE & HOMA 3902 KF-3902 MIDDLE OVEN 150 68 45% Lack of Round Tray
0 68 0
TOTAL 1000 522 total packed=353
53% 1.61041666667
AVERAGE PERFORMANCE total none packed =169
### A 5 ASSEFA BEKELE 60s-22 STANDING OVEN (2G+2E) 150 120 80%
120 0 0.833333333333
### A 9 TOTOBA & TILAHUN 3800 3800 ROUND OVEN 200 37 19% Lack of Round Tray
0 37 0
### A 1 MEGERSA & GERESU 3576 KF-3576 MINI OVEN 350 234 67% Shortage of Rectangular Tray
217 17 0.452083333333
### B 3 DEJENE & HOMA 3902 KF-3902 MIDDLE OVEN 150 70 47% Lack of Round Tray
0 70 0
### A 5 ASSEFA BEKELE 60s-22 STANDING OVEN (2G+2E) 150 110 73%
110 0 0.763888888889
### A 9 TOTOBA & TILAHUN 3800 3800 ROUND OVEN 200 60 30% Lack of Round Tray
0 60 0
### A 1 MEGERSA & GERESU 3576 KF-3576 MINI OVEN 350 256 73%
249 7 0.51875
### B 3 DEJENE & HOMA 3902 KF-3902 MIDDLE OVEN 150 106 71% Lack of Round Tray
42 64 0.116666666667
### A 5 ASSEFA BEKELE 60s-22 STANDING OVEN (2G+2E) 150 104 69%
104 0 0.722222222222
### A 9 TOTOBA & TILAHUN 3800 3800 ROUND OVEN 200 94 47% Lack of Round Tray
0 94 0
### A 3 DEJENE & HOMA 3902 KF-3902 MIDDLE OVEN 150 57 38% Lack of Round Tray
0 57 0
### B 1 MEGERSA & GERESU 3576 KF-3576 MINI OVEN 350 227 65% Lack of Rectangular Tray
102 125 0.2125
### A 9 TOTOBA & TILAHUN 3800 3800 ROUND OVEN 200 120 60% Lack of Round Tray
0 120 0
### A 3 DEJENE & HOMA 3902 KF-3902 MIDDLE OVEN 150 76 51% Lack of Round Tray
0 76 0
### B 1 MEGERSA & GERESU 3576 KF-3576 MINI OVEN 350 185 53%
175 10 0.364583333333
### A 5 ASSEFA BEKELE 60s-22 STANDING OVEN (2G+2E) 150 110 73%
110 0 0.763888888889
### A 9 TOTOBA & HOMA 3800 3800 ROUND OVEN 200 55 28% Lack of Round Tray
0 55 0
### A 9 TOTOBA & HOMA 13525 KF-13525 MINI OVEN 200 24 12%
24 0 0.05
### B 1 MEGERSA & GERESU 3576 KF-3576 MINI OVEN 350 250 71% Shortage of Round Tray
150 100 0.3125
### A 5 ASSEFA BEKELE 60s-22 STANDING OVEN (2G+2E) 150 137 91%
137 0 0.951388888889
### A 9 TOTOBA TESFAYE 3800 3800 ROUND OVEN 200 61 31% Lack of Round Tray
0 61 0
### A 3 DEJENE BAYISA 3902 KF-3902 MIDDLE OVEN 150 115 77%
115 0 0.319444444444
### B 1 GERESU ASSEFA 3576 KF-3576 MINI OVEN 350 257 73%
177 80 0.36875
### A 9 TOTOBA TESFAYE 3800 3800 ROUND OVEN 200 64 32% Lack of Round Tray
0 64 0
### A 3 DEJENE BAYISA 3902 KF-3902 MIDDLE OVEN 300 125 42%
125 0 0.347222222222
### B 1 GERESU ASSEFA 3576 KF-3576 MINI OVEN 350 267 76% shortage of tepsi
160 107 0.333333333333
TOTAL 1200 660 total packed=489
55% 1.66990740741
AVERAGE PERFORMANCE total none packed =171
### A 5 ASSEFA BEKELE 60s-22 STANDING OVEN (2G+2E) 150 122 81%
122 0 0.847222222222
### A 9 TOTOBA TESFAYE 3800 3800 ROUND OVEN 200 56 28% Lack of Round Tray
0 56 0
### A 3 DEJENE BAYISA 3902 KF-3902 MIDDLE OVEN 300 100 33%
100 0 0.277777777778
### B 1 GERESU ASSEFA 3576 KF-3576 MINI OVEN 350 238 68%
220 18 0.458333333333
12/2/2019 A 5 ASSEFA BEKELE 60s-22 STANDING OVEN (2G+2E) 150 110 73%
110 0 0.763888888889
12/2/2019 A 9 TOTOBA TESFAYE 3800 3800 ROUND OVEN 200 94 47% Lack of Round Tray
0 94 0
12/2/2019 A 1 GERESU ASSEFA 3576 KF-3576 MINI OVEN 350 165 47%
32 133 0.066666666667
12/3/2019 A 5 ASSEFA BEKELE 60s-22 STANDING OVEN (2G+2E) 150 88 59% Lack of Round Tray
70 18 0.486111111111
12/3/2019 A 9 TOTOBA TESFAYE 3800 3800 ROUND OVEN 200 76 38% Lack of Round Tray
8 68 0.015384615385
12/3/2019 A 1 GERESU ASSEFA 3576 KF-3576 MINI OVEN 350 175 50% Lack of Rectangular Tray
75 100 0.15625
12/4/2019 A 5 ASSEFA BEKELE 60s-22 STANDING OVEN (2G+2E) 150 102 68% Lack of Round Tray
53 49 0.368055555556
12/4/2019 A 9 TOTOBA TESFAYE 3800 3800 ROUND OVEN 200 36 18% Lack of Round Tray
0 36 0
12/4/2019 A 1 GERESU ASSEFA 3576 KF-3576 MINI OVEN 350 231 66% Lack of Rectangular Tray
0 231 0
12/5/2019 A 5 ASSEFA BEKELE 60s-22 STANDING OVEN (2G+2E) 150 120 80% Lack of Round Tray
32 88 0.222222222222
12/5/2019 A 1 GERESU ASSEFA 3576 KF-3576 MINI OVEN 350 280 80% Lack of Rectangular Tray
0 280 0
12/5/2019 B 7 HOMA DUMECHA 2820 LX-2820 HEATER 100 23 23%
23 0
NB:- 24 piece of Middle oven & 97 piece of Round Oven product is rework
/repacked /product .
12/6/2019 A 5 ASSEFA BEKELE 60s-22 STANDING OVEN (2G+2E) 150 95 63% Lack of Round Tray
15 80 0.104166666667
12/6/2019 A 9 TOTOBA TESFAYE 3800 3800 ROUND OVEN 200 144 72% Lack of Round Tray
0 144 0
12/6/2019 A 1 GERESU ASSEFA 3576 KF-3576 MINI OVEN 350 62 18% Lack of Rectangular Tray
0 62 0
### A 3 DEJENE BAYISA 2820 LX-2820 HEATER 200 126 63% 105 21 0
### B 1 GERESU ASSEFA 2820 LX-2820 HEATER 200 155 78% 0 155 0
TOTAL 750 439 total packed=169
AVERAGE PERFORMANCE
59% total none packed =270
0.26367521368
NB:- 69 piece of Round Oven & 100 piece Standing oven product is rework
/repacked /product .
### A 5 ASSEFA BEKELE 60s-22 STANDING OVEN (2G+2E) 150 140 93%
140 0 0.972222222222
### A 9 TOTOBA TESFAYE 3800 3800 ROUND OVEN Rework 200 63 32%
63 0 0.121153846154
### A 3 GERESU ASSEFA 2820 LX-2820 HEATER 300 152 51% Shortage of Handle
67 85 0
### B 9 DEJENE BAYISA 2820 LX-2820 HEATER 300 55 18%
55 0 0
### B 7 HOMA DUMECHA 3800 3800 ROUND OVEN Rework 200 38 19%
38 0 0.073076923077
NB:- 101 piece of Round Oven & 140 piece Standing oven product is rework
/repacked /product .
NB:- 274 piece of Round Oven & 66 piece Standing oven product is rework
/repacked /product .
NB:- 86 piece of Round Oven & 102 piece Mini Oven product is rework
/repacked /product .
### A 9&7 TOTOBA & MEGERSA 3800 3800 ROUND OVEN 300 45 15% Lack of Izgara
21 24 0.040384615385
### A 3 DEJENE BAYISA 2820 LX-2820 HEATER 300 180 60%
180 0 0
### B 3 GERESU ASSEFA 2820 LX-2820 HEATER 300 270 90%
270 0 0.519230769231
### B 1 GERESU ASSEFA 3576 KF-3576 MINI OVEN REWORK 350 228 65%
228 0 0.475
TOTAL 1250 723 total packed=699
AVERAGE PERFORMANCE
58% total none packed =24
1.03461538462
### A 9&7 TOTOBA & MEGERSA 3800 3800 ROUND OVEN 300 60 20% Shortage of Izgara
55 5 0.105769230769
### A 3 DEJENE BAYISA 2820 LX-2820 HEATER 300 155 52%
155 0 0
### A 1 GERESU ASSEFA 3576 KF-3576 MINI OVEN REWORK 350 200 57%
200 0 0.416666666667
### B 3 GERESU ASSEFA 2820 LX-2820 HEATER 300 160 53%
160 0 0
### B 1 GERESU ASSEFA 3576 KF-3576 MINI OVEN REWORK 350 325 93%
325 0 0.677083333333
TOTAL 1600 900 total packed=895
AVERAGE PERFORMANCE
55% total none packed =5
1.19951923077
NB:- 525 piece Mini & 155 piece of Heater product is rework
/repacked /product .
### A 9 TOTOBA TESFAYE 3800 3800 ROUND OVEN 300 67 22% Shortage of Izgara
31 36 0.059615384615
### A 3 DEJENE BAYISA 2820 LX-2820 HEATER 300 147 49% Shortage of Handle
33 114 0
### A 1 GERESU ASSEFA 3576 KF-3576 MINI OVEN REWORK 350 42 12%
42 0 0.0875
### B 3 GERESU ASSEFA 2820 LX-2820 HEATER 300 160 53% Shortage of Handle
0 160 0
### B 1 GERESU ASSEFA 3576 KF-3576 MINI OVEN REWORK 350 89 25%
89 0 0.185416666667
TOTAL 1600 505 total packed=195
AVERAGE PERFORMANCE
32% total none packed =310
0.33253205128
NB:- 197 piece of Round oven , 48 piece of Standing oven & 195 piece of Heater product is rework
/repacked /product .
### A 5 ASSEFA BEKELE 60s-04 STANDING OVEN (4E) 150 105 70%
105 0 0.729166666667
### A 9 TOTOBA TESFAYE 3800 3800 ROUND OVEN 300 116 39%
116 0 0.223076923077
### A 3 GERESU ASSEFA 2820 LX-2820 HEATER 300 168 56%
168 0 0
### B 3 DEJENE BAYISA 2820 LX-2820 HEATER 300 73 24%
73 0 0
NB:- 37 piece of Round oven & 85 piece of Mini oven product is rework
/repacked /product .
1/8/2020 A 3 MEGERSA DESSALEGN 2831 LX-2831 HEATER /M QUADRO/ 450 116 26%
74 42
1/8/2020 B 3 GERESU ASSEFA 2831 LX-2831 HEATER /M QUADRO/ 450 260 58%
260 0
1/10/2020 A 9 TOTOBA TESFAYE 3800 3800 ROUND OVEN 300 122 41%
122 0 0.234615384615
1/10/2020 A 3 ASSEFA BEKELE 2820 LX-2820 HEATER Second quality 200 44 22%
44 0
1/11/2020 A 3 MEGERSA DESSALEGN 2831 LX-2831 HEATER /M QUADRO/ 450 185 41%
185 0
1/14/2020 A 9 TOTOBA TESFAYE 3800 3800 ROUND OVEN 300 130 43%
90 40 0.173076923077
1/14/2020 A 3 MEGERSA DESSALEGN 2831 LX-2831 HEATER /M QUADRO/ 450 230 51%
150 80
1/15/2020 A 3 MEGERSA DESSALEGN 2831 LX-2831 HEATER /M QUADRO/ 450 185 41%
130 55
1/16/2020 A 9 TOTOBA TESFAYE 8525 8525 TINI MINI REWORK 200 44 22%
44 0
1/16/2020 A 8 LELISA ABEBE 2891 LX-2891 HEATER 450 130 29%
0 130
1/16/2020 A 3 ASSEFA BEKELE 2831 LX-2831 HEATER /M QUADRO/ 450 70 16%
70 0
1/16/2020 A 3 ASSEFA BEKELE 200 LX-200 EUROTEC REWORK 300 62 21%
62 0
1/16/2020 B 3 TESFAYE META 2891 LX-2891 HEATER 450 187 42%
187 0
1/16/2020 B 3 GERESU ASSEFA 200 LX-200 EUROTEC REWORK 300 25 8%
25 0
TOTAL 2150 518 total packed=388
AVERAGE PERFORMANCE
23% total none packed =130
0
1/17/2020 A 9 TOTOBA TESFAYE 3800 3800 ROUND OVEN 300 105 35%
75 30 0.144230769231
1/21/2020 A 9 TOTOBA TESFAYE 3800 3800 ROUND OVEN 300 37 12% LACK OF TRAY
0 37 0
1/21/2020 A 8 TESFAYE META 6030 KB_6030 BARBEQUE 450 72 16%
72 0
1/21/2020 A 3 ASSEFA BEKELE 200 LX-200 EUROTEC REWORK 300 43 14%
43 0
1/21/2020 B 3 LELISA ABEBE 2891 LX-2891 HEATER 450 150 33%
0 150
1/21/2020 B 7 GERESU ASSEFA 6700 LX-6700 TOSTER 300 49 16%
14 35
TOTAL 1800 351 total packed=129
18% 0
AVERAGE PERFORMANCE
18% total none packed =222
0
1/22/2020 A 9 TOTOBA TESFAYE 3800 3800 ROUND OVEN 300 30 10% LACK OF TRAY
0 30 0
1/22/2020 A 8 TESFAYE META 2891 LX-2891 HEATER 450 306 68%
0 306
1/22/2020 A 3 ASSEFA BEKELE 200 LX-200 EUROTEC 300 52 17%
52 0
1/22/2020 B 8 LELISA ABEBE 2891 LX-2891 HEATER 450 225 50%
0 225
1/22/2020 B 7 GERESU ASSEFA 6700 LX-6700 TOSTER 300 75 25%
40 35
TOTAL 1800 688 total packed=92
AVERAGE PERFORMANCE
34% total none packed =596
0
1/23/2020 A 9 TOTOBA TESFAYE 3800 3800 ROUND OVEN 300 107 36% LACK OF TRAY
3 104 0.005769230769
1/23/2020 A 8 TESFAYE META 2891 LX-2891 HEATER 450 82 18%
82 0
1/23/2020 A 3 ASSEFA BEKELE 200 LX-200 EUROTEC 300 140 47%
119 21
1/23/2020 B 8 LELISA ABEBE 2891 LX-2891 HEATER 450 250 56%
250 0
1/23/2020 B 7 GERESU ASSEFA 6700 LX-6700 TOSTER 300 110 37%
28 82
TOTAL 1800 689 total packed=482
AVERAGE PERFORMANCE
39% total none packed =207
0.00576923077
1/24/2020 A 9 TOTOBA TESFAYE 3800 3800 ROUND OVEN 300 80 27% LACK OF TRAY
0 80 0
1/25/2020 A 9 TOTOBA TESFAYE 3800 3800 ROUND OVEN 300 60 20% LACK OF TRAY
6 54 0.011538461538
1/27/2020 A 9 TOTOBA TESFAYE 3800 3800 ROUND OVEN 300 65 22% LACK OF TRAY
0 65 0
1/27/2020 B 3 ASSEFA BEKELE 200 LX-200 EUROTEC Below Second Quality 150 80 53%
80 0
1/27/2020 B 3 ASSEFA BEKELE 200 LX-200 EUROTEC Second Quality 150 93 62%
93 0
TOTAL 1800 965 total packed=793
AVERAGE PERFORMANCE
52% total none packed =172
0
1/29/2020 A 9 TOTOBA TESFAYE 3800 3800 ROUND OVEN 300 85 28% LACK OF TRAY
0 85 0
1/29/2020 A 7 GERESU ASSEFA 6700 LX-6700 TOSTER 300 121 40% shortage of teflon
40 81
1/30/2020 A 9 TOTOBA TESFAYE 3800 3800 ROUND OVEN 300 91 30% LACK OF TRAY
0 91 0
1/30/2020 A 7 GERESU ASSEFA 6700 LX-6700 TOSTER 300 198 66% shortage of teflon
41 157
2/18/2020 A 9 TOTOBA TESFAYE 3800 3800 ROUND OVEN 300 105 35% LACK OF ALMUNIUM TRAY
0 105 0
2/18/2020 B 1 GERESU ASSEFA 3858 KF-3858 MINI OVEN 300 122 41%
122 0 0.254166666667
2/19/2020 A 9 TOTOBA TESFAYE 3800 3800 ROUND OVEN 300 85 28% LACK OF ALMUNIUM TRAY
0 85 0
2/19/2020 B 1 GERESU ASSEFA 3858 KF-3858 MINI OVEN 300 171 57% shortage of Izgara
95 76 0.197916666667
2/20/2020 A 9 TOTOBA TESFAYE 3800 3800 ROUND OVEN 300 120 40% LACK OF ALMUNIUM TRAY
0 120 0
2/21/2020 A 9 TOTOBA TESFAYE 3800 3800 ROUND OVEN 300 90 30% LACK OF ALMUNIUM TRAY
0 90 0
2/22/2020 A 9 TOTOBA TESFAYE 3800 3800 ROUND OVEN 300 30 10% LACK OF ALMUNIUM TRAY
0 30 0
2/22/2020 A 3 HOMA DUMECHA 2830/31 LX-2830/31 HEATER 450 118 26%
118 0
2/24/2020 A 9 TOTOBA TESFAYE 3800 3800 ROUND OVEN 300 125 42% LACK OF ALMUNIUM TRAY
0 125 0
2/25/2020 A 9 TOTOBA TESFAYE 3800 3800 ROUND OVEN 300 126 42% LACK OF ALMUNIUM TRAY
0 126 0
2/25/2020 A 1 GERESU ASSEFA 3858 KF-3858 MINI OVEN 350 162 46% LACK OF IZGARA
0 162 0
2/26/2020 A 9 TOTOBA TESFAYE 3800 3800 ROUND OVEN 300 97 32% LACK OF ALMUNIUM TRAY
0 97 0
2/26/2020 A 1 GERESU ASSEFA 3858 KF-3858 MINI OVEN REWORK 350 157 45%
157 0 0.327083333333
2/26/2020 A 2 ASSEFA BEKELE SINGLE HOTPLATE 650 325 50%
0 325
2/26/2020 B 3 HOMA DUMECHA 23 EX-23 HEATER 300 128 43%
0 128
2/26/2020 B 2 TESFAYE META SINGLE HOTPLATE 650 335 52%
0 335
TOTAL 2250 1042 total packed=157
AVERAGE PERFORMANCE
44% total none packed =885
0.32708333333
2/27/2020 A 9 TOTOBA TESFAYE 3800 3800 ROUND OVEN 300 69 23% LACK OF ALMUNIUM TRAY
69 0
2/27/2020 A 1 GERESU ASSEFA 3858 KF-3858 MINI OVEN 350 101 29%
101 0 0.210416666667
2/28/2020 A 9 TOTOBA TESFAYE 3800 3800 ROUND OVEN 300 107 36% LACK OF ALMUNIUM TRAY
0 107 0
2/28/2020 A 1 GERESU ASSEFA 3858 KF-3858 MINI OVEN 350 115 33%
115 0 0.239583333333
2/29/2020 A 9 TOTOBA TESFAYE 3800 3800 ROUND OVEN 300 33 11% LACK OF ALMUNIUM TRAY
0 33 0
2/29/2020 A 1 GERESU ASSEFA 3858 KF-3858 MINI OVEN 350 105 30%
105 0 0.21875
3/3/2020 A 3 HOMA DUMECHA 7011 SINGLE HOTPLATE .7 STAR 650 124 19%
0 124
3/3/2020 A 3 HOMA DUMECHA 7011 SINGLE HOTPLATE. SPRIAL PLATE 750 32 4%
0 32
3/3/2020 A 1 GERESU ASSEFA 3858 KF-3858 MINI OVEN 350 72 21%
72 0 0.15
3/3/2020 A 2 ASSEFA BEKELE 7011 SINGLE HOTPLATE .7 STAR 650 312 48%
0 312
3/3/2020 B 3 LELISA ABEBE 7011 SINGLE HOTPLATE. SPRIAL PLATE 750 210 28%
0 210
3/3/2020 B 2 TESFAYE META 7011 SINGLE HOTPLATE .7 STAR 650 432 66%
0 432
TOTAL 3800 1182 total packed=72
AVERAGE PERFORMANCE
31% total none packed =1110
0.15
3/4/2020 A 3 HOMA DUMECHA 7011 SINGLE HOTPLATE. SPRIAL PLATE 750 301 40%
0 301
3/4/2020 A 1 GERESU ASSEFA 3858 KF-3858 MINI OVEN 350 170 49% SHORTAGE OF KNOB
131 39 0.272916666667
3/4/2020 A 2 ASSEFA BEKELE 7011 SINGLE HOTPLATE .7 STAR 650 370 57%
0 370
3/4/2020 B 3 LELISA ABEBE 7011 SINGLE HOTPLATE. SPRIAL PLATE 750 220 29%
0 220
3/4/2020 B 2 TESFAYE META 7011 SINGLE HOTPLATE .7 STAR 650 244 38%
0 244
TOTAL 3150 1305 total packed=131
AVERAGE PERFORMANCE
42% total none packed =1174
0.27291666667
3/5/2020 A 3 HOMA DUMECHA 7011 SINGLE HOTPLATE. SPRIAL PLATE 750 110 15%
0 110
3/5/2020 B 3 LELISA ABEBE 7011 SINGLE HOTPLATE. SPRIAL PLATE 750 320 43%
0 320
3/5/2020 B 2 TESFAYE META 7011 SINGLE HOTPLATE .7 STAR 650 305 47%
0 305
TOTAL 2150 735 total packed=0
AVERAGE PERFORMANCE
35% total none packed =735
0
3/6/2020 A 1 GERESU ASSEFA 3858/54 KF-3858/54 MINI OVEN 350 166 47%
117 49 0.24375
3/6/2020 A 2 ASSEFA BEKELE 7011 SINGLE HOTPLATE .7 STAR 650 365 56%
0 365
3/6/2020 A 3 HOMA DUMECHA 7011 SINGLE HOTPLATE. SPIRAL PLATE 750 380 51%
0 380
3/6/2020 B 3 LELISA ABEBE 7011 SINGLE HOTPLATE. SPIRAL PLATE 750 390 52%
0 390
3/6/2020 B 2 TESFAYE META 7011 SINGLE HOTPLATE .7 STAR 650 438 67%
0 438
TOTAL 3150 1739 total packed=117
AVERAGE PERFORMANCE
55% total none packed =1622
0
3/7/2020 A 1 GERESU ASSEFA 3854 KF-3854 MINI OVEN 350 177 51%
177 0 0.36875
3/7/2020 A 2 ASSEFA BEKELE 7011 SINGLE HOTPLATE .7 STAR 650 375 58%
0 375
3/7/2020 A 3 HOMA DUMECHA 7011 SINGLE HOTPLATE. SPIRAL PLATE 750 430 57%
0 430
3/7/2020 B 3 LELISA ABEBE 7011 SINGLE HOTPLATE. SPIRAL PLATE 750 369 49%
0 369
3/7/2020 B 2 TESFAYE META 7011 SINGLE HOTPLATE .7 STAR 650 422 65%
0 422
TOTAL 3150 1773 total packed=177
AVERAGE PERFORMANCE
56% total none packed =1596
0.36875
3/10/2020 A 1 GERESU ASSEFA 3854 KF-3854 MINI OVEN 300 120 40%
116 4 0.241666666667
3/10/2020 A 2 TESFAYE META 7011 SINGLE HOTPLATE .7 STAR 600 254 42%
0 254
3/10/2020 A 3 LELISA ABEBE 7011 SINGLE HOTPLATE. /SPIRAL PLATE/ 750 225 30%
0 225
3/10/2020 A 7 BIRU KUMA 7021 DOUBLE HOTPLATE. /SPIRAL PLATE/ 500 74 15%
0 74
3/10/2020 B 3 HOMA DUMECHA 7011 SINGLE HOTPLATE. /SPIRAL PLATE/ 750 310 41%
0 310
3/10/2020 B 2 ASSEFA BEKELE 7011 SINGLE HOTPLATE .7 STAR 600 350 58%
0 350
3/10/2020 B 7 TOTOBA TESFAYE 7021 DOUBLE HOTPLATE. /SPIRAL PLATE/ 500 160 32%
0 160
TOTAL 4000 1493 total packed=116
AVERAGE PERFORMANCE
37% total none packed =1377
0.24166666667
3/12/2020 A 1 GERESU ASSEFA 3854 KF-3854 MINI OVEN 300 156 52%
138 18 0.2875
3/12/2020 A 2 TESFAYE META 7011 SINGLE HOTPLATE .7 STAR 600 386 64%
282 104
3/12/2020 A 3 ASSEFA BEKELE 7011 SINGLE HOTPLATE. /SPIRAL PLATE/ 750 350 47%
0 350
3/12/2020 A 7 BIRU KUMA 7021 DOUBLE HOTPLATE. /SPIRAL PLATE/ 500 67 13%
0 67
3/12/2020 B 3 HOMA DUMECHA 7011 SINGLE HOTPLATE. /SPIRAL PLATE/ 750 404 54%
0 404
3/12/2020 B 2 LELISA ABEBE 7011 SINGLE HOTPLATE .7 STAR 600 455 76%
427 28
3/12/2020 B 7 TOTOBA TESFAYE 7021 DOUBLE HOTPLATE. /SPIRAL PLATE/ 500 133 27%
0 133
TOTAL 4000 1951 total packed=847
AVERAGE PERFORMANCE
48% total none packed =1104
0.2875
3/14/2020 A 1 GERESU ASSEFA 3854 KF-3854 MINI OVEN 300 175 58%
68 107 0.141666666667
3/14/2020 A 2 TESFAYE META 7011 SINGLE HOTPLATE .7 STAR 600 365 61%
0 365
3/14/2020 A 3 ASSEFA BEKELE 7011 SINGLE HOTPLATE. /SPIRAL PLATE/ 750 315 42%
0 315
3/14/2020 A 7 BIRU KUMA 7021 DOUBLE HOTPLATE. /SPIRAL PLATE/ 500 90 18%
0 90
3/14/2020 B 3 HOMA DUMECHA 7011 SINGLE HOTPLATE. /SPIRAL PLATE/ 750 223 30%
0 223
3/14/2020 B 2 LELISA ABEBE 7011 SINGLE HOTPLATE .7 STAR 600 323 54%
0 323
3/14/2020 B 7 TOTOBA TESFAYE 7021 DOUBLE HOTPLATE. /SPIRAL PLATE/ 500 137 27%
0 137
TOTAL 4000 1628 total packed=68
AVERAGE PERFORMANCE
41% total none packed =1560
0.14166666667
3/16/2020 A 1 GERESU ASSEFA 3854 KF-3854 MINI OVEN 300 133 44% SHORTAGE OF IZGARA
18 115 0.0375
3/16/2020 A 2 HOMA DUMECHA 7011 SINGLE HOTPLATE .7 STAR 600 335 56%
0 335
3/16/2020 A 3 ASSEFA BEKELE 7011 SINGLE HOTPLATE. /SPIRAL PLATE/ 750 255 34%
0 255
3/16/2020 A 7 TOTOBA TESFAYE 7021 DOUBLE HOTPLATE. /CLAY PLATE/ 300 40 13%
0 40
3/16/2020 B 3 TESFAYE META 7011 SINGLE HOTPLATE .7 STAR 600 288 48%
0 288
3/16/2020 B 2 LELISA ABEBE 7011 SINGLE HOTPLATE .7 STAR 600 222 37%
0 222
3/16/2020 B 7 BIRU KUMA 7021 DOUBLE HOTPLATE. /CLAY PLATE/ 500 85 17%
0 85
TOTAL 3850 1372 total packed=18
AVERAGE PERFORMANCE
32% total none packed =1354
0.0375
3/17/2020 A 1 GERESU ASSEFA 3854 KF-3854 MINI OVEN 300 158 53% SHORTAGE OF IZGARA
25 133 0.052083333333
3/17/2020 A 2 HOMA DUMECHA 7011 SINGLE HOTPLATE .7 STAR 600 240 40%
20 220
3/17/2020 A 7 TOTOBA TESFAYE 7021 DOUBLE HOTPLATE. /CLAY PLATE/ 300 76 25%
0 76
3/17/2020 A 7 TOTOBA TESFAYE 7021 DOUBLE HOTPLATE. /SPIRAL PLATE/ 200 30 15%
0 30
3/17/2020 B 2 TESFAYE META 7011 SINGLE HOTPLATE .7 STAR 600 332 55%
90 242
3/18/2020 A 1 GERESU ASSEFA 3854 KF-3854 MINI OVEN 300 104 35% SHORTAGE OF IZGARA
21 83 0.04375
3/18/2020 A 2 ASSEFA BEKELE 7011 SINGLE HOTPLATE .7 STAR 600 295 49%
165 130
3/18/2020 A 3 MEGERSA DESSALE 3576 KF-3576 MINI OVEN REWORK 300 88 29%
88 0 0.183333333333
3/18/2020 A 7 TOTOBA TESFAYE 7021 DOUBLE HOTPLATE. /CLAY PLATE/ 500 104 21%
0 104
3/18/2020 B 2 TESFAYE META 7011 SINGLE HOTPLATE .7 STAR 600 369 62%
192 177
3/18/2020 B 8 LELISA ABEBE 3576 KF-3576 MINI OVEN REWORK 300 188 63%
188 0 0.391666666667
3/19/2020 A 1 GERESU ASSEFA 3854 KF-3854 MINI OVEN 300 126 42% SHORTAGE OF IZGARA
13 113 0.027083333333
3/19/2020 A 2 ASSEFA BEKELE 7011 SINGLE HOTPLATE .7 STAR 600 305 51%
270 35
3/19/2020 A 3 MEGERSA DESSALE 3576 KF-3576 MINI OVEN REWORK 300 127 42%
127 0 0.264583333333
3/19/2020 A 7 TOTOBA TESFAYE 7021 DOUBLE HOTPLATE. /CLAY PLATE/ 500 90 18%
0 90
3/19/2020 B 2 TESFAYE META 7011 SINGLE HOTPLATE .7 STAR 600 381 64%
74 307
3/19/2020 B 8 LELISA ABEBE 3560 KF-3560 MINI OVEN REWORK 300 30 10%
30 0 0.0625
3/19/2020 B 5 LELISA ABEBE 60s-22 STANDING OVEN (2G+2E) REWORK 150 73 49%
73 0 0.506944444444
3/19/2020 B 7 BIRU KUMA 7021 DOUBLE HOTPLATE. /CLAY PLATE/ 500 61 12%
0 61
TOTAL 3250 1193 total packed=587
AVERAGE PERFORMANCE
36% total none packed =606
0.29166666667
NB:- 157 piece of Mini oven & 73 piece of Standing Oven product is rework
/repacked /product.
3/20/2020 A 1 GERESU ASSEFA 3854 KF-3854 MINI OVEN 300 173 58% SHORTAGE OF IZGARA
2 171 0.004166666667
3/20/2020 A 2 ASSEFA BEKELE 7011 SINGLE HOTPLATE .7 STAR 600 253 42%
173 80
3/20/2020 A 3 MEGERSA DESSALE 3576 KF-3576 MINI OVEN REWORK 300 140 47%
140 0 0.291666666667
3/20/2020 A 7 TOTOBA TESFAYE 7021 DOUBLE HOTPLATE. /CLAY PLATE/ 400 90 23%
0 90
3/20/2020 A 7 TOTOBA TESFAYE 7021 DOUBLE HOTPLATE. /SPIRAL PLATE/ 100 25 25%
0 25
3/20/2020 B 2 TESFAYE META 7021 DOUBLE HOTPLATE. /CLAY PLATE/ 500 99 20%
0 99
3/20/2020 B 8 LELISA ABEBE 3576 KF-3576 MINI OVEN REWORK 300 82 27%
82 0 0.170833333333
3/20/2020 B 7 BIRU KUMA 7021 DOUBLE HOTPLATE. /CLAY PLATE/ 500 86 17%
86 0
TOTAL 3000 948 total packed=483
AVERAGE PERFORMANCE
32% total none packed =465
0.29583333333
3/21/2020 A 1 GERESU ASSEFA 3854 KF-3854 MINI OVEN 300 130 43% SHORTAGE OF IZGARA
32 98 0.066666666667
3/21/2020 A 2 ASSEFA BEKELE 7021 DOUBLE HOTPLATE. /CLAY PLATE/ 500 85 17%
0 85
3/21/2020 A 3 MEGERSA DESSALE 3576 KF-3576 MINI OVEN REWORK 300 133 44%
133 0 0.277083333333
3/21/2020 A 7 TOTOBA TESFAYE 7021 DOUBLE HOTPLATE. /CLAY PLATE/ 500 132 26%
0 132
3/21/2020 B 2 TESFAYE META 7021 DOUBLE HOTPLATE. /CLAY PLATE/ 500 160 32%
0 160
3/21/2020 B 8 LELISA ABEBE 3576 KF-3576 MINI OVEN REWORK 300 110 37%
110 0 0.229166666667
3/21/2020 B 7 BIRU KUMA 7021 DOUBLE HOTPLATE. /CLAY PLATE/ 500 85 17%
0 85
TOTAL 2900 835 total packed=275
AVERAGE PERFORMANCE
31% total none packed =560
0.34375
3/23/2020 A 5 ASSEFA BEKELE 60s-22 STANDING OVEN (2G+2E) REWORK 150 15 10%
15 0 0.104166666667
3/23/2020 A 7 BIRU KUMA 7021 DOUBLE HOTPLATE. /CLAY PLATE/ 500 91 18%
0 91
3/23/2020 B 2 MEGERSA DESSALE 7021 DOUBLE HOTPLATE. /CLAY PLATE/ 500 127 25%
0 127
3/23/2020 B 7 TOTOBA TESFAYE 7021 DOUBLE HOTPLATE. /CLAY PLATE/ 500 130 26%
0 130
TOTAL 2750 777 total packed=30
AVERAGE PERFORMANCE
27% total none packed =747
0.13541666667
NB:- 15 piece of Mini oven & 15 piece of Standing Oven product is rework
/repacked /product.
3/24/2020 A 1 GERESU ASSEFA 3854 KF-3854 MINI OVEN 300 203 68% SHORTAGE OF IZGARA
0 203 0
3/24/2020 A 2 TESFAYE META 7021 DOUBLE HOTPLATE. /CLAY PLATE/ 500 159 32%
0 159
3/24/2020 A 5 ASSEFA BEKELE 60s-22 STANDING OVEN (2G+2E) REWORK 150 25 17%
25 0 0.173611111111
3/24/2020 A 7 BIRU KUMA 7021 DOUBLE HOTPLATE. /CLAY PLATE/ 500 74 15%
0 74
3/24/2020 B 2 MEGERSA DESSALE 7021 DOUBLE HOTPLATE. /CLAY PLATE/ 500 116 23%
0 116
3/24/2020 B 7 TOTOBA TESFAYE 7021 DOUBLE HOTPLATE. /CLAY PLATE/ 500 115 23%
0 115
TOTAL 2450 692 total packed=25
AVERAGE PERFORMANCE
30% total none packed =667
0.17361111111
3/25/2020 A 1 GERESU ASSEFA 3854 KF-3854 MINI OVEN 300 138 46% SHORTAGE OF IZGARA
0 138 0
3/25/2020 A 2 TESFAYE META 7021 DOUBLE HOTPLATE. /CLAY PLATE/ 500 123 25%
0 123
3/25/2020 A 7 BIRU KUMA 7021 DOUBLE HOTPLATE. /CLAY PLATE/ 500 101 20%
0 101
3/25/2020 B 2 MEGERSA DESSALE 7021 DOUBLE HOTPLATE. /CLAY PLATE/ 500 143 29%
0 143
3/25/2020 B 7 TOTOBA TESFAYE 7021 DOUBLE HOTPLATE. /CLAY PLATE/ 500 120 24%
0 120
TOTAL 2450 638 total packed=13
AVERAGE PERFORMANCE
25% total none packed =625
0.09027777778
3/27/2020 A 1 GERESU ASSEFA 3854 KF-3854 MINI OVEN 300 108 36% SHORTAGE OF IZGARA
0 108 0
3/27/2020 A 2 TESFAYE META 7021 DOUBLE HOTPLATE. /CLAY PLATE/ 500 151 30%
0 151
3/27/2020 A 5 ASSEFA BEKELE 60s-22 STANDING OVEN (2G+2E) REWORK 150 18 12%
18 0.125
3/27/2020 A 7 BIRU KUMA 7011 SINGLE HOTPLATE SKY BRAND . /CLAY PLATE/ 600 131 22%
0 131
3/27/2020 B 2 MEGERSA DESSALE 7021 DOUBLE HOTPLATE. /CLAY PLATE/ 500 160 32%
0 160
3/27/2020 B 7 TOTOBA TESFAYE 7011 SINGLE HOTPLATE SKY BRAND . /CLAY PLATE/ 600 136 23%
0 136
TOTAL 2650 704 total packed=18
AVERAGE PERFORMANCE
26% total none packed =686
0.125
3/28/2020 A 1 GERESU ASSEFA 3854 KF-3854 MINI OVEN 300 60 20% SHORTAGE OF IZGARA
0 60 0
3/28/2020 A 2 TESFAYE META 7021 DOUBLE HOTPLATE. /CLAY PLATE/ 500 183 37%
0 183
3/28/2020 A 5 ASSEFA BEKELE 60s-22 STANDING OVEN (2G+2E) REWORK 150 37 25%
37 0 0.256944444444
3/28/2020 A 7 BIRU KUMA 7011 SINGLE HOTPLATE SKY BRAND . /CLAY PLATE/ 600 160 27%
0 160
3/28/2020 A 8 GERESU ASSEFA 7011 SINGLE HOTPLATE SKY BRAND . /CLAY PLATE/ 600 32 5%
0 32
3/28/2020 B 2 MEGERSA DESSALE 7021 DOUBLE HOTPLATE. /CLAY PLATE/ 500 181 36%
0 181
3/28/2020 B 7 TOTOBA TESFAYE 7011 SINGLE HOTPLATE SKY BRAND . /CLAY PLATE/ 600 234 39%
0 234
TOTAL 3250 887 total packed=37
AVERAGE PERFORMANCE
27% total none packed =850
0.25694444444
3/30/2020 A 2 LELISA ABEBE 7021 DOUBLE HOTPLATE. /CLAY PLATE/ 500 130 26%
0 130
3/30/2020 A 5 ASSEFA BEKELE 60s-22 STANDING OVEN (2G+2E) REWORK 150 39 26%
39 0 0.270833333333
3/30/2020 A 7 TOTOBA TESFAYE 7011 SINGLE HOTPLATE SKY BRAND . /CLAY PLATE/ 600 225 38%
0 225
3/30/2020 A 8 GERESU ASSEFA 3854 KF-3854 MINI OVEN 300 125 42% SHORTAGE OF IZGARA
0 125 0
3/30/2020 B 2 TESFAYE META 7021 DOUBLE HOTPLATE. /CLAY PLATE/ 500 145 29%
0 145
TOTAL 2050 664 total packed=39
AVERAGE PERFORMANCE
32% total none packed =625
0.27083333333
3/31/2020 A 2 LELISA ABEBE 7021 DOUBLE HOTPLATE. /CLAY PLATE/ 500 90 18%
0 90
3/31/2020 A 5 ASSEFA BEKELE 60s-22 STANDING OVEN (2G+2E) REWORK 150 25 17%
25 0 0.173611111111
3/31/2020 A 7 TOTOBA TESFAYE 7011 SINGLE HOTPLATE /SPIRAL PLATE/ 600 112 19%
0 112
3/31/2020 B 2 TESFAYE META 7021 DOUBLE HOTPLATE. /CLAY PLATE/ 500 160 32%
0 160
TOTAL 1750 387 total packed=25
AVERAGE PERFORMANCE
21% total none packed =362
0.17361111111
NB:- 25 piece of Standing Oven product is rework
/repacked /product. From 25 piece 18 is kumtel brand & 7 piece is quantum.
4/1/2020 A 8 TOTOBA TESFAYE 7021 DOUBLE HOTPLATE. /SPIRAL PLATE/ 500 125 25%
0 125
4/1/2020 A 8 TOTOBA TESFAYE 7011 SINGLE HOTPLATE /SPIRAL PLATE/ 100 11 11%
0 11
4/1/2020 A 5 ASSEFA BEKELE 60s-22 STANDING OVEN (2G+2E) REWORK 150 33 22%
33 0 0.229166666667
4/1/2020 B 2 TESFAYE META 7021 DOUBLE HOTPLATE. /CLAY PLATE/ 500 165 33%
0 165
TOTAL 1250 334 total packed=33
AVERAGE PERFORMANCE
23% total none packed =301
0.22916666667
4/2/2020 A 8 TOTOBA TESFAYE 7011 SINGLE HOTPLATE SKY BRAND . /CLAY PLATE/ 500 74 15%
0 74
4/2/2020 A 5 ASSEFA BEKELE 60s-22 STANDING OVEN (2G+2E) REWORK 150 33 22%
33 0 0.229166666667
4/2/2020 B 2 TESFAYE META 7021 DOUBLE HOTPLATE. /CLAY PLATE/ 500 201 40%
0 201
TOTAL 1150 308 total packed=33
AVERAGE PERFORMANCE
26% total none packed =275
0.22916666667
-> And also out of 74 piece of single hotplate sky 54 piece has scratch problem only 20 piece is normal
4/3/2020 A 8 TOTOBA TESFAYE 7011 SINGLE HOTPLATE SKY BRAND . /CLAY PLATE/ 600 103 17%
0 103
4/3/2020 A 5 ASSEFA BEKELE 60s-22 STANDING OVEN (2G+2E) REWORK 150 35 23%
35 0 0.243055555556
4/3/2020 B 2 TESFAYE META 7021 DOUBLE HOTPLATE. /CLAY PLATE/ 500 210 42%
0 210
TOTAL 1250 348 total packed=35
AVERAGE PERFORMANCE
28% total none packed =313
0.24305555556
-> And also out of 103 piece of single hotplate sky 30 piece has scratch problem only 73 piece is normal
4/4/2020 A 8 TOTOBA TESFAYE 7011 SINGLE HOTPLATE SKY BRAND . /CLAY PLATE/ 600 176 29%
0 176
4/4/2020 A 5 ASSEFA BEKELE 60s-22 STANDING OVEN (2G+2E) REWORK 150 15 10%
15 0 0.104166666667
4/4/2020 B 2 TESFAYE META 7021 DOUBLE HOTPLATE. /CLAY PLATE/ 500 185 37%
0 185
TOTAL 1250 376 total packed=15
AVERAGE PERFORMANCE
25% total none packed =361
0.10416666667
-> And also out of 176 piece of single hotplate sky 75 piece has scratch problem only 101 piece is normal
-> And also out of 207 piece of single hotplate sky 81 piece has scratch problem only 126 piece is normal
-> And also out of 237 piece of single hotplate sky 149 piece has scratch problem only 88 piece is normal
4/8/2020 A 2 TESFAYE META 7021 DOUBLE HOTPLATE. /CLAY PLATE/ 500 53 11%
0 53
4/8/2020 A 5 ASSEFA BEKELE 60s-22 STANDING OVEN (2G+2E) REWORK 150 35 23%
35 0 0.243055555556
4/8/2020 B 8 TOTOBA TESFAYE 7011 SINGLE HOTPLATE SKY BRAND . /CLAY PLATE/ 600 220 37%
0 220
TOTAL 1250 308 total packed=35
AVERAGE PERFORMANCE
24% total none packed =273
0.24305555556
-> And also out of 220 piece of single hotplate sky 54 piece has scratch problem only 166 piece is normal
LINE NO P.CODE PACKED BRAND p.name REMARK/DESCRIPTION/
7 7011 466 7 Star single hotplate /clay/ only packing /Rework/
KUMTEL ASSEMBLY DEPARTMENT DAILY REAL PRODUCTION REPORT REMARK
TARGET Container Reason
DATE SHIFT LINE NO. LINE CHIEF NAME PRODUCT CODE PRODUCT NAME
PLAN
REAL PCS DAILY EFFICIENCY Packed Not packed Balance
4/9/2020 A 2 TESFAYE META 7021 DOUBLE HOTPLATE. /CLAY PLATE/ 500 195 39%
0 195
4/9/2020 A 5 ASSEFA BEKELE 60s-22 STANDING OVEN (2G+2E) REWORK 150 116 77%
116 0 0.805555555556
4/9/2020 B 8 TOTOBA TESFAYE 7011 SINGLE HOTPLATE SKY BRAND . /CLAY PLATE/ 600 245 41%
0 245
TOTAL 1250 556 total packed=116
AVERAGE PERFORMANCE
52% total none packed =440
0.80555555556
-> And also out of 245 piece of single hotplate sky 35 piece has scratch problem only 210 piece is normal
4/13/2020 A 2 TOTOBA TESFAYE 7021 DOUBLE HOTPLATE. /CLAY PLATE/ 500 160 32%
0 160
4/13/2020 A 5 ASSEFA BEKELE 60s-22 STANDING OVEN (2G+2E) REWORK 150 65 43%
65 0 0.451388888889
4/13/2020 B 2 TESFAYE META 7021 DOUBLE HOTPLATE. /CLAY PLATE/ 500 138 28%
0 138
TOTAL 1150 363 total packed=65
AVERAGE PERFORMANCE
34% total none packed =298
0.45138888889
4/16/2020 A 2 TOTOBA TESFAYE 7021 DOUBLE HOTPLATE. /CLAY PLATE/ 500 77 15%
0 77
4/16/2020 A 5 ASSEFA BEKELE 60s-22 STANDING OVEN (2G+2E) REWORK 150 40 27%
40 0 0.277777777778
4/16/2020 B 2 TESFAYE META 7021 DOUBLE HOTPLATE. /CLAY PLATE/ 500 168 34%
0 168
TOTAL 1150 285 total packed=40
AVERAGE PERFORMANCE
25% total none packed =245
0.27777777778
4/21/2020 A 2 TESFAYE META 7021 DOUBLE HOTPLATE. /CLAY PLATE/ 500 150 30%
0 150
4/21/2020 A 5 ASSEFA BEKELE 60s-22 STANDING OVEN (2G+2E) REWORK 150 42 28%
42 0 0.291666666667
4/21/2020 B 2 TOTOBA TESFAYE 7021 DOUBLE HOTPLATE. /CLAY PLATE/ 500 140 28%
0 140
TOTAL 1150 332 total packed=42
AVERAGE PERFORMANCE
29% total none packed =290
0.29166666667
-> And also out of 345 piece of Double hotplate seven star 53 piece has scratch problem only 292 piece is normal
4/23/2020 A 2 TESFAYE META 7021 DOUBLE HOTPLATE. /CLAY PLATE/ 500 261 52%
0 261
4/23/2020 A 8 ASSEFA BEKELE 7021 DOUBLE HOTPLATE. SKY TECH/SPIRAL PLATE/ 500 175 35%
0 175
4/23/2020 B 2 TOTOBA TESFAYE 7021 DOUBLE HOTPLATE. /CLAY PLATE/ 500 216 43%
0 216
TOTAL 1500 652 total packed=0
AVERAGE PERFORMANCE
43% total none packed =652
0
nb:- Out of piece 477 of Double hotplate seven star 57 piece has scratch problem only 420 piece is normal
4/24/2020 A 2 TESFAYE META 7021 DOUBLE HOTPLATE. /CLAY PLATE/ 500 242 48%
0 242
4/24/2020 A 8 ASSEFA BEKELE 7021 DOUBLE HOTPLATE. SKY TECH/SPIRAL PLATE/ 500 170 34%
0 170
4/24/2020 B 2 TOTOBA TESFAYE 7021 DOUBLE HOTPLATE. /CLAY PLATE/ 500 262 52%
0 262
TOTAL 1500 674 total packed=0
AVERAGE PERFORMANCE
45% total none packed =674
0
nb:- Out of piece 504 of Double hotplate seven star 31 piece has scratch problem only 473 piece is normal
>16 piece of Standing Oven product is rework /repacked /product. From 16 piece 10 is kumtel brand & 6 piece is quantum.
nb:- >Out of 404 piece of Double hotplate seven star 11 piece has scratch problem only 393 piece is normal
>Double Hotplate clay & Single Hotplate Sky tech clay doesn't cheecked by electric incase of power cable haven't plug
>42 piece of Standing Oven product is rework /repacked /product. From 42 piece 31 piece is kumtel brand ,9 piece is Luxcell brand & 2 piece is quantum.
nb:-
>Out of 97 piece of Double hotplate seven star 5 piece has scratch problem only 92 piece is normal
4/28/2020 A 2 TESFAYE META 7011 SINGLE HOTPLATE SKY BRAND . /CLAY PLATE/ 600 156 26%
0 156
4/28/2020 A 8 GEZU HIRPA 7011 SINGLE HOTPLATE SKY BRAND . /CLAY PLATE/ 600 100 17%
0 100
4/28/2020 A 5 ASSEFA BEKELE 60s-22 STANDING OVEN (4E) REWORK 150 61 41%
61 0 0.423611111111
4/28/2020 B 8 LELISA ABEBE 7011 SINGLE HOTPLATE SKY BRAND . /CLAY PLATE/ 600 130 22%
0 130
4/28/2020 B 2 TOTOBA TESFAYE 7011 SINGLE HOTPLATE SKY BRAND . /CLAY PLATE/ 600 150 25%
0 150
TOTAL 2550 597 total packed=61
AVERAGE PERFORMANCE
26% total none packed =536
0.42361111111
nb:- >Single Hotplate Sky tech clay doesn't cheecked by electric incase of power cable haven't plug
>61 piece of Standing Oven product is rework /repacked /product. From 61 piece 60 piece is kumtel brand & 1 piece is quantum.
7a&b 7021 275 SEVEN STAR Double hotplate /clay/ only packing /Rework/
4/29/2020 A 2 TESFAYE META 7011 SINGLE HOTPLATE SKY BRAND . /CLAY PLATE/ 600 263 44%
0 263
4/29/2020 A 9 GEZU HIRPA 7021 DOUBLE HOTPLATE. Of /1 SPIRAL & 1 PLATE/ 500 116 23%
0 116
4/29/2020 B 9 BIRU KUMA 7021 DOUBLE HOTPLATE. Of /1 SPIRAL & 1 PLATE/ 500 118 24%
0 118
4/29/2020 B 8 LELISA ABEBE 7011 SINGLE HOTPLATE SKY BRAND . /CLAY PLATE/ 600 191 32%
0 191
4/29/2020 B 2 TOTOBA TESFAYE 7011 SINGLE HOTPLATE SKY BRAND . /CLAY PLATE/ 600 138 23%
0 138
TOTAL 2950 839 total packed=13
AVERAGE PERFORMANCE
26% total none packed =826
0.09027777778
>Single Hotplate Sky tech clay doesn't cheecked by electric incase of power cable haven't plug
nb:- >13 piece of Standing Oven product is rework /repacked /product. From 13 piece 10 piece is kumtel brand & 3 piece is quantum. out of them 2 piece is 2G+2E.
>Out of 234 piece of Double hotplate of (1 spiral & 1 plate ),88 piece has physical problem & only 146 piece is normal
4/30/2020 A 2 TESFAYE META 7011 SINGLE HOTPLATE SKY BRAND . /CLAY PLATE/ 600 237 40%
0 237
4/30/2020 A 9 GEZU HIRPA 7021 DOUBLE HOTPLATE. Of /1 SPIRAL & 1 PLATE/ 500 105 21%
0 105
4/30/2020 A 5 ASSEFA BEKELE 60s-22 STANDING OVEN (2G+2E) REWORK 150 32 21%
32 0 0.222222222222
4/30/2020 B 9 BIRU KUMA 7011 SINGLE HOTPLATE SKY BRAND . /CLAY PLATE/ 600 126 21%
0 126
4/30/2020 B 8 LELISA ABEBE 7011 SINGLE HOTPLATE SKY BRAND . /CLAY PLATE/ 600 238 40%
0 238
4/30/2020 B 2 TOTOBA TESFAYE 7011 SINGLE HOTPLATE SKY BRAND . /CLAY PLATE/ 600 195 33%
0 195
TOTAL 3050 933 total packed=32
AVERAGE PERFORMANCE
29% total none packed =901
0.22222222222
>32 piece of Standing Oven product is rework /repacked /product. From 32 piece 10 piece is kumtel brand & 22 piece is quantum.
nb:- > Out of 796 piece of Single hotplate sky tech product; 670 piece is normal while 126 piece has sratch problem .
>Out of 105 piece of Double hotplate of (1 spiral & 1 plate ),45 piece has physical problem & only 60 piece is normal
5/2/2020 A 2 TESFAYE META 7011 SINGLE HOTPLATE SKY BRAND . /CLAY PLATE/ 600 248 41%
0 248
5/2/2020 A 9 GEZU HIRPA 7011 SINGLE HOTPLATE SKY BRAND . /CLAY PLATE/ 600 200 33%
0 200
5/2/2020 A 5 ASSEFA BEKELE 60s-22 STANDING OVEN (2G+2E) REWORK 150 36 24%
36 0 0.25
5/2/2020 B 9 BIRU KUMA 7011 SINGLE HOTPLATE SKY BRAND . /CLAY PLATE/ 600 92 15%
0 92
5/2/2020 B 8 LELISA ABEBE 7011 SINGLE HOTPLATE SKY BRAND . /CLAY PLATE/ 600 110 18%
0 110
5/2/2020 B 2 TOTOBA TESFAYE 7011 SINGLE HOTPLATE SKY BRAND . /CLAY PLATE/ 600 125 21%
0 125
TOTAL 3150 811 total packed=36
AVERAGE PERFORMANCE
26% total none packed =775
0.25
>36 piece of Standing Oven product is rework /repacked /product. From 36 piece 3 piece is kumtel brand & 33 piece is quantum.
nb:- > Out of 775 piece of Single hotplate sky tech product; 694 piece is normal while 81 piece has sratch & power problem .
5/4/2020 A 9 BIRU KUMA 7011 SINGLE HOTPLATE SKY BRAND . /CLAY PLATE/ 600 112 19%
0 112
5/4/2020 A 8 LELISA ABEBE 7011 SINGLE HOTPLATE SKY BRAND . /CLAY PLATE/ 600 110 18%
0 110
5/4/2020 A 2 TOTOBA TESFAYE 7011 SINGLE HOTPLATE SKY BRAND . /CLAY PLATE/ 600 130 22%
0 130
5/4/2020 B 2 TESFAYE META 7011 SINGLE HOTPLATE SKY BRAND . /CLAY PLATE/ 600 276 46%
0 276
5/4/2020 B 9 GEZU HIRPA 7011 SINGLE HOTPLATE KUMTEL BRAND . /NORMAL PLATE/ 600 200 33%
0 200
5/4/2020 B 5 ASSEFA BEKELE 60s-22 STANDING OVEN (2G+2E) REWORK 150 38 25%
38 0 0.263888888889
TOTAL 3150 866 total packed=38
AVERAGE PERFORMANCE
27% total none packed =828
0.26388888889
>38 piece of Standing Oven product is rework /repacked /product. It's Quantum.brand
nb:- > Out of 628 piece of Single hotplate sky tech product; 588 piece is normal while 40 piece has sratch problem .
5/6/2020 A 9 BIRU KUMA 7011 SINGLE HOTPLATE KUMTEL BRAND . /NORMAL PLATE/ 600 66 11%
0 66
5/6/2020 A 8 LELISA ABEBE 7011 SINGLE HOTPLATE SKY BRAND . /CLAY PLATE/ 600 82 14%
0 82
5/6/2020 A 2 TOTOBA TESFAYE 7011 SINGLE HOTPLATE SKY BRAND . /CLAY PLATE/ 600 149 25%
0 149
5/6/2020 A 9 LELISA ABEBE 6030 KB_6030 BARBEQUE 450 40 9%
0 40
5/6/2020 B 2 TESFAYE META 7021 DOUBLE HOTPLATE 7* BRAND . /CLAY PLATE/ REWORK 500 143 29%
0 143
5/6/2020 B 9 GEZU HIRPA 7011 SINGLE HOTPLATE KUMTEL BRAND . /NORMAL PLATE/ 300 48 16%
0 48
5/6/2020 B 9 GEZU HIRPA 7011 SINGLE HOTPLATE SKY BRAND . /CLAY PLATE/ 300 22 7%
0 22
>12 piece of Standing Oven product is rework /repacked /product. From 12 piece 8 piece is Kumtel Brand while 4 piece is Quantum.brand
nb:- > Out of 253 piece of Single hotplate sky tech product; 239 piece is normal while 14 piece has scratch problem .
5/7/2020 A 8 BIRU KUMA 7011 SINGLE HOTPLATE SKY BRAND . /CLAY PLATE/ 300 21 7%
0 21
5/7/2020 A 8 BIRU KUMA 7011 SINGLE HOTPLATE 7* BRAND . /CLAY PLATE/ 300 42 14%
0 42
5/7/2020 A 2 TOTOBA TESFAYE 7021 DOUBLE HOTPLATE 7* BRAND . /CLAY PLATE/ REWORK 500 150 30%
0 150
5/7/2020 B 2 TESFAYE META 7021 DOUBLE HOTPLATE 7* BRAND . /CLAY PLATE/ 500 153 31%
0 153
5/7/2020 B 9 GEZU HIRPA 7011 SINGLE HOTPLATE KUMTEL BRAND . /NORMAL PLATE/ 600 195 33%
0 195
5/7/2020 B 5 ASSEFA BEKELE 60s-22 STANDING OVEN (2G+2E) REWORK 150 21 14%
21 0 0.145833333333
TOTAL 2800 618 total packed=30
AVERAGE PERFORMANCE
19% total none packed =588
0.14583333333
>21 piece of Standing Oven product is rework /repacked /product. It's Kumtel Brand .
nb:- > Out of 21 piece of Single hotplate sky tech product; 8 piece is normal while 13 piece has scratch problem .
> Out of 153 piece of Double hotplate Seven Star product; 148 piece is normal while 5 piece has scratch problem .
5/8/2020 A 8 BIRU KUMA 7021 DOUBLE HOTPLATE. Of /1 SPIRAL & 1 PLATE/ 500 94 19%
0 94
5/8/2020 A 8 BIRU KUMA 7011 SINGLE HOTPLATE 7* BRAND . /CLAY PLATE/ 300 26 9%
0 26
5/8/2020 A 2 TOTOBA TESFAYE 7021 DOUBLE HOTPLATE 7* BRAND . /CLAY PLATE/ 500 167 33%
0 167
5/8/2020 A 9 LELISA ABEBE 7011 SINGLE HOTPLATE KUMTEL BRAND . /NORMAL PLATE/ 600 116 19%
0 116
5/8/2020 B 2 TESFAYE META 7011 SINGLE HOTPLATE 7* BRAND . /CLAY PLATE/ 600 194 32%
0 194
5/8/2020 B 2 TESFAYE META 7021 DOUBLE HOTPLATE 7* BRAND . /CLAY PLATE/ REWORK 200 57 29%
0 57
5/8/2020 B 9 GEZU HIRPA 7011 SINGLE HOTPLATE KUMTEL BRAND . /NORMAL PLATE/ 600 200 33%
0 200
5/8/2020 B 5 ASSEFA BEKELE 60s-22 STANDING OVEN (2G+2E) REWORK 150 30 20%
30 0 0.208333333333
TOTAL 3650 913 total packed=34
AVERAGE PERFORMANCE
23% total none packed =879
0.20833333333
nb:- >30 piece of Standing Oven product is rework /repacked /product. From 30 piece 22 piece is Kumtel Brand while 8 piece is Quantum.brand .
5/9/2020 A 8 BIRU KUMA 7021 DOUBLE HOTPLATE. Of /1 SPIRAL & 1 PLATE/ 500 115 23%
0 115
5/9/2020 A 2 TOTOBA TESFAYE 7011 SINGLE HOTPLATE 7* BRAND . /CLAY PLATE/ 300 25 8%
0 25
5/9/2020 A 2 TOTOBA TESFAYE 7021 DOUBLE HOTPLATE 7* BRAND . /CLAY PLATE/ 200 22 11%
0 22
5/9/2020 A 2 TOTOBA TESFAYE 7011 SINGLE HOTPLATE KUMTEL BRAND . /NORMAL PLATE of 1000W/ 600 94 16%
0 94
5/9/2020 A 9 GARESU ASSEFA 7011 SINGLE HOTPLATE KUMTEL BRAND . /NORMAL PLATE of 1500W/ 600 220 37%
0 220
5/9/2020 B 9 GEZU HIRPA 7011 SINGLE HOTPLATE KUMTEL BRAND . /NORMAL PLATE 1500W/ 600 110 18%
0 110
TOTAL 2800 586 total packed=0
AVERAGE PERFORMANCE
19% total none packed =586
0
nb:- >Out of 115 piece of Double hotplate of (1 spiral & 1 plate ),11 piece has physical problem while 104 piece is normal .
> Out of 330 piece of Single hotplate kumtel product; 275 piece is normal while 55 piece has physical problem .
5/11/2020 A 9 GEZU HIRPA 7011 SINGLE HOTPLATE KUMTEL BRAND . /NORMAL PLATE 1500W/ 600 84 14%
0 84
5/11/2020 B 2 TOTOBA TESFAYE 7021 DOUBLE HOTPLATE 7* BRAND . /CLAY PLATE/ REWORK/ 500 157 31%
0 157
5/11/2020 B 9 BIRU KUMA 7011 SINGLE HOTPLATE KUMTEL BRAND . /NORMAL PLATE 1500W/ 600 56 9%
0 56
TOTAL 1700 297 total packed=0
AVERAGE PERFORMANCE
18% total none packed =297
0
nb:-
> Out of 140 piece of Single hotplate kumtel product; 130 piece is normal while 10 piece has physical problem .
LINE NO P.CODE PACKED BRAND p.name REMARK/DESCRIPTION/
7&8 7021 83 SKY TECH Double hotplate /Spiral/ only packing /Rework/
7&8 7011 529 SKY TECH single hotplate /Spiral/ only packing /Rework/
7&8 7021 525 SEVEN STAR Double hotplate /Clay/ only packing /Rework/
2a 3900 70 REWORK MIDDLE OVEN ONLY CHECKING GAS & OTHER PART
nb:-
> Out of 268 piece of Single hotplate kumtel product; 226 piece is normal while 42 piece has physical problem .
7&8 7021 223 SEVEN STAR Double hotplate /Clay/ only packing /Rework/
2a 3900 89 REWORK MIDDLE OVEN ONLY CHECKING GAS & OTHER PART (physical)
5/13/2020 A 9 GEZU HIRPA 7011 SINGLE HOTPLATE KUMTEL BRAND . /NORMAL PLATE / 600 92 15%
0 92
5/13/2020 B 2 TOTOBA TESFAYE 7021 DOUBLE HOTPLATE 7* BRAND . /CLAY PLATE/ REWORK/ 500 180 36%
0 180
5/13/2020 B 9 BIRU KUMA 7011 SINGLE HOTPLATE KUMTEL BRAND . /NORMAL PLATE / 600 120 20%
0 120
TOTAL 1700 392 total packed=0
AVERAGE PERFORMANCE
24% total none packed =392
0
nb:-
> Out of 212 piece of Single hotplate kumtel product; 167 piece is normal while 45 piece has physical problem .
7&8 7021 532 SEVEN STAR Double hotplate /Clay/ only packing /Rework/
2a 3900 103 REWORK MIDDLE OVEN ONLY CHECKING GAS & OTHER PART (physical)
5/14/2020 A 9 GEZU HIRPA 7011 SINGLE HOTPLATE KUMTEL BRAND . /NORMAL PLATE / 600 27 5%
0 27
5/14/2020 B 2 TOTOBA TESFAYE 7021 DOUBLE HOTPLATE 7* BRAND . /CLAY PLATE/ REWORK/ 500 276 55%
0 276
5/14/2020 B 9 BIRU KUMA 7011 SINGLE HOTPLATE KUMTEL BRAND . /NORMAL PLATE / 600 144 24%
0 144
TOTAL 1700 447 total packed=0
AVERAGE PERFORMANCE
28% total none packed =447
0
7&8 7011 716 SKY TECH single hotplate /Spiral/ only packing /Rework/
7&8 7021 509 SEVEN STAR Double hotplate /Clay/ only packing /Rework/
2a 3900 95 REWORK MIDDLE OVEN ONLY CHECKING GAS & OTHER PART (physical)
7&8 7011 700 SKY TECH single hotplate /Spiral/ only packing /Rework/
7&8 7021 330 SEVEN STAR Double hotplate /Clay/ only packing /Rework/
2a 3900 100 REWORK MIDDLE OVEN ONLY CHECKING GAS & OTHER PART (physical)
2a 3900 77 REWORK MIDDLE OVEN ONLY CHECKING GAS & OTHER PART (physical)
2&7 7021 238 SEVEN STAR Double Hotplate/Clay/ only packing /Rework/
5/19/2020 A 2 TOTOBA TESFAYE 7021 DOUBLE HOTPLATE 7* BRAND . /CLAY PLATE/ REWORK/ 500 225 45%
0 225
TOTAL 500 225 total packed=0
AVERAGE PERFORMANCE
45% total none packed =225
0
3&7 7021 661 SEVEN STAR Double Hotplate/Clay/ only packing /Rework/
5/21/2020 A 3 GARESU ASSEFA 7021 DOUBLE HOTPLATE 7* BRAND . /CLAY PLATE/ REWORK/ 500 204 41%
204 0
5/21/2020 A 7 LELISA ABEBE 7021 DOUBLE HOTPLATE 7* BRAND . /CLAY PLATE/ REWORK/ 500 162 32%
162 0
5/21/2020 B 7 GEZU HIRPA 3854 KF-3854 MINI OVEN REWORK 350 116 33%
116 0 0.241666666667
TOTAL 2000 726 total packed=726
AVERAGE PERFORMANCE
32% total none packed =0
0.24166666667
nb:- >10 piece of Standing Oven product is rework /repacked /product. It's Quantum Brand .
5/22/2020 A 2 TOTOBA TESFAYE 7021 DOUBLE HOTPLATE 7* BRAND . /CLAY PLATE/ REWORK/ 500 165 33%
165 0
5/22/2020 A 7 BIRU KUMA 7021 DOUBLE HOTPLATE 7* BRAND . /CLAY PLATE/ REWORK/ 500 123 25%
123 0
5/22/2020 A 3 GARESU ASSEFA 3854 KF-3854 MINI OVEN REWORK 350 182 52%
182 0 0.379166666667
5/22/2020 B 5 ASSEFA BEKELE 60s-22 STANDING OVEN (2G+2E) REWORK 150 38 25%
38 0 0.263888888889
5/22/2020 B 2 TESFAYE META 7021 DOUBLE HOTPLATE 7* BRAND . /CLAY PLATE/ REWORK/ 500 234 47%
234 0
5/22/2020 B 3 GEZU HIRPA 3854 KF-3854 MINI OVEN REWORK 350 177 51%
177 0 0.36875
TOTAL 2500 928 total packed=928
AVERAGE PERFORMANCE
34% total none packed =0
1.07430555556
nb:- >47 piece of Standing Oven product is rework /repacked /product. It's Quantum Brand .
5/23/2020 A 2 TOTOBA TESFAYE 7021 DOUBLE HOTPLATE 7* BRAND . /CLAY PLATE/ REWORK/ 500 204 41%
204 0
5/23/2020 A 1 BIRU KUMA 3854 KF-3854 MINI OVEN REWORK 350 130 37%
130 0 0.270833333333
5/23/2020 A 7 LELISA ABEBE 7021 DOUBLE HOTPLATE 7* BRAND . /CLAY PLATE/ REWORK/ 500 61 12%
61 0
5/23/2020 A 3 GARESU ASSEFA 3854 KF-3854 MINI OVEN REWORK 350 152 43%
152 0 0.316666666667
5/23/2020 B 5 ASSEFA BEKELE 60s-22 STANDING OVEN (2G+2E) REWORK 150 45 30%
45 0 0.3125
5/23/2020 B 2 TESFAYE META 7021 DOUBLE HOTPLATE 7* BRAND . /CLAY PLATE/ REWORK/ 500 207 41%
207 0
5/23/2020 B 3 GEZU HIRPA 3854 KF-3854 MINI OVEN REWORK 350 161 46%
161 0 0.335416666667
TOTAL 2700 960 total packed=960
AVERAGE PERFORMANCE
36% total none packed =0
1.23541666667
nb:- >45 piece of Standing Oven product is rework /repacked /product. It's Quantum Brand .
5/25/2020 A 2 TESFAYE META 7021 DOUBLE HOTPLATE 7* BRAND . /CLAY PLATE/ REWORK/ 500 324 65%
324 0
5/25/2020 A 3 LELISA ABEBE 3854/58 & 3576 KF-3854/58 & 3576 MINI OVEN REWORK 500 120 24%
120 0 0.25
5/25/2020 A 5 ASSEFA BEKELE 60s-22 STANDING OVEN (2G+2E) REWORK 150 65 43%
65 0 0.451388888889
5/25/2020 B 3 GARESU ASSEFA 3854/58 & 3576 KF-3854/58 & 3576 MINI OVEN REWORK 500 163 33%
163 0 0.339583333333
5/25/2020 B 2 BIRU KUMA 7021 DOUBLE HOTPLATE 7* BRAND . /CLAY PLATE/ REWORK/ 500 115 23%
115 0
5/25/2020 B 7 TOTOBA TESFAYE 7021 DOUBLE HOTPLATE 7* BRAND . /CLAY PLATE/ REWORK/ 500 162 32%
162 0
TOTAL 2650 949 total packed=949
37% 1.04097222222
AVERAGE PERFORMANCE
37% total none packed =0
1.04097222222
nb:- >65 piece of Standing Oven product is rework /repacked /product. It's Quantum Brand .
nb:- >63 piece of Standing Oven product is rework /repacked /product. It's Quantum Brand .
5/27/2020 A 2 TESFAYE META 7021 DOUBLE HOTPLATE 7* BRAND . /CLAY PLATE/ REWORK/ 500 210 42%
210 0
5/27/2020 A 3 LELISA ABEBE 3854/58 & 3576 KF-3854/58 & 3576 MINI OVEN REWORK 500 101 20%
101 0 0.210416666667
5/27/2020 A 5 ASSEFA BEKELE 60s-22/04 STANDING OVEN (2G+2E)/4E/ REWORK 150 56 37%
56 0 0.388888888889
5/27/2020 B 3 GARESU ASSEFA 3576 KF- 3576 MINI OVEN REWORK 500 127 25%
127 0 0.264583333333
5/27/2020 B 2 BIRU KUMA 7021 DOUBLE HOTPLATE 7* BRAND . /CLAY PLATE/ REWORK/ 500 126 25%
126 0
5/27/2020 B 2&7 TOTOBA & BIRU 7021 DOUBLE HOTPLATE SKY TECH BRAND . /SPIRAL PLATE/ REWORK/ 500 340 68%
340 0
5/27/2020 B 7 TOTOBA TESFAYE 7021 DOUBLE HOTPLATE 7* BRAND . /CLAY PLATE/ REWORK/ 500 160 32%
160 0
TOTAL 3150 1120 total packed=1120
AVERAGE PERFORMANCE
36% total none packed =0
0.86388888889
>56 piece of Standing Oven product is rework /repacked /product. It's Quantum Brand .
nb:- >Out of 56 pcs 50 Pcs is four electric (4E) While 6 Pcs is two gas ; two electric (2G+2E).
>Out of 340 pcs of double hotplate spiral 287 pcs is packed through over time.
5/29/2020 A 2 TESFAYE META 7021 DOUBLE HOTPLATE 7* BRAND . /CLAY PLATE/ REWORK/ 500 130 26%
130 0
5/29/2020 A 3 LELISA ABEBE 3854 KF-3854 MINI OVEN REWORK 500 113 23%
113 0 0.235416666667
5/29/2020 A 5 ASSEFA BEKELE 60s-04 STANDING OVEN (4E) REWORK 150 68 45%
68 0 0.472222222222
5/29/2020 B 1 GARESU ASSEFA 3576 KF- 3576 MINI OVEN REWORK 500 125 25%
125 0 0.260416666667
5/29/2020 B 3 BIRU KUMA 7021 DOUBLE HOTPLATE 7* BRAND . /CLAY PLATE/ REWORK/ 500 40 8%
40 0
5/29/2020 B 3 BIRU KUMA 3854 KF- 3854 MINI OVEN REWORK 500 113 23%
113 0 0.235416666667
TOTAL 2650 589 total packed=589
AVERAGE PERFORMANCE
25% total none packed =0
1.20347222222
nb:- >68 piece of Standing Oven product is rework /repacked /product. It's Quantum Brand .
KUMTEL ASSEMBLY DEPARTMENT DAILY REAL PRODUCTION REPORT REMARK
TARGET Container Reason
DATE SHIFT LINE NO. LINE CHIEF NAME PRODUCT CODE PRODUCT NAME
PLAN
REAL PCS DAILY EFFICIENCY Packed Not packed Balance
5/30/2020 A 5 ASSEFA BEKELE 60s-04 STANDING OVEN (4E) REWORK 150 30 20%
30 0 0.208333333333
5/30/2020 B 1 GARESU ASSEFA 3854/58/3576 KF- 3854/58/3576 MINI OVEN REWORK 500 93 19%
93 0 0.19375
nb:- >30 piece of Standing Oven product is rework /repacked /product. It's Quantum Brand .
6/1/2020 A 2 TESFAYE META 7021 DOUBLE HOTPLATE 7* BRAND . /CLAY PLATE/ REWORK/ 650 31 5%
33 0
6/1/2020 A 5 ASSEFA BEKELE 60s-04/22/ STANDING OVEN (4E)/(2G+2E) REWORK 150 28 19%
28 0 0.194444444444
6/1/2020 A 2&3 LELISA & TESFAYE 6030 KB_6030 BARBEQUE REWORK 450 63 14%
63 0
6/1/2020 B 2 BIRU KUMA 7021 DOUBLE HOTPLATE 7* BRAND . /CLAY PLATE/ REWORK/ 650 70 11%
70 0
TOTAL 2600 290 total packed=206
AVERAGE PERFORMANCE
13% total none packed =86
0.21349206349
nb:- >28 piece of Standing Oven product is rework /repacked /product. It's Quantum Brand .
>Out of 28 pcs 11 Pcs is four electric (4E) While 17 Pcs is two gas ; two electric (2G+2E).
6/2/2020 A 3 LELISA & GAZU 5320 KF-5320 MINI OVEN 350 145 41%
38 107 0.060317460317
6/2/2020 A 2 TESFAYE META 7021 DOUBLE HOTPLATE 7* BRAND . /CLAY PLATE/ REWORK/ 650 121 19%
121 0
6/2/2020 A 5 ASSEFA BEKELE 60s-22 STANDING OVEN (2G+2E) REWORK 150 40 27%
40 0 0.277777777778
6/2/2020 B 7 TOTOBA TESFAYE 3800 KF-3800 ROUND OVEN REWORK 350 131 37%
131 0
6/2/2020 B 1 GARESU ASSEFA 3854/3576 KF- 3854/3576 MINI OVEN REWORK 500 91 18%
91 0 0.189583333333
6/2/2020 B 2 BIRU KUMA 7021 DOUBLE HOTPLATE 7* BRAND . /CLAY PLATE/ REWORK/ 650 86 13%
86 0
TOTAL 2650 614 total packed=507
AVERAGE PERFORMANCE
26% total none packed =107
0.52767857143
nb:- >40 piece of Standing Oven product is rework /repacked /product. It's Quantum Brand .
6/3/2020 A 3 LELISA & GAZU 5320 KF-5320 MINI OVEN 350 109 31%
24 85 0.038095238095
6/3/2020 A 2 TESFAYE META 7021 DOUBLE HOTPLATE 7* BRAND . /CLAY PLATE/ REWORK/ 650 133 20%
133 0
6/3/2020 A 5 ASSEFA BEKELE 60s-22 STANDING OVEN (2G+2E) REWORK 150 35 23%
35 0 0.243055555556
6/3/2020 B 7 TOTOBA TESFAYE 3800 KF-3800 ROUND OVEN REWORK 350 147 42%
147 0
6/3/2020 B 1 GARESU ASSEFA 5320 KF-5320 MINI OVEN REWORK 350 220 63%
220 0 0.458333333333
6/3/2020 B 2 BIRU KUMA 7021 DOUBLE HOTPLATE 7* BRAND . /CLAY PLATE/ REWORK/ 650 81 12%
81 0
TOTAL 2500 725 total packed=640
AVERAGE PERFORMANCE
32% total none packed =85
0.73948412698
nb:- >35 piece of Standing Oven product is rework /repacked /product. It's Quantum Brand .
6/4/2020 A 3 LELISA & GAZU 5320 KF-5320 MINI OVEN 350 109 31%
52 57 0.08253968254
6/4/2020 A 2 TESFAYE META 7021 DOUBLE HOTPLATE 7* BRAND . /CLAY PLATE/ REWORK/ 650 97 15%
97 0
6/4/2020 A 5 ASSEFA BEKELE 60s-22 STANDING OVEN (2G+2E) REWORK 150 20 13%
20 0 0.138888888889
6/4/2020 B 7 TOTOBA TESFAYE 3800 KF-3800 ROUND OVEN REWORK 350 128 37%
128 0
6/4/2020 B 1 GARESU ASSEFA 5320 KF-5320 MINI OVEN 350 112 32%
77 35 0.160416666667
6/4/2020 B 2 BIRU KUMA 7021 DOUBLE HOTPLATE Sky Tech BRAND . /SPIRAL PLATE/ REWORK/ 650 135 21%
135 0
TOTAL 2500 601 total packed=509
AVERAGE PERFORMANCE
25% total none packed =92
0.3818452381
nb:- >20 piece of Standing Oven product is rework /repacked /product. It's Quantum Brand .
6/5/2020 A 3 LELISA & GAZU 5320 KF-5320 MINI OVEN 350 117 33%
96 21 0.152380952381
6/5/2020 A 2 TESFAYE META 7021 DOUBLE HOTPLATE Sky Tech BRAND . /SPIRAL PLATE/ REWORK/ 650 352 54%
352 0
6/5/2020 A 5 ASSEFA BEKELE 60s-22 STANDING OVEN (2G+2E) REWORK 150 35 23%
35 0 0.243055555556
6/5/2020 B 7 TOTOBA TESFAYE 3800 KF-3800 ROUND OVEN REWORK 350 121 35%
121 0
6/5/2020 B 3 GARESU ASSEFA 5320 KF-5320 MINI OVEN 350 124 35%
102 22 0.2125
6/5/2020 B 2 BIRU KUMA 7021 DOUBLE HOTPLATE Sky Tech BRAND . /SPIRAL PLATE/ REWORK/ 650 295 45%
295 0
TOTAL 2500 1044 total packed=1001
AVERAGE PERFORMANCE
38% total none packed =43
0.60793650794
nb:- >35 piece of Standing Oven product is rework /repacked /product. It's Quantum Brand .
6/6/2020 A 3 LELISA & GAZU 5320 KF-5320 MINI OVEN 350 110 31%
110 0 0.174603174603
6/6/2020 A 2 TESFAYE META 7021 DOUBLE HOTPLATE Sky Tech BRAND . /SPIRAL PLATE/ REWORK/ 650 262 40%
262 0
6/6/2020 A 5 ASSEFA BEKELE 60s-22 STANDING OVEN (2G+2E) REWORK 150 28 19%
28 0 0.194444444444
6/6/2020 B 7 TOTOBA TESFAYE 3800 KF-3800 ROUND OVEN REWORK 350 129 37%
129 0
6/6/2020 B 3 GARESU ASSEFA 5320 KF-5320 MINI OVEN 350 118 34%
112 6 0.233333333333
6/6/2020 B 2 BIRU KUMA 7021 DOUBLE HOTPLATE 7*.BRAND . /CLAY PLATE/ REWORK/ 650 92 14%
92 0
TOTAL 2500 739 total packed=733
29% 0.60238095238
AVERAGE PERFORMANCE
29% total none packed =6
0.60238095238
nb:- >28 piece of Standing Oven product is rework /repacked /product. It's Quantum Brand .
6/8/2020 A 3 LELISA & GAZU 5320 KF-5320 MINI OVEN 350 67 19%
46 21 0.073015873016
6/8/2020 A 2 TESFAYE META 7021 DOUBLE HOTPLATE 7*.BRAND . /CLAY PLATE/ REWORK/ 650 45 7%
45 0
6/8/2020 A 5 ASSEFA BEKELE 60s-22 STANDING OVEN (2G+2E) REWORK 150 20 13%
20 0 0.138888888889
6/8/2020 B 7 TOTOBA TESFAYE 3800 KF-3800 ROUND OVEN REWORK 350 47 13%
47 0
6/8/2020 B 2 BIRU KUMA 7021 DOUBLE HOTPLATE 7*.BRAND . /CLAY PLATE/ REWORK/ 650 72 11%
72 0
TOTAL 2500 327 total packed=301
AVERAGE PERFORMANCE
14% total none packed =26
0.35982142857
nb:- >20 piece of Standing Oven product is rework /repacked /product. It's Quantum Brand .
6/9/2020 A 3 LELISA & GAZU 5320 KF-5320 MINI OVEN REWORK 350 99 28%
99 0 0.157142857143
6/9/2020 A 2 BIRU KUMA 7021 DOUBLE HOTPLATE 7*.BRAND . /CLAY PLATE/ REWORK/ 650 36 6%
36 0
6/9/2020 B 7 TOTOBA TESFAYE 7011 SINGLE HOTPLATE SKY TECH.BRAND . /SPIRAL PLATE/ REWORK/ 650 473 73%
473 0
6/9/2020 B 3 GARESU ASSEFA 5320/3858/ KF-5320/3858/ MINI OVEN REWORK 350 51 15%
51 0 0.080952380952
6/9/2020 B 2 TESFAYE META 7021 DOUBLE HOTPLATE 7*.BRAND . /CLAY PLATE/ REWORK/ 650 86 13%
86 0
TOTAL 2800 758 total packed=758
AVERAGE PERFORMANCE
24% total none packed =0
0.32837301587
>13 piece of Standing Oven product is rework /repacked /product. It's Quantum Brand .
nb:- >Out of 13 pcs 6 Pcs is four electric (4E) While 7 Pcs is two gas ; two electric (2G+2E).
>out of 51 piece of mini oven rework 48 piece is 5320 while 3 piece 3858.
6/10/2020 A 7 GAZU HIRPA 7011 SINGLE HOTPLATE SKY TECH.BRAND . /SPIRAL PLATE/ REWORK/ 650 271 42%
271 0
6/10/2020 A 5 ASSEFA BEKELE 60s-04 STANDING OVEN (4E) REWORK 150 32 21%
32 0 0.222222222222
6/10/2020 B 7 TOTOBA TESFAYE 7011 SINGLE HOTPLATE SKY TECH.BRAND . /SPIRAL PLATE/ REWORK/ 650 324 50%
324 0
6/10/2020 B 3 GARESU ASSEFA 5320 KF-5320 MINI OVEN 350 140 40%
140 0 0.222222222222
6/10/2020 B 2 BIRU KUMA 2891 LX-2891 HEATER REWORK 450 283 63%
283 0
TOTAL 2800 1132 total packed=1072
AVERAGE PERFORMANCE
34% total none packed =60
0.46349206349
nb:- >32 piece of Standing Oven product is rework /repacked /product. It's Quantum Brand .
KUMTEL ASSEMBLY DEPARTMENT DAILY REAL PRODUCTION REPORT
REMARK
Reason
DATE SHIFT LINE NO. LINE CHIEF NAME PRODUCT CODE PRODUCT NAME
TARGET
REAL PCS DAILY EFFICIENCY Packed Not packed Container
PLAN Balance
6/11/2020 A 3 TESFAYE META 5320 KF-5320 MINI OVEN 350 117 33%
105 12 0.166666666667
6/11/2020 A 7 GAZU HIRPA 2891 LX-2891 HEATER REWORK 450 234 52%
234 0
6/11/2020 B 3 GARESU ASSEFA 5320 KF-5320 MINI OVEN 350 146 42%
146 0 0.231746031746
6/11/2020 B 2 BIRU KUMA 2891 LX-2891 HEATER REWORK 450 354 79%
354 0
TOTAL 1950 940 total packed=928
AVERAGE PERFORMANCE
43% total none packed =12
0.83591269841
6/12/2020 A 3 TESFAYE META 5320 KF-5320 MINI OVEN 350 139 40%
139 0 0.220634920635
6/12/2020 A 7 GAZU HIRPA EX-23 EX-23 HEATER REWORK 450 145 32%
145 0
6/12/2020 B 7 TOTOBA TESFAYE 2820 KF-2820 HEATER REWORK 450 276 61%
276 0
6/12/2020 B 3 GARESU ASSEFA 5320 KF-5320 MINI OVEN 350 147 42%
147 0 0.233333333333
6/12/2020 B 2 BIRU KUMA 2820 KF-2820 HEATER REWORK 450 106 24%
106 0
TOTAL 2200 881 total packed=881
AVERAGE PERFORMANCE
41% total none packed =0
0.92619047619
6/13/2020 A 3 TESFAYE META 5320 KF-5320 MINI OVEN 350 126 36% Lack of Carton
30 96 0.047619047619
6/13/2020 B 7 TOTOBA TESFAYE 2891 LX-2891 HEATER REWORK 450 149 33%
149 0
6/13/2020 B 3 GARESU ASSEFA 5320 KF-5320 MINI OVEN 350 165 47% Lack of Carton
0 165 0
6/13/2020 B 2 BIRU KUMA 2820 KF-2820 HEATER REWORK 450 100 22%
100 0
TOTAL 2250 712 total packed=451
AVERAGE PERFORMANCE
32% total none packed =261
0.54761904762
6/15/2020 B 7 BIRU KUMA 2891 LX-2891 HEATER REWORK 450 221 49%
221 0
6/15/2020 B 3 TOTOBA TESFAYE 5320 KF-5320 MINI OVEN 350 162 46% Lack of Carton
0 162 0
TOTAL 1300 577 total packed=288
AVERAGE PERFORMANCE
44% total none packed =289
0.46527777778
6/16/2020 B 7 BIRU KUMA 2891 LX-2891 HEATER REWORK 450 300 67%
300 0
6/16/2020 B 3 TOTOBA TESFAYE 5320 KF-5320 MINI OVEN REWORK PACKED ONLY 350 144 41%
144 0 0.228571428571
TOTAL 1300 593 total packed=593
AVERAGE PERFORMANCE
44% total none packed =0
0.84007936508
6/17/2020 A 5 ASSEFA BEKELE 60s-04/02 STANDING OVEN (4E) /(2G+2E) 150 61 41%
61 0 0.423611111111
6/17/2020 B 7 BIRU KUMA EX-23 EX-23 HEATER REWORK 300 102 34%
102 0
nb:- >Out of 61 piece of Standing Oven product 27 Pcs is four electric (4E) While 34 Pcs is two gas ; two electric (2G+2E).
6/18/2020 A 3 TESFAYE META 3854/58 & 3576 KF-3854/58 & 3576 MINI OVEN REWORK 200 22 11%
22 0 0.045833333333
6/18/2020 A 7 TESFAYE META 3800 KF-3800 ROUND OVEN REWORK 200 29 15%
29 0
6/18/2020 B 7 TOTOBA TESFAYE 3800 KF-3800 ROUND OVEN REWORK 350 150 43%
150 0
6/18/2020 B 3 BIRU KUMA 5360 KF-5360 MINI OVEN 300 135 45%
135 0 0.28125
TOTAL 1200 411 total packed=411
AVERAGE PERFORMANCE
33% total none packed =0
0.84791666667
6/19/2020 A 7 TESFAYE META 3800 KF-3800 ROUND OVEN REWORK 350 123 35%
123 0
6/19/2020 B 7 TOTOBA TESFAYE 3800 KF-3800 ROUND OVEN REWORK 350 87 25%
87 0
6/19/2020 B 3&7 TOTOBA & BIRU 5320 KF-5320 MINI OVEN REWORK 350 112 32%
112 0 0.177777777778
6/19/2020 B 3 BIRU KUMA 5360 KF-5360 MINI OVEN REWORK 300 47 16%
47 0 0.097916666667
TOTAL 1500 420 total packed=420
AVERAGE PERFORMANCE
28% total none packed =0
0.62986111111
nb:- > Round oven & Mini Oven product is rework product. It's only packing.
6/20/2020 A 7 TESFAYE META 3800 KF-3800 ROUND OVEN REWORK 350 117 33%
117 0
6/20/2020 A 3 GEZU HIRPA 5320 KF-5320 MINI OVEN REWORK 350 100 29%
100 0 0.15873015873
6/20/2020 B 7 TOTOBA TESFAYE 3800 KF-3800 ROUND OVEN REWORK 200 22 11%
22 0
6/20/2020 B 7 TOTOBA TESFAYE 7021 DOUBLE HOTPLATE Sky Tech BRAND . /SPIRAL PLATE/ 300 47 16%
0 47
6/20/2020 B 3 BIRU KUMA 5320/60 KF-5320/60 MINI OVEN REWORK 200 24 12%
24 0 0.038095238095
6/21/2020 A 7 TESFAYE & GEZU 2820 KF-2820 HEATER REWORK 250 25 10%
25 0
6/21/2020 A 7 TESFAYE & GEZU 7021 DOUBLE HOTPLATE Sky Tech BRAND . /SPIRAL PLATE/ 250 20 8%
0 20
6/21/2020 B 7 TOTOBA TESFAYE 2831 KF-2831 HEATER M.QUADRO REWORK 450 77 17%
77 0
nb:- > Out of 40 pcs of 3520/70/ mini oven product; 37 pieces is 3520 while 3 piece is 3570.
6/24/2020 A 5 ASSEFA BEKELE 60s-22 ATLANTIS STANDING OVEN (2G+2E) 150 30 20%
0 30 0
6/24/2020 A 7 TESFAYE & GEZU Dx-6 DX-6 SACCER/ HUCKER/ 150 46 31%
0 46
6/24/2020 B 7 TOTOBA TESFAYE 2831 KF-2831 HEATER M.QUADRO REWORK 450 46 10%
46 0
6/24/2020 B 3 GARESU ASEFA 3570 KF-3570 MINI OVEN 350 132 38%
132 0 0.275
TOTAL 1250 277 total packed=201
AVERAGE PERFORMANCE
23% total none packed =76
0.43472222222
6/25/2020 A 5 ASSEFA BEKELE 60s-22 ATLANTIS STANDING OVEN (2G+2E) -> Rejected 150 25 17% 0 25 0 Rejected->incase of some part should be changed
6/25/2020 A 7 TESFAYE & GEZU Dx-6 DX-6 SACCER/ HUCKER/ 150 85 57%
0 85
6/25/2020 B 3 GARESU ASEFA 3570 KF-3570 MINI OVEN 350 104 30%
104 0 0.216666666667
TOTAL 1100 232 total packed=109
AVERAGE PERFORMANCE
22% total none packed =123
0.25138888889
6/26/2020 A 5 ASSEFA BEKELE 60s-22 STANDING OVEN (2G+2E).QUANTUM BRAND 150 75 50%
75 0 0.520833333333
6/26/2020 A 7 TESFAYE & GEZU Dx-6 DX-6 SACCER/ HUCKER/ 150 52 35%
0 52
6/26/2020 B 3 GARESU & BIRU 5320 KF-5320 MINI OVEN 350 86 25% Lack of Carton
0 86 0
6/27/2020 A 5 ASSEFA BEKELE 60s-22 STANDING OVEN (2G+2E).QUANTUM BRAND 150 27 18%
27 0 0.1875
6/27/2020 B 2 GARESU & BIRU 5320 KF-5320 MINI OVEN REWORK 350 27 8%
27 0 0.05625
6/27/2020 B 9 TOTOBA TESFAYE 2830 KF-2830 HEATER QUADRO REWORK 450 65 14%
65 0
TOTAL 1300 152 total packed=152
AVERAGE PERFORMANCE
12% total none packed =0
0.3125
6/29/2020 A 5 ASSEFA BEKELE 60s-22 STANDING OVEN (2G+2E).QUANTUM BRAND 150 45 30%
45 0 0.3125
nb:- >Out of 65 pcs of Standing Oven ; 31 pcs is Black color Quantum Brand while 34 pcs is White color Luxcell Brand.
7/9/2020 A 5 ASSEFA BEKELE 60s-22 STANDING OVEN (2G+2E). LUXCELL BRAND,WHITE COLOR 150 52 35%
42 10 0.291666666667
TOTAL 150 52
35% total packed=42 0.29166666667
AVERAGE PERFORMANCE total none packed =10
7/10/2020 A 5 ASSEFA BEKELE 60s-22 STANDING OVEN (2G+2E). LUXCELL BRAND,WHITE COLOR 150 74 49%
74 0 0.513888888889
7/10/2020 A 3 TESFAYE & GAZU 7021 DOUBLE HOTPLATE Sky Tech BRAND . /SPIRAL PLATE/ 500 50 10%
0 50
7/10/2020 B 3 GARESU ASSEFA 7021 DOUBLE HOTPLATE Sky Tech BRAND . /SPIRAL PLATE/ 500 95 19%
0 95
7/10/2020 B 9 TOTOBA TESFAYE 7021 DOUBLE HOTPLATE Sky Tech BRAND . /SPIRAL PLATE/ 500 130 26%
0 130
TOTAL 1650 349 total packed=74
AVERAGE PERFORMANCE
26% total none packed =275
0.51388888889
7/11/2020 A 5 ASSEFA BEKELE 60s-22 STANDING OVEN (2G+2E). LUXCELL BRAND,WHITE COLOR 150 70 47%
70 0 0.486111111111
7/11/2020 A 3 TESFAYE & GAZU 7021 DOUBLE HOTPLATE Sky Tech BRAND . /SPIRAL PLATE/ 500 90 18%
0 90
7/11/2020 B 3 GARESU ASSEFA 7021 DOUBLE HOTPLATE Sky Tech BRAND . /SPIRAL PLATE/ 500 175 35%
0 175
7/11/2020 B 9 TOTOBA TESFAYE 7021 DOUBLE HOTPLATE Sky Tech BRAND . /SPIRAL PLATE/ 500 222 44%
0 222
TOTAL 1650 557 total packed=70
AVERAGE PERFORMANCE
36% total none packed =487
0.48611111111
KUMTEL ASSEMBLY DEPARTMENT DAILY REAL PRODUCTION REPORT REMARK
TARGET Container Reason
DATE SHIFT LINE NO. LINE CHIEF NAME PRODUCT CODE PRODUCT NAME
PLAN
REAL PCS DAILY EFFICIENCY Packed Not packed Balance
7/13/2020 A 5 ASSEFA BEKELE 60s-22 STANDING OVEN (2G+2E). LUXCELL BRAND,WHITE COLOR 150 48 32%
48 0 0.333333333333
7/13/2020 A 3 TESFAYE & GAZU 7021 DOUBLE HOTPLATE Sky Tech BRAND . /SPIRAL PLATE/ 500 118 24%
0 118
7/13/2020 B 3 GARESU ASSEFA 7011 SINGLE HOTPLATE Sky Tech BRAND . /SPIRAL PLATE/ 750 402 54%
0 402
7/13/2020 B 9 TOTOBA TESFAYE 7021 DOUBLE HOTPLATE Sky Tech BRAND . /SPIRAL PLATE/ 500 102 20%
0 102
TOTAL 1900 670 total packed=48
AVERAGE PERFORMANCE
32% total none packed =622
0.33333333333
7/14/2020 A 5 ASSEFA BEKELE 60s-22 STANDING OVEN (2G+2E). LUXCELL BRAND,WHITE COLOR 150 28 19%
28 0 0.194444444444
7/14/2020 A 3 TESFAYE & GAZU 7011 SINGLE HOTPLATE Sky Tech BRAND . /SPIRAL PLATE/ 750 337 45%
0 337
7/14/2020 B 3 GARESU ASSEFA 7011 SINGLE HOTPLATE Sky Tech BRAND . /SPIRAL PLATE/ 750 560 75%
0 560
7/14/2020 B 9 BIRU KUMA 7011 SINGLE HOTPLATE Sky Tech BRAND . /SPIRAL PLATE/ 650 342 53%
0 342
7/14/2020 B 9 BIRU KUMA 7021 DOUBLE HOTPLATE Sky Tech BRAND . /SPIRAL PLATE/ 100 32 32%
0 32
TOTAL 2400 1299 total packed=28
AVERAGE PERFORMANCE
45% total none packed =1271
0.19444444444
nb:- >Out of 75 pcs of Standing Oven ; 45 pcs is Luxcell Brand whith White color . While 30 pcs is Arcodym Brand whith light Brown color.
7/16/2020 A 5 ASSEFA BEKELE 60s-22 STANDING OVEN (2G+2E). ARCODYM BRAND,LIGHT BROWN COLOR 150 64 43%
64 0 0.444444444444
7/16/2020 A 3 TESFAYE & GAZU 7011 SINGLE HOTPLATE Sky Tech BRAND . /SPIRAL PLATE/ 450 203 45%
0 203
7/16/2020 A 3 TESFAYE & GAZU 7021 DOUBLE HOTPLATE Sky Tech BRAND . /SPIRAL PLATE/ 300 63 21%
0 63
7/16/2020 B 3 GARESU ASSEFA 7021 DOUBLE HOTPLATE Sky Tech BRAND . /SPIRAL PLATE/ 500 125 25%
0 125
7/16/2020 B 9 TOTOBA TESFAYE 7021 DOUBLE HOTPLATE Sky Tech BRAND . /SPIRAL PLATE/ 500 90 18%
0 90
TOTAL 1900 545 total packed=64
AVERAGE PERFORMANCE
30% total none packed =481
0.44444444444
>Out of 64 pcs of Standing Oven ; 62 pcs is Arcodym Brand whith light Brown color,While 2 pcs is Luxcell Brand whith White color
nb:-
REWORK PRODUCT-> ONLY CHECKING & PACKING
nb:- >Out of 34 pcs of Standing Oven ; 18 pcs is Luxcell Brand whith light Brown color,While 16 pcs is Quantum Brand whith Black color
7/18/2020 A 5 ASSEFA BEKELE 60s-22 STANDING OVEN (2G+2E). ARCODYM BRAND,LIGHT BROWN COLOR 150 60 40%
60 0 0.416666666667
7/18/2020 A 3 TESFAYE & GAZU 7021 DOUBLE HOTPLATE Sky Tech BRAND . /SPIRAL PLATE/ 500 18 4%
0 187
7/18/2020 B 3 GARESU ASSEFA 7021 DOUBLE HOTPLATE Sky Tech BRAND . /SPIRAL PLATE/ 500 222 44%
0 222
7/18/2020 B 9 TOTOBA TESFAYE 7021 DOUBLE HOTPLATE Sky Tech BRAND . /SPIRAL PLATE/ 500 210 42%
0 210
TOTAL 1650 510 total packed=60
AVERAGE PERFORMANCE
33% total none packed =619
0.41666666667
nb:- >Out of 60 pcs of Standing Oven ; 20 pcs is Arcodym Brand with light Brown color, 39 pcs is Luxcell Brand with Beige color, &1 pcs is Quantum Brand with Black color
7/20/2020 A 5 ASSEFA BEKELE 60s-22 STANDING OVEN (2G+2E). ARCODYM BRAND,LIGHT BROWN COLOR 150 50 33%
50 0 0.347222222222
7/20/2020 A 3 TESFAYE & GAZU 7021 DOUBLE HOTPLATE Sky Tech BRAND . /SPIRAL PLATE/ 500 196 39%
0 196
7/20/2020 B 3 GARESU ASSEFA 7021 DOUBLE HOTPLATE Sky Tech BRAND . /SPIRAL PLATE/ 500 170 34%
0 170
7/20/2020 B 9 TOTOBA TESFAYE 7021 DOUBLE HOTPLATE Sky Tech BRAND . /SPIRAL PLATE/ 500 174 35%
0 174
TOTAL 1650 590 total packed=50
AVERAGE PERFORMANCE
35% total none packed =540
0.34722222222
nb:- >Out of 50 pcs of Standing Oven ; 31 pcs is Arcodym Brand with light Brown color, 18 pcs is Luxcell Brand with white color &1 pcs is Quantum Brand with Black color
7/21/2020 A 5 ASSEFA BEKELE 60s-22 STANDING OVEN (2G+2E). ARCODYM BRAND,LIGHT BROWN COLOR 150 42 28%
42 0 0.291666666667
7/21/2020 B 3 GARESU ASSEFA 7021 DOUBLE HOTPLATE Sky Tech BRAND . /SPIRAL PLATE/ 500 178 36%
0 178
TOTAL 650 220 total packed=42
AVERAGE PERFORMANCE
32% total none packed =178
0.29166666667
nb:- >Out of 42 pcs of Standing Oven ; 8 pcs is Arcodym Brand with light Brown color while 34 pcs is Luxcell Brand with Beige color .
7/22/2020 A 5 ASSEFA BEKELE 60s-22 STANDING OVEN (2G+2E). ARCODYM BRAND,LIGHT BROWN COLOR & Atelants 150 48 32%
23 25 0.159722222222
7/22/2020 A 3 TESFAYE & GAZU 7021 DOUBLE HOTPLATE Sky Tech BRAND . /SPIRAL PLATE/ REWORK / 600 408 68%
408 0
7/22/2020 B 9 TOTOBA TESFAYE 2830 KF-2830 HEATER 450 31 7%
0 31
7/22/2020 B 3 GARESU ASSEFA 7021 DOUBLE HOTPLATE Sky Tech BRAND . /SPIRAL PLATE/ 500 154 31%
92 62
TOTAL 1700 641 total packed=523
AVERAGE PERFORMANCE
34% total none packed =118
0.15972222222
nb:- >Out of 48 pcs of Standing Oven ; 23 pcs is Arcodym Brand with light Brown color while 25 pcs is Atelants Brand with inox .
7/23/2020 A 5 ASSEFA BEKELE 60s-22 STANDING OVEN (2G+2E). ATELANTIS 150 58 39% HANDLE OF DOOR PROBLEM
0 58 0
7/23/2020 A 3 TESFAYE & GAZU 7021 DOUBLE HOTPLATE Sky Tech BRAND . /SPIRAL PLATE/ 500 173 35%
0 173
7/23/2020 B 3 GARESU ASSEFA 7021 DOUBLE HOTPLATE Sky Tech BRAND . /SPIRAL PLATE/ 500 240 48%
0 240
TOTAL 1600 565 total packed=94
AVERAGE PERFORMANCE
36% total none packed =471
0
7/24/2020 A 3 TESFAYE & GAZU 7021 DOUBLE HOTPLATE KUMTEL BRAND . /1SPIRAL & 1 PLATE/ & 2 Spiral 500 56 11%
48 8
7/24/2020 B 9 TOTOBA TESFAYE 2830 KF-2830 HEATER 450 44 10%
44 0
7/24/2020 B 3 GARESU ASSEFA 7021 DOUBLE HOTPLATE Sky Tech BRAND . /SPIRAL PLATE/ 500 270 54%
0 270
TOTAL 1450 370 total packed=92
AVERAGE PERFORMANCE
25% total none packed =278
0
>Out of 56 pcs of Double Hotplate; 48 pcs is 1 spiral & 1 plate(1500w) while 8 pcs is 2 spiral .
nb:- REWORK PRODUCT-> ONLY CHECKING & PACKING
7/25/2020 A 5 ASSEFA BEKELE 60s-22 STANDING OVEN (2G+2E). ATELANTIS Rework 150 8 5%
8 0 0.055555555556
7/25/2020 A 3 TESFAYE & GAZU 7021 DOUBLE HOTPLATE Sky Tech BRAND . /SPIRAL PLATE/ Rework 500 92 18%
45 47
7/25/2020 B 9 TOTOBA TESFAYE 7021 DOUBLE HOTPLATE Sky Tech BRAND . /SPIRAL PLATE/ Rework 500 121 24%
121 0
7/25/2020 B 3 GARESU ASSEFA 7021 DOUBLE HOTPLATE Sky Tech BRAND . /SPIRAL PLATE/ Rework 500 306 61%
306 0
TOTAL 1650 527 total packed=480
AVERAGE PERFORMANCE
27% total none packed =47
0.05555555556
>Out of 519 pcs of Double Hotplate; 47 pcs is new product while 472 pcs is rework product.
nb:- REWORK PRODUCT-> ONLY CHECKING & PACKING
LINE NO P.CODE PACKED BRAND p.name REMARK/DESCRIPTION/
7a DP-6-S 45 KUMTEL SUCKER only packing /Rework/
7/27/2020 A 5 ASSEFA BEKELE 60s-22 STANDING OVEN (2G+2E). ATELANTIS Rework 150 25 17%
25 0 0.173611111111
7/27/2020 A 3 TESFAYE & GAZU 7021 DOUBLE HOTPLATE Sky Tech BRAND . /SPIRAL PLATE/ 500 143 29%
0 143
7/27/2020 B 9 TOTOBA TESFAYE 7021 DOUBLE HOTPLATE Sky Tech BRAND . /SPIRAL PLATE/ Rework 600 330 55%
330 0
7/27/2020 B 7 BIRU KUMA 7021 DOUBLE HOTPLATE Sky Tech BRAND . /SPIRAL PLATE/ Rework 600 372 62%
372 0
7/27/2020 B 3 GARESU ASSEFA 7021 DOUBLE HOTPLATE Sky Tech BRAND . /SPIRAL PLATE/ 500 250 50%
0 250
TOTAL 2350 1120 total packed=727
AVERAGE PERFORMANCE
42% total none packed =393
0.17361111111
>Out of 1095 pcs of Double Hotplate; 393 pcs is new product while 702 pcs is rework product /packing only/.
nb:- REWORK PRODUCT-> ONLY CHECKING & PACKING
LINE NO P.CODE PACKED BRAND p.name REMARK/DESCRIPTION/
7a DP-6-S 10 KUMTEL SUCKER only packing /Rework/
7/28/2020 A 5 ASSEFA & LELISA 60s-22 STANDING OVEN (2G+2E). ATELANTIS Rework 150 20 13%
20 0 0.138888888889
7/28/2020 A 3 BIRU KUMA 7021 DOUBLE HOTPLATE Sky Tech BRAND . /SPIRAL PLATE/ 500 239 48%
177 62
7/28/2020 A 7 TESFAYE META 7021 DOUBLE HOTPLATE Sky Tech BRAND . /SPIRAL PLATE/ Rework 600 322 54%
322 0
7/28/2020 B 7 GEZU HIRPA 7021 DOUBLE HOTPLATE Sky Tech BRAND . /SPIRAL PLATE/ Rework 600 274 46%
274 0
7/28/2020 B 9 TOTOBA TESFAYE 7021 DOUBLE HOTPLATE Sky Tech BRAND . /SPIRAL PLATE/ Rework 600 228 38%
228 0
7/28/2020 B 3 GARESU ASSEFA 7021 DOUBLE HOTPLATE Sky Tech BRAND . /SPIRAL PLATE/ 500 215 43%
10 205
TOTAL 2950 1298 total packed=1031
AVERAGE PERFORMANCE
40% total none packed =267
0.13888888889
nb:- >Out of 1278 pcs of Double Hotplate; 409 pcs is new product while 869 pcs is rework product /packing only/.
7/29/2020 A 5 ASSEFA & LELISA 60s-22 STANDING OVEN (2G+2E). ATELANTIS Rework 150 30 20%
30 0 0.208333333333
7/29/2020 A 3 TESFAYE META 7021 DOUBLE HOTPLATE Sky Tech BRAND . /SPIRAL PLATE/ Rework 600 137 23%
137 0
7/29/2020 A 7 GEZU HIRPA 7021 DOUBLE HOTPLATE Sky Tech BRAND . /SPIRAL PLATE/ Rework 600 169 28%
169 0
7/29/2020 B 7 TOTOBA TESFAYE 2710 KF-2710 BIG HEATER /Rework & Shearing Packet/ 200 34 17%
34 0
7/29/2020 B 9 TOTOBA TESFAYE 7021 DOUBLE HOTPLATE Sky Tech BRAND . /SPIRAL PLATE/ Rework 600 231 39%
231 0
7/29/2020 B 3 GARESU ASSEFA 7021 DOUBLE HOTPLATE Sky Tech BRAND . /SPIRAL PLATE/ Rework 600 120 20%
120 0
TOTAL 2750 721 total packed=721
AVERAGE PERFORMANCE
24% total none packed =0
0.20833333333
nb:- >Out of 657 pcs o f Double Hotplate; 21 pcs is new product while 636 pcs is rework product /packing only/.
7/30/2020 A 5 ASSEFA & LELISA 60s-22 STANDING OVEN (2G+2E). ATELANTIS Rework 150 27 18%
27 0 0.1875
7/30/2020 A 7 GEZU HIRPA 2710 KF-2710 BIG HEATER /Rework & Shearing Packet/ 200 58 29%
58 0
7/30/2020 B 3 GARESU ASSEFA 7021 DOUBLE HOTPLATE Sky Tech BRAND . /SPIRAL PLATE/ Rework 600 277 46%
277 0
TOTAL 1150 373 total packed=373
AVERAGE PERFORMANCE
25% total none packed =0
0.21805555556
8/1/2020 A 5 ASSEFA & LELISA 60s-22 STANDING OVEN (2G+2E). ATELANTIS Rework 150 35 23% 35 0 0.243055555556
8/1/2020 A 1 TESFAYE META A6-5f2 ANKESTERA /ELECTRIC OVEN/ Rework 150 15 10% 15 0
8/1/2020 A 7 GEZU HIRPA 2710 KF-2710 BIG HEATER /Rework & Shearing Packet/ 200 53 27% 53 0
8/1/2020 B 9 TOTOBA TESFAYE 5320/3570/3858/3576/ KF-5320/3570/3858/3576/ MINI OVEN Rework 200 17 9% 17 0 0.026984126984
8/1/2020 B 3 GARESU ASSEFA 7021 DOUBLE HOTPLATE Sky Tech BRAND . /SPIRAL PLATE/ Rework 600 321 54% 321 0
8/3/2020 A 5 ASSEFA & LELISA 60s-22 STANDING OVEN (2G+2E). ATELANTIS Rework 150 42 28% 15 27 0.104166666667
8/3/2020 A 1 TESFAYE META A6-5f2 ANKESTERA /ELECTRIC OVEN/ Rework 150 17 11% 17 0
8/3/2020 B 9 TOTOBA TESFAYE 7021 DOUBLE HOTPLATE Sky Tech BRAND . /SPIRAL PLATE/ Rework 300 11 4% 11 0
8/3/2020 B 9 TOTOBA TESFAYE 5320/3570/3858/3576/ KF-5320/3570/3858/3576/ MINI OVEN Rework 200 32 16% 32 0 0.050793650794
8/3/2020 B 3 GARESU ASSEFA 7021 DOUBLE HOTPLATE Sky Tech BRAND . /SPIRAL PLATE/ Rework 600 202 34% 202 0
8/4/2020 A 5 ASSEFA & LELISA 60s-22 STANDING OVEN (2G+2E). Rework & New work 150 45 30% 45 0 0.3125
8/4/2020 B 9 TOTOBA TESFAYE 5320/3570/3858/3576/ KF-5320/3570/3858/3576/ MINI OVEN Rework 200 34 17% 34 0 0.053968253968
8/4/2020 B 3 GARESU ASSEFA 7021 DOUBLE HOTPLATE Sky Tech BRAND . /SPIRAL PLATE/ Rework 600 150 25% 150 0
nb:- >Out of 45 pcs o f Standing Oven ; 13 pcs is new product while 32 pcs is rework product .
8/5/2020 A 5 ASSEFA & LELISA 60s-22 STANDING OVEN (2G+2E). 150 30 20% 30 0 0.208333333333
8/5/2020 B 9 TOTOBA TESFAYE 5320/3570/3858/3576/ KF-5320/3570/3858/3576/ MINI OVEN Rework 200 27 14% 27 0 0.042857142857
8/5/2020 B 3 GARESU ASSEFA 7021 DOUBLE HOTPLATE Sky Tech BRAND . /SPIRAL PLATE/ 600 203 34% 173 30
8/6/2020 A 5 ASSEFA & LELISA 60s-22 STANDING OVEN (2G+2E). 150 40 27% 40 0 0.277777777778
8/6/2020 B 3 GARESU ASSEFA 7021 DOUBLE HOTPLATE Sky Tech BRAND . /SPIRAL PLATE/ 600 176 29% 40 136
TOTAL 950 229 total packed=93
AVERAGE PERFORMANCE
21% total none packed =136
0.31388888889
8/7/2020 A 5 ASSEFA & LELISA 60s-22 STANDING OVEN (2G+2E). 150 42 28% 25 17 0.173611111111
8/7/2020 B 9 TOTOBA TESFAYE 2710 KF-2710 BIG HEATER /Rework & Shearing Packet/ 200 8 4% 8 0
8/7/2020 B 3 GARESU ASSEFA 7021 DOUBLE HOTPLATE Sky Tech BRAND . /SPIRAL PLATE/ 600 110 18% 0 110
8/8/2020 A 5 ASSEFA & LELISA 60s-22 STANDING OVEN (2G+2E). LUXCELL BRAND with gray color 150 22 15% 22 0 0.152777777778
8/8/2020 B 3 GARESU ASSEFA 7021 DOUBLE HOTPLATE Sky Tech BRAND . /SPIRAL PLATE/ 600 170 28% 0 170
8/10/2020 A 5 ASSEFA & LELISA 60s-22 STANDING OVEN (2G+2E). LUXCELL BRAND with gray color 150 13 9% 13 0 0.090277777778
8/10/2020 B 7 TOTOBA TESFAYE 7021 DOUBLE HOTPLATE Sky Tech BRAND . /SPIRAL PLATE/ REWORK/ 600 209 35% 209 0
8/10/2020 B 3 GARESU ASSEFA 7021 DOUBLE HOTPLATE Sky Tech BRAND . /SPIRAL PLATE/ 600 105 18% 20 85
8/11/2020 A 5 ASSEFA & LELISA 60s-22 STANDING OVEN (2G+2E). LUXCELL BRAND with gray color 150 50 33% 50 0 0.347222222222
8/11/2020 B 7 TOTOBA TESFAYE 7021 DOUBLE HOTPLATE Sky Tech BRAND . /SPIRAL PLATE/ REWORK/ 600 58 10% 58 0
8/11/2020 B 3 GARESU ASSEFA 7021 DOUBLE HOTPLATE Sky Tech BRAND . /SPIRAL PLATE/ 600 68 11% 48 20
8/12/2020 A 5 ASSEFA & LELISA 60s-22 STANDING OVEN (2G+2E). LUXCELL BRAND with gray color 150 25 17% 25 0 0.173611111111
8/12/2020 A 1 TESFAYE META A6-5f2 ANKESTERA /ELECTRIC OVEN/ REWORK 150 16 11% 16 0
8/12/2020 B 3 GARESU ASSEFA 7021 DOUBLE HOTPLATE Sky Tech BRAND . /SPIRAL PLATE/ 500 10 2% 10 0
TOTAL 1100 95 total packed=51
AVERAGE PERFORMANCE
11% total none packed =44
0.17361111111
8/13/2020 A 5 ASSEFA & LELISA 60s-22 STANDING OVEN (2G+2E). LUXCELL BRAND with Gray & Black color 150 27 18% 27 0 0.1875
8/13/2020 A 1 TESFAYE META A6-5f2 ANKESTERA /ELECTRIC OVEN/ 150 35 23% 0 35 Shortage of Izgara
8/13/2020 B 3 GARESU ASSEFA 7021 DOUBLE HOTPLATE Sky Tech BRAND . /SPIRAL PLATE/ 500 32 6% 32 0
8/13/2020 B 7 BIRU KUMA 7011 SINGLE HOTPLATE Sky Tech BRAND . /SPIRAL PLATE/ REWORK PACKING/ 750 158 21% 158 0
8/14/2020 A 5 ASSEFA & LELISA 60s-22 STANDING OVEN (2G+2E). LUXCELL BRAND with Black color 150 12 8% 12 0 0.083333333333
8/14/2020 A 1 TESFAYE META A6-5f2 ANKESTERA /ELECTRIC OVEN/ 150 31 21% 0 31 Shortage of Izgara
8/14/2020 A 7 GAZU HIRPA 7011 SINGLE HOTPLATE Sky Tech BRAND . /SPIRAL PLATE/ REWORK -ONLYPACKING/ 750 281 37% 281 0
8/14/2020 B 3 GARESU ASSEFA 3570 KF-3570 MINI OVEN 300 62 21% 0 62 0 Shortage of Izgara
8/14/2020 B 9 TOTOBA TESFAYE 3902 KF-3902 MIDDLE OVEN Rework 200 33 17% 33 0 0.091666666667
8/14/2020 B 9 TOTOBA TESFAYE 7011 SINGLE HOTPLATE Sky Tech BRAND . /SPIRAL PLATE/ REWORK -ONLY PACKING/ 650 166 26% 166 0
8/14/2020 B 7 BIRU KUMA 7011 SINGLE HOTPLATE Sky Tech BRAND . /SPIRAL PLATE/ REWORK -ONLY PACKING/ 750 423 56% 423 0
8/15/2020 A 5 ASSEFA & LELISA 60s-22 STANDING OVEN (2G+2E). LUXCELL BRAND with Black color 150 40 27% 40 0 0.277777777778
8/15/2020 B 3 GARESU ASSEFA 7011 SINGLE HOTPLATE Sky Tech BRAND . /SPIRAL PLATE/ REWORK -ONLY PACKING/ 750 583 78% 583 0
8/15/2020 B 9 TOTOBA TESFAYE 7011 SINGLE HOTPLATE Sky Tech BRAND . /SPIRAL PLATE/ REWORK -ONLY PACKING/ 750 277 37% 277 0
8/15/2020 B 7 BIRU KUMA 7011 SINGLE HOTPLATE Sky Tech BRAND . /SPIRAL PLATE/ REWORK -ONLY PACKING/ 750 434 58% 434 0
8/17/2020 A 5 ASSEFA & LELISA 60s-22 STANDING OVEN (2G+2E). LUXCELL BRAND with Black color 150 45 30% 45 0 0.3125
8/17/2020 B 3 GARESU ASSEFA 7011 SINGLE HOTPLATE Sky Tech BRAND . /CLAY PLATE/ REWORK -ONLY PACKING/ 750 162 22% 162 0
8/17/2020 B 7 BIRU KUMA 7011 SINGLE HOTPLATE Sky Tech BRAND . /SPIRAL PLATE/ REWORK -ONLY PACKING/ 750 66 9% 66 0
8/18/2020 A 5 ASSEFA & LELISA 60s-22 STANDING OVEN (2G+2E). LUXCELL BRAND with Black color 150 46 31% 6 40 0.041666666667
8/18/2020 B 3 GARESU ASSEFA 7011 SINGLE HOTPLATE Sky Tech BRAND . /CLAY PLATE/ REWORK -ONLY PACKING/ 750 420 56% 420 0
8/18/2020 B 9 TOTOBA TESFAYE 3800 KF-3800 ROUND OVEN REWORK 350 114 33%
114 0
8/18/2020 B 7 GAZU HIRPA 7011 SINGLE HOTPLATE Sky Tech BRAND . /CLAY PLATE/ REWORK -ONLY PACKING/ 750 300 40% 300 0
8/19/2020 A 5 ASSEFA & LELISA 60s-22 STANDING OVEN (2G+2E). LUXCELL BRAND with Black color 150 35 23% 35 0 0.243055555556
8/19/2020 A 1 TESFAYE META 2830 LX-2830 HEATER QUADRO 300 100 33%
100 0
8/19/2020 B 7 BIRU KUMA 7011 SINGLE HOTPLATE Sky Tech BRAND . /CLAY PLATE/ REWORK -ONLY PACKING/ 750 239 32% 239 0
8/19/2020 B 3 GARESU ASSEFA 7021 DOUBLE HOTPLATE Sky Tech BRAND . /SPIRAL PLATE/ 500 105 21% 105 0
8/19/2020 B 9 TOTOBA TESFAYE 3800 KF-3800 ROUND OVEN REWORK 200 21 11%
21 0
8/20/2020 A 5 ASSEFA & LELISA 60s-22 STANDING OVEN (2G+2E). LUXCELL BRAND with Black color 150 39 26% 39 0 0.270833333333
8/25/2020 B 9 TOTOBA TESFAYE 7021 DOUBLE HOTPLATE Sky Tech BRAND . /SPIRAL PLATE/ 500 46 9% 27 19
8/26/2020 A 5 ASSEFA & LELISA 60s-22 STANDING OVEN (2G+2E). LUXCELL BRAND with Black Color 150 35 23% 18 17 0.125 TRAY /TEPSI/ PROBLEM
8/26/2020 A 1 TESFAYE META A6-5f2 ANKESTERA /ELECTRIC OVEN/ REWORK PACKING / 100 15 15% 15 0
8/26/2020 B 3 GARESU ASSEFA 3551 KF-3551 MINI OVEN WITH PLATE (1000W,1000W) 300 42 14% 0 42 0
8/26/2020 B 9 TOTOBA TESFAYE 7021 DOUBLE HOTPLATE Sky Tech BRAND . /SPIRAL PLATE/ 500 117 23% 39 78
8/27/2020 A 5 ASSEFA & LELISA 60s-22 STANDING OVEN (2G+2E). LUXCELL BRAND with Black Color / REWORK PACKING / 150 9 6% 9 0 0.0625
8/27/2020 A 1 TESFAYE META A6-5f2 ANKESTERA /ELECTRIC OVEN/ REWORK PACKING / 100 5 5% 5 0
8/27/2020 B 3 GARESU ASSEFA 3551 KF-3551 MINI OVEN WITH PLATE (1000W,1000W) 300 68 23% 0 68 0
8/27/2020 B 9 TOTOBA TESFAYE 7021 DOUBLE HOTPLATE Sky Tech BRAND . /SPIRAL PLATE/ 500 130 26% 85 45
8/28/2020 A 5 ASSEFA & LELISA 60s-22 STANDING OVEN (2G+2E). LUXCELL BRAND with Black Color /REWORK PACKING +NEW/ 150 56 37% 56 0 0.388888888889
8/28/2020 A 1 TESFAYE META A6-5f2 ANKESTERA /ELECTRIC OVEN/ REWORK PACKING / 100 22 22% 22 0
8/28/2020 A 3 GAZU HIRPA 5320 KF-5320 MINI OVEN REWORK PACKING 350 43 12% 43 0 0.068253968254
8/28/2020 B 3 GARESU ASSEFA 3551 KF-3551 MINI OVEN WITH PLATE (1000W,1000W) 300 79 26% 0 79 0
8/28/2020 B 9 TOTOBA TESFAYE 7021 DOUBLE HOTPLATE Sky Tech BRAND . /SPIRAL PLATE/ 500 117 23% 113 4
>Out of 56 pieces of Standing Oven product ;38 pcs is rework /repacked /product while 18 pcs is new work /new product/.
nb:-
8/29/2020 A 5 ASSEFA & LELISA 60s-22 STANDING OVEN (2G+2E). LUXCELL BRAND with Black Color 150 60 40% 30 30 0.208333333333
8/29/2020 A 1 TESFAYE META A6-5f2 ANKESTERA /ELECTRIC OVEN/ REWORK PACKING / 100 17 17% 17 0
8/29/2020 A 3 GAZU HIRPA 5320 KF-5320 MINI OVEN REWORK PACKING 350 53 15% 53 0 0.084126984127
8/29/2020 B 3 GARESU ASSEFA 3551 KF-3551 MINI OVEN WITH PLATE (1000W,1000W) 300 119 40% 0 119 0
8/29/2020 B 9 TOTOBA TESFAYE 7021 DOUBLE HOTPLATE Sky Tech BRAND . /SPIRAL PLATE/ 500 125 25% 100 25
8/31/2020 A 5 ASSEFA & LELISA 60s-22 STANDING OVEN (2G+2E). LUXCELL BRAND with Black Color /REWORK PACKING +NEW/ 150 43 29% 43 0 0.298611111111
8/31/2020 A 1 TESFAYE META 3551 KF-3551 MINI OVEN WITH PLATE (1000W,1000W) REWORK PACKING 350 28 8% 28 0 0.058333333333
8/31/2020 B 3 GARESU ASSEFA 3551 KF-3551 MINI OVEN WITH PLATE (1000W,1000W) 300 98 33% 98 0 0.204166666667
8/31/2020 B 9 TOTOBA TESFAYE 7021 DOUBLE HOTPLATE Sky Tech BRAND . /SPIRAL PLATE/ 500 110 22% 110 0
nb:- >Out of 43 pieces of Standing Oven product ;20 pcs is rework /repacked /product while 23 pcs is new work /new product/.
9/1/2020 A 5 ASSEFA & LELISA 60s-22 STANDING OVEN (2G+2E). LUXCELL BRAND with Black Color /REWORK PACKING +NEW/ 150 38 25% 38 0 0.263888888889
9/1/2020 B 3 GARESU ASSEFA 3551 KF-3551 MINI OVEN WITH PLATE (1000W,1000W) /REWORK PACKING/ 350 27 8% 27 0 0.05625
9/1/2020 B 9 TOTOBA TESFAYE 7021 DOUBLE HOTPLATE Sky Tech BRAND . /SPIRAL PLATE/ 500 68 14% 68 0
9/2/2020 A 5 ASSEFA & LELISA 60s-22 STANDING OVEN (2G+2E). LUXCELL BRAND with Black Color /REWORK PACKING +NEW/ 150 30 20% 20 10 0.138888888889
9/2/2020 A 1 TESFAYE META 3551 KF-3551 MINI OVEN WITH PLATE (1000W,1000W) REWORK PACKING 350 50 14% 50 0 0.104166666667
9/2/2020 B 3 GARESU ASSEFA 3551 KF-3551 MINI OVEN WITH PLATE (1000W,1000W) 350 51 15% 25 26 0.052083333333
9/2/2020 B 7 BIRU KUMA 3800 KF-3800 ROUND OVEN /REWORK PACKING/ 200 25 13%
25 0
9/2/2020 B 9 BIRU KUMA 7021 DOUBLE HOTPLATE Sky Tech BRAND . /SPIRAL PLATE/ 300 41 14% 41 0
9/3/2020 A 5 ASSEFA & LELISA 60s-22 STANDING OVEN (2G+2E). LUXCELL BRAND with Black Color /REWORK PACKING +NEW/ 150 40 27% 22 18 0.152777777778
9/3/2020 A 3 GEZU HIRPA 3551 KF-3551 MINI OVEN WITH PLATE (1000W,1000W) REWORK PACKING 350 22 6% 22 0 0.045833333333
9/3/2020 B 3 GARESU ASSEFA 3551 KF-3551 MINI OVEN WITH PLATE (1000W,1000W) 300 64 21% 29 35 0.060416666667
9/3/2020 B 9 BIRU KUMA 7021 DOUBLE HOTPLATE Sky Tech BRAND . /SPIRAL PLATE/ 500 100 20% 100 0
9/4/2020 A 5 ASSEFA & LELISA 60s-22 STANDING OVEN (2G+2E). LUXCELL BRAND with Black Color /REWORK PACKING +NEW/ 150 60 40% 60 0 0.416666666667
9/4/2020 B 3 GARESU ASSEFA 3551 KF-3551 MINI OVEN WITH PLATE (1000W,1000W) REWORK PACKING 350 67 19% 67 0 0.139583333333
9/4/2020 B 7 BIRU KUMA 7021 DOUBLE HOTPLATE Sky Tech BRAND . /SPIRAL PLATE/ 500 132 26% 132 0
nb:- >Out of 60 pieces of Standing Oven product ;28 pcs is rework /repacked /product while 32 pcs is new work /new product/.
9/5/2020 A 5 ASSEFA & LELISA 60s-22 STANDING OVEN (2G+2E). LUXCELL BRAND with Black Color 150 48 32% 20 28 0.138888888889
9/5/2020 B 7 BIRU KUMA 3800 KF-3800 ROUND OVEN /REWORK PACKING/ 200 26 13% 26 0
9/5/2020 B 3 GARESU ASSEFA 7011 SINGLE HOTPLATE Sky Tech BRAND . /SPIRAL PLATE/ 650 148 23% 148 0
9/5/2020 B 7 TOTOBA TESFAYE 7021 DOUBLE HOTPLATE Sky Tech BRAND . /SPIRAL PLATE/ 500 124 25% 124 0
9/7/2020 A 5 ASSEFA & LELISA 60s-22 STANDING OVEN (2G+2E). LUXCELL BRAND with Black Color 150 40 27% 25 15 0.173611111111
9/7/2020 A 3 TESFAYE META 7011 SINGLE HOTPLATE Sky Tech BRAND . /SPIRAL PLATE/ 650 132 20% 132 0
9/7/2020 B 3 GARESU ASSEFA 7011 SINGLE HOTPLATE Sky Tech BRAND . /SPIRAL PLATE/ 650 69 11% 69 0
9/7/2020 B 7 TOTOBA TESFAYE 7021 DOUBLE HOTPLATE Sky Tech BRAND . /SPIRAL PLATE/ 500 99 20% 49 50
9/8/2020 A 5 ASSEFA & LELISA 60s-22 STANDING OVEN (2G+2E). LUXCELL BRAND with Black Color /REWORK PACKING/ 150 43 29% 43 0 0.298611111111
9/8/2020 A 1 TESFAYE META A6-5f2 ANKESTERA /ELECTRIC OVEN/ REWORK PACKING/ 100 27 27% 27 0
9/8/2020 A 3 GAZU HIRPA 7011 SINGLE HOTPLATE Sky Tech BRAND . /SPIRAL PLATE/ 650 141 22% 141 0
9/8/2020 B 3 BIRU KUMA 7021 DOUBLE HOTPLATE Sky Tech BRAND . /SPIRAL PLATE/ 500 131 26% 0 131
9/8/2020 B 7 TOTOBA TESFAYE 7021 DOUBLE HOTPLATE Sky Tech BRAND . /SPIRAL PLATE/ 500 134 27% 0 134
9/9/2020 A 5 ASSEFA & LELISA 60s-22 STANDING OVEN (2G+2E). LUXCELL BRAND with Black Color . 150 45 30% 45 0 0.3125
9/9/2020 A 1 TESFAYE META A6-5f2 ANKESTERA /ELECTRIC OVEN/ REWORK PACKING/ 100 14 14% 14 0
9/9/2020 A 3 GAZU HIRPA 7021 DOUBLE HOTPLATE Sky Tech BRAND . /SPIRAL PLATE/ 500 57 11% 0 57
9/9/2020 B 7 BIRU KUMA 7021 DOUBLE HOTPLATE Sky Tech BRAND . /SPIRAL PLATE/ 500 74 15% 0 74
9/10/2020 A 5 ASSEFA & LELISA 60s-22 STANDING OVEN (2G+2E). LUXCELL BRAND with Black Color . 150 30 20% 30 0 0.208333333333
9/10/2020 A 3 GAZU & TESFAYE 2820 LX-2820 HEATER 300 111 37% 111 0
9/14/2020 A 5 ASSEFA & LELISA 60s-22 STANDING OVEN (2G+2E). LUXCELL BRAND with Black Color . 150 13 9% 6 7 0.041666666667
>The main problem for low performance is lack of enamel powder for Hazne & plate(1500w) espcially for Standing Oven.
nb:-
9/15/2020 A 5 ASSEFA & LELISA 60s-22 STANDING OVEN (2G+2E). LUXCELL BRAND with Black Color . 150 10 7% 10 0 0.069444444444
9/15/2020 B 7 BIRU KUMA 7021 DOUBLE HOTPLATE Sky Tech BRAND . /SPIRAL PLATE/ 500 117 23% 0 117 Lack of Carton
nb:- >The main problem for low performance is lack of enamel powder for Hazne & plate(1500w) espcially for Standing Oven.
9/16/2020 A 5 ASSEFA & LELISA 60s-22 STANDING OVEN (2G+2E). LUXCELL BRAND with Black Color/REWORK PACKING +NEW/ 150 14 9% 14 0 0.097222222222
9/16/2020 A 8 ASSEFA BEKELE 7011 SINGLE HOTPLATE Sky Tech BRAND . /SPIRAL PLATE/ 650 50 8% 0 50 Lack of Carton
9/16/2020 A 7 LELISA ABEBE 7021 DOUBLE HOTPLATE Sky Tech BRAND . /SPIRAL PLATE/ 500 91 18% 0 91 Lack of Carton
9/16/2020 B 7 TOTOBA & BIRU 7011 SINGLE HOTPLATE Sky Tech BRAND . /SPIRAL PLATE/ 650 287 44% 0 287 Lack of Carton
9/16/2020 B 3 GARESU ASSEFA 2820 LX-2820 HEATER 300 125 42% 125 0
nb:- >Out of 14 pieces of Standing Oven product ;7 pcs is rework /repacked /product while 7 pcs is new work /new product/.
9/17/2020 A 3 GAZU HIRPA 2820 LX-2820 HEATER 300 166 55% 31 135 Shortage of Handle
9/17/2020 A 8 ASSEFA BEKELE 7011 SINGLE HOTPLATE Sky Tech BRAND . /SPIRAL PLATE/ 650 290 45% 0 290 Lack of Carton
9/17/2020 A 7 LELISA ABEBE 7011 SINGLE HOTPLATE Sky Tech BRAND . /SPIRAL PLATE/ 650 255 39% 0 255 Lack of Carton
9/17/2020 B 7 TOTOBA & BIRU 7011 SINGLE HOTPLATE Sky Tech BRAND . /SPIRAL PLATE/ 650 346 53% 0 346 Lack of Carton
9/17/2020 B 8 GARESU ASSEFA 7011 SINGLE HOTPLATE Sky Tech BRAND . /SPIRAL PLATE/ 650 342 53% 0 342 Lack of Carton
9/18/2020 A 3 GAZU HIRPA 2820 LX-2820 HEATER 300 140 47% 140 0
9/18/2020 A 8 ASSEFA BEKELE 7011 SINGLE HOTPLATE Sky Tech BRAND . /SPIRAL PLATE/ 650 282 43% 0 282 Lack of Carton
9/18/2020 A 7 LELISA ABEBE 7011 SINGLE HOTPLATE Sky Tech BRAND . /SPIRAL PLATE/ 650 292 45% 0 292 Lack of Carton
9/18/2020 B 7 TOTOBA & BIRU 7021 DOUBLE HOTPLATE Sky Tech BRAND . /SPIRAL PLATE/ 500 150 30% 0 150 Lack of Carton
9/18/2020 B 8 GARESU ASSEFA 7011 SINGLE HOTPLATE Sky Tech BRAND . /SPIRAL PLATE/ 650 358 55% 0 358 Lack of Carton
9/19/2020 A 3 GAZU HIRPA 2820 LX-2820 HEATER 300 106 35% 6 100
9/19/2020 A 8 ASSEFA BEKELE 7011 SINGLE HOTPLATE Sky Tech BRAND . /SPIRAL PLATE/ 650 295 45% 0 295 Lack of Carton
9/19/2020 A 7 LELISA ABEBE 7011 SINGLE HOTPLATE Sky Tech BRAND . /SPIRAL PLATE/ 650 302 46% 0 302 Lack of Carton
9/19/2020 B 7 TOTOBA & BIRU 7021 DOUBLE HOTPLATE Sky Tech BRAND . /SPIRAL PLATE/ 500 100 20% 0 100 Lack of Carton
9/19/2020 B 8 GARESU ASSEFA 7021 DOUBLE HOTPLATE Sky Tech BRAND . /SPIRAL PLATE/ 500 48 10% 0 48 Lack of Carton
9/21/2020 A 3 GAZU HIRPA 2820 LX-2820 HEATER 300 38 13% 0 38 Shortage of Handle
9/21/2020 A 8 ASSEFA BEKELE 7021 DOUBLE HOTPLATE Sky Tech BRAND . /SPIRAL PLATE/ 500 130 26% 0 130 Lack of Carton
9/21/2020 A 7 LELISA ABEBE 7021 DOUBLE HOTPLATE Sky Tech BRAND . /SPIRAL PLATE/ 500 106 21% 0 106 Lack of Carton
9/21/2020 A 9 TOTOBA TESFAYE 3800 KF-3800 ROUND OVEN /REWORK & MAINTENANCE/ 100 24 24% 0 24 TEPSI PROBLEM
9/21/2020 B 7 BIRU KUMA 7021 DOUBLE HOTPLATE Sky Tech BRAND . /SPIRAL PLATE/ 500 61 12% 0 61 Lack of Carton
9/22/2020 A 8 ASSEFA BEKELE 7021 DOUBLE HOTPLATE Sky Tech BRAND . /SPIRAL PLATE/ 500 170 34% 0 170 Lack of Carton
9/22/2020 A 7 LELISA ABEBE 7021 DOUBLE HOTPLATE Sky Tech BRAND . /SPIRAL PLATE/ 500 140 28% 0 140 Lack of Carton
9/22/2020 A 9 TOTOBA TESFAYE 3800 KF-3800 ROUND OVEN /REWORK & MAINTENANCE/ 100 64 64% 0 64 TEPSI PROBLEM
9/22/2020 B 7 BIRU KUMA 7021 DOUBLE HOTPLATE Sky Tech BRAND . /SPIRAL PLATE/ 500 111 22% 0 111 Lack of Carton
9/23/2020 A 3 TESFAYE META 2820 LX-2820 HEATER 300 151 50% 38 113
9/23/2020 A 8 ASSEFA BEKELE 7021 DOUBLE HOTPLATE Sky Tech BRAND . /SPIRAL PLATE/ 500 170 34% 0 170 Lack of Carton
9/23/2020 A 9 TOTOBA TESFAYE 3800 KF-3800 ROUND OVEN /REWORK & MAINTENANCE/ 100 25 25% 5 20 TEPSI PROBLEM
nb:- >2861 Heater 72 pcs is Rework packed at both shift through changing cord cable & knob
9/24/2020 A 8 ASSEFA BEKELE 7021 DOUBLE HOTPLATE Sky Tech BRAND . /SPIRAL PLATE/ REWORK PACKING/ 500 170 34% 170 0
9/24/2020 A 7 LELISA ABEBE 7021 DOUBLE HOTPLATE Sky Tech BRAND . /SPIRAL PLATE/REWORK PACKING/ 500 140 28% 140 0
9/24/2020 A 9 TOTOBA TESFAYE 2861 LX-2861 BIG HEATER / MAINTENANCE & REWORK PACKING/ 100 34 34% 34 0
9/24/2020 B 7 BIRU KUMA 7021 DOUBLE HOTPLATE Sky Tech BRAND . /SPIRAL PLATE/REWORK PACKING/ 500 125 25% 125 0
9/25/2020 A 3 TESFAYE META 2820 LX-2820 HEATER 300 128 43% 128 0
9/25/2020 A 8 ASSEFA BEKELE 7021 DOUBLE HOTPLATE Sky Tech BRAND . /SPIRAL PLATE/ REWORK PACKING/ 500 195 39% 195 0
9/25/2020 A 7 LELISA ABEBE 7021 DOUBLE HOTPLATE Sky Tech BRAND . /SPIRAL PLATE/REWORK PACKING/ 500 130 26% 130 0
9/25/2020 A 9 TOTOBA TESFAYE 2861 LX-2861 BIG HEATER / MAINTENANCE & REWORK PACKING/ 100 90 90% 90 0
9/25/2020 B 7 BIRU KUMA 7021 DOUBLE HOTPLATE Sky Tech BRAND . /SPIRAL PLATE/REWORK PACKING/ 500 150 30% 150 0
9/26/2020 A 3 TESFAYE META 2820 LX-2820 HEATER 300 194 65% 70 124
9/26/2020 A 8 ASSEFA BEKELE 7021 DOUBLE HOTPLATE Sky Tech BRAND . /SPIRAL PLATE/ REWORK PACKING/ 500 170 34% 170 0
9/26/2020 A 7 LELISA ABEBE 7021 DOUBLE HOTPLATE Sky Tech BRAND . /SPIRAL PLATE/REWORK PACKING/ 500 160 32% 160 0
9/26/2020 A 9 TOTOBA TESFAYE 2861 LX-2861 BIG HEATER / MAINTENANCE & REWORK PACKING/ 100 96 96% 96 0
9/26/2020 B 7 BIRU KUMA 7021 DOUBLE HOTPLATE Sky Tech BRAND . /SPIRAL PLATE/REWORK PACKING/ 500 30 6% 30 0
9/28/2020 A 5 ASSEFA & LELISA 60s-22 STANDING OVEN (2G+2E). LUXCELL BRAND with Black Color. 100 15 15% 0 15 0
9/28/2020 A 9 TOTOBA TESFAYE 7021 DOUBLE HOTPLATE Sky Tech BRAND . /SPIRAL PLATE/REWORK PACKING/ 500 28 6% 28 0
9/28/2020 B 7 BIRU KUMA 7021 DOUBLE HOTPLATE Sky Tech BRAND . /SPIRAL PLATE/REWORK PACKING/ 500 64 13% 64 0
9/28/2020 B 2 GARESU ASSEFA 3551 KF-3551 MINI OVEN 200 101 51% 0 101 0 Lack of Carton
9/29/2020 A 3 TESFAYE META 2820 LX-2820 HEATER 300 162 54% 0 162 Lack of Handle insace of Material
9/29/2020 A 5 ASSEFA & LELISA 60s-22 STANDING OVEN (2G+2E). LUXCELL BRAND with Black Color. 100 13 13% 0 13 0
9/29/2020 A 9 TOTOBA TESFAYE 7021 DOUBLE HOTPLATE Sky Tech BRAND . /SPIRAL PLATE/REWORK PACKING/ 500 50 10% 50 0
9/29/2020 B 7 BIRU KUMA 7021 DOUBLE HOTPLATE Sky Tech BRAND . /SPIRAL PLATE/REWORK PACKING/ 500 52 10% 52 0
9/29/2020 B 2 GARESU ASSEFA 3551 KF-3551 MINI OVEN 200 38 19% 0 38 0 Lack of Carton
9/30/2020 A 3 TESFAYE META 2820 LX-2820 HEATER 300 146 49% 0 146 Lack of Handle insace of Raw Material
9/30/2020 A 5 ASSEFA & LELISA 60s-22 STANDING OVEN (4E). QUANTUM BRAND with Black Color. 100 15 15% 0 15 0
9/30/2020 A 9 TOTOBA TESFAYE 7021 DOUBLE HOTPLATE Sky Tech BRAND . /SPIRAL PLATE/REWORK PACKING/ 500 70 14% 70 0
9/30/2020 B 7 BIRU KUMA 7021 DOUBLE HOTPLATE Sky Tech BRAND . /SPIRAL PLATE/REWORK PACKING/ 500 36 7% 36 0
9/30/2020 B 2 GARESU ASSEFA 3551 KF-3551 MINI OVEN 200 56 28% 0 56 0 Lack of Carton
10/1/2020 A 3 TESFAYE META 2820 LX-2820 HEATER 300 148 49% 41 107 Shortage of Handle insace of Raw Material
10/1/2020 B 3 GAZU HIRPA 2820 LX-2820 HEATER 300 53 18% 3 50 Shortage of Handle insace of Raw Material
> Out of 99 pcs of Mini Oven product; 45 pcs was done without leg
nb:- REWORK PRODUCT-> ONLY CHECKING & PACKING
10/2/2020 A 3 TESFAYE META 2820 LX-2820 HEATER 300 121 40% 0 121 Shortage of Handle insace of Raw Material
10/2/2020 B 3 GAZU HIRPA 2820 LX-2820 HEATER 300 43 14% 0 43 Shortage of Handle insace of Raw Material
10/2/2020 B 2 GARESU ASSEFA 3551 KF-3551 MINI OVEN 200 115 58% 0 115 0
10/5/2020 A 3 TESFAYE META 2820 LX-2820 HEATER 300 137 46% 0 137 Shortage of Handle insace of Raw Material
10/5/2020 B 3 GAZU HIRPA 7021 DOUBLE HOTPLATE Sky Tech BRAND . /SPIRAL PLATE/ 400 60 15% 15 45
10/5/2020 B 2 GARESU ASSEFA 3551 KF-3551 MINI OVEN 200 71 36% 71 0 0.112698412698
10/6/2020 A 7 LELISA ABEBE 7021 DOUBLE HOTPLATE Sky Tech BRAND . /SPIRAL PLATE/ 350 85 16.6 24% 85 0
10/6/2020 B 3 GAZU HIRPA 2820 LX-2820 HEATER 300 20 4.3 7% 0 20 Shortage of Handle insace of Raw Material
10/6/2020 B 2 GARESU ASSEFA 3551 KF-3551 MINI OVEN 250 95 7.3 38% 0 95 0
9a 7021 128 SKY TECH 4.1 Double hotplate /Spiral/ only packing /Rework/
3b 5320 27 LUXOR 4.3 Mini Oven With Out Plate only packing /Rework/
TOTAL 215
10/7/2020 A 3 TESFAYE META 2820 LX-2820 HEATER 300 119 17.1 40% 0 119 Shortage of Handle insace of Raw Material
10/7/2020 A 7 LELISA ABEBE 7021 DOUBLE HOTPLATE Sky Tech BRAND . /SPIRAL PLATE/ 350 34 15.9 10% 34 0
10/7/2020 B 3 GAZU HIRPA 2820 LX-2820 HEATER 300 90 20.8 30% 0 90 Shortage of Handle insace of Raw Material
10/7/2020 B 2 GARESU ASSEFA 3551 KF-3551 MINI OVEN 250 92 13.6 37% 0 92 0
7a 7011 135 SKY TECH 15.9 Single hotplate /Spiral/ only packing /Rework/
2a 5320 35 5.8 Mini Oven With Out Plate only packing /Rework/
10/8/2020 B 3 GAZU HIRPA 2820 LX-2820 HEATER 300 95 16.5 32% 0 95 Shortage of Handle insace of Raw Material
10/8/2020 B 2 GARESU ASSEFA 3551 KF-3551 MINI OVEN 250 91 13 36% 21 70 0.033333333333
7a 7011 235 SKY TECH 16.5 Single hotplate /Spiral/ only packing /Rework/
7b 7011 30 SKY TECH 15.7 Single hotplate /Spiral/ only packing /Rework/
1b 3551 21 LUXOR Mini Oven With Out Plate only packing /Rework/
6
1b 5320 9 Mini Oven With Out Plate only packing /Rework/
TOTAL 405
10/9/2020 B 3 GAZU HIRPA 7021 DOUBLE HOTPLATE Sky Tech BRAND . /SPIRAL PLATE/ 350 70 16.6 20% 25 45
10/9/2020 B 2 GARESU ASSEFA 3551 KF-3551 MINI OVEN 250 102 9.4 41% 28 74 0.058333333333
Out of 70 Pcs of Double hotplate product's; 45 pcs are failed by spiral hole problem made at Mould Department
nb:- REWORK PRODUCT-> ONLY CHECKING & PACKING
7a 7011 245 SKY TECH 15.4 Single hotplate /Spiral/ only packing /Rework/
1a & 2a 3551 35 LUXOR 5.5 Mini Oven With Plate only packing /Rework/
TOTAL 376
### A 7 LELISA ABEBE 7021 DOUBLE HOTPLATE Sky Tech BRAND . /SPIRAL PLATE/ 100 10 16.7 10% 10 0
### B 7 GAZU HIRPA 7021 DOUBLE HOTPLATE Sky Tech BRAND . /SPIRAL PLATE/ 350 110 16.7 31% 76 34
TOTAL 650 162 total packed=86
AVERAGE PERFORMANCE
21% total none packed =76
0
Out of 110 Pcs of Double hotplate product's; 34 pcs are failed by spiral Physical problem
nb:- REWORK PRODUCT-> ONLY CHECKING & PACKING
LINE NO P.CODE PACKED BRAND line speed p.name REMARK/DESCRIPTION/
8a 7011 56 SKY TECH 16 Single hotplate /Spiral/ only packing /Rework/
7a 7011 125 SKY TECH 16.7 Single hotplate /Spiral/ only packing /Rework/
1a&2a 3551 62 LUXOR 2 Mini Oven With Plate only packing /Rework/
8b 7011 88 SKY TECH 13.9 Single hotplate /Spiral/ only packing /Rework/
2b 3551 57 LUXOR 18.5 Mini Oven With Plate only packing /Rework/
TOTAL 439
### A 3 GAZU HIRPA 2831 LX-2831 HEATER 200 42 19.5 21% 0 42 Lack of Handle insace of Raw Material
### A 7 LELISA ABEBE 7021 DOUBLE HOTPLATE Sky Tech BRAND . /SPIRAL PLATE/ 350 85 16.7 24% 75 10
### B 7 TESFAYE META 7021 DOUBLE HOTPLATE Sky Tech BRAND . /SPIRAL PLATE/ 350 102 16.6 29% 102 0
2a 3551 40 LUXOR 6.5 Mini Oven With Plate only packing /Rework/
8b 7011 18 SKY TECH 5.6 Single hotplate /Spiral/ only packing /Rework/
2b 3551 30 LUXOR 5.8 Mini Oven With Plate only packing /Rework/
TOTAL 154
### A 7 LELISA ABEBE 7021 DOUBLE HOTPLATE Sky Tech BRAND . /SPIRAL PLATE/ 350 100 15.7 29% 85 15
### B 7 TESFAYE META 7021 DOUBLE HOTPLATE Sky Tech BRAND . /SPIRAL PLATE/ 350 108 16.6 31% 92 16
Out of 208 Pcs of Double hotplate product's; 31 pcs are failed by physical problem
nb:- REWORK PRODUCT-> ONLY CHECKING & PACKING
8a 7011 138 SKY TECH 17.4 Single hotplate /Spiral/ only packing /Rework/
1a 3551 20 LUXOR 7.5 Mini Oven With Plate only packing /Rework/
2a 3551 35 LUXOR 7.6 Mini Oven With Plate only packing /Rework/
2b 5320 40 8.6 Mini Oven With Out Plate only packing /Rework/
TOTAL 258
### B 7 GAZU HIRPA 7021 DOUBLE HOTPLATE Sky Tech BRAND . /SPIRAL PLATE/ 350 89 13.7 25% 55 34
Out of 163 Pcs of Double hotplate product's; 34 pcs are failed by physical problem
nb:-
REWORK PRODUCT-> ONLY CHECKING & PACKING
8a 7011 183 SKY TECH 15.5 Single hotplate /Spiral/ only packing /Rework/
2a 5320 16 7.9 Mini Oven With Out Plate only packing /Rework/
2b 5320 38 8.7 Mini Oven With Out Plate only packing /Rework/
TOTAL 279
KUMTEL ASSEMBLY DEPARTMENT DAILY REAL PRODUCTION REPORT REMARK
TARGET Container Reason
DATE SHIFT LINE NO. LINE CHIEF NAME PRODUCT CODE PRODUCT NAME
PLAN
REAL PCS LINE SPEED DAILY EFFICIENCY Packed Not packed Balance
### B 7 GAZU HIRPA 7021 DOUBLE HOTPLATE Sky Tech BRAND . /SPIRAL PLATE/ 350 151 16.5 43% 31 120
Out of 151 Pcs of Double hotplate product's;120 pcs are not packed incase of thread (vida) not approved by quality person.
nb:- REWORK PRODUCT-> ONLY CHECKING & PACKING
8a 7011 123 SKY TECH 16.9 Single hotplate /Spiral/ only packing /Rework/
7a 7021 73 SKY TECH 11.5 Double hotplate /Spiral/ only packing /Rework/
8b 7011 74 SKY TECH 12.7 Single hotplate /Spiral/ only packing /Rework/
2b 5320 9 8.3 Mini Oven With Out Plate only packing /Rework/
7b 7021 7 SKY TECH 11.6 Double hotplate /Spiral/ only packing /Rework/
TOTAL 337
Out of 95 Pcs of Double hotplate products; 75 pcs are not packed incase of plug of power cable problem
nb:- REWORK PRODUCT-> ONLY CHECKING & PACKING
LINE NO P.CODE PACKED BRAND line speed p.name REMARK/DESCRIPTION/
9a 3800 34 6.7 Round Oven only packing /Rework/
3a 2820 261 SKY TECH 16.3 Heater Inserting Handle & packing /Rework/
7a 7021 135 SKY TECH 10.6 Double hotplate /Spiral/ only packing /Rework/
3b 2820 250 SKY TECH 16 Heater Inserting Handle & packing /Rework/
7b 7021 102 SKY TECH 15.7 Double hotplate /Spiral/ only packing /Rework/
TOTAL 812
### B 7 GARESU ASSEFA 7021 DOUBLE HOTPLATE Sky Tech BRAND . /SPIRAL PLATE/ 350 192 16.1 55% 0 192 Power Cable Plug Problem
### B 8 BIRU KUMA 7021 DOUBLE HOTPLATE Sky Tech BRAND . /SPIRAL PLATE/ 350 84 15.7 24% 0 84 Power Cable Plug Problem
Out of 396 Pcs of Double hotplate products; 366 pcs are not packed incase of plug of power cable problem
nb:- REWORK PRODUCT-> ONLY CHECKING & PACKING
8b 7011 14 SKY TECH 15.7 Single hotplate /Spiral/ only packing /Rework/
TOTAL 433
### B 7 GARESU ASSEFA 7021 DOUBLE HOTPLATE Sky Tech BRAND . /SPIRAL PLATE/ 350 165 19.5 47% 0 165 Power Cable Plug Problem
8a 7011 8 SKY TECH 6 Single hotplate /Spiral/ Maintenance & packing /Rework/
5a 60s-22 35 4.7 Standing Oven Changing Knob,Checking Gas & packing /Rework/
7021 13 SKY TECH Double hotplate /Spiral/ Maintenance & packing /Rework/
8b 16.3
7011 71 SKY TECH Single hotplate /Spiral/ Maintenance & packing /Rework/
TOTAL 339
### B 3 GARESU ASSEFA 3576 KF-3576 MINI OVEN 150 50 12.5 33% 0 50 0 Lack of Carton
### B 7 BIRU KUMA 7021 DOUBLE HOTPLATE Sky Tech BRAND . /SPIRAL PLATE/ 350 113 17 32% 0 113 Lack of Carton
Mini Oven Product is Optional Product incase of plate (1500W) is repaired through Maintenance
nb:- REWORK PRODUCT-> ONLY CHECKING & PACKING
LINE NO P.CODE PACKED BRAND line speed p.name REMARK/DESCRIPTION/
9a 3800 13 6.1 Round Oven Maintenance & packing /Rework/
5a 60s-22 35 4.1 Standing Oven Changing Knob,Checking Gas & packing /Rework/
### B 3 GARESU ASSEFA 3576 KF-3576 MINI OVEN 150 78 12.5 52% 78 Lack of Carton
0 0
### B 7 BIRU KUMA 7021 DOUBLE HOTPLATE Sky Tech BRAND . /SPIRAL PLATE/ 350 137 16.9 39% 0 137 Lack of Carton
Mini Oven Product is Optional Product incase of plate (1500W) is repaired through Maintenance
nb:- REWORK PRODUCT-> ONLY CHECKING & PACKING
5a 60s-22 29 LUXELL 4.3 Standing Oven Changing Knob,Checking Gas & packing /Rework/
TOTAL 101
### B 3 GARESU ASSEFA 3576 KF-3576 MINI OVEN 150 81 10.5 54% 81 Lack of Carton
0 0
TOTAL 500 107 total packed=0
AVERAGE PERFORMANCE
31% total none packed =107
0
Mini Oven Product is Optional Product incase of plate (1500W) is repaired through Maintenance
nb:- REWORK PRODUCT-> ONLY CHECKING & PACKING
7a 7011 125 SKY TECH 14.7 Single hotplate /Spiral/ Maintenance & packing /Rework/
8a 7011 90 SKY TECH 15.3 Single hotplate /Spiral/ Maintenance & packing /Rework/
5a 60s-22 40 LUXELL 3.9 Standing Oven Changing Knob,Checking Gas & packing /Rew
7b 7011 46 SKY TECH 12.5 Single hotplate /Spiral/ Maintenance & packing /Rework/
8b 7011 184 SKY TECH 16.6 Single hotplate /Spiral/ Maintenance & packing /Rework/
TOTAL 553
nb:- Electric Problem happened Strating from 11:00 or 5:00 local time up to night shift.
REWORK PRODUCT-> ONLY CHECKING & PACKING
LINE NO P.CODE PACKED BRAND line speed p.name REMARK/DESCRIPTION/
9a 3800 7 4 Round Oven Maintenance & packing /Rework/
7a 7011 40 SKY TECH 15.3 Single hotplate /Spiral/ Maintenance & packing /Rework/
8a 7011 17 SKY TECH 15.3 Single hotplate /Spiral/ Maintenance & packing /Rework/
5a 60s-22 18 LUXELL 3.8 Standing Oven Changing Knob,Checking Gas & packing /Rew
TOTAL 97
Mini Oven Product is Optional Product incase of plate (1500W) is repaired through Maintenance
nb:- REWORK PRODUCT-> ONLY CHECKING & PACKING
7a 7011 62 SKY TECH 15.6 Single hotplate /Spiral/ Maintenance & packing /Rework/
8a 7011 42 SKY TECH 16.3 Single hotplate /Spiral/ Maintenance & packing /Rework/
5a 60s-22 10 LUXELL 4.3 Standing Oven Changing Knob,Checking Gas & packing /Rew
7021 37 SKY TECH Double hotplate /Spiral/ Maintenance & packing /Rework/
7b 18.1
7011 93 SKY TECH Single hotplate /Spiral/ Maintenance & packing /Rework/
8b 7011 8 SKY TECH 13.5 Single hotplate /Spiral/ Maintenance & packing /Rework/
TOTAL 286
Mini Oven Product is Optional Product incase of plate (1500W) is repaired through Maintenance
nb:- REWORK PRODUCT-> ONLY CHECKING & PACKING
LINE NO P.CODE PACKED BRAND line speed p.name REMARK/DESCRIPTION/
9a 3800 4 5 Round Oven Maintenance & packing /Rework/
3a 7021 67 SKY TECH 15.9 Double hotplate /Spiral/ Maintenance & packing /Rework/
7a 7021 125 SKY TECH 14 Double hotplate /Spiral/ Maintenance & packing /Rework/
8a 7021 110 SKY TECH 14 Double hotplate /Spiral/ Maintenance & packing /Rework/
5a 60s-22 30 LUXELL 4.6 Standing Oven Changing Knob,Checking Gas & packing /Rew
7b 7021 91 SKY TECH 15.5 Double hotplate /Spiral/ Maintenance & packing /Rework/
3b 2820 126 17.1 Heater Inserting Handle & Shearing packing /Rework
8b 7021 100 SKY TECH 12.5 Double hotplate /Spiral/ Maintenance & packing /Rework/
TOTAL 653
8a 7021 140 SKY TECH 14.3 Double hotplate /Spiral/ Maintenance & packing /Rework/
5a 60s-22 35 LUXELL 4.7 Standing Oven Changing Knob,Checking Gas & packing /Rew
7b 7021 208 SKY TECH 18.5 Double hotplate /Spiral/ Maintenance & packing /Rework/
3b 2820 102 17.5 Heater Inserting Handle & Shearing packing /Rework
TOTAL 608
7a 7011 81 SKY TECH 12.4 Single hotplate /Spiral/ Maintenance & packing /Rework/
8a 7021 88 SKY TECH 14 Double hotplate /Spiral/ Maintenance & packing /Rework/
5a 60s-22 27 LUXELL 4.7 Standing Oven Changing Knob,Checking Gas & packing /Rew
7b 7021 82 SKY TECH 12.5 Double hotplate /Spiral/ Maintenance & packing /Rework/
7021 46 SKY TECH Double hotplate /Spiral/ Maintenance & packing /Rework/
8b 15.7
7011 14 SKY TECH Single hotplate /Spiral/ Maintenance & packing /Rework/
TOTAL 385
7a 7011 60 SKY TECH 12.5 Single hotplate /Spiral/ Maintenance & packing /Rework/
8a 7021 70 SKY TECH 7 Double hotplate /Spiral/ Maintenance & packing /Rework/
5a 60s-22 6 LUXELL 4.7 Standing Oven Changing Knob,Checking Gas & packing /Rew
8b 7021 14 SKY TECH 10.7 Double hotplate /Spiral/ Maintenance & packing /Rework/
2b 3570 33 11.7 Mini Oven With Out Plate Maintenance & packed by plastic /Rework/
TOTAL 224
7a 7011 18 SKY TECH 12.5 Single hotplate /Spiral/ Maintenance & packing /Rework/
8a 7021 22 SKY TECH 8 Double hotplate /Spiral/ Maintenance & packing /Rework/
5a 60s-22 4 LUXELL 4.7 Standing Oven Changing Knob,Checking Gas & packing /Rew
8b 7021 16 SKY TECH 17.8 Double hotplate /Spiral/ Maintenance & packing /Rework/
TOTAL 94
>Additionally 63 pcs of Mini Oven is done without leg incase of Disk problem to grind it & 20 pcs has also physical problem
nb:- 3570 Mini oven packed by plastic incase of lack of Carton
REWORK PRODUCT-> ONLY CHECKING & PACKING
LINE NO P.CODE PACKED BRAND line speed p.name REMARK/DESCRIPTION/
5a 60s-22 5 LUXELL 6.5 Standing Oven Changing Knob,Checking Gas & packing /Rew
8b 7021 28 SKY TECH 17.9 Double hotplate /Spiral/ Maintenance & packing /Rework/
TOTAL 77
5a 60s-22 9 LUXELL 6.5 Standing Oven Changing Knob,Checking Gas & packing /Rew
TOTAL 37
>Additionally 51 pcs are worked but not packed incase of it has physical problem
nb:- >3570 Mini oven packed by plastic incase of lack of Carton
REWORK PRODUCT-> ONLY CHECKING & PACKING
LINE NO P.CODE PACKED BRAND line speed p.name REMARK/DESCRIPTION/
9a 3800 30 8 Round Oven Maintenance & packing /Rework/
5a 60s-22/04 17 LUXELL 4.6 Standing Oven Changing Knob,Checking Gas & packing /Rew
TOTAL 47
NB:-SHIFT-A WORKER'S DIDN'T START THEIR WORK UP TO 1:00 OR 7:00 LOCAL TIME INCASE OF SALARY NOT PAIED AT A TIME.
>Additionally 10 pcs are worked but not packed incase of it has physical problem
>3570 Mini oven packed by plastic incase of lack of Carton
nb:-
REWORK PRODUCT-> ONLY CHECKING & PACKING
5a 60s-22 6 QUANTUM 6.6 Standing Oven Changing Knob,Checking Gas & packing /Rew
TOTAL 17
TOTAL 150
TOTAL 155
8a A6-Sf2 6 KUMTEL 6 Ankestra(Electric Built in Oven) Maintenance & packing /Rework/ Rectangular Tepsi Problem (Quality Problem)
7a 3570 33 12.5 MINI OVEN WITHOUT PLATE Packed by Carton Box. Round Tray Problem Incase of Enamel Powder not Pure
3576 11 MINI OVEN WITH PLATE Packed by Carton Box. Round Tray Problem Incase of Enamel Powder not Pure
2b 12.5
2b 12.5
3570/20/ 34 MINI OVEN WITHOUT PLATE Packed by Carton Box. Round Tray Problem Incase of Enamel Powder not Pure
TOTAL 108
1b 3551 21 12.5 MINI OVEN WITH PLATE Packed by Carton Box. Shortage of Tray Incase of Electric Problem
2b 3551 14 10.5 MINI OVEN WITH PLATE Packed by Carton Box. Shortage of Tray Incase of Electric Problem
TOTAL 105
### A 5 ASSEFA & LELISA IF55G-22 STANDING OVEN (IF55G-22) REWORK 75 28 4 37%
28 0
### 7025 7025-COOKER Bozkurt BRAND. /SPIRAL PLATE/ 150 40 27% 0 40
B 2 GARESU & TESFAYE 10.5
### 7021 DOUBLE HOTPLATE Sky Tech BRAND . /SPIRAL PLATE/ 50 9 18% 9 0
NB:- AT SHIFT-A SOME WORKER'S & THEIR SUPERVISOR LEAVE THEIR WORKING PLACE
AT WORKING TIME AT LEAST for 30 minute.
nb:- REWORK PRODUCT-> ONLY CHECKING & PACKING Container TOTAL CONTAINER BALANCE
Balance
LINE NO P.CODE PACKED BRAND line speed p.name REMARK/DESCRIPTION/ PROBLEM 0.125694444444444
8a A6-5f2 5 7 ANKESTERA /BUILT IN ELECTRIC OVEN/ Changing Panel & Packed by Carton Box. 0 Air Problem
2b 5360 37 10.5 5360 Mini Oven With Plate Rework Packed by Carton Box. 0.0770833333333
TOTAL 42 0.07708333333333
nb:- REWORK PRODUCT-> ONLY CHECKING & PACKING Container TOTAL CONTAINER BALANCE
Balance
LINE NO P.CODE PACKED BRAND line speed p.name REMARK/DESCRIPTION/ PROBLEM 0.100694444444444
8a A6-5f2 25 KUMTEL 10 ANKESTERA /BUILT IN ELECTRIC OVEN/ Changing Panel & Packed by Carton Box. 0 Air Problem
7021 234 SKY TECH 15.9 DOUBLE HOTPLATE WITH SPIRAL PLATE Packed by Carton Box 0
2b
5360 5 10.5 5360 Mini Oven With Plate Rework Packed by Carton Box. 0.0104166666667
1b 7021 220 SKY TECH 16.5 DOUBLE HOTPLATE WITH SPIRAL PLATE Packed by Carton Box 0
TOTAL 484 0.0104166666667
→ from 20 pcs S.Oven,17 pcs 60*60 Standing Oven While 3 pcs is 50*50 Standing Oven
nb:- REWORK PRODUCT-> ONLY CHECKING & PACKING Container TOTAL CONTAINER BALANCE
Balance
LINE NO P.CODE PACKED BRAND line speed p.name REMARK/DESCRIPTION/ PROBLEM 0.180555555555556
8a A6-5f2 34 KUMTEL 10 ANKESTERA /BUILT IN ELECTRIC OVEN/ Changing Panel & Packed by Carton Box. 0
2a 7021 398 SKY TECH 16.5 DOUBLE HOTPLATE WITH SPIRAL PLATE Packed by Carton Box 0
1b 3576 20 8.5 3576 Mini Oven With Plate Rework Packed by Carton Box. 0.0416666666667
TOTAL 452 0.0416666666667
nb:- REWORK PRODUCT-> ONLY CHECKING & PACKING Container TOTAL CONTAINER BALANCE
Balance
LINE NO P.CODE PACKED BRAND line speed p.name REMARK/DESCRIPTION/ PROBLEM 0.164583333333333
8a A6-5f2 34 KUMTEL 10 ANKESTERA /BUILT IN ELECTRIC OVEN/ Changing Panel & Packed by Carton Box. 0
2b 7021 96 SKY TECH 12.5 DOUBLE HOTPLATE WITH SPIRAL PLATE Packed by Carton Box 0
1b & 2b 3576 28 10.5 3576 Mini Oven With Plate Rework Packed by Carton Box. 0.0583333333333
TOTAL 158 0.0583333333333
→ from 33 pcs of M.Oven,18 pcs is 3576 M.Oven While 15 pcs is 5360 M.Oven
nb:- REWORK PRODUCT-> ONLY CHECKING & PACKING Container TOTAL CONTAINER BALANCE
Balance
LINE NO P.CODE PACKED BRAND line speed p.name REMARK/DESCRIPTION/ PROBLEM 0.270138888888889
8a A6-5f2 25 KUMTEL 8.3 ANKESTERA /BUILT IN ELECTRIC OVEN/ Changing Panel & Packed by Carton Box. 0
TOTAL 25 0
KUMTEL ASSEMBLY DEPARTMENT DAILY REAL PRODUCTION REPORT REMARK
TARGET Container Reason
DATE SHIFT LINE NO. LINE CHIEF NAME PRODUCT CODE PRODUCT NAME
PLAN
REAL PCS LINE SPEED DAILY EFFICIENCY Packed Not packed Balance
6/19/2021 A 5 LELISA & ASSEFA 60s-22 STANDING OVEN (2G+2E). LUXOR BRAND WITH GREY & BLACK COLOR 100 9 4.4 9% 9 0 0.0625
6/19/2021 B 1 BIRU KUMA 3576 & 5360 KF-3576 & 5360 MINI OVEN With Plate 150 18 15.5 12% 0 18 0
TOTAL 250 27 total packed=9
AVERAGE PERFORMANCE
11% total none packed =18
0.0625
→ from 18 pcs of M.Oven,6 pcs is 3576 M.Oven While 12 pcs is 5360 M.Oven
nb:- REWORK PRODUCT-> ONLY CHECKING & PACKING Container TOTAL CONTAINER BALANCE
Balance
LINE NO P.CODE PACKED BRAND line speed p.name REMARK/DESCRIPTION/ PROBLEM 0.116666666666667
7a A6-5f2 13 KUMTEL 6.6 ANKESTERA /BUILT IN ELECTRIC OVEN/ Changing Panel & Packed by Carton Box. 0
2b 3576 26 10.5 3576 Mini Oven With Plate Rework Packed by Carton Box. 0.0541666666667
TOTAL 39 0.0541666666667
nb:- REWORK PRODUCT-> ONLY CHECKING & PACKING Container TOTAL CONTAINER BALANCE
Balance
LINE NO P.CODE PACKED BRAND line speed p.name REMARK/DESCRIPTION/ PROBLEM 0.227083333333333
7a A6-5f2 34 KUMTEL 14 ANKESTERA /BUILT IN ELECTRIC OVEN/ Changing Panel & Packed by Carton Box. 0
2a 3576 36 QUANTUM 10.2 3576 Mini Oven With Plate Rework Packed by Carton Box. 0.075
2b 3576 33 QUANTUM 15.5 3576 Mini Oven With Plate Rework Packed by Carton Box. 0.06875
TOTAL 103 0.14375
nb:- REWORK PRODUCT-> ONLY CHECKING & PACKING Container TOTAL CONTAINER BALANCE
Balance
LINE NO P.CODE PACKED BRAND line speed p.name REMARK/DESCRIPTION/ PROBLEM 0.33125
7a A6-5f2 12 KUMTEL 8.5 ANKESTERA /BUILT IN ELECTRIC OVEN/ Changing Panel & Packed by Carton Box. 0
2a 3576 49 QUANTUM 10.5 3576 Mini Oven With Plate Rework Packed by Carton Box. 0.1020833333333
TOTAL 61 0.1020833333333
nb:- REWORK PRODUCT-> ONLY CHECKING & PACKING Container TOTAL CONTAINER BALANCE
Balance
LINE NO P.CODE PACKED BRAND line speed p.name REMARK/DESCRIPTION/ PROBLEM 0.299305555555556
2b 3576 57 QUANTUM 12.5 3576 Mini Oven With Plate Rework Packed by Carton Box. 0.11875
TOTAL 57 0.11875
nb:- REWORK PRODUCT-> ONLY CHECKING & PACKING Container TOTAL CONTAINER BALANCE
Balance
LINE NO P.CODE PACKED BRAND line speed p.name REMARK/DESCRIPTION/ PROBLEM 0.122222222222222
2b 3576 22 QUANTUM 10.5 3576 Mini Oven With Plate Rework Packed by Carton Box. 0.0458333333333
TOTAL 22 0.0458333333333
nb:- REWORK PRODUCT-> ONLY CHECKING & PACKING Container TOTAL CONTAINER BALANCE
Balance
LINE NO P.CODE PACKED BRAND line speed p.name REMARK/DESCRIPTION/ PROBLEM 0.104166666666667
7b 7011 135 SKY TECH 16.5 Single hotplate /Spiral/ only packing /Rework/
TOTAL 135 0
nb:- REWORK PRODUCT-> ONLY CHECKING & PACKING Container TOTAL CONTAINER BALANCE
Balance
LINE NO P.CODE PACKED BRAND line speed p.name REMARK/DESCRIPTION/ PROBLEM 0.25
7b 7011 234 SKY TECH Single hotplate /Spiral/ only packing /Rework/ 0
10.5
2b 3576 20 QUANTUM 3576 Mini Oven With Plate Rework Packed by Carton Box. 0.0416666666667
TOTAL 254 0.0416666666667
nb:- REWORK PRODUCT-> ONLY CHECKING & PACKING Container TOTAL CONTAINER BALANCE
Balance
LINE NO P.CODE PACKED BRAND line speed p.name REMARK/DESCRIPTION/ PROBLEM 0.1875
2b 3576 50 QUANTUM 15.5 3576 Mini Oven With Plate Rework Packed by Carton Box. 0.1041666666667
TOTAL 50 0.1041666666667
nb:- REWORK PRODUCT-> ONLY CHECKING & PACKING Container TOTAL CONTAINER BALANCE
Balance
LINE NO P.CODE PACKED BRAND line speed p.name REMARK/DESCRIPTION/ PROBLEM 0.14375
2a & 2b 3576 & 5360 69 QUANTUM/LUXOR 10.5 3576 & 5360 Mini Oven With Plate Rework Packed by Carton Box. 0.14375
TOTAL 69 0.14375
nb:- REWORK PRODUCT-> ONLY CHECKING & PACKING Container TOTAL CONTAINER BALANCE
Balance
LINE NO P.CODE PACKED BRAND line speed p.name REMARK/DESCRIPTION/ PROBLEM 0.194444444444444
2b 3576 & 5360 20 QUANTUM/LUXOR 10.5 3576 & 5360 Mini Oven With Plate Rework Packed by Carton Box. 0.0416666666667
TOTAL 20 0.0416666666667
nb:- REWORK PRODUCT-> ONLY CHECKING & PACKING Container TOTAL CONTAINER BALANCE
Balance
LINE NO P.CODE PACKED BRAND line speed p.name REMARK/DESCRIPTION/ PROBLEM 0.0708333333333333
2b 3551 34 10.2 MINI OVEN WITH PLATE Packed by Carton Box. 0.0708333333333333
TOTAL 34 0.0708333333333
7a 2021 133 BOZKURT 18 SINGLE STEWPOT SPIRAL PLATE Rework Packed by Carton Box.
1b 2891 114 LUXOR 7.5 HEATER Only Packing with a leg by Carton Box.
7b 2021 230 BOZKURT 17 SINGLE STEWPOT SPIRAL PLATE Rework Packed by Carton Box.
TOTAL 645
REAL PCS
170
37
11
14
232
KUMTEK INDUSTRIAL PLC. TOTAL WORKER
DATE LINE NUMBER
PRODUCT CODE CHEFF NAME
PRODUCT NAME QUALITY NAME
TIME TARGET/PLAN REAL PSC. PROBLEM FACED
15:00-16:00
16:00-17:00
17:00-18:00
18:00-19:00
19:00-20:00
20:00-21:00
21:00-22:00
22:00-23:00
KUMTEK INDUSTRIAL PLC. TOTAL WORKER
DATE LINE NUMBER
PRODUCT CODE CHEFF NAME
PRODUCT NAME QUALITY NAME