Professional Documents
Culture Documents
M - TC - 105 Method of T&C For Fire Fighting System System
M - TC - 105 Method of T&C For Fire Fighting System System
M - TC - 105 Method of T&C For Fire Fighting System System
HOSHINO PROJECT
CONTENTS:
B. Testing Equipment
C.5 Hydrant & Sprinkler Piping Pressure Test Record for 1 Zone
C.6 Hydrant & Sprinkler Piping Pressure Test Record for All System
Decompression by bypass.
Switching test
Electric pump running ( automatically).
When power source off diesel pump will be running.
Final inspection
Finish
B. TESTING EQUIPMENT
5 Pressure gauges 2
Project name : HVC BINH DUONG NEW FACTORY Test Date: 21-Jan-2019
Damage YES NO
Anchor bolt OK NG
Installation
Anti-vibration OK NG
Note:
1./Check Control Panel Power Every Day.
2./Check Pressure Gauge Every Day of Main Pipe.
3./Check Pump & Pipe & Valve Condition.
Project name : HVC BINH DUONG NEW FACTORY Test Date: 21-Jan-2019
Current - -
Damage YES NO
Anchor bolt OK NG
Installation
Anti-vibration OK NG
Note:
1./Check Control Panel Power Every Day.
2./Check Pressure Gauge Every Day.
3./Check Pump & Pipe & Valve Condition.
4./Check Oil Tank Level 1 Week 1 Times.
5./Check UPS Indicator Lamp on Control Panel .
6./Check & Reset UPS Power Normal On When Power Cut Off Over 1hours .
Project name : HVC BINH DUONG NEW FACTORY Test Date: 21-Jan-2019
Damage YES NO
Anchor bolt OK NG
Installation
Anti-vibration OK NG
Note:
1./Check Control Panel Power Every Day.
2./Check Pressure Gauge Every Day .
3./Check Pump & Pipe & Valve Condition.
2 2 2nd Floor (B-J, 1-6) 16-Dec-2018 2 Good Passed Good Good Water
3 3 2nd Floor (B-J, 6-11) 21-Dec-2018 3 Good Passed Good Good Water
4 4 1st Floor (B-J, 1-6) 30-Dec-2018 4 Good Passed Good Good Water
5 5 1st Floor (B-J, 6-11) 05-Jan-2019 5 Good Passed Good Good Water
Media: Water
Date: 17-Dec-2018 Outside Temp 280C Date: 17-Dec-2018 Outside Temp 310C
Media: Water
Date: 16-Dec-2018 Outside Temp 330C Date: 16-Dec-2018 Outside Temp 310C
Media: Water
Date: 21-Dec-2018 Outside Temp 330C Date: 21-Dec-2018 Outside Temp 310C
Media: Water
Date: 30-Dec-2018 Outside Temp 320C Date: 30-Dec-2018 Outside Temp 300C
Media: Water
Date: 05-Jan-2019 Outside Temp 310C Date: 05-Jan-2019 Outside Temp 290C
Media: Water
Date: 14-Jan-2019 Outside Temp 330C Date: 14-Jan-2019 Outside Temp 310C
DRAWING ATTACHED
Drawing No. Drawing Name
MS-FF-03-01 FIRE HYDRANT SYSTEM FACTORY 1FL - PLAN
MS-SP-01 FIRE SPRINKLER SYSTEM FACTORY 1FL - PLAN
MS-SP-02 FIRE SPRINKLER SYSTEM PLAN FACTORY 2FL
MS-SP-03 FIRE FIGHTING SYSTEM PLAN BIKE PARKING 1FL
MS-SP-04 FIRE FIGHTING SYSTEM PLAN BIKE PARKING 2FL
C.6
Media: Water
Date: 12-Jan-2019 Outside Temp 340C Date: 12-Jan-2019 Outside Temp 320C
DRAWING ATTACHED
Drawing No. Drawing Name
M-FF-02 FIRE FIGHTING PIPING SYSTEM DIAGRAM
Ok Ok Ok Ok
FHB-2
NG NG NG NG
Ok Ok Ok Ok
FHB-3
NG NG NG NG
Ok Ok Ok Ok
FHB-4
NG NG NG NG
Ok Ok Ok Ok
FHB-5
NG NG NG NG
Ok Ok Ok Ok
FHB-6
NG NG NG NG
Ok Ok Ok Ok
FHB-7
NG NG NG NG
Ok Ok Ok Ok
FHB-8
NG NG NG NG
Ok Ok Ok Ok
FHB-9
NG NG NG NG
Ok Ok Ok Ok
FHB-10
NG NG NG NG
Ok Ok Ok Ok
FHB-11
NG NG NG NG
Note:
(See Drawing Location)
Ok Ok Ok Ok
FHB-13
NG NG NG NG
Ok Ok Ok Ok
FHB-14
NG NG NG NG
Ok Ok Ok Ok
FHB-15
NG NG NG NG
Ok Ok Ok Ok
FHB-16
NG NG NG NG
Ok Ok Ok Ok
FHB-17
NG NG NG NG
Ok Ok Ok Ok
FHB-18
NG NG NG NG
Ok Ok Ok Ok
FHB-19
NG NG NG NG
Ok Ok Ok Ok
FHB-20
NG NG NG NG
Ok Ok Ok Ok
FHB-21
NG NG NG NG
Ok Ok Ok Ok
FHB-22
NG NG NG NG
Note:
(See Drawing Location)
Ok Ok Ok Ok
OFHB-2
NG NG NG NG
Ok Ok Ok Ok
OFHB-3
NG NG NG NG
Ok Ok Ok Ok
OFHB-4
NG NG NG NG
Ok Ok Ok Ok
NG NG NG NG
Ok Ok Ok Ok
NG NG NG NG
Ok Ok Ok Ok
NG NG NG NG
Ok Ok Ok Ok
NG NG NG NG
Ok Ok Ok Ok
NG NG NG NG
Ok Ok Ok Ok
NG NG NG NG
Ok Ok Ok Ok
NG NG NG NG
Note: