Download as pdf or txt
Download as pdf or txt
You are on page 1of 8

Field Service Manager / Representative

Senior Maintenance Manager


 Name : Kanaiyalal Kadiya
 Father Name: Ramanlal Kadiya
 Date of Birth: 3rd January 1968
 Passport No: Z 4414427
 Nationality: Indian
 Marital Status: Married
 Degree in Instrumentation Control Engineering
 Post Graduate Diploma in Computer Application.PGDCA
 Diploma in Electrical Engineering.
 Diploma in Instrumentation Control Engineering.
 PMP Certified from MSME India
 SIX SIGMA Green Yellow belt Certified with MSME India
 GE Enegy Europe -9001FA++ DLN-II Gas Turbine O&M Training Done.
 GE-Energy Speedtronic-Mark-V O&M Training Done with Certificate.
 GE Power Singapore MARK V Training Done with Certificate
 ABB-Symphony DCS Training Done with Certificate.
 SIEMENS-PLC -STEP-5 Training done with Certificate.
 World wide work Experieance in UK,Australia,Kazakistan,Uzbekistan,
Algeria,Singapore,Malaysia,Brunei ,Kuwait,Qatar,UAE,Thailand,India.
 Holding USA Multiple Visitor Visa Valid up to 02 MARCH 2025.
Career History & Experieance: As a Lead Professional Band Position Held with as a Site Leader-Manager-
Engineer-Supervisor-TechnicianwithTwenty-fiveyearsexperienceinOilGas-Offshore
Onshore,GasTurbinePowerPlant,Petrochemical,Refinery,Marine,Fertilizer,Upstream Down Stream OIL & GAS
with GAS TURBINE in UK-Scotland-Aberdeen-Northsea-Singapore-Malaysia-Algeria-Kuwait-UAE-Thailand-India
and work with GE-POWER,GE OIL & GAS-ALSTOM-TRACTEBELSEMBCORP COGEN-PETRONAS-GROUPMENT
SONATRACH-AGIP-PARSON-SIEMENS-POWER GEN CEGELEC-KUWAIT NATIONAL PETROLEUM-GE-NUOVA
PIGNONE-TOTAL-SAIPEM. These include as Lead Professional Band in GE OIL & GAS many Sites work as Gas
Turbine Specialist for Start Up-Operation Maintenance-Shutdown-Overhaul with Control System Field
Instrument including Gas Turbine Major Inspection-Hot Gas Path Inspection-Combustion Inspection with
Mechanical Instrument-Electrical. I have self working Hand Experience from Bottom to Top side of in Gas
Turbine Power Plant. Key Skills Experience and skills in the following areas: Leadership and development of
Integrity Management Teams Inspection and monitoring techniques of Gas Turbine. Excellent knowledge of GAS
TURBINE relevant codes and standards. GE FRAME-9001FA++with DLN-II-Frame 7 & 6 & 5 PGT-10-
NuovaPignone-SRL-CompressorMARK-V-VI-VieSUVIMAC-II-GE-FANUC-90/30SIEMENS-PLC-PCS-7 WITH SIEMENS
GASTURBINE100/200/300/400/500/600/700/750/800.ALLENBRADLY-PLC.DCS-ABB-INFI-90-SYMPHONY-
HONEYWELL-TDC-2000/3000 THERMEX-FUJI. Gas Turbine Running Hours Calculation for MI+HGPI+CI as per
PILOT DATA. Operation & Maintenance, Calibration of Gas Turbine Instruments as per Procedures. Experience in
Boroscope of Gas Turbine with NDT Inspection Test of Turbine Blades. Materials spares parts of Gas Turbine
keep Record for Availability & Reliability.

KANAIYALAL RAMANLAL KADIYA


13-Shubha Laxmi Society Gayatri Mandir Road-RANIP- Ahmedabad-Gujarat-INDIA-382480
Skype-Kanaiyalal.kadiya/krkadiya@yahoo.com/krkadiya@hotmail.com/krkadiya@gmail.com
Kadiya.kanaiyalalramanlal@bakerhughes.com +918866114813/+918320184702/( INDIA )
Work Experience:
Feb 2017 - Continue BHGE Oil & Gas-QATAR World Wide.Control Engineer.India-Qatar-UAE-Kuwait
Site Name : Kuwait National Petroleum Co Mina Ahmedi LNG Train 5 Project Reliance Refinery
Jamnagar India Power Generation.BPCLKochi Refinery, Qatar Petroleum Qatar
Petrochemical, Qatar Fertilizer Doha Qatar Power Generation .ADCO Abu Dhabi.KOC Booster
Station, Kuwait. An astute professional with over 25 years of rich experience in Heavy Duty
& Aero Derivative Gas Turbine Controls, Centrifugal Compressors, LPG/LNG, Gas Plant, Gas
Processing Facility, Power Plant, Engineering, Project Management, Commissioning,
Operations & Maintenance with reputed organizations.In the leading a services agreement
project, which includes Project Management, Contract Administration, Maintenance Services,
Outage & Resource Planning, etc.Knowledge on ABB - Symphony Melody DCS and GE Mark
VI, Mark VIe & Mark VeCommunication Protocols - EGD, MODBUS, TCP/IP & OPC
Specialties: Project Management, Engineering, Control Systems, Gas Processing Facilities,
LPG Plant, Refinery, Gas Turbines, Aero Engines, Centrifugal Compressors, Thermal &
Combined Cycle Power Technologies. Specifically, Suvimac II Controls, HIMA Controls, Bentley
Nevada GE Fanuc, GE Mark V ,VI and VieVies.ToolBoxST,Cimplicity,DCS,PLCProject Management
experienceCustomer relationship experienceInstallation and commissioning for various types of
gas (heavy duty and aero-derivative) Turbines controlled Mark Vie/Vies in various power plants
and gas compression stations.

Feb 2015 – Feb 2017 . GE Oil & Gas-Nuova Pignone Italy – Renco –World Wide.Consultant as Control
Engineer.Australia-Kazakhstan-Brunei-India.

Site Name : Wheatstone LNG Australia/ APLNG Australia/KPO Kazakhstan/BLNG Brunei.


Installation and commissioning for various types of gas (heavy duty and aero- derivative) Turbines
controlled Mark Vie/Vies in various power plants and gas compression stationsI work on GE LM2500, Plus,
SAC, DLE, G4, PGT25 and HSPT as power turbines. Pre-commissioning and commissioning skid of oil system,
starting system, fuel gas system.installation, calibration and set-up electrical instrumentation (such as vibration
probes, temperature elements, servo actuators calibration, etc).Pre-start-up & Start-up checks.Trouble shooting
of LM2500,Plus,SAC,DLE,G4,HSPT,PGT25. Borescope inspections.Detailed Reporting.Site
managment.Coordination and management of manpower.

Sept 2014 – Feb 2015 . India Various Client as Control Engineer.


Installation and commissioning for various types of gas (heavy duty and aero- derivative)
turbines controlled Mark VIe in various power plants and gas compression stations.

March 2014 – August 2014 . GE Oil & Gas-Nuova Pignone Italy – Renco -World Wide.Consultant as Control
Engineer.J V Asia Trans Gas LLC Uzbekisatn.
Commissioning & start-up of GE 25 Gas Turbine with Centrifugal Compressor controlled by Mark
VIe system in CS 2 Gas Compression station.

July 2013 – Jan 2014 . GE Oil & Gas-Nuova Pignone Italy – Renco -World Wide.Consultant as Resident Engineer
Instrumentation Control Brunei Shell.Brunei.
Working as Resident Engineer Brunei Shell GE LM2500 Aeroderivative Machine with Speedtronic Mark V Control
System with BCL Compressor Station for GE Oil & Gas Contractual Service Aggrement CSA.

KANAIYALAL RAMANLAL KADIYA


13-Shubha Laxmi Society Gayatri Mandir Road-RANIP- Ahmedabad-Gujarat-INDIA-382480
Skype-Kanaiyalal.kadiya/krkadiya@yahoo.com/krkadiya@hotmail.com/krkadiya@gmail.com
Kadiya.kanaiyalalramanlal@bakerhughes.com +918866114813/+918320184702/( INDIA )
June 2012 – July 2013 . Siemens Turbomachinery AB. Finspang-Sweden-World Wide.Consultant as
Commissioning Manager Engineer Control Instrumentation Electrical in Thailand.
Plan, manage and follow-up the commissioning before during and after the realisationonsite.Ensure that the
commissioning fulfils stipulated targets for cost and delivery time Make sure that the commissioning is carried
out in such manner that Siemens,contractual and local demands regarding quality, safety and environment are
fulfilled. E O GT Solutions is the employer. The site subproject manager for the project in cooperation with the
line manager, project manager and site manager appoints the role. During the realisation of the commissioning
the commissioning manager is subordinated the project manager or the site manager. The commissioning
manager has a delegated responsibility for the health and safety of the personnel when a site manager has not
been appointed. Ensure that commissioning is optimised referring to time and cost.Be well initiated on the
contract.Report progress and deviation regarding time, cost and technical mattersEnsure that commissioning
isperformedaccordingtocontract,designandqualityplan.Ensurethecommissioningworkisdoneinsafewayaccordingt
oEHSplan.Report failure, non-conformities etc to the construction office according to instructions.Report and
document the work according to instructions.Plan the commissioning in co-operation with customer and sub-
supplier.Manage the commissioning work with the allocated commissioning resources according to
instruction.Plan and schedule resources.Daily reports to site manager and project.Cost, progress and time follow
up.Time scheduling.Report fault or deviation on products, methods of work and processes according to
instructions.Verify that the responsible engineer for each system approves all changes.Document and bring back
all changes in documentation to responsible engineers.Co-operate with customer and sub supplier.Report time
weeklyDocument the commissioning according to relevant procedures.Write commissioning report after
finalised commissioning Attest time sheets from subordinates and sub supplierThe commissioning manager has
the right to use the personnel subordinated to ensure maximum gain for the project.The commissioning
manager has the right to order over time in consultation with the site manager within the local working law and
Siemens instructions.The commissioning manager has the right to stop work if it can cause
personnel,environmental or material damage.Approve test protocol.Attest handing over of material,
commissioning documentation, etc to customer.Attest time sheets.Experience in programming, and
troubleshooting SIEMENS PCS7 with CFC function blocks and WinCC HMI interface,SGT-800/47.5 MW ,Field
Instruments Loop Checking ,Simulate Loop ,Calibration ,Pilot ,Main ,Central Gas Valve With Setting List, VGV
Calibration With Setting List With Servo Moog Controller ,BFI 3001 Flame Scanner ,SAFETECH Gas Detector
,BENTLY NEVEDA-3500 Vibration System With Key Phaser,JAQUET Overspeed System ,MINIMAX CO2 System
,SIEMENS Frequency Convertor For Starting Motor 6.6 KV TO 690 V AC.Starting Motor & Frequency
Convertor Power Cable Meggering ,Starting Motor Winding Temperature PT-100 Checking ,Barring Motor
Power Cable Meggering ABB Controller Setting List .Air Intake System Instruments ,Lube Oil Instruments With
Lube Oil Motor ,Oil Mist Fan Motor Power Cable Meggering ,Ventilation System Instruments With Fan Motor
Cable Meggering ,Lube Oil Flushing ,Nitrogen Flushing in Gas Line ,Jacking Oil Pressure Setting ,Gas Flow
Meter Setting List .Ignition Spark Plug With Transformer Check.Exhaust Thermocouple ,Pulsation System ,Bleed
Valve Check,Generator Winding Temperature ,P&ID Checking With Installation Equipments,Control Setting
Lists with Range Of Instruments & Alarm & Warning & Trip Logic check of all System as per
Configuration,One by one System Switch ON & Put in to service to Start Machine for with Condition
Monitoring System & Performance Tests Carried out as Per COMMISSIONING PROTOCOL & SETTING.Before
Start the Machine We have taken sample of Lube Oil & Fuel Gas for Laboratory Test as per Machine
Protocol .We have carried out successfully SGT800 SIEMENS Gas Turbine COMMISSIONING ACTIVITY.

KANAIYALAL RAMANLAL KADIYA


13-Shubha Laxmi Society Gayatri Mandir Road-RANIP- Ahmedabad-Gujarat-INDIA-382480
Skype-Kanaiyalal.kadiya/krkadiya@yahoo.com/krkadiya@hotmail.com/krkadiya@gmail.com
Kadiya.kanaiyalalramanlal@bakerhughes.com +918866114813/+918320184702/( INDIA )
Dec 2011 – Mar 2012 Honeywell Middle East. Abu Dhabi,UAE.ZADCO offshore InstrumentControl Engg .
Honeywell ME for the MOSAICS Project in Upper Zakum Field (ZADCO). Project scope involves to Modernization
of SCADA and Integrated Control systems, replaced existing TDC 2000, MTU, RTU’s and MATRA Systems with
EPKS System with C300 Controls and installed New Networking Systems Backbone Switches, FTE Switches,
Routers, RTU Servers at Central Complex, Satellites and ACPT 1.Duties included reviewing of Function Test
Procedures (FTP,S) & Cause & Effect Diagrams (C&E). Compiling commissioning work pack folders with Existing
and New Loop Drawings, P&ID Drawings, Single Line Electrical Drawings. Carried out site walk downs and
created punch lists accordingly.Responsible for Pre-power ‘On,’ Power Checks and SAT Test of All System
Cabinets, IOTA and Marshalling Cabinets. I have given responsibility to supervise Loop Integrity checks for all
areas, Central Complex, West, South and North Satellites.Responsibilities given to do the Changeover of GAS
TURBINE PLANT /CSP (Gas Separation & Central Separation Plant) and West Satellite Plant all are running
process plant.I have also involved in Fire & Gas Detectors replacement in ACPT 1 (Level 1 to Level 5) and
completed the Changeover of Fire and Gas Detectors to New FACP Tyco System.Completed safe changeover of
all areas without disturbing existing Process and to Production without causing any damage or property loss to
Customer and Company. Continually look for innovative ways to simplify construction, installation and
Commissioning. I have ensured all activities in accordance with the Company HSE policy, ensured that work
permits, where applicable are raised and processed. Ensured that the work is carried out in a professional
manner and in compliance with applicable contracts.

Oct 2010 – Mar 2011 Kuwait Oil Company. Kuwait. Engineer Instrumentation Control.
Work in Kuwait oil company under kharafi national for KOC maintenance project as contractor.In Kuwait Oil
Company, responsible for GE-RUSTON-MANTURBO-ROLLES-ROYCE Oil & Gas Turbine Booster station Operation
Maintenance, Overhaul, start up, Calibration of Field Instrument with HMI control system with under me fifty
Instrument Technician-Fitter people Staff working. The Supervisor Senior. Gas Turbine Specialist will be
responsible for the maintenance and calibration of all instrumentation for the Gas Turbine Compressors in KOC.
Also, The Supervisor Senior. Gas Turbine Specialist will be responsible for calibration of end devices including
transmitters, control valves, vibration sensors, RTD’s, power relays, power resources, NOX reduction systems,
limit switches, maintenance of programmable logic controller (PLC) software, maintenance of fire protection
(CO2) and safeguarding systems, and training and monitoring of Turbine. The Supervisor Senior. Gas Turbine
Specialist will also be responsible for creating maintenance procedures and participating in scheduled OEM
runtime based hot section and compressor inspections. The Supervisor Senior. Gas Turbine Specialist
responsibilities will include but not limited to: Calibration of end devices including transmitters, limit switches,
control valves, transducers and power replays. Identification & diagnosis of control system, power output
maximization and all subsequent failures for analysis Maintenance of PLC software and I/O cards,
communication protocols and local communication equipment Creation of instrumentation maintenance
procedures (PM, CM procedures in CMM) Provide input on full field development specifications and related
process equipment HazOps Maintenance of fire protection and other equipment and personnel safeguarding
systems Calibrations, testing, loop checking, troubleshooting and maintenance of process control instruments
and equipments. Experience in L&J servo Level gauges, VAREC level gauges and SAAB Rosemount Radar level
gauges. Servicing, calibration and testing of control valves Fisher, Masoneilan, and Valvetek. I have work with
following SMART and conventional transmitters Rosemount, Honeywell, ABB Kent, Tylor, Fuji FCX, Kent Delta PK,
Foxboro, Yokagawa, Taylor, Bells Etc. Leveltrols -(Masoneilan, Magnatrol, Fisher) Leveltek Experience of KNPC
loading and filling manifolds, Tank farms maintenance HONEYWELL TDC 3000 DCS system for controlling the
entire plant. FOXBORO I/A SERIES Rolls Royce Gas turbine/ Crude Transit Pump/Air Compressors Bently Nevada
3300 series vibration Monitors with Proximeters and Velometers

KANAIYALAL RAMANLAL KADIYA


13-Shubha Laxmi Society Gayatri Mandir Road-RANIP- Ahmedabad-Gujarat-INDIA-382480
Skype-Kanaiyalal.kadiya/krkadiya@yahoo.com/krkadiya@hotmail.com/krkadiya@gmail.com
Kadiya.kanaiyalalramanlal@bakerhughes.com +918866114813/+918320184702/( INDIA )
Feb 2007 – Jan 2010 GE-General Electric-Oil&Gas-Nuova Pignone.Italy Naroda-Santej-Ahmedabad-Gujarat-
India 60MW CCPP.Contract Performance Manager-Resident Engineer.
Worked with Direct GE Oil & Gas (CSA Team)Italy Base Company Global Service Contract Performance Manager
–Resident Engineer GE Gas Turbine Under GE Long Term Service Agreement Contract (LTSA)INDIA-with ARVIND
LIMITED –Ahmedabad-Santej & Naroda-INDIA- Co-Generation 60 MW Power plant with GE-Nuovo Pignone Gas
Turbine PGT-10X4 Machine with Moore-SUVIMAC-II Control System as Two sites Leader Working Responsibility
Gas Turbine Major Inspection+Hot Gas Path Inspection+Combustion Inspection Control & Instrumentation-
Mechanical-Electrical with Availability & Reliability of Machine. CPM I have to Create Invoice as per Contract &
Maintain Financial Checkbook with Cashbook Update Daily, Invoice Service Tax, Professionel Tax, and Income
Tax with Balance Sheet. I have to Maintain MATERIALS STORE critical spares & other consumable items Invoices
Materials of Gas Turbine Spare Parts with Airport Custom Clearance of Spare Part. & Take care about GE
Integrity policy with EHS Time to Time with Contractor & Employee with .Plant Maintenance PILOT DATA Every
Day Update for Maintenance & Avaibility Reliability of Machine.I have work in GAIL Jambua India Site for PGT-
10-Suvimac-II- Major Inspection Work as Start up Engineer Two Times. I have work in RELIANCE-BHARUCH
Booster Station as SITE LEADER on GE-10 With MARK-VI. .Commissioning, Maintenance and Troubleshooting
Activities of GE Frame-LM-6&25-5 & 6 & 7 & 9 Gas Turbines controlled by GE SPEEDTRONIC MARK-V & VI & VIe
(TMR) Control System. Capable to Perform Digital I/O, Analog I/O, Rungs Modification, Alarm Point Addition and
Control Constants Changing Configuration on SPEEDTRONIC MARK V & VI & VIe. Familiar with GCV, SRV, LFBV,
and IGVs NCV’s Calibration, Manual Stroke Checking, and Auto Calibration Function. Mechanical and Electrical
Turbine over Speed Test Function. Independently Handling All Field Instrumentation Jobs during Major
Overhauling, Hot Gas Path Inspection & Combustion Inspection & Pre-Startup jobs of GE Frame- 5 & 6 & 7 & 9
Gas Turbine. Understanding of Sequence Logic Control, Utilizing Process Flow Diagrams, Rung Diagrams, Relay
Control Logic, P & ID, Technical Manuals and Catalogs for Loop Checking, Trouble Shooting and Modification
Work in the Field & Control System. Familiar with GE Frame-5 & 6 & 7 & 9 Gas Turbine Fire Protection & Gas
Detection System. I have Given Training of Gas Turbine Operation & Maintenance to New employee of Customer
as per customer Request..I was Handling Two Site of GE-OIL & GAS Power Generation 60 Peoples Operation &
Maintenance Manpower Team. As per Process demand & specification sheet Time To Time I have to Update &
Configure New Process Data sheet of Control system. Worked with GE-NUOVA PIGNONE from since 1998-2000
Starting Irrection & Commissioning Loop checking Operation & Maintenance of this power plant. Evaluate the
quality of installed work on site. Completion of Factory Acceptance Tests (FAT) and Customer Acceptance Tests
(CAT) Integration of systems on-site Compliance to company workmanship and quality standards Creation and
updating of department documentation and procedures Progress report writing Functional testing of large
control systems Responsible for all GT and Generator controls issues, start – up of the machines, operating of
the GT’s with running and to be synchronized Responsibility.

Sept 2006 – Jan 2007 Santos Engineering Services Limited,Ireland. Pertonas-Bintulu Malaysia-Groupment
Sonatrach agip-Hassi Masudein-Algeria Senior Instrumentation Control Engineer.
Work as contractor job for GE Client in MALAYSIA & ALGERIA petronas & groupment sonatrach GAS TURBINE
overhaul & maintenance activity for MAJOR INSPECTION. Work with manpower supply of Santos Engineering,
Ireland base company for General Electric USA -Nuova Pignone, ITALY Global Service Cogeneration Power plant
with Compressor Booster Station Nuova Pignone compressor and GE Gas Turbine machine operation and
maintenance overhaul, shutdown for MARK-V-VI-Vie-Control System with Field Instruments Work in April-2006
with MALAYSIA LNG Complex, PETRONAS-Bintulu Site GE frame 7001x2 Gas Turbine with Nuova Pignone
Compressor- Train Machine shutdown work done under GE Nuova Pignone with MARK-V-VI-Vie-Control System
with Field Instruments.Work in September- December-2006- January- 2007 in ALGERIA GROUPMENT
SONATRACH-AGIP-BRN-HASSI MASSUDIEN site Under SULZER-ELBAR on GE-Frame 5002x2 AND 7001x2 Gas
Turbine with Nuova Pignone CompressorX4 with MARK-V- VI, PGT-10x3 with SUVIMAC-II & NUOVA PIGNONE
SRL COMPRESSOR x3 with GE-FANUC- 90/30 PLC with SIMPLICITY-VERSA pro-2.0,Gas Turbine machine with
Responsibility to carry out the repair and maintenance work of all types of field instruments such as

KANAIYALAL RAMANLAL KADIYA


13-Shubha Laxmi Society Gayatri Mandir Road-RANIP- Ahmedabad-Gujarat-INDIA-382480
Skype-Kanaiyalal.kadiya/krkadiya@yahoo.com/krkadiya@hotmail.com/krkadiya@gmail.com
Kadiya.kanaiyalalramanlal@bakerhughes.com +918866114813/+918320184702/( INDIA )
temperature, pressure, level, flow, vibration, speed, flame detectors, transmitters, switches, gauges, recorders
and analyzers. Calibration and maintenance of various types of control actuators e.g. Hydraulic, pneumatic and
motorized control valves. Should be familiar with safety practices and international standards, Operation &
Maintenance Loop checking shutdown work done as senior instrumentation control engineer.

Sept 2005 – Dec 2005 Technip Offshore,UK. North Sea-Scotland-UK.Engineer Instrumentation Control System.
Work as contractor for technip offshore DP BASE VESSEL maintenance.Northern Marine, North Sea. United
Kingdom, C & I Engg/Technician. On BP support vessel for Technip, Offshore Platform. Controls are DP Dynamic
Position Controls System Utilizing the Cegelec 900 series, 6 x thrusters, 6 x Generators with Control Systems with
Vessel Radar Global Navigation system. Working with the International Standards Offshore & Many Nationalities
persons. Under Chief Engineer Direction, Implement all Maintenance Activities Associates with Utility and
Process Equipment, on the Installation. Knowledge of All Calibration & Testing Equipments. Responsible for
Completing Verification Assurance & Maintenance Routines & Maintain Quality Records. Is Competent in the
Electrical Safety Procedures & to be certified as Responsible Instrument Tech, read & work from
Engineering/Vendor Drawings. Carries out Faultfinding & Repairs on Communications, Control and Instrument
System. Generator Units, Control Equipment & Protection Devices with SCADA System Permit to work
Procedures, Worked for Diving Support Vessel. D P base Vessels.

May 2000 – May 2004 Sembcorp Cogen Pte Ltd. Singapore.800MW Cogeneration Power.Senior
Instrumentation Control Engineer-Senior Control Room Operatation Engineer.
The Main Power Plant Control System Consisted of the Operation of 2 x Heat Recovery Steam Generators (HRSG-
BOP) with Distributed Control System ABB Symphony Control System Operating from Central Control System.
Responsible for the Operational Troubleshooting and Implementation Maintenance programmed. Total Control
system Including the LAN network with Remote Operating Stations in the Gas Turbines, Steam Turbines and
Interphase with SINGAPORE POWER GRID, Siemens & Allen Bradley PLC for Small Package Units The Gas
Turbines Plant Consisting of 2 x 230MW GE Frame Gas Turbine 9001FA++ With DLN-II Which Controlled by the
Latest Technology of GE SPEEDTRONIC- MARK- V. Responsible for Operation, Troubleshooting and Maintenance
of the Gas Turbine Controls Including Field Smart Transmitters, Bentley Nevada 3300 System & Industrial CO2
Fire System for Gas Turbine & Steam Turbine Instruments.The Steam Turbine Plant Consists of 1 x 340MW
ALSTOM Steam Turbine Controlled by Microrec Controls had Total Responsibility for Operation, Troubleshooting
and Maintenance of the Steam Turbine Controls with all Field Smart Instruments.Semb corp has given Special
Training in the All above Areas and our Team is looking after Overall Control of Instrumentation and Control
Operation and Maintenance works Including the Planned/Preventive/Breakdown Maintenance works. Has been
given Special Training in SAP System Software to Carry out Plant Maintenance Jobs and Material Management
Works. so our Team is Responsible for our Division Inventory Controls, Budgeting and cost Control.800MW
Power plant Irrection & Commissioning Loop checking work done from since joining this power plant.

May1998 – May2000 GE-General Electric-Oil&Gas-Nuova Pignone-Italy. Naroda-Santej-Ahmedabad-Gujarat-


India 60MW CCPP.Control Instrument Control Engineer.
Work with GE-Suvimac II Turbine Control System & DCS Thermex Fuji CCPP Power Plant. Complete Maintenance
Instrumentation & Control of 2 x 10.5MW GE-Nuova Pignone -PGT10, 13.5 MVA Jeumount Generators and 6MW
Steam Turbine -BHEL. With 1200m3/hr Capacity Circulation Cooling Water System for Gas Turbine. Combined
Cycle co-Gen HRSG of TBW of 72 ton/hr Steam with Supplementary Firing with BFW System, Deareator. Also 2 x
1100 TR Vapor Absorber Heat Recovery Process of Thermex for Supply of 6 Degree Centigrade Chilled Water
System to Gas Turbine. Two (2) x Circulation Cooling Tower with Auxiliary Pumping System. Naphtha Unloading,
2 x 4000kl Floating Roof Tank Naphtha Transfer to BOP/GT/HRSG System 1 x 24 TPH FM Boiler of TBW, 1 x 10
TPH & 16 TPH Auxiliary Nestler Boiler Looking Over all Power Plant Instrumentation & Control System
Maintenance.Irrection & Commissioning Loop checking work carried out from 1998 to 2000 for Client ARVIND
LIMITED-Ahmedabad-Naroda & Santej-Site Location.

KANAIYALAL RAMANLAL KADIYA


13-Shubha Laxmi Society Gayatri Mandir Road-RANIP- Ahmedabad-Gujarat-INDIA-382480
Skype-Kanaiyalal.kadiya/krkadiya@yahoo.com/krkadiya@hotmail.com/krkadiya@gmail.com
Kadiya.kanaiyalalramanlal@bakerhughes.com +918866114813/+918320184702/( INDIA )
March 1998 – May 1998 Cegelac Abu Dhabi,UAE-Das Island Offshore Plateform S/D.Instrument Control Engg
Das Island Banduq Oil field platform Field Instrument Overhaul & calibration work carried out as contractor

Sept1995–Feb 1996 Jurong Engineering Ltd. Singapore.2250MW Steam Turbine Boiler Power Plant-Parson-UK-
Power Gen.Control Instrumentation Engineer.
Work with jurong engineering under Main contractor PARSON TURBINE GENERATOR from UK to built up
2250MW steam turbine power plant since IRRECTION & COMMISSIONING.dentify the major critical aspects
leading to intermediate and major breakdown and implementing proactive maintenance / corrective
maintenance so as to achieve target plant availability and executing the client personnel to create contingency
plan for critical equipment and operational process.ABB-Bailey-Japan-INFI-90 System Touch Screen in Erection &
Commissioning / Loop Checking of all Process Instrument field to CCR, CCR to Field, Field to MCC to CCR. Cabinet
like CCS - Control Circuit System Cabinet SEM - Sequence Event Monitor Cabinet IC - Interlock Cabinet DCIS -
Distributed Control Information System Cabinet PCIS - Parson Control Information System Cabinet TTRC -
Turbine Trip Relay Circuit Cabinet EHG - Electro Hydraulic Governor Cabinet.

July 1994 – July 1995 Consolidated Turbine Services Ltd. Dubai,UAE.Specialist Electrical Instrument Engineer.
Work as contractor for UAE power station GAS TURBINE to upgrade fuel system from liquid system to gas
system.Ministry of Electricity & Water UAE –Abu Dhabi-Ras Al Khaimah-Umal Kuwain-Ajman-Sharjaha-Dubai-
Power Station GE-Gas Turbine MARK-II-V- Convert in to Gas system with New Control System. New Control
system with field Instrumentation Irrection & Installation Commission Loop checking work carried out.

Feb 1992 – Feb 1994 Kuwait National Petroleum Company. Instrumentation Control Engineer.
Running plant maintenance activity carried out as contractor. dentify the major critical aspects leading to
intermediate and major breakdown and implementing proactive maintenance / corrective maintenance so as to
achieve target plant availability and executing the client personnel to create contingency plan for critical
equipment and operational process. KUWAIT NATIONAL PETROLEUM-Mina Abdullah Refinery Diesel-Naphtha-
Kerosene-Cracker Unit Plant Instrumentation Maintenance & Calibration work done with Honeywell TDC-
2000/3000.Bently Nevada 3300 System Maintenance done. I have Knowledge of the operating principles of
control and measurement devices including pneumatic and electric liquid levels, interface level, static pressure
and differential pressure controllers, Irrection commissioning Loop checking work carried out of Refinery
Instruments.

July 1990 – Feb 1992 Bayer India Ltd. Himmatnager,Gujarat, India Instrumentation Control-Process Engineer.
Work as client with contractor to IRRECTION & COMMISSION with start up new plant.As client with SIEMENS
PLC CONTROL SYSTEM with field instruments irrection commission loop checking calibration activity carried
out under our supervision. Work as CLIENT with DALAL contractors to built up trunkey project In BAYER INDIA
daily monitoring BATCH PROCESS considering for achieving the plant availability and target meeting the BAYER
MANAGEMENT reuirement & weekly meeting with all contractor shorting out critical issue.In BAYER INDIA we
were conducting meeting Review and understand the quality requirement and conduct regular quality audits
with contractor construction activities and documentation.Identify the major critical aspects leading to
intermediate and major breakdown and implementing proactive maintenance / corrective maintenance so as to
achieve target plant availability and executing the client personnel to create contingency plan for critical
equipment and operational process.Work with New Install Agrochemical Fertilizer Pesticide Plant
Instrumentation Irrection Commissioning Loop checking with Operation & Maintenance of Plant as Control
Instrument Technician cum Process Technician work carried out with SIEMENS Step-5 PLC-Programmable Logic
Controller. Company has provided SIEMENS PLC-Step-5 Training in SIEMENS HOUSE in MUMBAI-India for 15
Days with Certificates.

KANAIYALAL RAMANLAL KADIYA


13-Shubha Laxmi Society Gayatri Mandir Road-RANIP- Ahmedabad-Gujarat-INDIA-382480
Skype-Kanaiyalal.kadiya/krkadiya@yahoo.com/krkadiya@hotmail.com/krkadiya@gmail.com
Kadiya.kanaiyalalramanlal@bakerhughes.com +918866114813/+918320184702/( INDIA )
Feb 1989 – June 1990 Sandoz India Limited. Ankleshwar,Gujarat, India Instrumentation Control Engineer.
Running plant maintenance work carried out. Work with Fertilizer Plant Instrumentation Irrection &
Commissioning with Loop checking with Allen Bradley 2/30 PLC.Plant Instrumentation Control System
Maintenance.

Sept 1987 – Sept 1988 Indian Petrochemical Co Ltd. Vadodara,Gujarat, India Instrument Control Apprentice.
Irrection commissioning plant with start up plant activity with routine maintenance.Petrochemical Plant
Instrumentation new Irrection & Installation Commission Loop Checking Calibration work done DCS TOSDIC-II
Toshiba Japan Control System. Petrochemical Plant Instrumentation Control System Maintenance work done

Aug 1985 – July 1987 Esjey Engineering. Vadodara,Gujarat, India. Instrumentation Mechanic.
IRRECTION & COMMISSIONING of IPCL DRY SPUN ACRYLIC fibre plant as contractor.Petrochemical Plant
Instrumentation new Installation Commission Loop Checking Calibration work done Errection Commission
Petrochemical Plant Dry Spun Acrylic Fiber Plant Instrumentation Control System.

TRAINING DONE WITH CERTIFICATES


PLC Siemens, Allen Bradley, Suvimac II, Bently Nevada, Mark V - Mark VI DCS-ABB-INFI-90-SYMPHONY PLC-
SIEMENS-235U-135U-100U HONEYWELL-TDC-2000-3000 PLC ALLENBRADLY-2/30 GE FANUC 90/30 PLC-VERSA
PRO-2.0 THERMEX-FUJI DCS GAS TURBINE- MARK-V -IV SPEEDTRONIC / MOORE-SIEMENS-SUVIMAC-II
Siemens India Ltd Bombay-India - Programmable Logic Controller. GE-ENERGY & POWER SPEEDTRONIC MARK-V
TRAINING DONE. ABB Alstom Singapore - Power General Power Plant Overview and Balance of Plants System
Operation.GE Energy Product Europe Singapore - MS9001FA+ + Gas Turbine Basic Study GE Energy Product
Europe Singapore - MS9001FA+ +Gas Turbine Mechanics & Maintenance Survey.GE Power System Singapore -
Speedtronic MARK V Overview. GE Energy Product Europe Singapore - Gas Turbine MKV Control and Operation
ABB Automation University in Singapore-DCS (Distrubuted Control System) Below Training Done. ABB M200-
Symphony Enterprise Management System Overview ABB M206- Symphony Conductor NT Operator ABB
M202- Composer Automation Architect ABB M203- Conductor NT Hathaway IDM Training,Singapore.SUT
Sakra Emergency Response Brigade BatamIndonesia - Industrial Fire Fighting Course 3M Hearing Protection
Singapore - Training & 3M Respirator Training NORTH SEA =Naval Maritime Academy in Mumbai Below STCW-
95 Sea survival Training Done.Personal Safety & Social Responsibility-Elementary First Aid-Personal Survival
Technique-Fire Prevention & Fire Fighting NORTH SEA MSTS in Malaysia by Nutec RotterdamdamB.V
Netherlands Below Training Done. STCW-95 NorthSea survival One Week Training Basic Offshore Safety
Induction & Emergency Training Basic Safety & Emergency Preparation.

KANAIYALAL RAMANLAL KADIYA


13-Shubha Laxmi Society Gayatri Mandir Road-RANIP- Ahmedabad-Gujarat-INDIA-382480
Skype-Kanaiyalal.kadiya/krkadiya@yahoo.com/krkadiya@hotmail.com/krkadiya@gmail.com
Kadiya.kanaiyalalramanlal@bakerhughes.com +918866114813/+918320184702/( INDIA )

You might also like