Feb 2015 – Feb 2017 . GE Oil & Gas-Nuova Pignone Italy – Renco –World Wide.Consultant as Control
Engineer.Australia-Kazakhstan-Brunei-India.
March 2014 – August 2014 . GE Oil & Gas-Nuova Pignone Italy – Renco -World Wide.Consultant as Control
Engineer.J V Asia Trans Gas LLC Uzbekisatn.
Commissioning & start-up of GE 25 Gas Turbine with Centrifugal Compressor controlled by Mark
VIe system in CS 2 Gas Compression station.
July 2013 – Jan 2014 . GE Oil & Gas-Nuova Pignone Italy – Renco -World Wide.Consultant as Resident Engineer
Instrumentation Control Brunei Shell.Brunei.
Working as Resident Engineer Brunei Shell GE LM2500 Aeroderivative Machine with Speedtronic Mark V Control
System with BCL Compressor Station for GE Oil & Gas Contractual Service Aggrement CSA.
Oct 2010 – Mar 2011 Kuwait Oil Company. Kuwait. Engineer Instrumentation Control.
Work in Kuwait oil company under kharafi national for KOC maintenance project as contractor.In Kuwait Oil
Company, responsible for GE-RUSTON-MANTURBO-ROLLES-ROYCE Oil & Gas Turbine Booster station Operation
Maintenance, Overhaul, start up, Calibration of Field Instrument with HMI control system with under me fifty
Instrument Technician-Fitter people Staff working. The Supervisor Senior. Gas Turbine Specialist will be
responsible for the maintenance and calibration of all instrumentation for the Gas Turbine Compressors in KOC.
Also, The Supervisor Senior. Gas Turbine Specialist will be responsible for calibration of end devices including
transmitters, control valves, vibration sensors, RTD’s, power relays, power resources, NOX reduction systems,
limit switches, maintenance of programmable logic controller (PLC) software, maintenance of fire protection
(CO2) and safeguarding systems, and training and monitoring of Turbine. The Supervisor Senior. Gas Turbine
Specialist will also be responsible for creating maintenance procedures and participating in scheduled OEM
runtime based hot section and compressor inspections. The Supervisor Senior. Gas Turbine Specialist
responsibilities will include but not limited to: Calibration of end devices including transmitters, limit switches,
control valves, transducers and power replays. Identification & diagnosis of control system, power output
maximization and all subsequent failures for analysis Maintenance of PLC software and I/O cards,
communication protocols and local communication equipment Creation of instrumentation maintenance
procedures (PM, CM procedures in CMM) Provide input on full field development specifications and related
process equipment HazOps Maintenance of fire protection and other equipment and personnel safeguarding
systems Calibrations, testing, loop checking, troubleshooting and maintenance of process control instruments
and equipments. Experience in L&J servo Level gauges, VAREC level gauges and SAAB Rosemount Radar level
gauges. Servicing, calibration and testing of control valves Fisher, Masoneilan, and Valvetek. I have work with
following SMART and conventional transmitters Rosemount, Honeywell, ABB Kent, Tylor, Fuji FCX, Kent Delta PK,
Foxboro, Yokagawa, Taylor, Bells Etc. Leveltrols -(Masoneilan, Magnatrol, Fisher) Leveltek Experience of KNPC
loading and filling manifolds, Tank farms maintenance HONEYWELL TDC 3000 DCS system for controlling the
entire plant. FOXBORO I/A SERIES Rolls Royce Gas turbine/ Crude Transit Pump/Air Compressors Bently Nevada
3300 series vibration Monitors with Proximeters and Velometers
Sept 2006 – Jan 2007 Santos Engineering Services Limited,Ireland. Pertonas-Bintulu Malaysia-Groupment
Sonatrach agip-Hassi Masudein-Algeria Senior Instrumentation Control Engineer.
Work as contractor job for GE Client in MALAYSIA & ALGERIA petronas & groupment sonatrach GAS TURBINE
overhaul & maintenance activity for MAJOR INSPECTION. Work with manpower supply of Santos Engineering,
Ireland base company for General Electric USA -Nuova Pignone, ITALY Global Service Cogeneration Power plant
with Compressor Booster Station Nuova Pignone compressor and GE Gas Turbine machine operation and
maintenance overhaul, shutdown for MARK-V-VI-Vie-Control System with Field Instruments Work in April-2006
with MALAYSIA LNG Complex, PETRONAS-Bintulu Site GE frame 7001x2 Gas Turbine with Nuova Pignone
Compressor- Train Machine shutdown work done under GE Nuova Pignone with MARK-V-VI-Vie-Control System
with Field Instruments.Work in September- December-2006- January- 2007 in ALGERIA GROUPMENT
SONATRACH-AGIP-BRN-HASSI MASSUDIEN site Under SULZER-ELBAR on GE-Frame 5002x2 AND 7001x2 Gas
Turbine with Nuova Pignone CompressorX4 with MARK-V- VI, PGT-10x3 with SUVIMAC-II & NUOVA PIGNONE
SRL COMPRESSOR x3 with GE-FANUC- 90/30 PLC with SIMPLICITY-VERSA pro-2.0,Gas Turbine machine with
Responsibility to carry out the repair and maintenance work of all types of field instruments such as
Sept 2005 – Dec 2005 Technip Offshore,UK. North Sea-Scotland-UK.Engineer Instrumentation Control System.
Work as contractor for technip offshore DP BASE VESSEL maintenance.Northern Marine, North Sea. United
Kingdom, C & I Engg/Technician. On BP support vessel for Technip, Offshore Platform. Controls are DP Dynamic
Position Controls System Utilizing the Cegelec 900 series, 6 x thrusters, 6 x Generators with Control Systems with
Vessel Radar Global Navigation system. Working with the International Standards Offshore & Many Nationalities
persons. Under Chief Engineer Direction, Implement all Maintenance Activities Associates with Utility and
Process Equipment, on the Installation. Knowledge of All Calibration & Testing Equipments. Responsible for
Completing Verification Assurance & Maintenance Routines & Maintain Quality Records. Is Competent in the
Electrical Safety Procedures & to be certified as Responsible Instrument Tech, read & work from
Engineering/Vendor Drawings. Carries out Faultfinding & Repairs on Communications, Control and Instrument
System. Generator Units, Control Equipment & Protection Devices with SCADA System Permit to work
Procedures, Worked for Diving Support Vessel. D P base Vessels.
May 2000 – May 2004 Sembcorp Cogen Pte Ltd. Singapore.800MW Cogeneration Power.Senior
Instrumentation Control Engineer-Senior Control Room Operatation Engineer.
The Main Power Plant Control System Consisted of the Operation of 2 x Heat Recovery Steam Generators (HRSG-
BOP) with Distributed Control System ABB Symphony Control System Operating from Central Control System.
Responsible for the Operational Troubleshooting and Implementation Maintenance programmed. Total Control
system Including the LAN network with Remote Operating Stations in the Gas Turbines, Steam Turbines and
Interphase with SINGAPORE POWER GRID, Siemens & Allen Bradley PLC for Small Package Units The Gas
Turbines Plant Consisting of 2 x 230MW GE Frame Gas Turbine 9001FA++ With DLN-II Which Controlled by the
Latest Technology of GE SPEEDTRONIC- MARK- V. Responsible for Operation, Troubleshooting and Maintenance
of the Gas Turbine Controls Including Field Smart Transmitters, Bentley Nevada 3300 System & Industrial CO2
Fire System for Gas Turbine & Steam Turbine Instruments.The Steam Turbine Plant Consists of 1 x 340MW
ALSTOM Steam Turbine Controlled by Microrec Controls had Total Responsibility for Operation, Troubleshooting
and Maintenance of the Steam Turbine Controls with all Field Smart Instruments.Semb corp has given Special
Training in the All above Areas and our Team is looking after Overall Control of Instrumentation and Control
Operation and Maintenance works Including the Planned/Preventive/Breakdown Maintenance works. Has been
given Special Training in SAP System Software to Carry out Plant Maintenance Jobs and Material Management
Works. so our Team is Responsible for our Division Inventory Controls, Budgeting and cost Control.800MW
Power plant Irrection & Commissioning Loop checking work done from since joining this power plant.
Sept1995–Feb 1996 Jurong Engineering Ltd. Singapore.2250MW Steam Turbine Boiler Power Plant-Parson-UK-
Power Gen.Control Instrumentation Engineer.
Work with jurong engineering under Main contractor PARSON TURBINE GENERATOR from UK to built up
2250MW steam turbine power plant since IRRECTION & COMMISSIONING.dentify the major critical aspects
leading to intermediate and major breakdown and implementing proactive maintenance / corrective
maintenance so as to achieve target plant availability and executing the client personnel to create contingency
plan for critical equipment and operational process.ABB-Bailey-Japan-INFI-90 System Touch Screen in Erection &
Commissioning / Loop Checking of all Process Instrument field to CCR, CCR to Field, Field to MCC to CCR. Cabinet
like CCS - Control Circuit System Cabinet SEM - Sequence Event Monitor Cabinet IC - Interlock Cabinet DCIS -
Distributed Control Information System Cabinet PCIS - Parson Control Information System Cabinet TTRC -
Turbine Trip Relay Circuit Cabinet EHG - Electro Hydraulic Governor Cabinet.
July 1994 – July 1995 Consolidated Turbine Services Ltd. Dubai,UAE.Specialist Electrical Instrument Engineer.
Work as contractor for UAE power station GAS TURBINE to upgrade fuel system from liquid system to gas
system.Ministry of Electricity & Water UAE –Abu Dhabi-Ras Al Khaimah-Umal Kuwain-Ajman-Sharjaha-Dubai-
Power Station GE-Gas Turbine MARK-II-V- Convert in to Gas system with New Control System. New Control
system with field Instrumentation Irrection & Installation Commission Loop checking work carried out.
Feb 1992 – Feb 1994 Kuwait National Petroleum Company. Instrumentation Control Engineer.
Running plant maintenance activity carried out as contractor. dentify the major critical aspects leading to
intermediate and major breakdown and implementing proactive maintenance / corrective maintenance so as to
achieve target plant availability and executing the client personnel to create contingency plan for critical
equipment and operational process. KUWAIT NATIONAL PETROLEUM-Mina Abdullah Refinery Diesel-Naphtha-
Kerosene-Cracker Unit Plant Instrumentation Maintenance & Calibration work done with Honeywell TDC-
2000/3000.Bently Nevada 3300 System Maintenance done. I have Knowledge of the operating principles of
control and measurement devices including pneumatic and electric liquid levels, interface level, static pressure
and differential pressure controllers, Irrection commissioning Loop checking work carried out of Refinery
Instruments.
July 1990 – Feb 1992 Bayer India Ltd. Himmatnager,Gujarat, India Instrumentation Control-Process Engineer.
Work as client with contractor to IRRECTION & COMMISSION with start up new plant.As client with SIEMENS
PLC CONTROL SYSTEM with field instruments irrection commission loop checking calibration activity carried
out under our supervision. Work as CLIENT with DALAL contractors to built up trunkey project In BAYER INDIA
daily monitoring BATCH PROCESS considering for achieving the plant availability and target meeting the BAYER
MANAGEMENT reuirement & weekly meeting with all contractor shorting out critical issue.In BAYER INDIA we
were conducting meeting Review and understand the quality requirement and conduct regular quality audits
with contractor construction activities and documentation.Identify the major critical aspects leading to
intermediate and major breakdown and implementing proactive maintenance / corrective maintenance so as to
achieve target plant availability and executing the client personnel to create contingency plan for critical
equipment and operational process.Work with New Install Agrochemical Fertilizer Pesticide Plant
Instrumentation Irrection Commissioning Loop checking with Operation & Maintenance of Plant as Control
Instrument Technician cum Process Technician work carried out with SIEMENS Step-5 PLC-Programmable Logic
Controller. Company has provided SIEMENS PLC-Step-5 Training in SIEMENS HOUSE in MUMBAI-India for 15
Days with Certificates.
Sept 1987 – Sept 1988 Indian Petrochemical Co Ltd. Vadodara,Gujarat, India Instrument Control Apprentice.
Irrection commissioning plant with start up plant activity with routine maintenance.Petrochemical Plant
Instrumentation new Irrection & Installation Commission Loop Checking Calibration work done DCS TOSDIC-II
Toshiba Japan Control System. Petrochemical Plant Instrumentation Control System Maintenance work done
Aug 1985 – July 1987 Esjey Engineering. Vadodara,Gujarat, India. Instrumentation Mechanic.
IRRECTION & COMMISSIONING of IPCL DRY SPUN ACRYLIC fibre plant as contractor.Petrochemical Plant
Instrumentation new Installation Commission Loop Checking Calibration work done Errection Commission
Petrochemical Plant Dry Spun Acrylic Fiber Plant Instrumentation Control System.