Communicate with the group regularly to 10 5 1 2 5
accomplish the work task (GC, messenger, etc,.) Contributes meaningfully to the group if ideas are 10 6 9 6 5 being asked or voluntarily give ideas to the success of the project. Given works are being accomplished before the 8 10 6 2 5 given deadline of the leader. Doing the work with factual, importance, quality 8 5 10 2 1 and in a critical manner. Does have a sense of attitude, cooperativeness 8 8 4 10 10 towards the group.