Professional Documents
Culture Documents
Detail Engineering Design (DED) : Denah Lantai 1
Detail Engineering Design (DED) : Denah Lantai 1
JENIS PEKERJAAN:
85
HALAMAN
PEMBANGUNAN
220
BELAKANG
TERAS KLINIK RAWAT INAP PRATAMA
135
-0.45
100 -0.10
dr. VITIS ARUNDINA
A TOILET TOILET TOILET TOILET TOILET TOILET TOILET
A
150
150
-0.10 -0.10 -0.10 -0.10 -0.10 -0.10 -0.10
-0.05 -0.05 -0.05 -0.05 -0.05 -0.05 -0.05
LOKASI PEKERJAAN:
500
±0.00
R. PERAWATAN
VIP A-1
R. PERAWATAN
VIP A-2
R. PERAWATAN
VIP A-3
R. PERAWATAN
VIP A-4
R. PERAWATAN
VIP A-5
R. PERAWATAN
VIP A-6
R. PERAWATAN
VVIP 1
KECAMATAN GROGOL
350
350
±0.00 ±0.00 ±0.00 ±0.00 ±0.00 ±0.00 ±0.00
KABUPATEN KEDIRI
DIAJUKAN OLEH:
HALAMAN
-0.60
-0.75
-0.45
-0.15
-0.30
250
250
BELAKANG ±0.00
SELASAR
-0.75 ±0.00
B -0.30
-0.45
-0.30
-0.45
R. PERAWAT B PERENCANA:
250
+2.70
±0.00
R. JAGA 1 +2.50
TOILET
±0.00 -0.15 -0.15 +2.10
500
-0.30 +1.90
-0.45 +1.70
+1.50
2350
NAIK
+1.30
-0.45
+1.10
(MARIA ULFA, ST)
250
SELASAR -0.30
+0.90 Direktur CV. LAKU CIPTA KONSULINDO
±0.00 +0.70
+0.50
2470
-0.15
-0.30
-0.45
-0.45
420
NAIK
HALAMAN
570
R.USG
±0.00 -0.45 (EMMY PUJI HANDAYANI, ST)
470
Site Engineer CV. LAKU CIPTA KONSULINDO
TOILET
DISETUJUI/DISAHKAN OLEH:
-0.05 R. OXIGEN
150
-0.05 ±0.00
-0.15
-0.30 DINAS PEKERJAAN UMUM DAN TATA RUANG
1000
-0.45 KABUPATEN KEDIRI
320
HALAMAN
380
BELAKANG
-0.75
530
NAIK
(.................................)
-0.75 -0.45
60
BORDES TANGGAL
150
TOILET NAIK
+1.55
-0.60 -0.45
SKALA 1 : 125
NAIK
KODE GAMBAR JML.GBR NO.GBR
+1.70