Nagpur Metro Rail Project

(REACH-1 & AT-GRADE STATIONS CONTRACTS)

Sr No. Contractor Name Brief description of the contract LOA No. Current Status

Reach-1 stations

Contract Name : Design and construction of Viaduct in Reach-3


between Jhansi Rani Square and Lokmanya Nagar Stations from Ch Variation Order
7825m to Ch18212m on the East –West Corridor of Nagpur Metro Rail 1)NMRP/AGM(Cont.)/2425/AFCONS/R3/
M/s. AFCONS Project Contract No : N1C- Sitabuldi Stn.-Struct.works/2018
1 Work in Progress
Infrastructure Ltd 08/2016/LOA/164(P3) dated 26.10.2016 dated:16.02.2018 (Structural Work)
Variation Work : Construction of interchange metro station at 2) NMRCL/CPM-R1/AFCONS /Corres.
sitabuldi including OCC above the station, including associated /111/2013 dated :17.10.2018 (Arch.) ,
structures of nagpur metro rail project.

M/s. AFCONS Balance Work of Reach-1 station including construction of operational LOA No.Maha-Metro/Proc/LOA/N1-C-
2 Work in Progress
Infrastructure Ltd room facilities at mihan and hingna depots. 31/2019/1063 dated 27/05/19.

Balance Work of Reach-1 station including construction of operational


M/s Mall Construction room facilities at mihan and hingna depots. Final Bill submitted by Agency under
3
(Under Afcons LOA) LOA No.Maha-Metro/Proc/LOA/N1-C-31/2019/1063 dated 27/05/19. Maha-Metro/ED(Proc)/902 dated 14.08.2020 process.
NMRCL/CPM-R1/Mall Stations/Corres/162/A/3556 dated: 11.03.2020

Construction of seven elevated metro stations and three at grade


stations (north south corridor) viz. Congress Nagar To Khapri And
Final Variation has been submitted to Maha
Viaducts Between Ch:7/850 To 8/030 And Ch:8/574 To 9/692 In Reach- LOA No: N1C-23/2019/LOA/212 dated:
4 M/s Mall Constructions Metro, under approval. Final Bill will be
1 (Balance Civil Works Of Ajni Station, Congress Nagar And Rahate 25.01.2019
submitted after approval of Variation.
Colony Metro Station Including Granite Work But Excluding Other
Finishing Works).
Construction of Seven Elevated Metro Stations and Three at grade
LOA No.N1C-22/2019/LOA/214/2019 dated
Stations (North South corridor) viz. Congress Nagar to Khapri and
M/s Mall Constructions 25.01.2019
5 viaducts between CH:7/850 to 8/030 and CH:8/574 to 9/692 in Reach- Work in Progress
(Under Sudhir LOA) NMRCL/CPM-R1/Mall Stations/Corres
1 of Nagpur Metro Rail project (Balance Civil Works of J P Nagar, Ujjwal
/149/A/3932 dated 10.09.2020.
Nagar and Airport Metro Station)

Construction of seven elevated metro stations and three at grade


M/s Sudhir
stations (North South corridor) viz. Congress Nagar to Khapri and LOA NO.N1C-22/2019/LOA/214/2019 dated
6 Constructions Final bill to be submitted by Agency.
viaducts between ch:7/850 to 8/030 and ch:8/754 to 9/692 in Reach-1 25.01.2019
Infraspace Pvt. Ltd
(Balance Civil Works Of JP Nagar And Ujjwal Nagar Metro Station)

Construction of seven elevated metro stations and three at grade


stations (north south corridor) viz. Congress Nagar To Khapri And LOA NO.N1C-21/2018/LOA/145/1102 dated Final bill to be submitted by Agency.
7 M/s NCC
Viaducts Between Ch:7/850 To 8/030 And Ch:8/574 To 9/692 In Reach- 18.01.2019 (3.98 cr amount to be received from NMC)
1 (Balance Civil Works Of Nagpur Metro Project.

Page 1 of 5
Nagpur Metro Rail Project
(REACH-1 & AT-GRADE STATIONS CONTRACTS)

Sr No. Contractor Name Brief description of the contract LOA No. Current Status

Providing, fabricating to require profile and shape, transporting,


LOA NO. Maha-Metro/N1-C-
erecting and fixing in position Pre Engineered Structures (PEB) at Awaiting final variation, sheeting rate
8 M/s. Innoventure 53/2021/ED(Proc)/LOA/169, dated
Congress Nagar in Reach-1 Section of Wardha Road for Nagpur Metro decision to be confirmed by Maha Metro.
03.03.2021
Rail Project Metro Rail Project.

Providing, fabricating and fixing of Structural Steel over PEB structures NMRP/GM(Proc.)/Reach-
M/s ACON PEB Industry
9 to fix façade panel at Airport Station Located on Wardha Road in reach 1/Station/PEB/ACON/2018/ 1598(A) ,dated: FINAL BILL DONE
Pvt. Ltd.
1 section for Nagpur Metro Rail Project. 28.12.2018

Designing, Supplying and fixing of Façade work at JP Nagar Metro NMRP/GM(Proc.)/Reach-


Final bill to be submitted by
10 M/s. Adit Enterprises station (East Side) in Reach-1 section of Wardha road for Nagpur Metro 1/Stations/Facades/ADIT/ 2018/1617 ,
Agency.Instructed to agency.
Rail project. dated: 31.12.2018

Providing and fixing of roof sheeting over the existing steel structure at NMRP/GM(Proc.)/Reach-
M/s. Aditya Profiles Pvt.
11 Airport metro station located on wardha road in Reach-1 section for 1/Stations/Roofing/Aditya /2018, dated: FINAL BILL DONE
Ltd.
Nagpur Metro Project. 26.12.2018

Providing and fixing of Aluminium doors, windows, Glass works, ACP


NMRP/GM(Proc.)/Reach-1/Stations/Doors &
M/s Alutech Metalcraft cladding and other miscellaneous work at Airport Metro Station, JP Work Completed in all respect. Final bill to
12 Windows/Alutech/2018/1597 "A" dated:
Pvt. Ltd Nagar Metro Station and Other Metro Station in Reach-1 section of be submitted by Agency.
29.12.2018
Wardha road for Nagpur Metro Rail project.

NMRP/GM(Proc.)/1502(B)/Reach-
Construction of left out items of work for Airport Metro Station & JP
13 M/s Balu Balaji Granites 1/Stations/Airport Stn./Civil/2018 dated: FINAL BILL DONE
Nagar Metro Station on Wardha Road for Nagpur Metro Rail Project.-.
14.12.2018

M/s Eco Structures Pvt. Execution of Tensile Membrane roofing at Sitabuldi Station and other Maha-Metro/Proc/LOA/C-36/Tensile
14 Work in Progress
Ltd station of Reach-1 for Nagpur Metro Rail Project Membrane/2019/1037/9236 Dt: 22.05.2019

Design, Supply and installation of Terra Cotta Clay Tiles, Providing and
installation of Vertical Linear Baffle Ceiling, Supply and Fixing Luxalon
NMRP/GM(Proc.)1502(A)/Reach-1/ Final bill to be submitted by
15 M/s Newlook Furnishers Torsion Spring, Supply and Fixing Luxalon Horizantal and vertical
Stations/New Look/2018 Dated- 14.12.2018 Agency.Instructed to agency.
panels items of work for Airport Metro Station on Wardha Road for
Nagpur Metro Rail Project.

Providing, fabricating to require profile and shape, transport, erecting


M/s. Satec Envir Maha-Metro/Proc/LOA/N1C-32/R-1 Final bill to be submitted by Agency. Rate
16 and fixing in position pre engineering structure (PEB) in Reach-1
Engineering (I) Pvt. Ltd PEB/2019/975/8672 dated 14.05.2019 yet not finalised.
section of Wardha road for Nagpur Metro rail project.

Page 2 of 5
Nagpur Metro Rail Project
(REACH-1 & AT-GRADE STATIONS CONTRACTS)

Sr No. Contractor Name Brief description of the contract LOA No. Current Status

LOA No.1359 Maha-Metro/Proc/LOA/Misc-


Supply and Installation works (including Fabrication) of signage and
19/Signgs R-1/2018/18589 , Dated:
Graphics including all transportation, Loading and unloading etc., for 7
M/s Satin Neo 16/11/2018
17 Metro Stations viz. Airport, Ujjwal Nagar, Jai Prakash Nagar, Work in Progress
Dimensions Pvt Ltd. Amendment LOA No. 80 Maha-
Chhatrapati Sq., Ajni Sq., Rahate Colony and Congress Nagar for
Metro/Proc./Amnd LOA/Misc-19/Signgs R-
Nagpur Metro Rail Project.
1/2019/648 dated: 10.01.2019

Design, Fabrication, Providing ,Erection & Fixing in position of Work Completed in all respect. Final bill to
M/s Skyline Façade NMRP/GM(Proc.)/Reach-1/Stations/Airport &
18 structural Glazing Works and allied works at Airport & JP Nagar Metro be submitted by Agency.Instructed to
Solutions Pvt. Ltd. JPN/Skyline /2018/1555 Dated 20-12-2018
Station on Wardha Road In Reach-1 Section-Nagpur Metro Rail Project. agency.

Supply, Fabrication and Fixing of Structural Steel Work For Link Bridge
at Airport Metro Station and Link Bridge, Approach Bridge at JP Nagar NMRP/GM (Proc.)/Reach-
M/s. V N Roofing &
19 Station Including Providing and Fixing of GI Gutters at Airport and J P 1/Station/Roofing/VN/2018 /1590(A) Dated:- FINAL BILL DONE
Cladding Pvt.Ltd.
Nagar Metro Station Located on Wardha Road in Reach-1 Section for 27.12.2018
Nagpur Metro Rail Project.

Providing, fabricating to require profile and shape, transporting,


NMRP/GM(Proc.)/1525(A)/Reach-
M/s. Voltagreen erecting and fixing in position Pre Engineered Structures (PEB) for JP
20 1/Station/JPN-PEB/VOLTA/2018 dated: FINAL BILL DONE
Structures Pvt. Ltd Nagar Station Located on Wardha Road in Reach-1 Section for Nagpur
17.12.2018.
Metro Rail Project.

Providing and laying of digital printed ceramic wall tiles, digital printed
LOA No. Maha-Metro/Proc/LOA/C-
21 M/s. Y.P Creations . multicolour ACP Sheet, digital printed glass etc. at various stations of Final Bill submitted to Maha-Metro.
40/2019/1980 dated: 16.11.2019
Reach-1 .

M/s. Construlan India CIVIL/MMI Work at Airport , Rahate Jail Road , JP Nagar Station for Maha-Metro/Proc/LOA/C-40/2019/1749
22 FINAL BILL DONE
LLP Nagpur Metro Rail Project. dated :18.09.2019

Fabrication, Supply and Installation of 'Station Signage ' for Chhatrapati Work Order No: NMRCL/CPM-R1/STATION Work Completed in all respect. Final bill to
M/s. DA SUV Engineers
23 square, Ajni Square, Rahate Colony, Ujjwal Nagar and Congress nagar NAME SIGNAGE/W. O/157/3705 dated be submitted by Agency.Instructed to
& Suppliers Pvt Ltd.
Station Reach-1. 08.06.2020 agency.

Fabrication, Supply and Installation of Station Name Signage for Work Completed in all respect. Final bill to
M/s. DA SUV Engineers Work Order No: Admin/SPC/Work
24 Sitabuldi Interchange Station and Jaiprakash Station of Maha Metro. be submitted by Agency.Instructed to
& Suppliers Pvt Ltd. Order/2019/4 Date: 14th August 2019
Contractor Name: agency.

Fabrication, Supply and Installation of Station Name Signage for Airport Work Order No: NMRCL/CPM-R1/Station
M/s. Infra Craft
25 South, Airport Metro Station and Airport Pier Arm. Name Signage/W. O/157/3463 Date: FINAL BILL DONE
Consultants Pvt Ltd.
13/02/2020

Page 3 of 5
Nagpur Metro Rail Project
(REACH-1 & AT-GRADE STATIONS CONTRACTS)

Sr No. Contractor Name Brief description of the contract LOA No. Current Status

INFRACRAFT
DEVELOPMENT OF REPLICA OF SEWAGRAM ASHRAM (BAPU KUTI) AT LOA No. NMRCL/CPM-R1/Station Name
26 CONSULTANTS PVT FINAL BILL DONE
AIRPORT METRO STATION. Signage/W.O/157/4120 dated- 07.11.2020
LTD

Design, Manugacture, Supply & Installation of Expansion Joint at LOA No.: NMRP/GM(Proc.)/Reach-
M/s. Kantaflex (India)
27 Airport Metro Station & JP Nagar Metro station in Reach-1 section on 1/Station/Exp.Jts. /Kantaflex/2018/1616 FINAL BILL DONE
Pvt. Ltd
Wardha Road for Nagpur Metro Rail project . DTD: 31.12.2018

Fabrication, supply, erection and fixing in position of Stainless steel & LOA No.: NMRP/GM (Proc.) /Reach-1/JP
28 M/s. KEDDY CONCEPT glass railing works at Airport & JP Nagar Metro station on Wardha road Nagar & Airport Stations/SS Railling /Keddy Final Bill submitted to Maha-Metro
in reach-1 section for Nagpur Metro Rail Project. Concept/2018/1528(B) dated :17.12.2018

LOA No.: NMRP/GM(Proc.)/Reach-


M/s. Mohan Construction of Civil works at CONGRESS NAGAR METRO STATIONS on
29 1/Stations/Civil/Mohan/ 2018/1580(B) FINAL BILL DONE
Constructions Company. Wardha Road in REACH-1 Section-Nagpur Metro Rail Project .
Date:26.12.2018

Designing, Fabrication, Supply & Fixing of Fire rated door of approved Contract Agreement No: Letter No: Work Completed in all respect. Final bill to
M/s. Signum Fire
30 quality at Airport Metro Station and J P Nagpur Metro Station located NMRP/GM (Proc.)/Reach-1/stations/FR be submitted by Agency.Instructed to
Protection (I) Pvt. Ltd.
on Wardha Road in Reach 1 Section for Nagpur Metro Rail Project. Doors/Signum/2019/ dated :25.01.2019 agency.

Supply and placing of RMC Concrete for JP Nagar metro station & LOA No.: NMRP/GM(Proc.)/Reach-1/JP Work Completed in all respect. Final bill to
M/s Ultratech Cement
31 Airport Metro station in Reach-1 section on Wardha road at Nagpur for Nagar & Airport Station/Ultratech- be submitted by Agency.Instructed to
Limited
Nagpur Metro Rail Project. RMC/2018/1525(B) dated 17.12.2018 agency.

Construction of Steel Structure Space Frame Roof Covering of


M/s. Renuka LOA No. Maha-Metro/N1-C-52/2021/ED
32 Entry/Exit Structure of Sitabuldi Interchange Metro Station in Reach-1, Work in Progress
Equipments Pvt. Ltd. (Proc)/LOA/186 dated 05.03.2021
Section for Nagpur Metro Rail Project.

Providing, Fabricating to Required Profile and Shape, Transport, Work Completed in all respect. Final bill to
M/s. Renuka LOA No. Maha-Metro/N1-C-48/2020/ED
33 Erecting and Fixing in Position Pre-Engineering Structure at Ujwal be submitted by Agency.Instructed to
Equipments Pvt. Ltd. (Proc)/LOA/1280 dated 08.12.2020
Nagar in Reach-1 Section of Wardha Road for NMRP. agency.

LOA No.: NMRP/GM (Proc.) /Reach-1/JP


M/s. ACME Painting works for Airport and JP Nagar Metro Station on Wardha Road
34 Nagar & Airport Stations/ACME- FINAL BILL DONE
Constructions for Nagpur Metro Rail Project.
Paintings/2018/1525(C) dated :17.12.2018

Epoxy painting in Reach - 1 station portion at Airport Station, Ajni Agreement No.: Maha-Metro/ED(Proc)/N1C-
35 M/s. Pankaj Patwardhan FINAL BILL DONE
Station & Pocket Track portion Of Nagpur Metro Rail Project. 43/R-1/2020/889 Dt. 11/08/2020

Page 4 of 5
Nagpur Metro Rail Project
(REACH-1 & AT-GRADE STATIONS CONTRACTS)

Sr No. Contractor Name Brief description of the contract LOA No. Current Status

Work Completed in all respect. Final bill to


Supply and installation of façade and internal glass work for Airport LOA no. Maha-Metro/N1-C-
36 M/s ALUCOMET be submitted by Agency.Instructed to
south station at Three At grade station. 51/2021/ED(Proc)LOA/238 dated 24.03.2021
agency.

AT-GRADE

M/s. Nakshtra Interior And Allied Works Of Convention Hall In South Airport Station LOA No. Maha-Metro/Proc/LOA/N1C-
1 Work in Progress
Infrastructures Pvt. Ltd. Of Nagpur Metro Rail Project. 24/2019/556/4611 dated :08.03.2019

Providing and Installation Of Galvanized Steel Pipe Space Frame with LOA No. Maha-Metro/ Proc/LS-
M/s Renuka
2 Laminated Glass at the Entrance Of New Airport Station along At Grade 05/2019/Space frame/2019/1509/14446 FINAL BILL DONE
Equipments Pvt. Ltd.
in Reach-1 Section of Wardha Road for Nagpur Metro Rail Project. dated: 06.08.2019

Construction of Four lane road from TCI Warehouse to Khapri Station,


M/s.Venus Buildtech LOA No.: 217N1-(U/S)/(C) -
3 providing RCC drain, Canvas Concreting At Grade Section within Metro FINAL BILL DONE
India Pvt Ltd 23/2017/3008,DATE: 27/02/2018
Corridor near MIHAN ROB.

Construction/Development of Eco-Park adjacent to MIHAN Depot and


Multi Modal Integration for 03 stations in priority section namely Khapri
M/s SVK INFRACON LOA No.: Maha-Metro/Proc/LOA/N1-C-
4 Metro station,New Airport Station and South Airport Metro Station and Work in Progress
PVT. LTD. 28/2019/776 dated 11.04.2019
balance work of at Grade Stations.
Contractor Name:

Page 5 of 5