A MICRO PROJECT REPORT ON


MARKET RATES OF MATERIALS, LABOUR WAGES,
HIRE CHARGES OF TOOLS AND EQUIPMENTS

UNDER THE GUIDANCE OF:


Prof. R.B. KAVIMANDAN

SUBMITTED BY: PRIYA SANTOSH NALAMWAR 1901045


SHRADDHA DATTA MUNDHE 1901044
PRADNYA DNYANOBA MUNDHE 1901043
JYOTI SHIVAJI MUNDHE 1901042

Page 1 of 8
1901045, 1901044, 1901043, 1901042.

GOVERNMENT POLYTECHNIC, PUNE


(AUTONOMOUS INSTITUTE OF GOVERNMENT OF MAHARASHTRA)

CERTIFICATE
This to certify that Term work entitled as
A MICRO PROJECT REPORT on
MARKET RATES OF MATERIALS, LABOUR WAGES,
HIRE CHARGES OF TOOLS AND EQUIPMENTS

Is the bonafied work carried out by


Student Of Third Year Civil Engineering Diploma
During academic year
2021-2022
This report embodies the study done by the candidate
Towards the partial fulfilment of Diploma in Civil Engineering

Prof.R.B.Kavimandan Prof.V.B.Kondawar. Prof.Dr.V.B.Bandal


(Guide) (Head of department) (Principal)

Page 2 of 8
1901045, 1901044, 1901043, 1901042.

INDEX

1. INTRODUCTION

2. MARKET RATES OF MATERIALS,LABOUR WAGES, 2021-22

3. HIRE CHARGES OF TOOLS AND EQUIPMENTS

4. HIRE CHARGES OF TOOLS AND EQUIPMENTS

5. CONCLUSION & REFERANCE

Page 3 of 8
1901045, 1901044, 1901043, 1901042.

Introduction

Material cost is the cost of materials used to manufacture a


product or provide a service. Excluded from the material cost is
all indirect materials, such as cleaning supplies used in the
production process.

The cost of labour is the amount of all salaries paid to the


workers, as well as the employee benefits and payroll taxes
charged by an employer.
The labour rates vary from place to place

The construction Equipment segment is mainly catering to road


construction equipment. This segment includes backhoe loader,
excavator, soil compactor, tractor loader, tandem roller, concrete
mixer, concrete pump, dumper tipper, generator, skid loader,
some small equipment is there used in the road industry.

Page 4 of 8
1901045, 1901044, 1901043, 1901042.

MARKET RATES OF MATERIALS,


LABOUR WAGES, 2021-22

Sr.No Materials Rates (Rs.) Labours Wages/day


. (Rs.)
1 Cement 5600/mt Mason I class 641/day
2 Sand (Natural) 1575/cu.mt. Mason II class 641/day
Coarse
3 Aggregate(20mm) 996/cu.mt. Carpentet I/ IIclass 641/day
Plumber With
4 Brick (Second 8/no Tools 641/day
class) - Skilled
Painter I/II
5 Reinforcement 56000/mt class,skilled 641/day
6 Binding Wire 88/kg Bar bender ,skilled 611/day
7 Rubble (Stone) 610/cu.mt. Bhisti ,semi skilled 611/day

Rough Shahbad , Mazdoor -


8 25 mm to 30 mm 234/sq.mt. Unskilled Heavy 579/day
thick Male

kota stone , 45 Mazdoor -


9 to 55 mm thick 909/sq.mt. Unskilled Heavy 579/day
Female
10 country teak wood 108229/cu.mt Electrician 641/day
.
Plywood
commercial ,18
11 mm thick 893/sq.mt. Welder,skilled 641/day

Page 5 of 8
1901045, 1901044, 1901043, 1901042.

HIRE CHARGES OF TOOLS AND EQUIPMENTS

HEAVY EQUIPMENT HIRING RATES


1) Excavator monthly rental 2,00,000/- INR
rate (20 ton) (Transportation will be Extra)
2) Backhoe Loader (JCB) 90,000/- INR
monthly rental rate
3) Backhoe loader hourly 850-900/- Per hour (Fuel
hiring charges Owner’s Scope )
4) Excavator monthly rental 8,00,000/- INR
rate (45 ton) (Transportation will be Extra)
5) Hydra monthly rental 45,000/- INR
rate
6) Forklift monthly rental 55,000/- INR
rate
7) 3 Ton Loader monthly 1,50,000/ INR
rate
8) Soil Compactor monthly 1,15,000/- INRAA
rental rate
9) Motor Grader monthly 2,10,000/-
hiring rate
10) Transit Mixer 1,10,000/- INR
monthly rate

Page 6 of 8
1901045, 1901044, 1901043, 1901042.

HIRE CHARGES OF TOOLS AND EQUIPMENTS

DISCRIPTION UNIT RATE


1) Rent for polishing machine with screw Day 1173/-
2) Rent for chain polly block with tripod Day 567/-
3) Rent for pump including operation excluding fuel Day 217/-
4) Rent for Mech. mixture with fuel &crew Day 2913/-
5) Rent for vibration with fuel and crew Day 1091/-
6) Plate bender Day 1058/-
7) Rent for welding set with electric set Day 1277/-
8) Rent for concrete Breaker Day 2946/-
9) Rent for welding set with Generator Day 2654/-
10) Truck hire charges upto 20Km Day 2784/-
11) Truck hire charges upto 20Km to 50Km Day 2585/-
12) Truck hire charges upto 50Km & above Day 2268/-
13) Rent for poclain Hour 2541/-
14) Rent for crane Hour 1653/-
15) Rent for JCB Hour 1239/-
16) Plumber ( Building ) Day 641/-
17) Painter for expoxy paint Day 641/-

Page 7 of 8
1901045, 1901044, 1901043, 1901042.

CONCLUSION
 The demand for goods might vary strongly with the price. Because of this, it is
possible for a small price reduction to lead to a big increase in sales. It is often
better to sell many pieces at a low price rather than to sell a few pieces at a
high price. A cost calculation will quickly show which alternative is best.

 The selling price should be higher than the production costs, but low enough so that
the price is attractive to your customers and competitive with other producers and
other products.