Detailed Cum Abstract Estimate: Government of Andhra Pradesh Panchayath Raj Engineering Department Anantapuramu District
Detailed Cum Abstract Estimate: Government of Andhra Pradesh Panchayath Raj Engineering Department Anantapuramu District
Detailed Cum Abstract Estimate: Government of Andhra Pradesh Panchayath Raj Engineering Department Anantapuramu District
Habitation : Motukupalli
Mandal : Kadiri
Division : Penukonda
District : Ananthapur
SPECIFICATION REPORT
Specification report to accompany the estimate for the work Levelling the
earthen road from Anike anand reddy(H) to Nadimpalli At Motukupalli village of Motukupalli GP in
Kadiri Mandal.
Est Cost :- 0.092 Lakhs Grant :- GP - General fund
The above work Levelling the earthen road from Anike anand reddy(H) to
Nadimpalli At Motukupalli village of Motukupalli GP in Kadiri Mandal.With an estimate is sanctioned under
the grant of GP-General fund was administratively sanctioned for Rs.0.092 Lakhs of the panchayat
secretery Rc: Dated :
The road is damaged due to heavy rains, the existing surface is having undulations and deep pot holes are
formed, the water is stagnet,it is difficult to pass on the road for public as well as vehicles.
The estimate is prepared with the following provisions for obtaining technical sanction.
1
Collection , Supply and Spreading With Selected Earth for Levelling Coarse including convayance
of all materials including labour charages.
2 Q.C charges @ 0.5%.
3 GST 12%
4 Seignorage charges.
The estimate is prepared with the current SSR 2021-22 and the work will be executed as per standards
MEO,MPP
KADIRI
ork Levelling the
Motukupalli GP in
- General fund
nand reddy(H) to
sanctioned under
panchayat
ed as per standards
DETAILED CUM ABSTRACT ESTIMATE
Levelling the Earthen road from Anike anand red
Name of the work:
Motukupalli village of Motukupalli GP in Kadiri M
Grant : GP-General fund
Measurements
Sl.No Description of work No.s
L B D
1 2 3 4 5 6
Collection , Supply and Spreading With Selected Earth for Levelling Coarse including convayance of all
1
materials including labour charages
1 X 1 42.00 3.00 0.10
1 X 1 10.00 3.00 0.30
1 X 1 10.00 3.00 0.30
7 8 9
nvayance of all
12.60
9.00
9.00
30.60 239.63 1cum 7333.00
7333.00
37.00
393.00
1377.00
9410.00
90.00
TOTAL 9500.00
MEO,MPP
KADIRI
DATA SHEET
Levelling the Earthen road from NH Road to Ganesh kiran (H) and Rdt community hall backside
to kowlepalli At kowlepalli village of Motukupalli GP in Kadiri Mandal.
Unit = cum
Taking output = 10 cum
Taking output = 1 cum
(a) Material
300.00 Selected Earth 196.90 cum 59070.00
(b) Labour
Labour charges for
spreading of Selected
300.00 Earth unloaded by tractor 25.69 cum 7707.00
on the road. RSSR item
15
0.40 Days Mate 530.00 1 Day 212.00
10.00 Days Mazdoor 490.00 1 Day 4900.00
(C) Machinery
Water tanker 6 Kl
5.00 Hrs Capacity 732.50 Hr 3662.50
Unit = cum
Taking output = 10 cum
Taking output = 1 cum
(a) Material
300.00 Selected Earth 196.90 cum 59070.00
(b) Labour
(C) Machinery
Water tanker 6 Kl
5.00 Hrs Capacity 732.50 Hr 0.00
MEO,MPP
KADIRI
LEAD STATEMENT (2021-22)
NAME OF THE Levelling the Earthen road from Anike anand reddy(H) to Nadimpalli At
WORK : Motukupalli village of Motukupalli GP in Kadiri Mandal.
1 2 3 4 5 6 7 8 9
1 Gravel Local 5.00 138.00 0.00 0.00 89.90 89.90
2 Selected earth Local 5.00 107.00 0.00 0.00 89.90 89.90
CERTIFICATE
Certified that the above leads are correct to the best of my knowledge .
MEO,MPP
KADIRI
H) to Nadimpalli At
al.
11 12
227.90 1 cum
196.90 1 cum
GOVERNMENT OF ANDHRA PRADESH
Habitation : Motukupalli
Mandal : Kadiri
Division : Penukonda
District : Ananthapur
ddy(H) to
i GP in Kadiri
SPECIFICATION REPORT
Levelling the Earthen road from Anike anand reddy(H) to Nadimpalli At Motukupalli village of
Motukupalli GP in Kadiri Mandal.
Est Cost :- 0.092 Lakhs Grant :- GP-General
fund
The above work Levelling the earthen road from Anike anand reddy(H) to
Nadimpall at motukupalli village of motukupalli GP in Kadiri Mandal.With an estimate is sanctioned under the
grant of GP-General fund was administratively sanctioned for Rs.0.092 Lakhs of the panchayat secretery
Rc: Dated :
The road is damaged due to heavy rains, the existing surface is having undulations and deep pot holes are
formed, the water is stagnet,it is difficult to pass on the road for public as well as vehicles.
The estimate is prepared with the following provisions for obtaining technical sanction.
1
Collection , Supply and Spreading With Selected Earth for Levelling Coarse including convayance
of all materials including labour charages
2 Q.C charges @ 0.5%.
3 GST12% .
4 Seignorage charges.
The estimate is prepared with the current SSR 2021-22 and the work will be executed as per standards
MEO,MPP
KADIRI
alli village of
ant :- GP-General
nand reddy(H) to
anctioned under the
chayat secretery
cluding convayance
ed as per standards
COMPLETION REPORT
Levelling the Earthen road from Anike anand reddy(H) to Nadimpalli At Motukupalli village of Motukupalli GP
GRANT : GP-General
As per Working Estimate As per Mbook
Sl.No Description of item
Qty Rate Amount Qty
1 2 3 4 5 6
Filliing the undulations using selected
1 earth including spreading ,watering and 30.60 239.63 7333.00 30.60
ramming etc complete.
SUB TOTAL 7333.00
2 Provision towards Q.C Charges @ 0.5% 37.00
3 Provision towards GST 393.00
4 Provision towards Seignorage Charges 1377.00
5 Unforeseen items such as price adjustment 60.00
TOTAL 9200.00
EC : 0.092 Lakhs
As per Mbook
Excess Less
Rate Amount
7 8 9 10
7332.67
36.66 0.34
392.90 0.10
1377.00
0.00 60.00
MEO,MPP
KADIRI
DETAILED CUM ABSTRACT ESTIMATE
Levelling the Earthen road from Anike anand reddy(H) to Nadimp
Name of the work:
Motukupalli village of Motukupalli GP in Kadiri Mandal.
Grant : GP-General fund Est. Rs. 0.092
Measurements
Sl.No Description of work No.s contents Rate
L B D
1 2 3 4 5 6 7 8
Collection , Supply and Spreading With Selected Earth for Levelling Coarse including
1
convayance of all materials including labour charages
1 X 1 42.00 3.00 0.10 12.60
1 X 1 10.00 3.00 0.30 9.00
1 X 1 10.00 3.00 0.30 9.00
2 30.60 239.63
MEO,MPP
KADIRI
E
nd reddy(H) to Nadimpalli At
adiri Mandal.
Lakhs
Per Amount
9 10
1cum 7333.00
7333.00
37.00
393.00
1377.00
9140.00
60.00
TOTAL 9200.00
MEO,MPP
KADIRI
COMPARATIVE STATEMENT
Levelling the Earthen road from Anike anand reddy(H) to Nadimpalli At Motukupalli village of
GRANT : GP-General fund
As per Original Estimate
Sl.No Description of item
Qty Rate Amount
1 2 3 4 5
Collection , Supply and Spreading With Selected Earth
for Levelling Coarse including convayance of all materials 30.60 239.63 7333.00
1 including labour charages
SUB TOTAL 7333.00
2 Provision towards Q.C Charges @ 0.5% 37.00
3 Provision towards GST12% 393.00
4 Provision towards Seignorage Charges 1377.00
5 Unforeseen items such as price adjustment 60.00
TOTAL 9200.00
7333.00
37.00
393.00
1377.00
60.00
9200.00
MEO,MPP
KADIRI
Levelling the Earthen road from Anike anand reddy(H) to Nadimpalli At
Motukupalli village of Motukupalli GP in Kadiri Mandal.
GST
S.no Material name Qty Initial rate Gst % Amount
1 Selected earth 30.60 107.00 12% 393.00
Total 393.00
MEO,MPP
KADIRI
MEO,MPP
KADIRI