Scope: Successful Construction With PERI

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 16

Formwork, Shoring and Scaffolding

Issue 1 | 2011 USA

Successful construction with PERI scope

Optimal Systems for Range of GARAGEDECK System for Complex


Applications on High-Rise Tower Beam and Slab Parking Garage
Page 8 Page 12

Full Scope Formwork for Bridge Formwork for Architectural Concrete


Construction Provided by PERI on the Flight 93 Memorial
Page 10 Page 16
To Our Valued Clients and which insures our clients are to select the proper systems At PERI we constantly strive
Prospective Clients getting the optimal solution and appropriate equipment to offer the best solutions,
for each aspect of every quantities to successfully technical support, logistics
In this edition of PERI scope project. execute each project. service and jobsite training
we profile 17 current projects Technical support comes for your formwork and scaf-
that illustrate PERI’s wide But equipment is only part of from over 65 PERI trained folding requirements. We
range of formwork, shoring what PERI provides. We rec- Design Engineers located truly value your business and
and scaffolding systems. ognize that we are as much, throughout the country look forward to working with
if not more so, a service providing layout drawings for you in 2011.
Contractors in today’s chal- provider than an equipment every concrete placement.
lenging construction market supplier and for our custom- Equipment is readily available
are faced with increased ers to reap the full benefit of from our six fully stocked
competition and intense price our products it must be pro- regional distribution yards
pressure which require the vided with the best service in which provides one day deliv-
most labor efficient and cost the industry. ery to virtually any location in
effective equipment solu- the continental U.S. On site
tions for their jobsites. PERI PERI’s Sales Engineers are technical support and train-
offers the largest product formwork experts who work ing is provide by PERI Site Thomas A. Ameel, P.E.
portfolio in the industry as partners with contractors Technicians. Chief Executive Officer

BEAMDECK on MULTIPROPs
Unbeatable Combination for Tall Story Heights
Arizona State University, Tempe, AZ

The new Interdisciplinary


Science and Technology
Building at Arizona State
University consists of seven
levels of 12” and 16” thick
flat slabs with story heights
of 21’, 23’ and 14’ for the
1st, 2nd and typical floors,
respectively. After evaluating David Steel,
all the available grid beam Project Manager:
formwork systems, Sundt “We already knew PERI had
Construction purchased the best system before the
BEAMDECK and MULTI- project which is why we
PROP shores for the project. purchased the BEAMDECK.
MP 480 shores were used We love how easy it is to
on the typical floors and make onsite adjustments
MP 625s for the taller floors. for a first time user. My
Only MULTIPROPs have the crew also appreciates not
ability to form story heights needing to stack shoring
up to 23’ with single post for the 21’ and 23’ high
shores which was a critical decks.”
factor in Sundt’s decision go
with PERI. BEAMDECK also
allowed the contractor to se-
lect the appropriate plywood Contractor
to achieve the required finish Sundt Construction, Tempe, AZ
Field Service
on the exposed slabs.
BEAMDECK on MULTIPROP 625 shores erected for the 1st floor. PERI Phoenix

2
Versatile TRIO and BEAMDECK Contractor

Ideal for Hotel Construction Morley Construction,


Santa Monica, CA
Field Service
Ocean Avenue Travelodge, Santa Monica, CA PERI Los Angeles, CA

Morley Construction chose PERI to aluminum MULTIPROPS shores.


supply the formwork for a new hotel BEAMDECK provides the industry’s
consisting of four levels of underground largest standard bay for a grid beam
parking and four levels of guest rooms system for maximum efficiency and
near the famous Santa Monica Pier. allows the use of appropriate plywood
Versatile TRIO was used for the shear to achieve the required finish. The PERI
walls and columns because it could be proprietary tilting drophead that permit
easily adapted to the various lift heights the shore to be set vertically on slopes
that ranged from 9’ to 16’. The slabs up to 10º was employed on the garage
were formed with BEAMDECK on parking ramps.

Columns and shear


walls that varied in
height up to 16‘ were
formed with TRIO.

BEAMDECK in use BEAMDECK’s four-way Dave Loomis,


on the parking garage drophead and square
Superintendent:
ramp with the tilting typical grid permits the
drophead that allow systems to be rotated “The BEAMDECK  and TRIO systems
the shore to be set 90°. have provided the versatility, speed
vertically. and efficiency that was needed to
complete this project on time and
under budget.“

3
Highly Productive Panelized Systems Contractor

For Walls, Columns and Slabs Sundt Construction,


Tempe, AZ
Field Service
Rydal Park, Jenkintown, PA PERI Phoenix

SKYDECK with PEP shores efficiently forms the


flat slabs including the infills at the columns.

Rydal Park, Philadelphia’s premier con- John Evans,


tinuing care retirement community, is cur- General Superintendent:
rently building an addition to its medical “I’ve been working with PERI for over
center. The structure consists of founda- 25 years now and I have always found
tion walls, core walls and four 40,000 ft² their systems to be so versatile.
post-tensioned slabs. Forcine Concrete SKYDECK was the right way to go
selected PERI to provide the full scope with this job.”
formwork package for the project.

TRIO panelized wall formwork was used TRIO core wall formwork, QUATTRO column
formwork and SKYDECK aluminum slab formwork
for the foundation walls and core walls.
system in use.
The BFD coupler is the only connecting
hardware required for the system which
allows the contractor to quickly and effi­-
ciently reconfigure the panels for the nu-
merous wall configurations. TRIO for
10´-8“

the core walls was supported on exterior


CB brackets and interior BR platforms
for safe climbing and highly productive
operation. The various column sizes
were all formed with QUATTRO. The
windmill configuration of the QUATTRO
panels allows the system to be easily
adjusted for columns from 8” x 8” to
24” x 24” yet can be stripped and
moved with one crane pick. The integral
concreting platform with ladder provides
for optimal safety. Panelized SKYDECK
used for the eleva­ted slabs was selected
because of its high productivity. The typi- TRIO core wall formwork supported on exterior
CB brackets and interior BR platform for safe
cal 5’ x 2.5’ panels and 7.5’ main beams
operation.
weigh less than 35 lbs and can be erec­
ted with only a three man crew. Unlike
other panelizes systems, SKYDECK
includes all of the components neces-
sary for the perimeter of the slab and QUATTRO column formwork with integral
concreting platform can be stripped and
for infills at columns and walls.
reset with a single crane pick.

4
Shoring for Complex Bridge Ramp Over Water Contractor
Prismatic Development

Completed Successfully with PERI UP Rosett Corporation,


Fairfield, NJ
Field Service
North Shore Marine Transfer Station, Flushing, NY PERI New York, NY

The new North Shore Marine Transfer the building. The inclined, curved ramp PERI’s solution employed PERI UP
Station being built just offshore in Flush- divides in two to access the loading and Rosett shoring with GT 24 girders to
ing Bay will handle the majority of solid tipping floors at different elevations. form the soffit of the cast-in-place
waste from the borough of Queens. An Prismatic Development chose a solution concrete box girder bridge. The irregular
access ramp from the shore is under offered by PERI to form this complex geometry required a versatile system
construction for garbage trucks to reach structure. Set on falsework in the bay, that could be erected efficiently.

Bridge deck soffit formed with GT 24 girders on


PERI UP Rosett shoring.

PERI UP shoring supported on falsework for the


construction of the access ramps over the water.

Architectural Exposed Concrete Walls and Slabs


Require Experienced Formwork Partner
The Barnes Foundation, Philadelphia, PA

Contractor Harry Duke,


Madison Concrete Con-
Project Manager:
struction, Malvern, PA
Field Service “With the PERI Systems we are able
PERI Philadelphia, PA to work very efficiently on this com­
plex structure with all the regular
and architectural finished walls and
decks.”

Scheduled to be completed late in 2011,


the Barnes Foundation is a major addi-
tion to Philadelphia’s cultural corridor
on Benjamin Franklin Parkway and will
house one of the finest collection of
19th and 20th century French paintings
in the world.

Long time PERI client Madison Concrete Fiberglass form ties used with the VARIO form-
work require no patching and blend in with the
selected VARIO GT 24 girder wall form­­-
concrete.
work and MULTIFLEX girder slab
formwork for the architecturally expo­sed
walls and slab of this new museum.
When selecting a supplier for this de­
manding project, PERI’s proven ability
on architectural concrete with experi-
enced engineering and local field sup-
port were important considerations.
VARIO formwork for architecturally exposed walls.

5
High Productivity with TRIO and VARIO
for Louisiana Levee Flood Wall
Chalmette Loop Levee (LPV 146), Bayou Dupre to Highway 46, LA

The LPV 146 project consists of 40,000 ft


(7.5 miles) of flood protection wall with
footings that varied from 3’ to 5’ and
battered walls from 8.5’ to 11.5’ tall.
TRIO with brace frames assembled from
standard rentable components allowed
the footings to be poured without the
use of ties. The walls were formed with
Al Merchison, Superintendent: VARIO using 8” walers that allowed for
“PERI’s solutions for our walls and footing were ideal for an 8’ horizontal tie spacing with only one
this project and gave us the least amount of wet ties in a row a wet ties.
50’ long monolith pour and the least number of crane picks.
Contractor
When we started this project we were two months behind
St. Bernard Levee Partners, Boise, ID
schedule due to the pile driving and today we can easily Field Service
say that we will finish one month ahead of schedule.” PERI Houston, TX

Versatile Systems Easily Adapt to


Irregular Walls and Slabs Contractor
Mason Building Group, Newark, DE
Field Service
Wilmington Hospital Expansion, Wilmington, DE PERI Baltimore, MD

Mason Building Group is the concrete formwork and MULTIFLEX shoring for
subcontractor for phase one of the the slabs. TRIO’s speed and ease of
386,000 ft² expansion to the Wilmington reconfiguration was a major advantage
Hospital for Christiana Care Health for the irregular walls at the foundation
System which features a nine-story level. MULTIFLEX allowed the customer
patient tower and medical office. PERI to quickly and efficiently form slabs with
is providing all of the required formwork numerous beams and column drop panels
including TRIO and RUNDFLEX for the and it was adaptable to all four levels
foundations walls, QUATTRO column which varied significantly in layout. RUNDFLEX and TRIO in use for the construction
of foundation walls.

Bill West, Superintendent:


“I have been working with PERI since
1999. They have always provided a
high quality service supplying the
most cost effective solutions with a
variety of their systems.”

6
Architectural Walls and Slabs Formed Contractor

Efficiently with VARIO and BEAMDECK Concrete Structures,


Inc., Peoria, AZ
Field Service
Orangutan Experience at the Phoenix Zoo, Phoenix, AZ PERI Phoenix, AZ

Part of the Phoenix Zoo’s architecturally exposed walls


major remodel in time for its and slabs. The 16’ tall VARIO
50th anniversary is the new panels were designed for the
Orangutan Experience, an higher pour pressure required
expanded enclosure for the for the self-consolidating
zoo’s orangutans, replacing concrete (SCC) and 135°
their current bunker-style corners were fabricated to
home with a 2-story dwell- accommodate the octagonal
R.T. Mayo, ing nearly triple in size. PERI shape. BEAMDECK was
Project Superintendent: provided Concrete Structures used for the elevated slabs
“All of the extra time spent with VARIO formwork and which efficiently adapted to
on the front end with design BEAMDECK shoring for the the irregular geometry.
allowed minimum assem­
bly of panels while maximiz­-
ing utilization and sequenc­
ing timing. The high pour
pressures designed into
the panels also allowed
for maximum speed while
pouring non SCC walls.”
16‘ tall VARIO panel designed for BEAMDECK beam slab formwork Completed complex architectural
1,850 psf pour pressure is moved can easily accommodate the irregular walls with BEAMDECK installed
into position for the next pour. geometry between the walls. for the elevated slabs.

Suspended PERI UP Stair Tower Provides


Safe Access to Tunnel Project Contractor
GTF Joint Venture, Tarrytown, NY
Field Service
Queens Bored Tunnels, Long Island City, NY PERI New York, NY

PERI UP stair tower suspended from


top platform is mounted on the exca- Gino I’ppolito,
vation bracing. Project Engineer:
“After careful review of se­ver­al
stair tower systems we felt that
PERI had provi­ded a nice blend
of products to provide the sus-
pended stair tower and work
access platforms built atop the
4’ diameter struts. PERI provi-
ded well designed drawings
The Queens Tunnel is part of suspended PERI UP stair in 3 m increments. GTF JV that met with MTA approval
the East Side Access project towers for worker access found the system to be very and good site service to allow
by the MTA to bring the Long to the bottom of the con- ridged and acknowledged the our field carpenters to build
Island Rail Road into a new struction excavation. As the labor efficiency that PERI UP the system safely. The platform
East Station at Grand Central contractor dug deeper the offered with the quick locking and stair tower will allow us a
Terminal in Manhattan. PERI PERI UP stair towers were connection of the PERI UP very stable and safe site access
provided work platforms and erected vertically downward Rosett system. for this long term project.”

7
Variety of PERI Systems Provide Cost-Effective
Solutions for Range of Applications
St. John‘s On The Lake, Milwaukee, WI

Saint John’s On The Lake is Milwau- town center. VJS Construction Services SKYDECK panelized slab formwork.
kee’s premier retirement commu- looked to PERI to provide the full scope VARIO was used for the core wall and
nity, with breathtaking views of Lake formwork for this high profile project. three shear walls which extend for the
Michigan and the city’s skyline. The full height of the building with self-clim­
244’ tall tower consists of 21 floors of The perimeter walls of the parking bing ACS (Automatic Climbing System)
senior living residences atop two levels levels were formed with TRIO and and RCS (Rail Climbing System) con­
of underground parking and first floor the 72,000 ft² slabs were formed with figured to pour the walls on the same

UNIPORTAL tableform being lifted and reset using ACS G brackets climb through openings in the slab RCS G unit mounted to the outside of shear wall 1
extended Lifting Fork designed for projects using for shear wall 3. carries both the exterior and interior formwork.
two floors of shoring.

8
9’-10’’
9’-10’’
The systematic design and orderly erection of
SKYDECK makes the system highly productive.

9’-10’’
9’-10’’
17’-4’’

Contractor
Concrete Structures,
Inc., Peoria, AZ
Field Service
PERI Phoenix, AZ

day as the surrounding slab. ACS P support both sides of the formwork low in weight, quickly moved with
(P = platform) was used for the core with over-wall gallows. The typical level the use of a lifting fork and provide
with the internal and external formwork slabs were formed with a combination maximum safety as no loose forming
along with the placing boom raised in a of UNIPORTAL perimeter tables and is performed at the edge of the slabs.
single operation. The three shear walls SKYDECK. These two systems used SKYDECK on the interior is high produc-
were self-climbed using a combination together gave the contractor many tivity as the individual components are
of RCS G and ACS G brackets which advantages. The perimeter tables are lightweight and easily handset.

Craig Wilson,
Concrete
Superintendent:

“This is the first time using PERI’s


ACS and RCS systems and we were
able to cycle the core and three shear
walls in one day with only four men.
We have used SKYDECK in the past
with good results, and the addition
of UNIPORTAL perimeter tables
allowed us to move large area’s of
formwork quickly and with increased
safety. The ongoing support and en­
Formwork for shear wall 2, core wall and shear wall 3 were all configured to be self-climbed and sus-
pended above the slab so that the walls could be poured on the same day as the slab. gineering from PERI allows for
a successful project.”

9
Full Scope Formwork for Bridge Construction Contractor

Provided by PERI Abel Construction,


Mountville, PA
Field Service
Hanover Street Bridge, Hershey, PA PERI Baltimore, MD

VARIOKIT bridge overhang brackets Lower access platform Pier cap is formed with TRIO wall
were set as assembled units which of the VARIOKIT bridge formwork and a susbstructure with
include an access platform. overhang units. MBP beams and GT 24 girders.

Abel Construction selected Pier caps were supported on George Gladwin,


PERI to provide the full scope VT 20K girders which the con­- General Superintendent:
formwork required for the tractor preferred to decking “TRIO is a very nice product. It has a
Hanover Street bridge. supported on friction collars small learning curve, is easy to recon­
TRIO was used for the foot- because it was much quicker figure and is the fastest system we
ings, abutment and wing to assemble. VARIOKIT have ever used. The overhangs were
walls, pier stems and pier bridge overhang units used easy to put together and fly in place.
caps. The versatility of TRIO for the cantilevered bridge Stripping access and speed is where
and ease of reconfiguration deck have the advantage of we see the biggest advantage of this
with the single BFD coupler being pre­assembled and set system.”
made it the logical choice. intact.

10
Clarifier Tanks Built with RUNDFLEX Contractor

Circular Wall Formwork System Stief Concrete,


New Holland, PA
Field Service
Middletown Wastewater Treatment Plant, Middletown, PA PERI Baltimore, MD

As part of an expansion to
the Middletown WWTP, Stief
Concrete is constructing two
78’ diameter clarifier tanks.
The 17’ tall walls are formed
with RUNDFLEX circular wall
formwork which is easily set
to the required radius on site.
The PERI Fin-Ply form face
leaves an excellent concrete
finish and the DK tie system
properly spaces the formwork
while allowing easy patching
of the tie holes to the water-
proof specifications.

PERI Fin-Ply form face of the RUNDFLEX panels are easily


RUNDFLEX panels leaves an moved and connected together
excellent concrete finish. using the BFD coupler.

Brian Hollinger, Vice President:


“RUNDFLEX is a great sys­tem.
Initial radial adjustment is
so easy it takes no time to
get your first pour set up.
After that, no major adjust-
ments are needed.”

Treatment Plant Expansion


Built with Range of PERI Systems Contractor
Stief Concrete, New Holland, PA
Field Service
Swatara Wastewater Treatment Plant, Hummelstown, PA PERI Baltimore. MD

Stief Concrete used a wide rator tank. For the aeration fine the interior walls with the top
range of PERI systems in con­- bubble tank GRV circular form- walkways formed with the walls
TRIO in use for the interior walls of
structing the Swarata WWTP. work was preassembled by without the need for shoring.
the aeration fine bubble tank with
RUNDFLEX was used for the PERI to form the 10’ diameter PERI UP stair towers were the walkway formed monolithically
24’-8” tall 22’ diameter sepa- pier and TRIO was supplied for also provided for site access. without the need for any shoring.

Dan Quinn, Foreman:


“GRV was the right solution for inte­
rior pier allowing fast and easy instal­
lation and stripping. TRIO’s quickness
and versatility allowed monolithic
pour of the wall and walkway saving
a great deal of time and labor.”

11
Beam table with shores
and slab stringer is eas-
ily moved by hand on
the integral casters.

Beam table is moved


from floor to floor using
PERI Lifting Fork.

Edge of slab table rests


on top of beam side
and is chamfered for
easy stripping.

GARAGEDECK System is the Right Solution


for Complex Beam and Slab Parking Garage
Amway Center Parking Garage, Orlando, FL

The recently completed GEICO Garage this means that each ramp is unique PCL Construction Services chose PERI
adjacent to the new Amway Center in with shoring heights up to 20’ and not to provide a comprehensive formwork
Orlando is anything but a typical parking simply repetitive ramps as on a typi- package for this challenging project.
garage. Each floor of the eight level cal garage. Other challenges include Central to PERI’s solution is GARAGEDECK
structure features a speed ramp for 30,000 ft² of 20’ shoring height on which is an extension to the MULTIFLEX
direct access to street level to allow pa- the 3rd floor and 4,500 ft² of 38’ to girder slab formwork for the construc­-
trons to exit rapidly after the end of an 48’ shoring above an adjacent pond tion of beam and slab post-tensioned
event at the arena. For the construction, for the 4th and 5th levels. parking garages. GARAGEDECK’s 100 %

PERI fabricated column capital panels accept Slab tables are supported on the aluminum string- Slab table is stripped with the use of forklift strip-
beam tables. ers which are part of the tie-less beam table. ping platform.

12
Gene Schreckengost, General Superintendent:
“GARAGEDECK performed above our expectations and
we would recommend it for your consideration when
planning a formwork system for any cast in place garage.
PERI’s pour sequencing with formwork plans and engi­
neering were right on and a large part of our success. We
have found PERI to be a partner from start to finish.”

rentable components can be pre­ compared to other garage beam systems


assembled at a PERI’s warehouse and is the use of MULTIPROPS shore for the
delivered to the jobsite ready for use. beam table legs. The MP 250 shores
The system consists of beam tables used for typical 7’ beam to slab clear
configured to the width and depth of the story height can quickly be replaced with
post-tensioned beams and 8’ wide slab taller MULTIPROP shores up to MP 625s
tables that span between beam tables. for clear story heights to 23’-6” without
An obvious benefit of GARAGEDECK as the need for stacked shores.

Contractor
PCL Construction Services, Orlando, FL
Field Service
PERI Orlando, FL

Tall reshoring with MULTIPROP shores for one of Slab table is held in place with embedded anchor
the many atypical areas on this complex project. while adjacent beam tables are stripped.

13
Combination of Systems Efficiently Form Slabs
PERI UP Stair Tower for Safe Access on Construction Site
University of Arizona, Tucson, AZ

A combination of BEAMDECK and UNIPORTAL perimeter flying tables provide an efficient and safe solu-
tion for the project‘s elevated slabs.

For the construction of eight new dormi­- productivity and eliminates almost all
tories at the University of Arizona, PERI filler areas. Both systems allow the con-
provided Concrete Structures a combi- tractor to use their choice of plywood
nation of BEAMDECK and UNIPORTAL sheathing to achieve the required finish
shoring systems for the irregular shaped on the exposed ceilings.
8’ flat slab structures. To achieve a
three-day cycle for each 6,000 ft² pour, PERI also supplied two PERI UP stair
the perimeter of the 11’ high decks towers to access the six story struc-
are formed using the UNIPORTAL tures during construction. The 39” (1 m)
tables while the interior of the slabs wide treads provided ample room for
are formed with the BEAMDECK grid workers to safely carry material and
beam system. This combination of tools or to pass one another which is
shoring systems provides the contractor not feasible with conventional scaffold
with excellent perimeter safety, high stairs.

PERI UP stair tower provides safe access to the BEAMDECK‘s typical 7‘ x 7‘ grid makes it easy to The BEAMDECK drophead remains in place to
multi-story building during construction. move within the shores and the system can adapt provide reshoring and the system‘s use of project
to any slab configuration. specific form lining produces the required finish.

Contractor Adam Arenivas,


Concrete Structures,
Project Superintendent:
Inc., Peoria, AZ
Field Service “Previous stairs did not allow the
PERI Phoenix, AZ room to carry equipment while
ascending and descending and
I loved flying the entire 6 stories
in one piece.”

14
Versatile MULTIFLEX for Challenging Shoring Contractor

on Oklahoma Skyscraper Southern Pan Services,


Atlanta, GA
Field Service
Devon World Headquarters Tower, Oklahoma City, OK PERI Atlanta, GA

MULTIFLEX shoring with single MULTIPROP for


story heights up to 18‘ and MULTIPROP towers for
taller applications.

Shoring of the non-typical levels varied in height from 18‘ to over 30‘.

Mark Curlee, Project Superintendent:


“This system has afforded us a a third reduction in our
labor cost due to its fast assembly, low small-parts count,
versatility and its ability to be flown into place or hand-
set. The low small-parts count and simple configuration
and assembly allow faster and more accurate pre-pour
inspections.”

Southern Pan Services ordered system that was able accommodate all
MULTIFLEX shoring for all the non-typ- applications. When SPS reviewed their
ical levels on the 50 story Devon World options for this project the need for fast
Headquarters Tower building. With story erection, flexible reshoring with single
heights that ranged from 18’ to over posts wherever possible, and a reliable
30’ and beams that varied from 16” to partner with proven shoring design ex-
114” they needed to have one shoring pertise the logical choice was PERI.

MULTIPROP post shores can be com- can be attached to either the outer or
bined with frames to erect shoring tow- inner tubes of the MULTIPROP shore.
ers. The MULTIPROP frame, available in The frames are also used as support
14 different lengths from 62.5 cm (2’-0”) for planks or decking for working areas.
to 2.96 m (9’-6”), allows for proper Advantages:
tower size and spacing for individual  High load-bearing capacity
job site requirements. By means of the  High degree of adaptability
captive wedge, the MULTIPROP frame  Fast and safe assembly

15
9/11 Memorial
Being Built with PERI
Flight 93 Memorial, Shankesville, PA

VARIO for the Memorial Wall was configured to


have only one row of exposed ties.

On September 11, 2001, the U.S. came


under attack when four commercial air-
liners were hijacked to strike high profile
targets. The planned attack on Washing-
ton, D.C. was thwarted because of the
decisive actions of the passengers and
crew on one of the planes, Flight 93.
Construction has begun on the Flight 93
Memorial at the site where the plane
crashed in Shankesville, Pennsylvania.

US en 12/2010 15.0eb Art. Nr.: 792821 © Copyright by PERI GmbH


Tight spacing of the vertical GT 24 girders allowed Finished concrete of the Memorial Wall and the Kinsley Construction chose PERI to
the horizontal walers to be widely spaced so that architectural form liner.
provide the full scope formwork for
the top tie was above the concrete.
the project. VARIO was configured to
minimize the exposed ties on the Me-
Contractor Eric Knepper, Superintendent: morial Wall that features an architectural
Kinsley Construction,
“As a first time PERI user I can say form liner. TRIO was selected for the
York, PA
Field Service that VARIO has a very low learning Flight Path Wall and Visitor Shelter walls
PERI Baltimore, MD curve and due to project design its because of the ease of reconfiguration
repetitiveness allows us to move provided by the BFD coupler. The slabs
at an impressive speed always of the Visitor Shelter will be built using
maintaining the high quality finish MULTIFLEX shoring to accommodate
required.” the form liner.

The illustrations featured in this brochure PERI USA


are photographs taken at a particular 7135 Dorsey Run Road
time on a construction site. This is why Elkridge, MD 21075
the safety details shown cannot be
Phone +1 410 -712-7225
considered as final.
Fax +1 410 -712-7080
© Copyright by PERI GmbH info@peri-usa.com
www.peri-usa.com

You might also like