Scope: Successful Construction With PERI
Scope: Successful Construction With PERI
Scope: Successful Construction With PERI
BEAMDECK on MULTIPROPs
Unbeatable Combination for Tall Story Heights
Arizona State University, Tempe, AZ
2
Versatile TRIO and BEAMDECK Contractor
3
Highly Productive Panelized Systems Contractor
TRIO panelized wall formwork was used TRIO core wall formwork, QUATTRO column
formwork and SKYDECK aluminum slab formwork
for the foundation walls and core walls.
system in use.
The BFD coupler is the only connecting
hardware required for the system which
allows the contractor to quickly and effi-
ciently reconfigure the panels for the nu-
merous wall configurations. TRIO for
10´-8“
4
Shoring for Complex Bridge Ramp Over Water Contractor
Prismatic Development
The new North Shore Marine Transfer the building. The inclined, curved ramp PERI’s solution employed PERI UP
Station being built just offshore in Flush- divides in two to access the loading and Rosett shoring with GT 24 girders to
ing Bay will handle the majority of solid tipping floors at different elevations. form the soffit of the cast-in-place
waste from the borough of Queens. An Prismatic Development chose a solution concrete box girder bridge. The irregular
access ramp from the shore is under offered by PERI to form this complex geometry required a versatile system
construction for garbage trucks to reach structure. Set on falsework in the bay, that could be erected efficiently.
Long time PERI client Madison Concrete Fiberglass form ties used with the VARIO form-
work require no patching and blend in with the
selected VARIO GT 24 girder wall form-
concrete.
work and MULTIFLEX girder slab
formwork for the architecturally exposed
walls and slab of this new museum.
When selecting a supplier for this de
manding project, PERI’s proven ability
on architectural concrete with experi-
enced engineering and local field sup-
port were important considerations.
VARIO formwork for architecturally exposed walls.
5
High Productivity with TRIO and VARIO
for Louisiana Levee Flood Wall
Chalmette Loop Levee (LPV 146), Bayou Dupre to Highway 46, LA
Mason Building Group is the concrete formwork and MULTIFLEX shoring for
subcontractor for phase one of the the slabs. TRIO’s speed and ease of
386,000 ft² expansion to the Wilmington reconfiguration was a major advantage
Hospital for Christiana Care Health for the irregular walls at the foundation
System which features a nine-story level. MULTIFLEX allowed the customer
patient tower and medical office. PERI to quickly and efficiently form slabs with
is providing all of the required formwork numerous beams and column drop panels
including TRIO and RUNDFLEX for the and it was adaptable to all four levels
foundations walls, QUATTRO column which varied significantly in layout. RUNDFLEX and TRIO in use for the construction
of foundation walls.
6
Architectural Walls and Slabs Formed Contractor
7
Variety of PERI Systems Provide Cost-Effective
Solutions for Range of Applications
St. John‘s On The Lake, Milwaukee, WI
Saint John’s On The Lake is Milwau- town center. VJS Construction Services SKYDECK panelized slab formwork.
kee’s premier retirement commu- looked to PERI to provide the full scope VARIO was used for the core wall and
nity, with breathtaking views of Lake formwork for this high profile project. three shear walls which extend for the
Michigan and the city’s skyline. The full height of the building with self-clim
244’ tall tower consists of 21 floors of The perimeter walls of the parking bing ACS (Automatic Climbing System)
senior living residences atop two levels levels were formed with TRIO and and RCS (Rail Climbing System) con
of underground parking and first floor the 72,000 ft² slabs were formed with figured to pour the walls on the same
UNIPORTAL tableform being lifted and reset using ACS G brackets climb through openings in the slab RCS G unit mounted to the outside of shear wall 1
extended Lifting Fork designed for projects using for shear wall 3. carries both the exterior and interior formwork.
two floors of shoring.
8
9’-10’’
9’-10’’
The systematic design and orderly erection of
SKYDECK makes the system highly productive.
9’-10’’
9’-10’’
17’-4’’
Contractor
Concrete Structures,
Inc., Peoria, AZ
Field Service
PERI Phoenix, AZ
day as the surrounding slab. ACS P support both sides of the formwork low in weight, quickly moved with
(P = platform) was used for the core with over-wall gallows. The typical level the use of a lifting fork and provide
with the internal and external formwork slabs were formed with a combination maximum safety as no loose forming
along with the placing boom raised in a of UNIPORTAL perimeter tables and is performed at the edge of the slabs.
single operation. The three shear walls SKYDECK. These two systems used SKYDECK on the interior is high produc-
were self-climbed using a combination together gave the contractor many tivity as the individual components are
of RCS G and ACS G brackets which advantages. The perimeter tables are lightweight and easily handset.
Craig Wilson,
Concrete
Superintendent:
9
Full Scope Formwork for Bridge Construction Contractor
VARIOKIT bridge overhang brackets Lower access platform Pier cap is formed with TRIO wall
were set as assembled units which of the VARIOKIT bridge formwork and a susbstructure with
include an access platform. overhang units. MBP beams and GT 24 girders.
10
Clarifier Tanks Built with RUNDFLEX Contractor
As part of an expansion to
the Middletown WWTP, Stief
Concrete is constructing two
78’ diameter clarifier tanks.
The 17’ tall walls are formed
with RUNDFLEX circular wall
formwork which is easily set
to the required radius on site.
The PERI Fin-Ply form face
leaves an excellent concrete
finish and the DK tie system
properly spaces the formwork
while allowing easy patching
of the tie holes to the water-
proof specifications.
Stief Concrete used a wide rator tank. For the aeration fine the interior walls with the top
range of PERI systems in con- bubble tank GRV circular form- walkways formed with the walls
TRIO in use for the interior walls of
structing the Swarata WWTP. work was preassembled by without the need for shoring.
the aeration fine bubble tank with
RUNDFLEX was used for the PERI to form the 10’ diameter PERI UP stair towers were the walkway formed monolithically
24’-8” tall 22’ diameter sepa- pier and TRIO was supplied for also provided for site access. without the need for any shoring.
11
Beam table with shores
and slab stringer is eas-
ily moved by hand on
the integral casters.
The recently completed GEICO Garage this means that each ramp is unique PCL Construction Services chose PERI
adjacent to the new Amway Center in with shoring heights up to 20’ and not to provide a comprehensive formwork
Orlando is anything but a typical parking simply repetitive ramps as on a typi- package for this challenging project.
garage. Each floor of the eight level cal garage. Other challenges include Central to PERI’s solution is GARAGEDECK
structure features a speed ramp for 30,000 ft² of 20’ shoring height on which is an extension to the MULTIFLEX
direct access to street level to allow pa- the 3rd floor and 4,500 ft² of 38’ to girder slab formwork for the construc-
trons to exit rapidly after the end of an 48’ shoring above an adjacent pond tion of beam and slab post-tensioned
event at the arena. For the construction, for the 4th and 5th levels. parking garages. GARAGEDECK’s 100 %
PERI fabricated column capital panels accept Slab tables are supported on the aluminum string- Slab table is stripped with the use of forklift strip-
beam tables. ers which are part of the tie-less beam table. ping platform.
12
Gene Schreckengost, General Superintendent:
“GARAGEDECK performed above our expectations and
we would recommend it for your consideration when
planning a formwork system for any cast in place garage.
PERI’s pour sequencing with formwork plans and engi
neering were right on and a large part of our success. We
have found PERI to be a partner from start to finish.”
Contractor
PCL Construction Services, Orlando, FL
Field Service
PERI Orlando, FL
Tall reshoring with MULTIPROP shores for one of Slab table is held in place with embedded anchor
the many atypical areas on this complex project. while adjacent beam tables are stripped.
13
Combination of Systems Efficiently Form Slabs
PERI UP Stair Tower for Safe Access on Construction Site
University of Arizona, Tucson, AZ
A combination of BEAMDECK and UNIPORTAL perimeter flying tables provide an efficient and safe solu-
tion for the project‘s elevated slabs.
For the construction of eight new dormi- productivity and eliminates almost all
tories at the University of Arizona, PERI filler areas. Both systems allow the con-
provided Concrete Structures a combi- tractor to use their choice of plywood
nation of BEAMDECK and UNIPORTAL sheathing to achieve the required finish
shoring systems for the irregular shaped on the exposed ceilings.
8’ flat slab structures. To achieve a
three-day cycle for each 6,000 ft² pour, PERI also supplied two PERI UP stair
the perimeter of the 11’ high decks towers to access the six story struc-
are formed using the UNIPORTAL tures during construction. The 39” (1 m)
tables while the interior of the slabs wide treads provided ample room for
are formed with the BEAMDECK grid workers to safely carry material and
beam system. This combination of tools or to pass one another which is
shoring systems provides the contractor not feasible with conventional scaffold
with excellent perimeter safety, high stairs.
PERI UP stair tower provides safe access to the BEAMDECK‘s typical 7‘ x 7‘ grid makes it easy to The BEAMDECK drophead remains in place to
multi-story building during construction. move within the shores and the system can adapt provide reshoring and the system‘s use of project
to any slab configuration. specific form lining produces the required finish.
14
Versatile MULTIFLEX for Challenging Shoring Contractor
Shoring of the non-typical levels varied in height from 18‘ to over 30‘.
Southern Pan Services ordered system that was able accommodate all
MULTIFLEX shoring for all the non-typ- applications. When SPS reviewed their
ical levels on the 50 story Devon World options for this project the need for fast
Headquarters Tower building. With story erection, flexible reshoring with single
heights that ranged from 18’ to over posts wherever possible, and a reliable
30’ and beams that varied from 16” to partner with proven shoring design ex-
114” they needed to have one shoring pertise the logical choice was PERI.
MULTIPROP post shores can be com- can be attached to either the outer or
bined with frames to erect shoring tow- inner tubes of the MULTIPROP shore.
ers. The MULTIPROP frame, available in The frames are also used as support
14 different lengths from 62.5 cm (2’-0”) for planks or decking for working areas.
to 2.96 m (9’-6”), allows for proper Advantages:
tower size and spacing for individual High load-bearing capacity
job site requirements. By means of the High degree of adaptability
captive wedge, the MULTIPROP frame Fast and safe assembly
15
9/11 Memorial
Being Built with PERI
Flight 93 Memorial, Shankesville, PA